Problem statement:-
Why there is difference
between Vibrating Wire
Strain Gage and Load
Cell readings during
pre-loading
How does Vibrating
Wire Strain Gage
Work ?
VW gage
Pluck Coil
Vibrating Wire Strain Gage (VWSG)
Functionality
Strain is proportional to Frequency
x Frequency.
A 5% error in Frequency Reading
is a 25 % Strain calculation
= (0.03% of FSD)
In VWSG, we are monitoring the change in load over
time. Sensitivity or Resolution is more critical than
absolute level as we zero it
y = 1.0921x + 11.065
-2000.00
-1500.00
-1000.00
-500.00
0.00
500.00
-1800 -1600 -1400 -1200 -1000 -800 -600 -400 -200 0
Computed Strain (uE)
EstimatedStrain(uE)
Series1
Linear (Series1)
Tritech
Instrument
Laboratory
Test Results
Linear
Regression of
Measured vs
Calculated Strain
m = 1.092
C = 11.065
Welding can cause
Vibrating Wire Strain
Gage Errors
0
500
1000
1500
2000
2500
00:00:00 12:00:00 00:00:00 12:00:00 00:00:00 12:00:00 00:00:00 12:00:00 00:00:00 12:00:00 00:00:00 12:00:00
Time
Load(kN)
SG Welding side
SG Non Welding side
Construction Impact - Welding
Load increase (600kN)
due to welding
Welding
Sudden decrease in load (400kN)
due to EMI effect of welding
SG on the side of
welding of strut
SG on the non welding
side of strut
Welding side
How does Vibrating
Wire Strain Load Cell
Work ?
+/- 20% is actually 40% possible difference
Why use Vibrating
Wire Strain Gage?
A comparison
• US $200 each
• Measures less than
1% of strut cross
sectional area
• US $4000 each
measures the full
load
Strain Gauges Load Cells
LTA : 25% of all struts for deep excavations shall
be monitored for load by strain gauge and/or load
cell, and of those monitored by strain gauge 15%
shall also be monitored by load cell.
Known Documented
reading differences
between VWSG and
Load Cell readings
Comparison of Results between
Load Cells and Strain Gauges
Average 30%
difference @ low
load levels
Actual VWSG and Load Cell
installations.
Only under ideal single strut
loading (without bracing) can
the readings be correlate
better
VWSG gives localize strain
while Load Cell gives global
strain
Strain Gage installation
Load Cell installation

More Related Content

What's hot

Top 45 baker hughes interview questions and answers pdf
Top 45 baker hughes interview questions and answers pdfTop 45 baker hughes interview questions and answers pdf
Top 45 baker hughes interview questions and answers pdfmollieturner86
 
Beams design and analysis
Beams design and analysisBeams design and analysis
Beams design and analysisAman Adam
 
Geotechnical Engineering-I [Lec #7: Sieve Analysis-2]
Geotechnical Engineering-I [Lec #7: Sieve Analysis-2]Geotechnical Engineering-I [Lec #7: Sieve Analysis-2]
Geotechnical Engineering-I [Lec #7: Sieve Analysis-2]Muhammad Irfan
 
Testing of dry/hardened concrete
Testing of dry/hardened concreteTesting of dry/hardened concrete
Testing of dry/hardened concreteE. O. Ochieng'
 
1-D Consolidation Test
1-D Consolidation Test1-D Consolidation Test
1-D Consolidation TestA K
 
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]Muhammad Irfan
 
Impact of new codes in silos design
Impact of new codes in silos designImpact of new codes in silos design
Impact of new codes in silos designKhaled Eid
 
Geotechnical Engineering-I [Lec #18: Consolidation-II]
Geotechnical Engineering-I [Lec #18: Consolidation-II]Geotechnical Engineering-I [Lec #18: Consolidation-II]
Geotechnical Engineering-I [Lec #18: Consolidation-II]Muhammad Irfan
 
Chapter 11: Stability of Equilibrium: Columns
Chapter 11: Stability of Equilibrium: ColumnsChapter 11: Stability of Equilibrium: Columns
Chapter 11: Stability of Equilibrium: ColumnsMonark Sutariya
 
Triaxil test and mohrs cycle
Triaxil test and mohrs cycleTriaxil test and mohrs cycle
Triaxil test and mohrs cycleBilal Mirani
 
