SlideShare a Scribd company logo
1 of 5
Work Clearance Management:ConfigurationGuide
Configuration:-
DefiningApplicationProfile
DefiningEnhancementModel
DefiningAdditional ApplicationforHotWork
DefiningNumberRange forWorkApproval
DefiningNumberRange forApplication
DefiningNumberRange forWC Documents
DefiningNumberRange forTags
AssigningNumberRanges
MaintainingUsage forWork Approval
DefiningDefaultUsage forWork Approval
MaintainingUsage forApplications
DefiningDefaultUsage forApplication
DefiningCode GroupforCatalogTypes - DefiningCode Group
DefiningCode GroupforCatalogTypes - DefiningCodes
DefiningCatalogProfile - Catalog
DefiningCatalogProfile - Catalogs/Code Groups
AssigningCatalogTypesandCatalogProfile
CopyingSAPScriptFormsfromClient
GeneratingPrintSettings
0 DefiningShopPapersandLayoutforPrintout
GeneratingBasicSettingforData Transfer
DefiningPermitCategories
MaintainingApprovalsforWCMObjects
MaintainingUsage forWork Clearance Documents
DefiningDefaultUsage forWork Clearance Documents
AssigningApprovals
DefiningBlockIssuingof Approval DependentonSystemStatus
DefiningHierarchyforApprovals
DefiningCross-DocumentApproval Process
ActivatingWork Clearance ManagementforMaintenance Orders
DefiningOperational Groups0
DefiningOperational Conditions0
DefiningOperational Types
MaintainingOperationalConditions(CombinedwithOperationalType)
DefiningPrintFormatforOperational Tags
MaintainingConflictRules
DefiningUserFieldProfile
DefiningWorkstationApplication
DownloadingOperationalDocumenttoLocal PC
Master Data
CreatingDocumentMasterRecordfor WCD
CreatingWorkClearance Document(WCD) Template - Header
Maintenance Screenof WCD Template
CreatingTaskList Group - Header
Creating Task List Group - Operation
Process Overview Table:-
Process step External
process
reference
Business
condition
Business role Trans-
action
code
Expected results
Creating
Maintenance
Order with
WCM
Requirement
Chemicals:
Maintenance
Specialist
IW31 Maintenance order is
created.
Creating
Work
Approval
from
Maintenance
Order
Chemicals:
Maintenance
Specialist
IW32 The work approval is
created.
Creating
Work
Clearance
Application
(WCA) from
Work
Approval
(WAP)
PM-WCM:
Maintenance
Planner
WCTB The WC application is
created
Creating an
Additional
Application
for Hot Work
from WAP
PM-WCM:
Maintenance
Planner
WCTB The application for hot
work is created.
Creating
Operational
Work
Clearance
Document
(WCD) from
WCA
PM-WCM:
Maintenance
Planner
WCTL Operational WCD is
created.
Process step External
process
reference
Business
condition
Business role Trans-
action
code
Expected results
Assigning
External
Document to
Operational
WCD
PM-WCM:
Maintenance
Planner
WCT7 External document is link to
operational WCD.
Setting WAP
to
"Prepared"
PM-WCM:
Maintenance
