Sr.No Project Title Duration Total Amount Client
1 Geotechnical Investigation of Patrind Hydro
Power Project.More than 475 meters drilling in
metamorphic rock (Hazara Slates) were
completed having depth from 30 meters to 150
meters at places including insitu testing,
8 Months 2.8 Million DECON
2 Geotechnical Investigation of Proposed
commercial building (City Centre) at Plot
No.1&2, Survey 137/A Nusrat Road, Multan
1 Month 0.530 Million Baig Associates
3 Geotecnical Investigation of Syedanwala Farm
Kot Radha Kishan
20 Days 0.075 Million Packages,LHR
4 Geotechnical Investigation of underground
water tank of walled city Project, Lahore
20 Days 0.1 Million ACE, LHR
5 Drilling of Three (3) Borehole for Coal
Exploration at Training Mines Katas, District
Chakwal
3 Months 2.4 Million
Inspectorate of Mines &
Minerals Department,
GoP
6 Core Drilling in Limestone and Sandstone of
(10) Boreholes having average depth varies
from 160 to 200 meters at classified locations of
National Development Complex (NDC) in
5 Months 5.75 Million Trisektor
7 Water Supply & Sewerage Project, Mirpur Area,
AJK
1.5 Month 0.4 Million ACE, LHR
8 Geotechnical Investigation at River Garden
Homes Scheme, Gujrat
2 Month 0.5 Million Baig Associates
9 Geotechnical Investigation at Mohsin Hospital,
Gujrat
1 Month 0.475 Million Baig Associates
10 Geotechnical Investigation at Brothers Sugar
Mill, Chunian
1.5 Month 0.565 Million Baig Associates
11 Revaluate the Geotechnical parameters at Baigs
Apartment, Waris Road Lahore
15 Days 0.215 Million Baig Associates
12 Geotechnial Investigation at Umer Hospital,
Toba Tek Singh
25 Days 0.365 Million Baig Associates
13 Geotechnical Investigation of Communication
Towers
2 Months 3.75 Million Trisektor
14 Geotecnical Investigation of Govt.College
Rajanpur
20 Days 0.25 Million DECON
15 Development of Irrigation System
Dams/Barrages of Pakistan Map in GIS
10 Days 0.1 Million Mitsubishi Corporation
16 Development of GIS Maps of Punjab Irrigation
System
1 Month 0.2 Million
Punjab Irrigation &
Power Department
17 Supply of Quick Bird High Resolution Satellite
Data
15 Days 3.0 Million
Atomic Energy Mineral
Centre
18 Development of GIS for Punjab Information
Technology Board
3 Months 3.0 Million PIT Board
19 Geotecnical Investigation of Mehmood Textile
Mills, Multan
1 Month 0.45 Million DECON
List of Few Completed Projects in Last 3 Years / Past
Sr.No Project Title Duration Total Amount Client
20 Geotecnical Investigation at Ameen Sons, Kasur 15 Days 0.15 Million DECON
21 Geotecnical Investigation of Shainwala Grid
Station, Faisalabad
25 Days 0.385 Million DECON
22 Geotechnial Investigation at Abu Dhabi Palace,
Rahimyar Khan
1 Month 0.685 Million DECON
23 Geological Mapping of Patrind Hydro Power
Project.
7 Months 7 Million M/s DECON
24 Topographical Survey & Digital Mapping of
Rental Power Project At Satiana-Faisalabad Rd. 1 Month 0.1 Million Young Gen Power Ltd.
25 Topographic Survey of Maple Leaf Cement
Factory
10 Days 0.441 Million Maple Leaf (Pvt.) Ltd.
26 Geotechnial Investigation of 220 KV Grid
Station, Mardan
2 Months 0.850 Million DECON
27 Geotechnical Investigation of Sheranwala Gate
Walled City Lahore Project
1 Week 0.0589 Million ACE, LHR
28 Parco Asphalt Blowing Unit (ABU) Project 9 Days 0.332 Million DESCON
29 Geotechnical Invst in the Pilot Prj Area_LWCP 9 Days 0.126 Million ACE, LHR
30 Improvement and Re-Construction of Central