អត្ថបទស្រាវជ្រាវទាក់ទងនឹងការសិក្សាលើគ្រឹះជម្រៅ
អត្ថបទស្រាវជ្រាវទាក់ទងនឹងការសិក្សាលើគ្រឹះជម្រៅអត្ថបទស្រាវជ្រាវទាក់ទងនឹងការសិក្សាលើគ្រឹះជម្រៅ
អត្ថបទស្រាវជ្រាវទាក់ទងនឹងការសិក្សាលើគ្រឹះជម្រៅNational Polytechnic institute of Cambodia
 
Q913 re1 w2 lec 6
Q913 re1 w2 lec 6Q913 re1 w2 lec 6
Q913 re1 w2 lec 6AFATous
 
Bearing Capacity of Shallow Foundation SPT
Bearing Capacity of Shallow Foundation SPTBearing Capacity of Shallow Foundation SPT
Bearing Capacity of Shallow Foundation SPTLatif Hyder Wadho
 
Geotechnical testign methods ii as
Geotechnical testign methods ii asGeotechnical testign methods ii as
Geotechnical testign methods ii asieqa zainol
 
Well Logging: 02 caliper log
Well Logging: 02 caliper logWell Logging: 02 caliper log
Well Logging: 02 caliper logkhaled Zidan
 
Calculation of dead load
Calculation of dead loadCalculation of dead load
Calculation of dead loadRidhdhi Gandhi
 
Module4 s dynamics- rajesh sir
Module4 s dynamics- rajesh sirModule4 s dynamics- rajesh sir
Module4 s dynamics- rajesh sirSHAMJITH KM
 

What's hot (20)

Top 45 baker hughes interview questions and answers pdf
Top 45 baker hughes interview questions and answers pdfTop 45 baker hughes interview questions and answers pdf
Top 45 baker hughes interview questions and answers pdf
 
Beams design and analysis
Beams design and analysisBeams design and analysis
Beams design and analysis
 
Geotechnical Engineering-I [Lec #7: Sieve Analysis-2]
Geotechnical Engineering-I [Lec #7: Sieve Analysis-2]Geotechnical Engineering-I [Lec #7: Sieve Analysis-2]
Geotechnical Engineering-I [Lec #7: Sieve Analysis-2]
 
Testing of dry/hardened concrete
Testing of dry/hardened concreteTesting of dry/hardened concrete
Testing of dry/hardened concrete
 
1-D Consolidation Test
1-D Consolidation Test1-D Consolidation Test
1-D Consolidation Test
 
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
 
Impact of new codes in silos design
Impact of new codes in silos designImpact of new codes in silos design
Impact of new codes in silos design
 
Geotechnical Engineering-I [Lec #18: Consolidation-II]
Geotechnical Engineering-I [Lec #18: Consolidation-II]Geotechnical Engineering-I [Lec #18: Consolidation-II]
Geotechnical Engineering-I [Lec #18: Consolidation-II]
 
Hw ch7
Hw ch7Hw ch7
Hw ch7
 
Trixial test
Trixial testTrixial test
Trixial test
 
Chapter 11: Stability of Equilibrium: Columns
Chapter 11: Stability of Equilibrium: ColumnsChapter 11: Stability of Equilibrium: Columns
Chapter 11: Stability of Equilibrium: Columns
 
Triaxil test and mohrs cycle
Triaxil test and mohrs cycleTriaxil test and mohrs cycle
Triaxil test and mohrs cycle
 
អត្ថបទស្រាវជ្រាវទាក់ទងនឹងការសិក្សាលើគ្រឹះជម្រៅ
អត្ថបទស្រាវជ្រាវទាក់ទងនឹងការសិក្សាលើគ្រឹះជម្រៅអត្ថបទស្រាវជ្រាវទាក់ទងនឹងការសិក្សាលើគ្រឹះជម្រៅ
អត្ថបទស្រាវជ្រាវទាក់ទងនឹងការសិក្សាលើគ្រឹះជម្រៅ
 
Q913 re1 w2 lec 6
Q913 re1 w2 lec 6Q913 re1 w2 lec 6
Q913 re1 w2 lec 6
 
SP Log
SP Log SP Log
SP Log
 
Bearing Capacity of Shallow Foundation SPT
Bearing Capacity of Shallow Foundation SPTBearing Capacity of Shallow Foundation SPT
Bearing Capacity of Shallow Foundation SPT
 
Geotechnical testign methods ii as
Geotechnical testign methods ii asGeotechnical testign methods ii as
Geotechnical testign methods ii as
 