Planner
WCTB The WAP is set to "PREP".
Setting WCA
to
"Prepared"
PM-WCM:
Maintenance
Planner
WCTL The WCA is set to PREP.
Setting the
Hot Work
Application
to
"Prepared"
PM-WCM:
Maintenance
Planner
WCTI The Hot work is set
to Prepared
Approving
Tagging for
WCA before
Hot work is
Approved
PM-WCM:
Maintenance
Planner
WCTL The
permit YU_TAGAPRcannot
be issued if hot work has
not been approved yet.
Approving
Hot Work
Permit
PM-WCM:
Maintenance
Planner
WCTI In Hot Work, all permits are
issued and traffic light turns
green
Approving
Tagging for
WCA after
Hot Work is
Approved
PM-WCM:
Maintenance
Planner
WCTL The
permit YU_TAGAPRwas
issued.
Setting WCD
to
"Prepared"
to Start
Tagging
PM-WCM:
Maintenance
Planner
WCT7 The Operational WCD is set
to PREP.
Performing
Tagging
PM-WCM:
Maintenance
Planner
WCT7 In WCD, all permits are
issued and traffic light turns
green.
Approving
Safety
Measurement
in WCA
PM-WCM:
Maintenance
Planner
WCTL In WCA, all permits are
issued and traffic light turns
green.
Printing
Work Permit
PM-WCM:
Maintenance
Planner
WCTL The work permit is printed.
Releasing
Execution for
Work Order
Chemicals:
Maintenance
Specialist
IW32 The work order is released.
Process step External
process
reference
Business
condition
Business role Trans-
action
code
Expected results
Performing
Test Cycle
PM-WCM:
Maintenance
Planner
WCTL The test cycle is completed.
Setting Work
Order to
"Work
Completed"
Chemicals:
Maintenance
Specialist
IW32 The WOCO status is active
for the order.
Setting Work
Approval to
"Closed"
PM-WCM:
Maintenance
Planner
WCTB The WAP is set to Closed.
Setting
Application
for Hot Work
to "Closed"
PM-WCM:
Maintenance
Planner
WCTI The Hot work is set
to Closed.
Setting WCA
to "Closed"
PM-WCM:
Maintenance
Planner
WCTL The WCA is set to Closed.
Perform
Untagging
PM-WCM:
Maintenance
Planner
WCT7 Untagging is completed.
Setting WCD
to " Closed "
PM-WCM:
Maintenance
Planner
WCT7 The WCD is set
to completed.
Technically
Completing
the Order
See
Operation
Maintenance
(929)
Settling the
Order
See
Operation
Maintenance
(929)
Closing the
Order
See
Operation
Maintenance
(929)
Creating
Maintenance
Plan
Chemicals:
Maintenance
Specialist
IP41 Maintenance plan has been
created.
Scheduling
Maintenance
Plan
Chemicals:
Maintenance
Specialist
IP10 Maintenance plan has been
scheduled.
Running
Program
RIWC0016
to Generate
IT
Administrator
(Professional
User)
SE38 The planned maintenance
order with WCM control
key has generated related
WCM objects.
Process step External
process
reference
Business
condition
Business role Trans-
action
code
Expected results
WCM
Objects
Checking
Call Object
Chemicals:
Maintenance
Specialist
IP10 A work approvalis created
and then assigned to the
maintenance order
automatically.
1likes

