National Centre for Coastal Research ( NCCR)
Dated: 01st March,2022 (Tuesday)
Consultant
Consultancy Services
for
Technical Assistance in Preparation of DPR’s for Kalpasar Project
Client
National Centre for Coastal
Research ( NCCR)
Ministry of Earth Sciences,
NIOT Campus,
Pallikaranai, Chennai-
In JV with
At a Glance
 About Aarvee Associates
 Key Projects
 About G – Tech Infra
 Project in Brief
 Scope of Services
 Methodology
 Project Team
 Activity Schedule
In This Presentation
Contents
3/17/2022
2
Countries of Operation
 Established in 1989 with Head Quarters at Hyderabad
 2000 employees
Aarvee Associates Architects, Engineers & Consultants Pvt Ltd
Key Projects
3/17/2022
3
Project Technical Advisory Consultants (PTAC)
NAME PTAC-CS-2 under climate Adaptation in Vennar Sub basin
Location Thanjavur, Tamil nadu
Client Lower Cauvery Basin Circle, Water Resources Department
Scope of Work • Preparation of GIS maps for 37 rivers in Cauvery delta
• Preparation of survey DEM for each river
• Hydrological and hydraulic analysis of the streams and required
minimum section of the river is derived from HECRAS and SWAT
models
• To support the implementation of the establishment of a DSS,
and flood risk mapping and establishment of forecasting and
warning systems
Proof Engineering Consultant(PEC)
NAME PEC FOR IMPEMENTATION OF MEGA LIFT PROJECTS
Location Orissa
Client Department of Water Resources
Scope of Work • Vetting of Design Memorandum
• Review of Overall Lift irrigation Planning
• Review of Hydrologic, Hydraulic and Structural Planning and
Design of Intake works, Sump, Pump House, Rising Main,
Distribution Chamber and Irrigation Distribution Network
• Principles of Planning and design of Electro-Mechanical
components for Pumping and smooth Operation of Pump House
• Principle of Planning and Design of Power System Connectivity of
the Cluster and dedicated Power Supply to the Pump Station
3/17/2022
4
Project Implementation
NAME PIU FOR MINOR LIFT IRRIGATION SCHEMES
Location Orissa
Client Department of Water Resources
Scope of Work Project Implementation Unit (PIU) for Minor Lift Irrigation
Planning and Implementation (MLIPI) ,Orissa
(Funded by ADB)
• Assist the Project Management Unit (PMU) in preparation of
appraisal reports for lift irrigation schemes
• Contracting NGOs and mobilization of WUA through NGOs
• Institutional building and strengthening of Water Users Associations
• Facilitation of WUA participation in rehabilitation
• Assisting PMU for procurement
• Training of WUA members, and Supervising rehabilitation
of 1400 lift irrigation schemes and agriculture intensification
Detailed Project Report
NAME SRIPADA SAGAR PROJECT
Location Karimnagar, Telangana, India.
Client I & CAD Department
Salient features
Barrage
Max. Flood Discharge – 55,900 Cumecs
Length of barrage – 1180m
No. of Vents – 62
Lift System
No. of stages of Lift – 12 stages
Total Lift – 235m (single max -95m)
Power Requirement – 330 MW Total
MS Pipe Line – 3m Dia
Ayacut – 4,62,000 Acres
Quantity of water Utilization – 43.5 TMC
Type of Gates - Vertical
3/17/2022
5
Detailed Project Report
NAME P.V. NARSIMHA RAO KANTHANPALLI LIFT
IRRIGATION PROJECT
Location Warangal, Telangana, India.
Client I & CAD Department
Salient features Barrage
Max. Flood Discharge – 82,200 Cumecs
Length of barrage – 1972m
No. & size of Vents – 131 nos 12mX10m
Type of Gates - Radial
Lift System
No. of stages of Lift – 3 stages
Total Lift – 250m (single max -120m)
Power Requirement – 875 MW Total
Tunnels – 9.0m Dia (D-Shaped)
Ayacut – 4,00,000 Acres
Quantity of water Utilization – 50 TMC
Detailed Project Reports
NAME CHANAKA – KORATA BARRAGE
Location Adilabad, Telangana, India.
Client
Salient features Storage Capacity – 0.89 TMC
Ayacut - 13,500 Acres
I & CAD Department
Max. Flood Discharge – 16,400 Cumecs
Length of Barrage – 287.500m
No. & size of Vents – 20 nos 12mX10m
Type of Gates - Vertical
Quantity of water Utilization – 1.20 TMC
3/17/2022
6
Detailed Project Reports
NAME RARHU RESERVOIR SCHEME
Location Jharkhand, India.
Client Public Works Department
Scope of Work Survey & Investigations, Design of
222' high dam and 49 Kms canal
Salient features
Storage Capacity - 4 TMC
Length of Dam – 706m
Length of Spillway – 205m
Ayacut - 49,000 Acres
Power Generation – 2X2.24 MW
Detailed Project Report
NAME BARRAGES(2 NOS) ON KRISHNA RIVER D/S
PRAKASAM BARRAGE
Location Vijayawada, A.P, India.
Client Water Resources Department
Salient features Barrage – 1 @ Km 16.110 D/S of Prakasam Barrage
Max. Flood Discharge – 35,099 Cumecs
Length of barrage – 1244.50m
No. & size of Vents – 84 nos 12mX4.45m
Type of Gates - Vertical
Barrage – 2 @ Km 67.100 D/S of Prakasam Barrage
Storage Capacity – 4.131 TMC
Length of barrage – 1252m
No. & size of Vents – 100 nos 10mX 3.0m
Type of Gates - Vertical
Storage Capacity – 4.950 TMC
3/17/2022
7
Detailed Project Reports
Name Lower Penganga Inter State
Project
Location Adilabad, A.P. India.
Client I & CAD Department
Scope of
Work
Design of main canal &
distributaries, CM & CD
Structures, EIA & EMP Studies
Salient
features
Canal System
Utilisation - 5.12 TMC
Length of Canal – 90 Km.
Ayacut - 47,000 Acres
Detailed Design Engineering
Name Chagallu Barrage Project
Location Anantapur, A.P. India.
Client Navayuga –Transstroy (JV)
Scope of
Work
Detailed design of the project
components, Preparation of quality
control and quality assurance
programme, land acquisition
proposals
Salient
features
Construction of Barrage
Storage Capacity – 1.5 TMC
Length of Barrage – 2.15 Km
Length of Spillway – 291.5m
No. of Vents - 16 Nos. 14.5X7.5
Ayacut – 4,000 Acres
3/17/2022
8
Name Bhima Lift Irrigation Project
Lift-II : Stage-1&2
Location Mahabubnagar, A.P. India.
Client NEC-NCC-Maytas (JV)
Scope of
Work
Detailed designs of tunnel, canal and
viaducts, pump house balancing
reservoirs and pipelines
Salient
features
Lift Irrigation Scheme.
Stage – I
Lifting Head – 38m
Quantity – 63.72 Cumecs
Lifting Pumps – 3X12 MW
Stage – II
Lifting Head – 23m
Quantity – 32.28 Cumecs
Lifting Pumps – 3X4 MW
Detailed Design Engineering
Detailed Design Engineering
Name Panahitha – Chevella (Kaleswaram) Lift
Irrigation Scheme – Package:6
Location Karimnagar, A.P. India.
Client Navayuga – Patel – BHEL (Consortium)
Scope of
Work
Detailed Design of 10m twin tunnels,
underground surgepool and under ground
pump house
Salient
features
Mega Lift Irrigation Scheme.
Lifting Head – 102m
Quantity – 535cumecs (146.24 TMC)
Lifting Pumps – 6X110MW (reversible
turbine pumps)
Twin Tunnels – 10m dia. and about
10km long each (D-Shaped)
Under Ground Pumping Station
3/17/2022
9
Name Pranahitha – Chevella (Kaleswaram) Lift Irrigation
Scheme - Package:11 (Ongoing)
Location Karimnagar, A.P. India.
Client MEIL
Scope of
Work
Detailed Design of 9.5m twin tunnels,
underground surgepool and under ground
pump house
Salient
features
Mega Lift Irrigation Scheme.
Lifting Head – 110m, Quantity – 88.24 TMC
Lifting Pumps – 4X85 MW (reversible turbine
pumps)
Twin Tunnels – 9.5m dia. and about 8.6km
long each (D-Shaped)
Under Ground Pumping Station
Distributory system of 1,10,000 Acres
Detailed Design Engineering
Modernization/Rehabilitation Studies
Comprehensive Safety of TB Dam
To evaluate the in-situ density of masonry dam
body by using Non Destructive methods -
Sonic tomography in collaboration with IIT
Madras and M/s SOLGEO Italy.