Well Logging: 02 caliper log
Well Logging: 02 caliper logWell Logging: 02 caliper log
Well Logging: 02 caliper log
 
Calculation of dead load
Calculation of dead loadCalculation of dead load
Calculation of dead load
 
Module4 s dynamics- rajesh sir
Module4 s dynamics- rajesh sirModule4 s dynamics- rajesh sir
Module4 s dynamics- rajesh sir
 

Similar to Difference in Load readings between Strain Gage and Load Cell

STRAIN GAUGES-ppt1.ppt
STRAIN GAUGES-ppt1.pptSTRAIN GAUGES-ppt1.ppt
STRAIN GAUGES-ppt1.pptJehadYamin1
 
Power Electronics Lab Manual Spring 2017
Power Electronics Lab Manual Spring 2017Power Electronics Lab Manual Spring 2017
Power Electronics Lab Manual Spring 2017Zeeshan Ahmed
 
Analysis of SVPWM for Inverter fed DTC of Induction motor Drive
Analysis of SVPWM for Inverter fed DTC of Induction motor DriveAnalysis of SVPWM for Inverter fed DTC of Induction motor Drive
Analysis of SVPWM for Inverter fed DTC of Induction motor DriveIJSRED
 
Datasheet Metrel MI 3121. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Metrel MI 3121. Hubungi PT. Siwali Swantika 021-45850618Datasheet Metrel MI 3121. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Metrel MI 3121. Hubungi PT. Siwali Swantika 021-45850618PT. Siwali Swantika
 
CHAPTER 3 Voltage Drop and Short Circuit Analysis.pptx
CHAPTER 3 Voltage Drop and Short Circuit Analysis.pptxCHAPTER 3 Voltage Drop and Short Circuit Analysis.pptx
CHAPTER 3 Voltage Drop and Short Circuit Analysis.pptxLiewChiaPing
 
Adcmt catalog 6253-e-denkei DC Voltage Current Source Monitor
Adcmt catalog 6253-e-denkei  DC Voltage Current Source MonitorAdcmt catalog 6253-e-denkei  DC Voltage Current Source Monitor
Adcmt catalog 6253-e-denkei DC Voltage Current Source MonitorNIHON DENKEI SINGAPORE
 
ADCMT DC Voltage Current Source/Monitor Catalog 6253 DENKEI
ADCMT DC Voltage Current Source/Monitor  Catalog 6253  DENKEIADCMT DC Voltage Current Source/Monitor  Catalog 6253  DENKEI
ADCMT DC Voltage Current Source/Monitor Catalog 6253 DENKEINIHON DENKEI SINGAPORE
 
Analog and Digital Multimeters
Analog and Digital MultimetersAnalog and Digital Multimeters
Analog and Digital MultimetersDinesh Sharma
 
Symmetrical Components Fault Calculations
Symmetrical Components Fault CalculationsSymmetrical Components Fault Calculations
Symmetrical Components Fault Calculationsmichaeljmack
 
Line Differential - Test report for Alstom make Micom P546 relay
Line Differential - Test report for Alstom make Micom P546 relayLine Differential - Test report for Alstom make Micom P546 relay
Line Differential - Test report for Alstom make Micom P546 relaydavid roy
 
Compensation of Balanced and Unbalanced Voltage Disturbance using SRF Control...
Compensation of Balanced and Unbalanced Voltage Disturbance using SRF Control...Compensation of Balanced and Unbalanced Voltage Disturbance using SRF Control...
Compensation of Balanced and Unbalanced Voltage Disturbance using SRF Control...IRJET Journal
 
Power Quality Basics_Complex Compatibility_Aclara
Power Quality Basics_Complex Compatibility_AclaraPower Quality Basics_Complex Compatibility_Aclara
Power Quality Basics_Complex Compatibility_AclaraAclara
 
9. article azojete vol 11 103 113 dibal
9. article azojete vol 11 103 113 dibal9. article azojete vol 11 103 113 dibal
9. article azojete vol 11 103 113 dibalOyeniyi Samuel
 
A Study of SVC’s Impact Simulation and Analysis for Distance Protection Relay...
A Study of SVC’s Impact Simulation and Analysis for Distance Protection Relay...A Study of SVC’s Impact Simulation and Analysis for Distance Protection Relay...
A Study of SVC’s Impact Simulation and Analysis for Distance Protection Relay...IJECEIAES
 