Prison, Peshawar Geotechnical Investigation
3 Months 0.85 Million NESPAK
31 Seismic Survey of Patrind Hydro Power Project. 7 Months 7 Million M/s DECON
32 Geophysical Investigation for Trimmu Barrage 7 Days 0.612 Million PIAIP,(NESPAK, NDC)
33 ER Survey Khuirata Azad Kashmir Project 11 Days .360 Million AKMIDC, AJK
34 ER Survey Descon J&P - J.V Satpara Dam
Project
13 Days .145 Million DESCON
35 Geotechnical Investigation of Gomal River 2 Months 0.85 Million FWO
36 Geotechnical Investigation of Parking Area
Bara Gali and Lower Topa
2 Months 0.75 Million NESPAK
37 Core Drilling for Material Evaluation for
Gharibwal Cement Plant Limstone and Gypsum
Quarry Areas
6 Months 7.5 Million Gharibwal Cement LTD.
38 Elecrical Resistivity Survey for Groundwater
Stuides and execution of two test wells at GCL
Piadar Areas
2 Months 1.875 Million Gharibwal Cement LTD.
39 Eexecution of two tubewells having 1 cusec
capacity complete in all respect at Piadar Area,
GCL.
2 Months 5.4 Million Gharibwal Cement LTD.
40 Geotechnical Investigations of 50 MW Coal
Based Power Plant at M3 Faisalabad
1 Months 0.65 Million MM Pakaistan
41 Geotechnical Investigations of 50 MW Coal
Based Power Plant at Sundar Industrial Estate
Lahore
1 Months 0.55 Million MM Pakaistan
42 Core Drilling for Material Evaluation for Cherat
Cement Company Limited Limstone Quarry
Areas ( work in progress)
6 Months 7.25 Million
Cherat Cement Company
LTD, KPK - gfg Group
43 Geotechnical Investigations and topographic
survey for Gondlanwala Sanitary Land Fill Site.
1Month 0.71 Million
Lean & Green Pvt.
Limited Multan
Sr.No Project Title Duration Total Amount Client
44 Geotechnical Investigations and topographic
survey for Chianwali Sanitary Land Fill Site.
1Month 0.71 Million
Lean & Green Pvt.
Limited Multan
45 Topographic survey of new quarry area of
Gharibwal Cement Plant.(work in progress)
1 Month 1.45 Million Gharibwal Cement LTD.
46 Topographic survey and Geotechnical
Investigations for LPG & NGL Recovery
Plant -III at Adhi Gas Field, An EPCC project
of M/S PDIL, Lahore.
1 Month 2.00 Million
Presson Descon
International (Pvt.), LTD.
47 Down Hole Seismic Survey for LPG & NGL
Recovery Plant -III at Adhi Gas Field, An
EPCC project of M/S PDIL, Lahore.
1 Month 0.50 Million
Presson Descon
International (Pvt.), LTD.
48 Geotechnical Investigations for Rehablitation
Design of Khaire Murat Bridge and Access
d
1 Month 0.90 Million MDP, Islamabad
49 Geotechnical Investigations and Topographic
survey for Wah Nobel Extension 1 MW Solar
j
1 Month 0.710 Million
REON Energy Solution
Karachi
50 Geotechnical Investigations for Gambat South
GPF - II. 03 Months 2.40 Million
Presson Descon
International (Pvt.), LTD.
51
Electrical Resistivity Survey for Groundwater
delineation for GCL. 01 Month 0.65 Million Gharibwal Cement LTD.
52
Additional Electrical Resistivity Survey for
Groundwater delineation for GCL near 10 days 0.15 Million Gharibwal Cement LTD.
53
Geotechnical Investigations for Gulahmad Wind
Farm Project, Jhampir. 03 Months 5.20 Million
Presson Descon
International (Pvt.), LTD.
54
Geotechnical Investigations and Topographic
Survey for 100 MW Solar Power project at
Chubara District Layyah
25 days 1.582 Million
Renewable Resources
(Pvt.) LTD, Islamabad
55
Electric Resistivity Survey at Qarshi Knowledge
City near Burhan Interchage M-1 Motorway for
groundwater exploration.
21 dyas 0.40 Million
Qarshi Foundation,
Lahore