To increase the spillway capacity by providing
additional spillway.
A detailed study of warning time available and
capacity of the existing structure to handle PMF
without increasing FRL/MWL can be
established.
To check stability of dam for seismic forces and
proposing suitable rehabilitation measures.
3/17/2022
10
Modernization of Canal
Name Modernization of TBP LLC
Main Canal
Location Bellary, Karnataka, India.
Client Tungabhadra Board
Scope of
Work
Study of existing canal system,
stability of structures, stabilization of
Ayacut
Salient
features
Modernization of TBP LLC main
Canal
Length of Canal - 250.58 Kms
Distributories - 11 Nos.
No. of Structures - 322 Nos.
Modernization/Rehabilitation Studies
Name Modernization of Nagarjuna Sagar
project
Location Nalgonda, A.P. India.
Client I & CAD Department
Scope of
Work
Study of existing canal system, stability of
structures, stabilization of Ayacut
Salient
features
Storage Capacity - 400 TMC
Height of the Dam - 125m
Length of the Dam – 4865m
Water Utilizaion – 264 TMC
Ayacut – 22,00,000 Acres
Length of Main Canals – 500Kms.
Length of Branches & Distributories: 24,140km
3/17/2022
11
Diversity In
PROJECTS
(End-to-End
Solutions))
Real Estate
(Commercial Complexes,
Mixed Land Use, Stadium,
Integrated Check Post,
Terminal Buildings,
Institutional Buildings, Statue)
Water Supply
(Hydrology &
Irrigation)
Smart
Cities
Structural Health
Monitoring System
Smart Solid Waste
Management
Tunnels
Cable Stayed/Extra
Dosed Bridges
Intelligent
Lighting/
Illumination www.gtechinfra.in
Transportation
(Inland Waterways, Road &
Highways, Traffic, Railways,
Metro & Ports)
Environment
(EIA/ EMP)
www.repl.global
FLAGSHIP PROJECTS
www.gtechinfra.in
3/17/2022
12
Flagship
PROJECTS
www.gtechinfra.in
WATER & ENVIRONMENT SECTOR
1. Consultancy services for “Feasibility Study, Environmental Impact Assessment (EIA),
Environmental Management Plan (EMP), Social Impact Assessment (SIA) and Resettlement
Action Plan (RAP) for Capacity Augmentation of National Waterways-1 (Jal Marg Vikas
Project) (Funded by the World Bank)”.
AMBIENT AIR QUALITY MONITORING
PUBLIC CONSULTATION
NOISE MONITORING GROUND WATER MONITORING
Flagship
PROJECTS
www.gtechinfra.in
WATER & ENVIRONMENT SECTOR
2. Consultancy Services for “Capacity Augmentation of Navigational Infrastructure of
National Waterway-1” at Varanasi & Sahibganj, TSSC-1 (Jal Marg Vikas Project)- World Bank
funded.”
TERMINAL AT VARANASI, INDIA HON’BLE PRIME MINISTER AT VARANASI
TERMINAL - INDIA’S FIRST MULTI MODAL
TERMINAL RECEIVING FIRST CARGO
TRANSPORTED ON INLAND WATERWAYS FROM
KOLKATA
3/17/2022
13
Flagship
PROJECTS
www.gtechinfra.in
WATER & ENVIRONMENT SECTOR
3. Consultancy services for “Consultancy Services for Adityapur Water Supply Project.”
Flagship
PROJECTS
www.gtechinfra.in
WATER & ENVIRONMENT SECTOR
4. Consultancy services for “Consultancy Services for Dibrugarh town Water Supply Project.”
3/17/2022
14
Flagship
PROJECTS
www.gtechinfra.in
WATER & ENVIRONMENT SECTOR
5. Consultancy services for “Consultancy Services for Environmental And Social Impact
Assessment (EIA-EMP & SIA) Studies In National Waterway -NW-95 in the state of Assam .”
Flagship
PROJECTS
www.gtechinfra.in
WATER & ENVIRONMENT SECTOR
6. Consultancy services for “Environment Impact Assessment and
Plan for obtaining multiple clearances for developing Inland
Waterway stretch between Pedaganjam And Ennore of North
Buckingham Canal in National Waterway-4”
18. Consultancy services for “Environment
Management Plan with Wildlife Clearance
and obtaining NOC for project initiation
along Inland Waterways in Ghaghra River,
NW 38.”
3/17/2022
15
Flagship
PROJECTS
www.gtechinfra.in
TRANSPORTATION SECTOR
7. Consultancy services for “Authority’s Engineer for Supervision of Construction of 4 Lane
Signature bridge (900m long central cable stayed Module) connecting missing link between
Okha and Beyt Dwarka including Construction of Approaches on New National Highway No
NH -51in the State of Gujarat on EPC basis.”
Flagship
PROJECTS
www.gtechinfra.in
TRANSPORTATION SECTOR
8. Consultancy services for “Feasibility study & Preparation of EPC documents for
construction of 4 Lane high level vehicular bridge on Daman ganga river on NH/848-B at
Daman”
Major Features: Total length of bridge: 1.46 Km, Viaduct-
840 m, Centre span-250m, Total Cable portion- 446m.
3/17/2022
16
Flagship
PROJECTS
www.gtechinfra.in
TRANSPORTATION SECTOR
Consultancy services for “Feasibility study & Preparation of EPC documents for construction
of 4 Lane high level vehicular bridge on Daman ganga river on NH/848-B at Daman”
Flagship
PROJECTS
www.gtechinfra.in
TRANSPORTATION SECTOR
9. Consultancy services for “Construction Design Engineering and Construction Supervision
of Cable Stayed Bridge across Yamuna River in Wazirabad, Delhi, India.”
3/17/2022
17
Flagship
PROJECTS
www.gtechinfra.in
TRANSPORTATION SECTOR
10. Consultancy services for “Design and Engineering Support for the construction of 4 lane
Cable Stayed Bridge at Polavaram Irrigation Project, Andhra Pradesh.”
Flagship
PROJECTS
www.gtechinfra.in
SMART CITIES
11. Consultancy services for “Project Management to design, develop, implement and
manage Smart City Projects under Smart City Mission in Allahabad (now Prayagraj) , Uttar
Pradesh.”
3/17/2022
18
Flagship
PROJECTS
www.gtechinfra.in
REAL ESTATE SECTOR
12. Consultancy services for “Detailed Engineering for Integrated Check Post (ICP) at Dawki,
Meghalaya.”
Flagship
PROJECTS
www.gtechinfra.in
REAL ESTATE SECTOR
13. Consultancy services for “Detailed Engineering for Integrated Check Post (ICP) at
Sabroom, Tripura”.
3/17/2022
19
Flagship
PROJECTS
www.gtechinfra.in
REAL ESTATE SECTOR
14. Consultancy Services for “Fabrication, supply and installation of 106.68 meter high
bronze Statue of Bharatratna Dr. Babasaheb Bhimrao Ambedkar at United India Mill No.6
Mumbai, Maharashtra , India”.
Project in brief
3/17/2022
20
Project in Brief
 Kalpasar Project aims for creation of fresh water coastal reservoir in the
Gulf of Khambhat by construction of about 30kms dam connecting east and
west banks of the gulf.
 It will be the world’s largest freshwater lake in the marine environment.
 To create huge fresh water of about 10,000 Million cubic meters for
irrigation, drinking and industrial purposes
Introduction
Kalpasar
Dam
Project
Description Details
Length of dam (in sea) 30 km
Top width of dam 100m, 10 lane
Reservoir :
Full Reservoir Level (FRL) (+) 3.0m
Maximum Water Level (MWL) (+) 5.0m
Minimum Draw Down Level (MDDL) (-) 4.0m
Irrigation command
Water envisaged for irrigation 6500 mcm
Ground water improvement in periphery of
reservoir
7.0 lakh ha
Extra land to be recovered (Availability of new
fresh land)
1.2 lakh ha
Reduction in distance
Bhavnagar – South Gujarat 136 km
Proposed Power Generation
Wind Power 1470 MW
Solar Power 1000 MW
3/17/2022
21
Kalpasar
Project
Layout
 World's largest man made fresh water reservoir in the sea.
 Highest importance and priority to irrigation and drinking water for
Saurashtra and Central Gujarat regions.
 The Reservoir will have the storage more than double the Sardar
Sarovar (Narmada Reservoir) capacity.
 Approx. 10.54-lakh hectare land in 37 talukas of nine districts of
Saurashtra region will get irrigation benefit facility including
rejuvenation of rivers. More than 60 existing dams will get
permanently filled up with water.