EEE 117L Network Analysis Laboratory Lab 1 1
EEE 117L Network Analysis Laboratory  Lab 1     1  EEE 117L Network Analysis Laboratory  Lab 1     1
EEE 117L Network Analysis Laboratory Lab 1 1 EvonCanales257
 

Similar to Difference in Load readings between Strain Gage and Load Cell (20)

STRAIN GAUGES-ppt1.ppt
STRAIN GAUGES-ppt1.pptSTRAIN GAUGES-ppt1.ppt
STRAIN GAUGES-ppt1.ppt
 
Power Electronics Lab Manual Spring 2017
Power Electronics Lab Manual Spring 2017Power Electronics Lab Manual Spring 2017
Power Electronics Lab Manual Spring 2017
 
Analysis of SVPWM for Inverter fed DTC of Induction motor Drive
Analysis of SVPWM for Inverter fed DTC of Induction motor DriveAnalysis of SVPWM for Inverter fed DTC of Induction motor Drive
Analysis of SVPWM for Inverter fed DTC of Induction motor Drive
 
Datasheet Metrel MI 3121. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Metrel MI 3121. Hubungi PT. Siwali Swantika 021-45850618Datasheet Metrel MI 3121. Hubungi PT. Siwali Swantika 021-45850618
Datasheet Metrel MI 3121. Hubungi PT. Siwali Swantika 021-45850618
 
CHAPTER 3 Voltage Drop and Short Circuit Analysis.pptx
CHAPTER 3 Voltage Drop and Short Circuit Analysis.pptxCHAPTER 3 Voltage Drop and Short Circuit Analysis.pptx
CHAPTER 3 Voltage Drop and Short Circuit Analysis.pptx
 
Adcmt catalog 6253-e-denkei DC Voltage Current Source Monitor
Adcmt catalog 6253-e-denkei  DC Voltage Current Source MonitorAdcmt catalog 6253-e-denkei  DC Voltage Current Source Monitor
Adcmt catalog 6253-e-denkei DC Voltage Current Source Monitor
 
ADCMT DC Voltage Current Source/Monitor Catalog 6253 DENKEI
ADCMT DC Voltage Current Source/Monitor  Catalog 6253  DENKEIADCMT DC Voltage Current Source/Monitor  Catalog 6253  DENKEI
ADCMT DC Voltage Current Source/Monitor Catalog 6253 DENKEI
 
CURRENT VOLTAGE TRANSFORMER BASICS.pdf
CURRENT VOLTAGE TRANSFORMER BASICS.pdfCURRENT VOLTAGE TRANSFORMER BASICS.pdf
CURRENT VOLTAGE TRANSFORMER BASICS.pdf
 
Ijetae 1214 83
Ijetae 1214 83Ijetae 1214 83
Ijetae 1214 83
 
Analog and Digital Multimeters
Analog and Digital MultimetersAnalog and Digital Multimeters
Analog and Digital Multimeters
 
Symmetrical Components Fault Calculations
Symmetrical Components Fault CalculationsSymmetrical Components Fault Calculations
Symmetrical Components Fault Calculations
 
Line Differential - Test report for Alstom make Micom P546 relay
Line Differential - Test report for Alstom make Micom P546 relayLine Differential - Test report for Alstom make Micom P546 relay
Line Differential - Test report for Alstom make Micom P546 relay
 
97
9797
97
 
97
9797
97
 
Compensation of Balanced and Unbalanced Voltage Disturbance using SRF Control...
Compensation of Balanced and Unbalanced Voltage Disturbance using SRF Control...Compensation of Balanced and Unbalanced Voltage Disturbance using SRF Control...
Compensation of Balanced and Unbalanced Voltage Disturbance using SRF Control...
 
Power Quality Basics_Complex Compatibility_Aclara
Power Quality Basics_Complex Compatibility_AclaraPower Quality Basics_Complex Compatibility_Aclara
Power Quality Basics_Complex Compatibility_Aclara
 
9. article azojete vol 11 103 113 dibal
9. article azojete vol 11 103 113 dibal9. article azojete vol 11 103 113 dibal
9. article azojete vol 11 103 113 dibal
 
EE101 Lab4 Guillemaud
EE101 Lab4 GuillemaudEE101 Lab4 Guillemaud
EE101 Lab4 Guillemaud
 
A Study of SVC’s Impact Simulation and Analysis for Distance Protection Relay...
A Study of SVC’s Impact Simulation and Analysis for Distance Protection Relay...A Study of SVC’s Impact Simulation and Analysis for Distance Protection Relay...
A Study of SVC’s Impact Simulation and Analysis for Distance Protection Relay...
 