More Related Content

Similar to List of Completed Projects September 2015

Presentation 1
Presentation 1Presentation 1
Presentation 1Baig Ali
 
Mining Overview For Coal And Bauxite Mine of Nalco.pptx
Mining Overview For Coal And Bauxite Mine of Nalco.pptxMining Overview For Coal And Bauxite Mine of Nalco.pptx
Mining Overview For Coal And Bauxite Mine of Nalco.pptxPramitPattanayak
 
QUATRZ DRILLING AND LAB COMPANY PROFILE.pdf
QUATRZ DRILLING AND LAB COMPANY PROFILE.pdfQUATRZ DRILLING AND LAB COMPANY PROFILE.pdf
QUATRZ DRILLING AND LAB COMPANY PROFILE.pdfNeerajOjha17
 
Yogesh 8th sem project report
Yogesh 8th sem project reportYogesh 8th sem project report
Yogesh 8th sem project reportYogesh Thakur
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptxAmirShafiq25
 
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...FICCINorthEast
 
Detailed Project Report-BAVLA-Green Eminent 2010 GUDM
Detailed Project Report-BAVLA-Green Eminent 2010 GUDMDetailed Project Report-BAVLA-Green Eminent 2010 GUDM
Detailed Project Report-BAVLA-Green Eminent 2010 GUDMShashikant Kumar, Ph.D
 
Kalpasar Project PPT _NCCR-1.3.22.pdf
Kalpasar Project PPT _NCCR-1.3.22.pdfKalpasar Project PPT _NCCR-1.3.22.pdf
Kalpasar Project PPT _NCCR-1.3.22.pdfAbhinava Tripathi
 
Hp wq study of ground water quality characteristics in industrially predomina...
Hp wq study of ground water quality characteristics in industrially predomina...Hp wq study of ground water quality characteristics in industrially predomina...
Hp wq study of ground water quality characteristics in industrially predomina...hydrologyproject2
 
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...iassrmohanty
 
Gigawatt scale wind and solar project in Nepal
Gigawatt scale wind and solar project in NepalGigawatt scale wind and solar project in Nepal
Gigawatt scale wind and solar project in NepalKushal Gurung
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam JunaidAshraf31
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitaeSunil Singh
 
Up date Cv of Tokon Khan
Up date Cv of Tokon KhanUp date Cv of Tokon Khan
Up date Cv of Tokon Khantokonkhan khan
 
Geological mapping 27.04.18 updated (only mapping)
Geological mapping   27.04.18 updated (only mapping)Geological mapping   27.04.18 updated (only mapping)
Geological mapping 27.04.18 updated (only mapping)hosting guests
 
Project Information 060709[1]
Project Information 060709[1]Project Information 060709[1]
Project Information 060709[1]Lau Teng
 

Similar to List of Completed Projects September 2015 (20)

Presentation 1
Presentation 1Presentation 1
Presentation 1
 
Mining Overview For Coal And Bauxite Mine of Nalco.pptx
Mining Overview For Coal And Bauxite Mine of Nalco.pptxMining Overview For Coal And Bauxite Mine of Nalco.pptx
Mining Overview For Coal And Bauxite Mine of Nalco.pptx
 
QUATRZ DRILLING AND LAB COMPANY PROFILE.pdf
QUATRZ DRILLING AND LAB COMPANY PROFILE.pdfQUATRZ DRILLING AND LAB COMPANY PROFILE.pdf
QUATRZ DRILLING AND LAB COMPANY PROFILE.pdf
 
Yogesh 8th sem project report
Yogesh 8th sem project reportYogesh 8th sem project report
Yogesh 8th sem project report
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
 
Sripadasagar project
Sripadasagar projectSripadasagar project
Sripadasagar project
 
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
 
Detailed Project Report-BAVLA-Green Eminent 2010 GUDM
Detailed Project Report-BAVLA-Green Eminent 2010 GUDMDetailed Project Report-BAVLA-Green Eminent 2010 GUDM
Detailed Project Report-BAVLA-Green Eminent 2010 GUDM
 
Kalpasar Project PPT _NCCR-1.3.22.pdf
Kalpasar Project PPT _NCCR-1.3.22.pdfKalpasar Project PPT _NCCR-1.3.22.pdf
Kalpasar Project PPT _NCCR-1.3.22.pdf
 
Hp wq study of ground water quality characteristics in industrially predomina...
Hp wq study of ground water quality characteristics in industrially predomina...Hp wq study of ground water quality characteristics in industrially predomina...
Hp wq study of ground water quality characteristics in industrially predomina...
 