 Wind and solar energy will be generated which can also be used for
lifting fresh water from the reservoir to the canal.
Benefits of the Project
3/17/2022
22
 Bhavnagar port will get revived which will result into speedy
development of the region.
 There will be large saving in travel time and fuel due to reduction in
distance by about 136 km between Bhavnagar to Surat/Mumbai.
 Saline ground water of coastal area of Saurashtra & Central Gujarat will
get converted into fresh water with reduction in soil salinity.
 Substantial improvement in ground water quality as well as soil salinity
of coastal area of Saurashtra & Central Gujarat.
 About 1.2 lakh hectare land along the periphery of the reservoir will be
opened up for development towards value-based land utilization.
 Enhanced benefit of world class industrial estate like Dahej and Dholera
will be available to Bhavnagar/Saurashtra region.
Benefits of the Project
 The key task of the consultant is to provide technical assistance to
support National Centre for Coastal Research (NCCR)
 To assist client in review and finalization of DPRs by providing domain
experts’ technical input
 Compile the reports of the completed studies,
 Identify the gap areas,
 Assist NCCR Carry out additional studies by engaging various
organisations, and
 Finalization of Detailed Project Report (DPR) as per CWC and MoEF&CC
guidelines for obtaining the necessary clearances and statutory
approvals for the construction of the Dam.
Scope of the Services
3/17/2022
23
Scope
of
Works
Methodology
3/17/2022
24
Methodology
Preliminary works
Works Activities Results
Preliminary
works
Team Mobilisation Team exposure to clients
Interaction with the client
Methodology
Data Collection
Field Data
Irrigation Topographic Map, Water Source, Irrigation Canal System, Canal Design Discharge,
Irrigated Area
Hydrology, Meteorology
& Oceanography
Rainfall, Temperature (Max and Min), Humidity, Wind Speed, Tides, Currents,
Wave climate, Tsumani, Strom surges, seiches
Hydrology River System, River Discharge, Catchment area, Development Plans in the same
river basin, Existing irrigation systems related to the same river
Agriculture Current Cropping Patterns, Present Crop Yields, Crop water demand, Irrigation
and water supply
Drainage Inundation Condition, Drainage Requirement, Drainage System
Geology Geophysical profile, Reservoir seiches, Geotechnical strata,
Transportation Alignment survey, Logistics location survey
3/17/2022
25
Methodology
Consultation and data collection
Works Activities Results
Consultation and
data collection
Collection & review of past
studies undertaken
Review and compilation of
available data on project,
summary of findings and go
ahead towards development
of designs
- Reconaisssance Study
- Pre-feasibility study
- Specific studies
- Tidal Power
- Dam Alignment studies
- Earlier feasibility studies
Methodology
Engineering Investigations
Works Activities Results
Engineering
Investigations
Review of data on
topographical survey,
Bathymetry
Water demand and Water
resources assement,
climate change aspects,
Transportation facilities
assessment
Review of meteorological
and Oceanography
Water resources Assessment
& Hydrological studies
Review of geological &
geophysical profile
Climate change aspects
Transportation studies
3/17/2022
26
Methodology
Engineering Design
Works Activities Results
Engineering
Design
Configuration & Design of Kalpasar
dam
Feasibility study Report
Roadway & Railway Design
Irrigation & Flood protection
structures
Renewable energy design
Methodology of construction
Feasibility Benefits of the project
Economic Viability
Conclusions & Recommendations
Softwares
3/17/2022
27
Softwares
Project Team
3/17/2022
28
SL.
No.
Key
Expert
Name of
Expert
Qualification Total
Exp.
Relevant Experience
01. Dam
Design
Expert
Mr. Rakesh
Mahajan
• M.Tech (Civil),
Indian Institute
of Technology
(IIT) Delhi;
• MBA,
• BE(Civil);
39 Yrs • More than 35 years experience in Dam
Design, Design Review, Preparation of
Feasibility Reports, Tender Documents,
Detailed Project and Design Reports
• Successfully handled more than 25 dam
projects in India and abroad including
countries like Nepal, Afghanistan, Bhutan,
Democratic Republic of Congo, Rwanda,
Sri Lanka
02 Dam
Safety
&
Operati
ons
Expert
Mr. M V V
Saradhi
• M.Tech –Water
Resources
• B.Tech Civil
24 Yrs • 24 years’ experience in carrying out
operations for dams/barrages including
preparation of safety standards and
manuals for dams/barrages in similar
capacity
• experience of working in 21 projects of
dams/barrages
03 Dam
Constru
ction
Expert
Mr. Priya
Kant
Kaushik
• Master’s
Degree, ME-
Civil
Engineering
Bachelor’s
Degree, BE-Civil
Engineering
31 Yrs. • Total 27 years experience in carrying out
operations for dams/barrages including
preparation of safety standards and
manuals for dams/barrages
• Experience of working in 12 projects of
dams/barrages
SL.
No
.
Key
Expert
Name
of
Expert
Qualification Total
Exp.
Relevant Experience
04 Spillway
Design
Expert
Mr.Jagan
Mohan
Rao
• M.E. in
Water
Resources
Engineering
• B.E. Civil
45 Yrs. • 10 years’ experience in designing dam spillways
including foundations.
• Worked in 04 projects of dams/barrages
05 Hydrologi
st
Ms Jaya
Sood
• M.Tech in
Water
Resources
Engineering
• B.E in Civil
27 Yrs. • 22 years experience in River hydrology and
ground water hydrology in similar capacity
• Handled 20 projects of dams/barrages/civil
infrastructure
06 Irrigation
Planning
and
Comman
d Area
Expert
Mr. V
Balagura
vaiah
• M. Tech in
Water
Resources
Engineering
• B.Tech Civil
20 Yrs. • 16 years’ experience in Irrigation Planning and
Command Area Development in similar
capacity
• Worked in 16 projects of dams/barrages
3/17/2022
29
SL.
No.
Key Expert Name of
Expert
Qualificati
on
Total
Exp.
Relevant Experience
07. Expert-
Analysis and
Design of
Ocean/Coa
stal
Structures
Mr. Maruti
Dattatrey
Kudale
• M.Tech
(Marine
Structures)
• B.E. (Civil)
41 Yrs. • 31 years experience in Analysis
and Design of Ocean and
Coastal structures including
Numerical Modelling of coastal
and ocean processes
• Involved in 14 nos. of
coastal/ocean projects
08. Geophysical
Survey
Expert
Dr. John
Devadas
• Post M.Sc
(Tech) in
Hydrogeol
ogy
• MSc in
Geology
26 Yrs. • 25 years’ experience in
geophysical and Seismological
survey for civil projects.
• Worked in more than 20 projects
09. Contract &
Tendering
Expert
Mr. Desh Raj • B.E (Hons)
Civil
42 Yrs. • Total 39 years’ experience in
contacting and tendering for
civil projects in similar Capacity
• Worked in 10 projects of large
civil infrastructure
SL.
No.
Key Expert Name of
Expert
Qualificati
on
Total
Exp.
Relevant Experience
10. Marine
Ecologist
Dr. Ashok Kumar • M.Sc. In
Biological
Sciences
• B.Sc in
Botany,
Chemistry,
Zoology
16 Yrs. • 16 years experience in marine
ecology projects
• worked in 19 infrastructure/civil
projects for preparation of EIA
11. Fishery
Expert
Mr. R
Nandakumar
• M.Sc. In
Coastal
Aquacultu
re
• B.Sc in
Zoology
22 Yrs • Total 18 years’ experience in Fisheries
for various projects.
• worked in 17 projects including fresh
water and saltwater
12. Project
Coordinator
Mr. Amit Kumar
Agrawal
• B.E.
(Mechani
cal
Engineerin
g)
26 Yrs. • 26 years’ experience in project
management and coordination
• Successfully handled more than 18
large infrastructure Projects
3/17/2022
30
Activity Schedule
3/17/2022
31
Thank you