EEE 117L Network Analysis Laboratory Lab 1 1
EEE 117L Network Analysis Laboratory  Lab 1     1  EEE 117L Network Analysis Laboratory  Lab 1     1
EEE 117L Network Analysis Laboratory Lab 1 1
 

More from RekaNext Capital

Root cause of Magnetic Humming due to Transformer
Root cause of Magnetic Humming due to TransformerRoot cause of Magnetic Humming due to Transformer
Root cause of Magnetic Humming due to TransformerRekaNext Capital
 
Design for Product Assembly#4
Design for Product Assembly#4Design for Product Assembly#4
Design for Product Assembly#4RekaNext Capital
 
Design for Product Assembly#3
Design for Product Assembly#3Design for Product Assembly#3
Design for Product Assembly#3RekaNext Capital
 
Design for Product Assembly#2
Design for Product Assembly#2Design for Product Assembly#2
Design for Product Assembly#2RekaNext Capital
 
Henderson Bridge Report.pdf
Henderson Bridge Report.pdfHenderson Bridge Report.pdf
Henderson Bridge Report.pdfRekaNext Capital
 
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...RekaNext Capital
 
MBFC Test Report Dec2008.doc
MBFC Test Report Dec2008.docMBFC Test Report Dec2008.doc
MBFC Test Report Dec2008.docRekaNext Capital
 
Z Vibration Monitoring for pre-cast slab
Z Vibration Monitoring for pre-cast slab Z Vibration Monitoring for pre-cast slab
Z Vibration Monitoring for pre-cast slab RekaNext Capital
 
IDA Mission Critical M2M of SysEng.pdf
IDA Mission Critical M2M of SysEng.pdfIDA Mission Critical M2M of SysEng.pdf
IDA Mission Critical M2M of SysEng.pdfRekaNext Capital
 
Dr Tan Guan Hong PhD Thesis 1980.pdf
Dr Tan Guan Hong PhD Thesis 1980.pdfDr Tan Guan Hong PhD Thesis 1980.pdf
Dr Tan Guan Hong PhD Thesis 1980.pdfRekaNext Capital
 
ZigBee Personnel Tracking System
ZigBee Personnel Tracking SystemZigBee Personnel Tracking System
ZigBee Personnel Tracking SystemRekaNext Capital
 
Computer Vision for Measurement & FR
Computer Vision for Measurement & FRComputer Vision for Measurement & FR
Computer Vision for Measurement & FRRekaNext Capital
 
Business Transformation V6
Business Transformation V6Business Transformation V6
Business Transformation V6RekaNext Capital
 
Business Transformation V5
Business Transformation V5Business Transformation V5
Business Transformation V5RekaNext Capital
 
Building and Construction Authority GeoSS Seminar 2010
Building and Construction Authority GeoSS Seminar 2010Building and Construction Authority GeoSS Seminar 2010
Building and Construction Authority GeoSS Seminar 2010RekaNext Capital
 
SysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentationSysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentationRekaNext Capital
 
SysEng Environmental Projects
SysEng Environmental ProjectsSysEng Environmental Projects
SysEng Environmental ProjectsRekaNext Capital
 
SysEng Computer Vison Systems
SysEng Computer Vison SystemsSysEng Computer Vison Systems
SysEng Computer Vison SystemsRekaNext Capital
 

More from RekaNext Capital (20)

Root cause of Magnetic Humming due to Transformer
Root cause of Magnetic Humming due to TransformerRoot cause of Magnetic Humming due to Transformer
Root cause of Magnetic Humming due to Transformer
 
Design for Product Assembly#4
Design for Product Assembly#4Design for Product Assembly#4
Design for Product Assembly#4
 
Design for Product Assembly#3
Design for Product Assembly#3Design for Product Assembly#3
Design for Product Assembly#3
 
Design for Product Assembly#2
Design for Product Assembly#2Design for Product Assembly#2
Design for Product Assembly#2
 
Henderson Bridge Report.pdf
Henderson Bridge Report.pdfHenderson Bridge Report.pdf
Henderson Bridge Report.pdf
 
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...
 
