The document discusses various maintenance and asset management tasks that can be performed in a plant maintenance information system, including:
1. Creating, changing, and displaying functional locations, equipment, bills of material, task lists, and object links.
2. Creating maintenance strategies, plans, orders, and evaluating work center capacity and permits.
3. Performing breakdown maintenance with or without work orders, preventative maintenance inspections and repairs, capital repair jobs, and equipment modifications.
4. Managing repair day planning, work center scheduling, and maintenance orders.
1. Create, Change and Display Functional Location and Structure the Functional Location
Create Equipment Master , Install the Equipment in the F/Locn. Check the User Status of the Equipment
Creation, Change and Display of Bill of Material (BOM). Functional Location, Equipment and Material BOM.
Create Task List - Equipment, Functional Location and General
Create Object Link for Functional locations, Equipment
Creation, Change and Display of Measuring Point & Counter
Classification of Equipments
Creation of Maintenance Strategy for Planned Maintenance
Creation of Cycle Set for Planned Maintenance
Creation of Single Cycle Plan
Creation of Strategy Based Plan(Time Based Strategy)
Creation of Multiple Counter Plan
Creation of Maintenance Order
Check Plant Maintenance Information System Reports
Work Center Capacity Evaluation and dispatching
Process of Creation / Change / Display of Permits
Activation of Work Clearance Management (WCM) from Maintenance Order and creation of Work Clearance Application
Preparing Work Clearance objects
Approving and Performing Lock Outs and Tag outs
Create, Change and Display Work center.
Breakdown Maintenance with notification only
Breakdown Maintenance with order and notification (W/O Material)
Processing of Workshop orders (Local & Central)
Breakdown Maintenance with more than one central agency
Breakdown Maintenance requiring central agency and PRT.
Preventive Maintenance with daily/weekly/monthly inspection with notification and fulfilment
Preventive Maintenance with daily/weekly/monthly inspection with order
Preventive Maintenance with weekly/fortnightly/monthly repair with central agencies.
Building and Structural Inspection
Hydraulic Cellar Maintenance Plan
Preparation of Capital Repair Total job list
Capital Repair Preparatory Jobs
Capital Repair Special Protocol Jobs
Capital Repair total job scheduling
Capital Repair total job scheduling-Agency wise
Capital Repair jobs daily progress review
Capital Repair -Crane loading chart preparation
Capital Repair -Work Clearance Management
Capital Repair -Work in Gas Pipe Line
Capacity Planning of Central Agencies for Weekly/Monthly Repair
Viewing of Job alloted to Central Agencies at their end.
Visibility of central agency capacity planning by Shop Planner for job planning
Window AC, Drinking Water Cooler & Refrigerators Maintenance
Capacity planning of Central agencies by themselves
Operation Confirmation by central Agencies at their end.
Viewing a maintenance notification & Processing (shop)
Processing of a Maint order (ZM02) by shop
2. Receiving Breakdown Notification and Processing with order (Central Agency) W/O Material
Changing an Equipment (Motor, Reducer etc) dismantling from F/L
Equipment Changeover (Status of Active / Reserve Equipments)
Repairs of spare equipments at shop-floor W/O material
Create / Manage Catalogs and Catalog Profiles
Maintenance of Cables, Pipes etc within a shop(Repair of Object Link)
Equipment Modifications
Inspection (thru' Plans) of multiple equipments in a single call object
Processing Inspection abnormalities
Creation of operational Work Clearence Document
Managing Repair day Planning and addressing Differings (Prepone /Postpone)
Work Center Scheduling for equipments (shops in scope)
Creating Maintenance Order for Checking the Limit Switches of Cranes once a month
Check the Oil Level in all the Hydraulic Cellars of Shop1 - Daily
Replacement of Mould in machine #5
Creation of Repair Order for Heat Shield of Degasser of Shop2 after 120 heats.
Creation of Repair Order for Degasser Vessel after 120 heats (Every 120 heats)
Note the water pressure of Cooling Water line on hourly Basis
Maintaining Hydraulic Cylinders usage history
Trial and Testing post major/capital repairs
Issue and track of PRT's
Preparation of task list with input from inspections