More Related Content

What's hot

Climate change impact assessment on hydrology on river basins
Climate change impact assessment on hydrology on river basinsClimate change impact assessment on hydrology on river basins
Climate change impact assessment on hydrology on river basinsAbhiram Kanigolla
 
Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020India Water Portal
 
Development works on Major river basins of nepal
Development works on Major river basins of nepalDevelopment works on Major river basins of nepal
Development works on Major river basins of nepalAnilKoirala
 
Artificial recharge of groundwater
Artificial recharge of groundwaterArtificial recharge of groundwater
Artificial recharge of groundwaterLakshmi K Suresh
 
Kaleshwaram project (klis)pp open
Kaleshwaram project (klis)pp openKaleshwaram project (klis)pp open
Kaleshwaram project (klis)pp openrajuadepu1998
 
Diversion channel, water way and spreading ground
Diversion channel, water way and spreading groundDiversion channel, water way and spreading ground
Diversion channel, water way and spreading groundTahmid Imran Imon
 
WATERSHED MANAGEMENT
WATERSHED MANAGEMENTWATERSHED MANAGEMENT
WATERSHED MANAGEMENTSALMA VEJLANI
 
Report on the dynamic ground water resources of Maharashtra (2008-2009)
Report on the dynamic ground water resources of Maharashtra  (2008-2009)Report on the dynamic ground water resources of Maharashtra  (2008-2009)
Report on the dynamic ground water resources of Maharashtra (2008-2009)People's Archive of Rural India
 
National water policy
National water policyNational water policy
National water policyArshana Anu
 
Seminar on Hydrological modelling
Seminar on Hydrological modellingSeminar on Hydrological modelling
Seminar on Hydrological modellingvishvam Pancholi
 
Analysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in BangladeshAnalysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in BangladeshRituSaha3
 
RESERVOIR SEDIMENTATION
RESERVOIR SEDIMENTATIONRESERVOIR SEDIMENTATION
RESERVOIR SEDIMENTATIONLaxmanBhoyewar
 
Analysis of runoff for vishwamitri river watershed using scs cn method and ge...
Analysis of runoff for vishwamitri river watershed using scs cn method and ge...Analysis of runoff for vishwamitri river watershed using scs cn method and ge...
Analysis of runoff for vishwamitri river watershed using scs cn method and ge...vishvam Pancholi
 
Case study of dam failure ppt by ankur sahay
Case study of dam failure ppt by ankur sahayCase study of dam failure ppt by ankur sahay
Case study of dam failure ppt by ankur sahayMRINALJYOTI ADHYAPOK
 
Losses IN Canals
Losses IN CanalsLosses IN Canals
Losses IN CanalsAnand Kumar
 
Prospects and challenges in development of ground water resources of bangladesh
Prospects and challenges in development of ground water resources of bangladesh Prospects and challenges in development of ground water resources of bangladesh
Prospects and challenges in development of ground water resources of bangladesh Jahangir Alam
 

What's hot (20)

Climate change impact assessment on hydrology on river basins
Climate change impact assessment on hydrology on river basinsClimate change impact assessment on hydrology on river basins
Climate change impact assessment on hydrology on river basins
 
Tarbela dam
Tarbela damTarbela dam
Tarbela dam
 
Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020
 
Development works on Major river basins of nepal
Development works on Major river basins of nepalDevelopment works on Major river basins of nepal
Development works on Major river basins of nepal
 
Artificial recharge of groundwater
Artificial recharge of groundwaterArtificial recharge of groundwater
Artificial recharge of groundwater
 
Kaleshwaram project (klis)pp open
Kaleshwaram project (klis)pp openKaleshwaram project (klis)pp open
Kaleshwaram project (klis)pp open
 
Diversion channel, water way and spreading ground
Diversion channel, water way and spreading groundDiversion channel, water way and spreading ground
Diversion channel, water way and spreading ground
 