MBFC Test Report Dec2008.doc
MBFC Test Report Dec2008.docMBFC Test Report Dec2008.doc
MBFC Test Report Dec2008.doc
 
Z Vibration Monitoring for pre-cast slab
Z Vibration Monitoring for pre-cast slab Z Vibration Monitoring for pre-cast slab
Z Vibration Monitoring for pre-cast slab
 
Pre-load results.ppt
Pre-load results.pptPre-load results.ppt
Pre-load results.ppt
 
IDA Mission Critical M2M of SysEng.pdf
IDA Mission Critical M2M of SysEng.pdfIDA Mission Critical M2M of SysEng.pdf
IDA Mission Critical M2M of SysEng.pdf
 
Dr Tan Guan Hong PhD Thesis 1980.pdf
Dr Tan Guan Hong PhD Thesis 1980.pdfDr Tan Guan Hong PhD Thesis 1980.pdf
Dr Tan Guan Hong PhD Thesis 1980.pdf
 
ZigBee Personnel Tracking System
ZigBee Personnel Tracking SystemZigBee Personnel Tracking System
ZigBee Personnel Tracking System
 
AV Latency Measurement
AV Latency MeasurementAV Latency Measurement
AV Latency Measurement
 
Computer Vision for Measurement & FR
Computer Vision for Measurement & FRComputer Vision for Measurement & FR
Computer Vision for Measurement & FR
 
Business Transformation V6
Business Transformation V6Business Transformation V6
Business Transformation V6
 
Business Transformation V5
Business Transformation V5Business Transformation V5
Business Transformation V5
 
Building and Construction Authority GeoSS Seminar 2010
Building and Construction Authority GeoSS Seminar 2010Building and Construction Authority GeoSS Seminar 2010
Building and Construction Authority GeoSS Seminar 2010
 
SysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentationSysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentation
 
SysEng Environmental Projects
SysEng Environmental ProjectsSysEng Environmental Projects
SysEng Environmental Projects
 
SysEng Computer Vison Systems
SysEng Computer Vison SystemsSysEng Computer Vison Systems
SysEng Computer Vison Systems
 

Recently uploaded

Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxPurva Nikam
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 

Recently uploaded (20)

Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 

Difference in Load readings between Strain Gage and Load Cell

  • 1. Problem statement:- Why there is difference between Vibrating Wire Strain Gage and Load Cell readings during pre-loading
  • 2. How does Vibrating Wire Strain Gage Work ?
  • 3. VW gage Pluck Coil Vibrating Wire Strain Gage (VWSG) Functionality
  • 4. Strain is proportional to Frequency x Frequency. A 5% error in Frequency Reading is a 25 % Strain calculation
  • 5. = (0.03% of FSD) In VWSG, we are monitoring the change in load over time. Sensitivity or Resolution is more critical than absolute level as we zero it
  • 6. y = 1.0921x + 11.065 -2000.00 -1500.00 -1000.00 -500.00 0.00 500.00 -1800 -1600 -1400 -1200 -1000 -800 -600 -400 -200 0 Computed Strain (uE) EstimatedStrain(uE) Series1 Linear (Series1) Tritech Instrument Laboratory Test Results Linear Regression of Measured vs Calculated Strain m = 1.092 C = 11.065
  • 7. Welding can cause Vibrating Wire Strain Gage Errors
  • 8. 0 500 1000 1500 2000 2500 00:00:00 12:00:00 00:00:00 12:00:00 00:00:00 12:00:00 00:00:00 12:00:00 00:00:00 12:00:00 00:00:00 12:00:00 Time Load(kN) SG Welding side SG Non Welding side Construction Impact - Welding Load increase (600kN) due to welding Welding Sudden decrease in load (400kN) due to EMI effect of welding SG on the side of welding of strut SG on the non welding side of strut Welding side
  • 9. How does Vibrating Wire Strain Load Cell Work ?
  • 10. +/- 20% is actually 40% possible difference
  • 11.
  • 12. Why use Vibrating Wire Strain Gage?
  • 13. A comparison • US $200 each • Measures less than 1% of strut cross sectional area • US $4000 each measures the full load Strain Gauges Load Cells LTA : 25% of all struts for deep excavations shall be monitored for load by strain gauge and/or load cell, and of those monitored by strain gauge 15% shall also be monitored by load cell.
  • 14. Known Documented reading differences between VWSG and Load Cell readings
  • 15. Comparison of Results between Load Cells and Strain Gauges Average 30% difference @ low load levels
  • 16. Actual VWSG and Load Cell installations. Only under ideal single strut loading (without bracing) can the readings be correlate better VWSG gives localize strain while Load Cell gives global strain
  • 17.
  • 18. Strain Gage installation Load Cell installation