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
 
Gigawatt scale wind and solar project in Nepal
Gigawatt scale wind and solar project in NepalGigawatt scale wind and solar project in Nepal
Gigawatt scale wind and solar project in Nepal
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Up date Cv of Tokon Khan
Up date Cv of Tokon KhanUp date Cv of Tokon Khan
Up date Cv of Tokon Khan
 
Geological mapping 27.04.18 updated (only mapping)
Geological mapping   27.04.18 updated (only mapping)Geological mapping   27.04.18 updated (only mapping)
Geological mapping 27.04.18 updated (only mapping)
 
CVDMP
CVDMPCVDMP
CVDMP
 
GSP waqas - Copy.pptx
GSP waqas - Copy.pptxGSP waqas - Copy.pptx
GSP waqas - Copy.pptx
 
Final PPT.pptx
Final PPT.pptxFinal PPT.pptx
Final PPT.pptx
 
Project Information 060709[1]
Project Information 060709[1]Project Information 060709[1]
Project Information 060709[1]
 

List of Completed Projects September 2015

  • 1. Sr.No Project Title Duration Total Amount Client 1 Geotechnical Investigation of Patrind Hydro Power Project.More than 475 meters drilling in metamorphic rock (Hazara Slates) were completed having depth from 30 meters to 150 meters at places including insitu testing, 8 Months 2.8 Million DECON 2 Geotechnical Investigation of Proposed commercial building (City Centre) at Plot No.1&2, Survey 137/A Nusrat Road, Multan 1 Month 0.530 Million Baig Associates 3 Geotecnical Investigation of Syedanwala Farm Kot Radha Kishan 20 Days 0.075 Million Packages,LHR 4 Geotechnical Investigation of underground water tank of walled city Project, Lahore 20 Days 0.1 Million ACE, LHR 5 Drilling of Three (3) Borehole for Coal Exploration at Training Mines Katas, District Chakwal 3 Months 2.4 Million Inspectorate of Mines & Minerals Department, GoP 6 Core Drilling in Limestone and Sandstone of (10) Boreholes having average depth varies from 160 to 200 meters at classified locations of National Development Complex (NDC) in 5 Months 5.75 Million Trisektor 7 Water Supply & Sewerage Project, Mirpur Area, AJK 1.5 Month 0.4 Million ACE, LHR 8 Geotechnical Investigation at River Garden Homes Scheme, Gujrat 2 Month 0.5 Million Baig Associates 9 Geotechnical Investigation at Mohsin Hospital, Gujrat 1 Month 0.475 Million Baig Associates 10 Geotechnical Investigation at Brothers Sugar Mill, Chunian 1.5 Month 0.565 Million Baig Associates 11 Revaluate the Geotechnical parameters at Baigs Apartment, Waris Road Lahore 15 Days 0.215 Million Baig Associates 12 Geotechnial Investigation at Umer Hospital, Toba Tek Singh 25 Days 0.365 Million Baig Associates 13 Geotechnical Investigation of Communication Towers 2 Months 3.75 Million Trisektor 14 Geotecnical Investigation of Govt.College Rajanpur 20 Days 0.25 Million DECON 15 Development of Irrigation System Dams/Barrages of Pakistan Map in GIS 10 Days 0.1 Million Mitsubishi Corporation 16 Development of GIS Maps of Punjab Irrigation System 1 Month 0.2 Million Punjab Irrigation & Power Department 17 Supply of Quick Bird High Resolution Satellite Data 15 Days 3.0 Million Atomic Energy Mineral Centre 18 Development of GIS for Punjab Information Technology Board 3 Months 3.0 Million PIT Board 19 Geotecnical Investigation of Mehmood Textile Mills, Multan 1 Month 0.45 Million DECON List of Few Completed Projects in Last 3 Years / Past