Dam safety
Dam safetyDam safety
Dam safety
 
Chapter 11 Fetter Groundwater Development
Chapter 11 Fetter Groundwater DevelopmentChapter 11 Fetter Groundwater Development
Chapter 11 Fetter Groundwater Development
 
WATERSHED MANAGEMENT
WATERSHED MANAGEMENTWATERSHED MANAGEMENT
WATERSHED MANAGEMENT
 
Report on the dynamic ground water resources of Maharashtra (2008-2009)
Report on the dynamic ground water resources of Maharashtra  (2008-2009)Report on the dynamic ground water resources of Maharashtra  (2008-2009)
Report on the dynamic ground water resources of Maharashtra (2008-2009)
 
National water policy
National water policyNational water policy
National water policy
 
Seminar on Hydrological modelling
Seminar on Hydrological modellingSeminar on Hydrological modelling
Seminar on Hydrological modelling
 
Analysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in BangladeshAnalysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
 
RESERVOIR SEDIMENTATION
RESERVOIR SEDIMENTATIONRESERVOIR SEDIMENTATION
RESERVOIR SEDIMENTATION
 
Analysis of runoff for vishwamitri river watershed using scs cn method and ge...
Analysis of runoff for vishwamitri river watershed using scs cn method and ge...Analysis of runoff for vishwamitri river watershed using scs cn method and ge...
Analysis of runoff for vishwamitri river watershed using scs cn method and ge...
 
Case study of dam failure ppt by ankur sahay
Case study of dam failure ppt by ankur sahayCase study of dam failure ppt by ankur sahay
Case study of dam failure ppt by ankur sahay
 
Multipurpose projects
Multipurpose projectsMultipurpose projects
Multipurpose projects
 
Losses IN Canals
Losses IN CanalsLosses IN Canals
Losses IN Canals
 
Prospects and challenges in development of ground water resources of bangladesh
Prospects and challenges in development of ground water resources of bangladesh Prospects and challenges in development of ground water resources of bangladesh
Prospects and challenges in development of ground water resources of bangladesh
 

Similar to Technical Assistance for Kalpasar Project DPRs

Copy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMCopy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMB SARKAR
 
Mechanical Engineer. WTP Pipeline
Mechanical Engineer. WTP PipelineMechanical Engineer. WTP Pipeline
Mechanical Engineer. WTP PipelineAwaiz 766
 
Punasa report on indra sagar Dam, 9608684800
Punasa  report on indra sagar Dam, 9608684800Punasa  report on indra sagar Dam, 9608684800
Punasa report on indra sagar Dam, 9608684800PRIYANSHU KUMAR
 
IVRCL - Company Profile.
IVRCL - Company Profile.IVRCL - Company Profile.
IVRCL - Company Profile.Gitanjali Singh
 
Prime Consulting Group Profile
Prime Consulting Group ProfilePrime Consulting Group Profile
Prime Consulting Group ProfileMANOJ PATNE
 
Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2Chandra Dissanayake
 
Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2Chandra Dissanayake
 
Prime consulting group brochure
Prime consulting group brochurePrime consulting group brochure
Prime consulting group brochureMANOJ PATNE
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitaeSunil Singh
 
Performance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power PlantPerformance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power PlantGirish Gupta
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjay Sankar
 
Summer internship Project on Sangam barrage working procedure,
Summer internship Project on Sangam barrage working procedure,Summer internship Project on Sangam barrage working procedure,
Summer internship Project on Sangam barrage working procedure,PANEM SRINIVASULU
 

Similar to Technical Assistance for Kalpasar Project DPRs (20)

Copy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMCopy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOM
 
Mechanical Engineer. WTP Pipeline
Mechanical Engineer. WTP PipelineMechanical Engineer. WTP Pipeline
Mechanical Engineer. WTP Pipeline
 
Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15
 
Punasa report on indra sagar Dam, 9608684800
Punasa  report on indra sagar Dam, 9608684800Punasa  report on indra sagar Dam, 9608684800
Punasa report on indra sagar Dam, 9608684800
 
IVRCL - Company Profile.
IVRCL - Company Profile.IVRCL - Company Profile.
IVRCL - Company Profile.
 
Prime Consulting Group Profile
Prime Consulting Group ProfilePrime Consulting Group Profile
Prime Consulting Group Profile
 
Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2
 
Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2
 
Prime consulting group brochure
Prime consulting group brochurePrime consulting group brochure
Prime consulting group brochure
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
 
Performance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power PlantPerformance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power Plant
 
TCExpression Sep'11
TCExpression Sep'11TCExpression Sep'11
TCExpression Sep'11
 
Tnl design
Tnl designTnl design
Tnl design
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ Engineer
 
Sarvesh_CV (2)
Sarvesh_CV (2)Sarvesh_CV (2)
Sarvesh_CV (2)
 
CV Krishna Dhanya
CV Krishna DhanyaCV Krishna Dhanya
CV Krishna Dhanya
 
Anil_CV_Recent
Anil_CV_RecentAnil_CV_Recent
Anil_CV_Recent
 
Summer internship Project on Sangam barrage working procedure,
Summer internship Project on Sangam barrage working procedure,Summer internship Project on Sangam barrage working procedure,
Summer internship Project on Sangam barrage working procedure,
 

Recently uploaded

Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 

Recently uploaded (20)

Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 

Technical Assistance for Kalpasar Project DPRs

  • 1. 3/17/2022 1 National Centre for Coastal Research ( NCCR) Dated: 01st March,2022 (Tuesday) Consultant Consultancy Services for Technical Assistance in Preparation of DPR’s for Kalpasar Project Client National Centre for Coastal Research ( NCCR) Ministry of Earth Sciences, NIOT Campus, Pallikaranai, Chennai- In JV with At a Glance  About Aarvee Associates  Key Projects  About G – Tech Infra  Project in Brief  Scope of Services  Methodology  Project Team  Activity Schedule In This Presentation Contents
  • 2. 3/17/2022 2 Countries of Operation  Established in 1989 with Head Quarters at Hyderabad  2000 employees Aarvee Associates Architects, Engineers & Consultants Pvt Ltd Key Projects
  • 3. 3/17/2022 3 Project Technical Advisory Consultants (PTAC) NAME PTAC-CS-2 under climate Adaptation in Vennar Sub basin Location Thanjavur, Tamil nadu Client Lower Cauvery Basin Circle, Water Resources Department Scope of Work • Preparation of GIS maps for 37 rivers in Cauvery delta • Preparation of survey DEM for each river • Hydrological and hydraulic analysis of the streams and required minimum section of the river is derived from HECRAS and SWAT models • To support the implementation of the establishment of a DSS, and flood risk mapping and establishment of forecasting and warning systems Proof Engineering Consultant(PEC) NAME PEC FOR IMPEMENTATION OF MEGA LIFT PROJECTS Location Orissa Client Department of Water Resources Scope of Work • Vetting of Design Memorandum • Review of Overall Lift irrigation Planning • Review of Hydrologic, Hydraulic and Structural Planning and Design of Intake works, Sump, Pump House, Rising Main, Distribution Chamber and Irrigation Distribution Network • Principles of Planning and design of Electro-Mechanical components for Pumping and smooth Operation of Pump House • Principle of Planning and Design of Power System Connectivity of the Cluster and dedicated Power Supply to the Pump Station
  • 4. 3/17/2022 4 Project Implementation NAME PIU FOR MINOR LIFT IRRIGATION SCHEMES Location Orissa Client Department of Water Resources Scope of Work Project Implementation Unit (PIU) for Minor Lift Irrigation Planning and Implementation (MLIPI) ,Orissa (Funded by ADB) • Assist the Project Management Unit (PMU) in preparation of appraisal reports for lift irrigation schemes • Contracting NGOs and mobilization of WUA through NGOs • Institutional building and strengthening of Water Users Associations • Facilitation of WUA participation in rehabilitation • Assisting PMU for procurement • Training of WUA members, and Supervising rehabilitation of 1400 lift irrigation schemes and agriculture intensification Detailed Project Report NAME SRIPADA SAGAR PROJECT Location Karimnagar, Telangana, India. Client I & CAD Department Salient features Barrage Max. Flood Discharge – 55,900 Cumecs Length of barrage – 1180m No. of Vents – 62 Lift System No. of stages of Lift – 12 stages Total Lift – 235m (single max -95m) Power Requirement – 330 MW Total MS Pipe Line – 3m Dia Ayacut – 4,62,000 Acres Quantity of water Utilization – 43.5 TMC Type of Gates - Vertical
  • 5. 3/17/2022 5 Detailed Project Report NAME P.V. NARSIMHA RAO KANTHANPALLI LIFT IRRIGATION PROJECT Location Warangal, Telangana, India. Client I & CAD Department Salient features Barrage Max. Flood Discharge – 82,200 Cumecs Length of barrage – 1972m No. & size of Vents – 131 nos 12mX10m Type of Gates - Radial Lift System No. of stages of Lift – 3 stages Total Lift – 250m (single max -120m) Power Requirement – 875 MW Total Tunnels – 9.0m Dia (D-Shaped) Ayacut – 4,00,000 Acres Quantity of water Utilization – 50 TMC Detailed Project Reports NAME CHANAKA – KORATA BARRAGE Location Adilabad, Telangana, India. Client Salient features Storage Capacity – 0.89 TMC Ayacut - 13,500 Acres I & CAD Department Max. Flood Discharge – 16,400 Cumecs Length of Barrage – 287.500m No. & size of Vents – 20 nos 12mX10m Type of Gates - Vertical Quantity of water Utilization – 1.20 TMC
  • 6. 3/17/2022 6 Detailed Project Reports NAME RARHU RESERVOIR SCHEME Location Jharkhand, India. Client Public Works Department Scope of Work Survey & Investigations, Design of 222' high dam and 49 Kms canal Salient features Storage Capacity - 4 TMC Length of Dam – 706m Length of Spillway – 205m Ayacut - 49,000 Acres Power Generation – 2X2.24 MW Detailed Project Report NAME BARRAGES(2 NOS) ON KRISHNA RIVER D/S PRAKASAM BARRAGE Location Vijayawada, A.P, India. Client Water Resources Department Salient features Barrage – 1 @ Km 16.110 D/S of Prakasam Barrage Max. Flood Discharge – 35,099 Cumecs Length of barrage – 1244.50m No. & size of Vents – 84 nos 12mX4.45m Type of Gates - Vertical Barrage – 2 @ Km 67.100 D/S of Prakasam Barrage Storage Capacity – 4.131 TMC Length of barrage – 1252m No. & size of Vents – 100 nos 10mX 3.0m Type of Gates - Vertical Storage Capacity – 4.950 TMC
  • 7. 3/17/2022 7 Detailed Project Reports Name Lower Penganga Inter State Project Location Adilabad, A.P. India. Client I & CAD Department Scope of Work Design of main canal & distributaries, CM & CD Structures, EIA & EMP Studies Salient features Canal System Utilisation - 5.12 TMC Length of Canal – 90 Km. Ayacut - 47,000 Acres Detailed Design Engineering Name Chagallu Barrage Project Location Anantapur, A.P. India. Client Navayuga –Transstroy (JV) Scope of Work Detailed design of the project components, Preparation of quality control and quality assurance programme, land acquisition proposals Salient features Construction of Barrage Storage Capacity – 1.5 TMC Length of Barrage – 2.15 Km Length of Spillway – 291.5m No. of Vents - 16 Nos. 14.5X7.5 Ayacut – 4,000 Acres
  • 8. 3/17/2022 8 Name Bhima Lift Irrigation Project Lift-II : Stage-1&2 Location Mahabubnagar, A.P. India. Client NEC-NCC-Maytas (JV) Scope of Work Detailed designs of tunnel, canal and viaducts, pump house balancing reservoirs and pipelines Salient features Lift Irrigation Scheme. Stage – I Lifting Head – 38m Quantity – 63.72 Cumecs Lifting Pumps – 3X12 MW Stage – II Lifting Head – 23m Quantity – 32.28 Cumecs Lifting Pumps – 3X4 MW Detailed Design Engineering Detailed Design Engineering Name Panahitha – Chevella (Kaleswaram) Lift Irrigation Scheme – Package:6 Location Karimnagar, A.P. India. Client Navayuga – Patel – BHEL (Consortium) Scope of Work Detailed Design of 10m twin tunnels, underground surgepool and under ground pump house Salient features Mega Lift Irrigation Scheme. Lifting Head – 102m Quantity – 535cumecs (146.24 TMC) Lifting Pumps – 6X110MW (reversible turbine pumps) Twin Tunnels – 10m dia. and about 10km long each (D-Shaped) Under Ground Pumping Station
  • 9. 3/17/2022 9 Name Pranahitha – Chevella (Kaleswaram) Lift Irrigation Scheme - Package:11 (Ongoing) Location Karimnagar, A.P. India. Client MEIL Scope of Work Detailed Design of 9.5m twin tunnels, underground surgepool and under ground pump house Salient features Mega Lift Irrigation Scheme. Lifting Head – 110m, Quantity – 88.24 TMC Lifting Pumps – 4X85 MW (reversible turbine pumps) Twin Tunnels – 9.5m dia. and about 8.6km long each (D-Shaped) Under Ground Pumping Station Distributory system of 1,10,000 Acres Detailed Design Engineering Modernization/Rehabilitation Studies Comprehensive Safety of TB Dam To evaluate the in-situ density of masonry dam body by using Non Destructive methods - Sonic tomography in collaboration with IIT Madras and M/s SOLGEO Italy. To increase the spillway capacity by providing additional spillway. A detailed study of warning time available and capacity of the existing structure to handle PMF without increasing FRL/MWL can be established. To check stability of dam for seismic forces and proposing suitable rehabilitation measures.