  • 2. Sr.No Project Title Duration Total Amount Client 20 Geotecnical Investigation at Ameen Sons, Kasur 15 Days 0.15 Million DECON 21 Geotecnical Investigation of Shainwala Grid Station, Faisalabad 25 Days 0.385 Million DECON 22 Geotechnial Investigation at Abu Dhabi Palace, Rahimyar Khan 1 Month 0.685 Million DECON 23 Geological Mapping of Patrind Hydro Power Project. 7 Months 7 Million M/s DECON 24 Topographical Survey & Digital Mapping of Rental Power Project At Satiana-Faisalabad Rd. 1 Month 0.1 Million Young Gen Power Ltd. 25 Topographic Survey of Maple Leaf Cement Factory 10 Days 0.441 Million Maple Leaf (Pvt.) Ltd. 26 Geotechnial Investigation of 220 KV Grid Station, Mardan 2 Months 0.850 Million DECON 27 Geotechnical Investigation of Sheranwala Gate Walled City Lahore Project 1 Week 0.0589 Million ACE, LHR 28 Parco Asphalt Blowing Unit (ABU) Project 9 Days 0.332 Million DESCON 29 Geotechnical Invst in the Pilot Prj Area_LWCP 9 Days 0.126 Million ACE, LHR 30 Improvement and Re-Construction of Central Prison, Peshawar Geotechnical Investigation 3 Months 0.85 Million NESPAK 31 Seismic Survey of Patrind Hydro Power Project. 7 Months 7 Million M/s DECON 32 Geophysical Investigation for Trimmu Barrage 7 Days 0.612 Million PIAIP,(NESPAK, NDC) 33 ER Survey Khuirata Azad Kashmir Project 11 Days .360 Million AKMIDC, AJK 34 ER Survey Descon J&P - J.V Satpara Dam Project 13 Days .145 Million DESCON 35 Geotechnical Investigation of Gomal River 2 Months 0.85 Million FWO 36 Geotechnical Investigation of Parking Area Bara Gali and Lower Topa 2 Months 0.75 Million NESPAK 37 Core Drilling for Material Evaluation for Gharibwal Cement Plant Limstone and Gypsum Quarry Areas 6 Months 7.5 Million Gharibwal Cement LTD. 38 Elecrical Resistivity Survey for Groundwater Stuides and execution of two test wells at GCL Piadar Areas 2 Months 1.875 Million Gharibwal Cement LTD. 39 Eexecution of two tubewells having 1 cusec capacity complete in all respect at Piadar Area, GCL. 2 Months 5.4 Million Gharibwal Cement LTD. 40 Geotechnical Investigations of 50 MW Coal Based Power Plant at M3 Faisalabad 1 Months 0.65 Million MM Pakaistan 41 Geotechnical Investigations of 50 MW Coal Based Power Plant at Sundar Industrial Estate Lahore 1 Months 0.55 Million MM Pakaistan 42 Core Drilling for Material Evaluation for Cherat Cement Company Limited Limstone Quarry Areas ( work in progress) 6 Months 7.25 Million Cherat Cement Company LTD, KPK - gfg Group 43 Geotechnical Investigations and topographic survey for Gondlanwala Sanitary Land Fill Site. 1Month 0.71 Million Lean & Green Pvt. Limited Multan
  • 3. Sr.No Project Title Duration Total Amount Client 44 Geotechnical Investigations and topographic survey for Chianwali Sanitary Land Fill Site. 1Month 0.71 Million Lean & Green Pvt. Limited Multan 45 Topographic survey of new quarry area of Gharibwal Cement Plant.(work in progress) 1 Month 1.45 Million Gharibwal Cement LTD. 46 Topographic survey and Geotechnical Investigations for LPG & NGL Recovery Plant -III at Adhi Gas Field, An EPCC project of M/S PDIL, Lahore. 1 Month 2.00 Million Presson Descon International (Pvt.), LTD. 47 Down Hole Seismic Survey for LPG & NGL Recovery Plant -III at Adhi Gas Field, An EPCC project of M/S PDIL, Lahore. 1 Month 0.50 Million Presson Descon International (Pvt.), LTD. 48 Geotechnical Investigations for Rehablitation Design of Khaire Murat Bridge and Access d 1 Month 0.90 Million MDP, Islamabad 49 Geotechnical Investigations and Topographic survey for Wah Nobel Extension 1 MW Solar j 1 Month 0.710 Million REON Energy Solution Karachi 50 Geotechnical Investigations for Gambat South GPF - II. 03 Months 2.40 Million Presson Descon International (Pvt.), LTD. 51 Electrical Resistivity Survey for Groundwater delineation for GCL. 01 Month 0.65 Million Gharibwal Cement LTD. 52 Additional Electrical Resistivity Survey for Groundwater delineation for GCL near 10 days 0.15 Million Gharibwal Cement LTD. 53 Geotechnical Investigations for Gulahmad Wind Farm Project, Jhampir. 03 Months 5.20 Million Presson Descon International (Pvt.), LTD. 54 Geotechnical Investigations and Topographic Survey for 100 MW Solar Power project at Chubara District Layyah 25 days 1.582 Million Renewable Resources (Pvt.) LTD, Islamabad 55 Electric Resistivity Survey at Qarshi Knowledge City near Burhan Interchage M-1 Motorway for groundwater exploration. 21 dyas 0.40 Million Qarshi Foundation, Lahore