  • 10. 3/17/2022 10 Modernization of Canal Name Modernization of TBP LLC Main Canal Location Bellary, Karnataka, India. Client Tungabhadra Board Scope of Work Study of existing canal system, stability of structures, stabilization of Ayacut Salient features Modernization of TBP LLC main Canal Length of Canal - 250.58 Kms Distributories - 11 Nos. No. of Structures - 322 Nos. Modernization/Rehabilitation Studies Name Modernization of Nagarjuna Sagar project Location Nalgonda, A.P. India. Client I & CAD Department Scope of Work Study of existing canal system, stability of structures, stabilization of Ayacut Salient features Storage Capacity - 400 TMC Height of the Dam - 125m Length of the Dam – 4865m Water Utilizaion – 264 TMC Ayacut – 22,00,000 Acres Length of Main Canals – 500Kms. Length of Branches & Distributories: 24,140km
  • 11. 3/17/2022 11 Diversity In PROJECTS (End-to-End Solutions)) Real Estate (Commercial Complexes, Mixed Land Use, Stadium, Integrated Check Post, Terminal Buildings, Institutional Buildings, Statue) Water Supply (Hydrology & Irrigation) Smart Cities Structural Health Monitoring System Smart Solid Waste Management Tunnels Cable Stayed/Extra Dosed Bridges Intelligent Lighting/ Illumination www.gtechinfra.in Transportation (Inland Waterways, Road & Highways, Traffic, Railways, Metro & Ports) Environment (EIA/ EMP) www.repl.global FLAGSHIP PROJECTS www.gtechinfra.in
  • 12. 3/17/2022 12 Flagship PROJECTS www.gtechinfra.in WATER & ENVIRONMENT SECTOR 1. Consultancy services for “Feasibility Study, Environmental Impact Assessment (EIA), Environmental Management Plan (EMP), Social Impact Assessment (SIA) and Resettlement Action Plan (RAP) for Capacity Augmentation of National Waterways-1 (Jal Marg Vikas Project) (Funded by the World Bank)”. AMBIENT AIR QUALITY MONITORING PUBLIC CONSULTATION NOISE MONITORING GROUND WATER MONITORING Flagship PROJECTS www.gtechinfra.in WATER & ENVIRONMENT SECTOR 2. Consultancy Services for “Capacity Augmentation of Navigational Infrastructure of National Waterway-1” at Varanasi & Sahibganj, TSSC-1 (Jal Marg Vikas Project)- World Bank funded.” TERMINAL AT VARANASI, INDIA HON’BLE PRIME MINISTER AT VARANASI TERMINAL - INDIA’S FIRST MULTI MODAL TERMINAL RECEIVING FIRST CARGO TRANSPORTED ON INLAND WATERWAYS FROM KOLKATA
  • 13. 3/17/2022 13 Flagship PROJECTS www.gtechinfra.in WATER & ENVIRONMENT SECTOR 3. Consultancy services for “Consultancy Services for Adityapur Water Supply Project.” Flagship PROJECTS www.gtechinfra.in WATER & ENVIRONMENT SECTOR 4. Consultancy services for “Consultancy Services for Dibrugarh town Water Supply Project.”
  • 14. 3/17/2022 14 Flagship PROJECTS www.gtechinfra.in WATER & ENVIRONMENT SECTOR 5. Consultancy services for “Consultancy Services for Environmental And Social Impact Assessment (EIA-EMP & SIA) Studies In National Waterway -NW-95 in the state of Assam .” Flagship PROJECTS www.gtechinfra.in WATER & ENVIRONMENT SECTOR 6. Consultancy services for “Environment Impact Assessment and Plan for obtaining multiple clearances for developing Inland Waterway stretch between Pedaganjam And Ennore of North Buckingham Canal in National Waterway-4” 18. Consultancy services for “Environment Management Plan with Wildlife Clearance and obtaining NOC for project initiation along Inland Waterways in Ghaghra River, NW 38.”
  • 15. 3/17/2022 15 Flagship PROJECTS www.gtechinfra.in TRANSPORTATION SECTOR 7. Consultancy services for “Authority’s Engineer for Supervision of Construction of 4 Lane Signature bridge (900m long central cable stayed Module) connecting missing link between Okha and Beyt Dwarka including Construction of Approaches on New National Highway No NH -51in the State of Gujarat on EPC basis.” Flagship PROJECTS www.gtechinfra.in TRANSPORTATION SECTOR 8. Consultancy services for “Feasibility study & Preparation of EPC documents for construction of 4 Lane high level vehicular bridge on Daman ganga river on NH/848-B at Daman” Major Features: Total length of bridge: 1.46 Km, Viaduct- 840 m, Centre span-250m, Total Cable portion- 446m.
  • 16. 3/17/2022 16 Flagship PROJECTS www.gtechinfra.in TRANSPORTATION SECTOR Consultancy services for “Feasibility study & Preparation of EPC documents for construction of 4 Lane high level vehicular bridge on Daman ganga river on NH/848-B at Daman” Flagship PROJECTS www.gtechinfra.in TRANSPORTATION SECTOR 9. Consultancy services for “Construction Design Engineering and Construction Supervision of Cable Stayed Bridge across Yamuna River in Wazirabad, Delhi, India.”
  • 17. 3/17/2022 17 Flagship PROJECTS www.gtechinfra.in TRANSPORTATION SECTOR 10. Consultancy services for “Design and Engineering Support for the construction of 4 lane Cable Stayed Bridge at Polavaram Irrigation Project, Andhra Pradesh.” Flagship PROJECTS www.gtechinfra.in SMART CITIES 11. Consultancy services for “Project Management to design, develop, implement and manage Smart City Projects under Smart City Mission in Allahabad (now Prayagraj) , Uttar Pradesh.”
  • 18. 3/17/2022 18 Flagship PROJECTS www.gtechinfra.in REAL ESTATE SECTOR 12. Consultancy services for “Detailed Engineering for Integrated Check Post (ICP) at Dawki, Meghalaya.” Flagship PROJECTS www.gtechinfra.in REAL ESTATE SECTOR 13. Consultancy services for “Detailed Engineering for Integrated Check Post (ICP) at Sabroom, Tripura”.
  • 19. 3/17/2022 19 Flagship PROJECTS www.gtechinfra.in REAL ESTATE SECTOR 14. Consultancy Services for “Fabrication, supply and installation of 106.68 meter high bronze Statue of Bharatratna Dr. Babasaheb Bhimrao Ambedkar at United India Mill No.6 Mumbai, Maharashtra , India”. Project in brief
  • 20. 3/17/2022 20 Project in Brief  Kalpasar Project aims for creation of fresh water coastal reservoir in the Gulf of Khambhat by construction of about 30kms dam connecting east and west banks of the gulf.  It will be the world’s largest freshwater lake in the marine environment.  To create huge fresh water of about 10,000 Million cubic meters for irrigation, drinking and industrial purposes Introduction Kalpasar Dam Project Description Details Length of dam (in sea) 30 km Top width of dam 100m, 10 lane Reservoir : Full Reservoir Level (FRL) (+) 3.0m Maximum Water Level (MWL) (+) 5.0m Minimum Draw Down Level (MDDL) (-) 4.0m Irrigation command Water envisaged for irrigation 6500 mcm Ground water improvement in periphery of reservoir 7.0 lakh ha Extra land to be recovered (Availability of new fresh land) 1.2 lakh ha Reduction in distance Bhavnagar – South Gujarat 136 km Proposed Power Generation Wind Power 1470 MW Solar Power 1000 MW
  • 21. 3/17/2022 21 Kalpasar Project Layout  World's largest man made fresh water reservoir in the sea.  Highest importance and priority to irrigation and drinking water for Saurashtra and Central Gujarat regions.  The Reservoir will have the storage more than double the Sardar Sarovar (Narmada Reservoir) capacity.  Approx. 10.54-lakh hectare land in 37 talukas of nine districts of Saurashtra region will get irrigation benefit facility including rejuvenation of rivers. More than 60 existing dams will get permanently filled up with water.  Wind and solar energy will be generated which can also be used for lifting fresh water from the reservoir to the canal. Benefits of the Project
  • 22. 3/17/2022 22  Bhavnagar port will get revived which will result into speedy development of the region.  There will be large saving in travel time and fuel due to reduction in distance by about 136 km between Bhavnagar to Surat/Mumbai.  Saline ground water of coastal area of Saurashtra & Central Gujarat will get converted into fresh water with reduction in soil salinity.  Substantial improvement in ground water quality as well as soil salinity of coastal area of Saurashtra & Central Gujarat.  About 1.2 lakh hectare land along the periphery of the reservoir will be opened up for development towards value-based land utilization.  Enhanced benefit of world class industrial estate like Dahej and Dholera will be available to Bhavnagar/Saurashtra region. Benefits of the Project  The key task of the consultant is to provide technical assistance to support National Centre for Coastal Research (NCCR)  To assist client in review and finalization of DPRs by providing domain experts’ technical input  Compile the reports of the completed studies,  Identify the gap areas,  Assist NCCR Carry out additional studies by engaging various organisations, and  Finalization of Detailed Project Report (DPR) as per CWC and MoEF&CC guidelines for obtaining the necessary clearances and statutory approvals for the construction of the Dam. Scope of the Services
  • 24. 3/17/2022 24 Methodology Preliminary works Works Activities Results Preliminary works Team Mobilisation Team exposure to clients Interaction with the client Methodology Data Collection Field Data Irrigation Topographic Map, Water Source, Irrigation Canal System, Canal Design Discharge, Irrigated Area Hydrology, Meteorology & Oceanography Rainfall, Temperature (Max and Min), Humidity, Wind Speed, Tides, Currents, Wave climate, Tsumani, Strom surges, seiches Hydrology River System, River Discharge, Catchment area, Development Plans in the same river basin, Existing irrigation systems related to the same river Agriculture Current Cropping Patterns, Present Crop Yields, Crop water demand, Irrigation and water supply Drainage Inundation Condition, Drainage Requirement, Drainage System Geology Geophysical profile, Reservoir seiches, Geotechnical strata, Transportation Alignment survey, Logistics location survey
  • 25. 3/17/2022 25 Methodology Consultation and data collection Works Activities Results Consultation and data collection Collection & review of past studies undertaken Review and compilation of available data on project, summary of findings and go ahead towards development of designs - Reconaisssance Study - Pre-feasibility study - Specific studies - Tidal Power - Dam Alignment studies - Earlier feasibility studies Methodology Engineering Investigations Works Activities Results Engineering Investigations Review of data on topographical survey, Bathymetry Water demand and Water resources assement, climate change aspects, Transportation facilities assessment Review of meteorological and Oceanography Water resources Assessment & Hydrological studies Review of geological & geophysical profile Climate change aspects Transportation studies
  • 26. 3/17/2022 26 Methodology Engineering Design Works Activities Results Engineering Design Configuration & Design of Kalpasar dam Feasibility study Report Roadway & Railway Design Irrigation & Flood protection structures Renewable energy design Methodology of construction Feasibility Benefits of the project Economic Viability Conclusions & Recommendations Softwares
  • 28. 3/17/2022 28 SL. No. Key Expert Name of Expert Qualification Total Exp. Relevant Experience 01. Dam Design Expert Mr. Rakesh Mahajan • M.Tech (Civil), Indian Institute of Technology (IIT) Delhi; • MBA, • BE(Civil); 39 Yrs • More than 35 years experience in Dam Design, Design Review, Preparation of Feasibility Reports, Tender Documents, Detailed Project and Design Reports • Successfully handled more than 25 dam projects in India and abroad including countries like Nepal, Afghanistan, Bhutan, Democratic Republic of Congo, Rwanda, Sri Lanka 02 Dam Safety & Operati ons Expert Mr. M V V Saradhi • M.Tech –Water Resources • B.Tech Civil 24 Yrs • 24 years’ experience in carrying out operations for dams/barrages including preparation of safety standards and manuals for dams/barrages in similar capacity • experience of working in 21 projects of dams/barrages 03 Dam Constru ction Expert Mr. Priya Kant Kaushik • Master’s Degree, ME- Civil Engineering Bachelor’s Degree, BE-Civil Engineering 31 Yrs. • Total 27 years experience in carrying out operations for dams/barrages including preparation of safety standards and manuals for dams/barrages • Experience of working in 12 projects of dams/barrages SL. No . Key Expert Name of Expert Qualification Total Exp. Relevant Experience 04 Spillway Design Expert Mr.Jagan Mohan Rao • M.E. in Water Resources Engineering • B.E. Civil 45 Yrs. • 10 years’ experience in designing dam spillways including foundations. • Worked in 04 projects of dams/barrages 05 Hydrologi st Ms Jaya Sood • M.Tech in Water Resources Engineering • B.E in Civil 27 Yrs. • 22 years experience in River hydrology and ground water hydrology in similar capacity • Handled 20 projects of dams/barrages/civil infrastructure 06 Irrigation Planning and Comman d Area Expert Mr. V Balagura vaiah • M. Tech in Water Resources Engineering • B.Tech Civil 20 Yrs. • 16 years’ experience in Irrigation Planning and Command Area Development in similar capacity • Worked in 16 projects of dams/barrages
  • 29. 3/17/2022 29 SL. No. Key Expert Name of Expert Qualificati on Total Exp. Relevant Experience 07. Expert- Analysis and Design of Ocean/Coa stal Structures Mr. Maruti Dattatrey Kudale • M.Tech (Marine Structures) • B.E. (Civil) 41 Yrs. • 31 years experience in Analysis and Design of Ocean and Coastal structures including Numerical Modelling of coastal and ocean processes • Involved in 14 nos. of coastal/ocean projects 08. Geophysical Survey Expert Dr. John Devadas • Post M.Sc (Tech) in Hydrogeol ogy • MSc in Geology 26 Yrs. • 25 years’ experience in geophysical and Seismological survey for civil projects. • Worked in more than 20 projects 09. Contract & Tendering Expert Mr. Desh Raj • B.E (Hons) Civil 42 Yrs. • Total 39 years’ experience in contacting and tendering for civil projects in similar Capacity • Worked in 10 projects of large civil infrastructure SL. No. Key Expert Name of Expert Qualificati on Total Exp. Relevant Experience 10. Marine Ecologist Dr. Ashok Kumar • M.Sc. In Biological Sciences • B.Sc in Botany, Chemistry, Zoology 16 Yrs. • 16 years experience in marine ecology projects • worked in 19 infrastructure/civil projects for preparation of EIA 11. Fishery Expert Mr. R Nandakumar • M.Sc. In Coastal Aquacultu re • B.Sc in Zoology 22 Yrs • Total 18 years’ experience in Fisheries for various projects. • worked in 17 projects including fresh water and saltwater 12. Project Coordinator Mr. Amit Kumar Agrawal • B.E. (Mechani cal Engineerin g) 26 Yrs. • 26 years’ experience in project management and coordination • Successfully handled more than 18 large infrastructure Projects