More Related Content

What's hot

Lam config-131007234330-phpapp01
Lam config-131007234330-phpapp01Lam config-131007234330-phpapp01
Lam config-131007234330-phpapp01MaheshMamidi3
 
SAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.infoSAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.infosapdocs. info
 
SAP PM Plant Maintenance Training
SAP PM Plant Maintenance Training SAP PM Plant Maintenance Training
SAP PM Plant Maintenance Training Senthil kumar
 
Etm equipment and_tools management
Etm equipment and_tools managementEtm equipment and_tools management
Etm equipment and_tools managementPiyush Bose
 
Sap plant-maintenance-pm-business-blueprint-bbp2
Sap plant-maintenance-pm-business-blueprint-bbp2Sap plant-maintenance-pm-business-blueprint-bbp2
Sap plant-maintenance-pm-business-blueprint-bbp2gabrielsyst
 
Pm overview comprehensive_1
Pm overview comprehensive_1Pm overview comprehensive_1
Pm overview comprehensive_1Venu Vemula
 
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.infoSAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.infosapdocs. info
 
SAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCESAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCEPANKAJ TIKEKAR
 
Sap fico configuration
Sap fico configurationSap fico configuration
Sap fico configurationRanjith Patil
 
Document management in sap pm 12b
Document management in sap pm 12bDocument management in sap pm 12b
Document management in sap pm 12bGiuseppe Caselli
 
ISPM Equipment Warranty Solution for SAP
ISPM Equipment Warranty Solution for SAPISPM Equipment Warranty Solution for SAP
ISPM Equipment Warranty Solution for SAPTony Ciliberti PE
 
Framework of sap mm blueprint by pennonsoft
Framework of sap mm blueprint by pennonsoftFramework of sap mm blueprint by pennonsoft
Framework of sap mm blueprint by pennonsoftPennonSoft
 

What's hot (20)

Lam config-131007234330-phpapp01
Lam config-131007234330-phpapp01Lam config-131007234330-phpapp01
Lam config-131007234330-phpapp01
 
SAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.infoSAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.info
 
Pm kds..
Pm kds..Pm kds..
Pm kds..
 
SAP PM Plant Maintenance Training
SAP PM Plant Maintenance Training SAP PM Plant Maintenance Training
SAP PM Plant Maintenance Training
 
Etm equipment and_tools management
Etm equipment and_tools managementEtm equipment and_tools management
Etm equipment and_tools management
 
Sap plant-maintenance-pm-business-blueprint-bbp2
Sap plant-maintenance-pm-business-blueprint-bbp2Sap plant-maintenance-pm-business-blueprint-bbp2
Sap plant-maintenance-pm-business-blueprint-bbp2
 
SAP PM
SAP PMSAP PM
SAP PM
 
SAP PM: Test Equipment Management/Calibration process
SAP PM: Test Equipment Management/Calibration processSAP PM: Test Equipment Management/Calibration process
SAP PM: Test Equipment Management/Calibration process
 
Sap pm test scripts
Sap pm test scriptsSap pm test scripts
Sap pm test scripts
 
Org structure SAP
Org structure SAPOrg structure SAP
Org structure SAP
 
Pm overview comprehensive_1
Pm overview comprehensive_1Pm overview comprehensive_1
Pm overview comprehensive_1
 
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.infoSAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
 
SAP Plant Maintenance.pptx
SAP Plant Maintenance.pptxSAP Plant Maintenance.pptx
SAP Plant Maintenance.pptx
 
SAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCESAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCE
 
Sap fico configuration
Sap fico configurationSap fico configuration
Sap fico configuration
 
Sap plant maintenance
Sap plant maintenanceSap plant maintenance
Sap plant maintenance
 
Document management in sap pm 12b
Document management in sap pm 12bDocument management in sap pm 12b
Document management in sap pm 12b
 
ISPM Equipment Warranty Solution for SAP
ISPM Equipment Warranty Solution for SAPISPM Equipment Warranty Solution for SAP
ISPM Equipment Warranty Solution for SAP
 
Sap plant maintenance
Sap plant maintenanceSap plant maintenance
Sap plant maintenance
 
Framework of sap mm blueprint by pennonsoft
Framework of sap mm blueprint by pennonsoftFramework of sap mm blueprint by pennonsoft
Framework of sap mm blueprint by pennonsoft
 

Similar to Work clearance management config and steps

Venkateswarlu Thandlam_SAP
Venkateswarlu Thandlam_SAPVenkateswarlu Thandlam_SAP
Venkateswarlu Thandlam_SAPpradeepthota
 
The New CA Vantage™ Storage Resource Manager Storage Management Like You’ve N...
The New CA Vantage™ Storage Resource Manager Storage Management Like You’ve N...The New CA Vantage™ Storage Resource Manager Storage Management Like You’ve N...
The New CA Vantage™ Storage Resource Manager Storage Management Like You’ve N...CA Technologies
 
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...VMworld
 
WebSphere Technical University: Top WebSphere Problem Determination Features
WebSphere Technical University: Top WebSphere Problem Determination FeaturesWebSphere Technical University: Top WebSphere Problem Determination Features
WebSphere Technical University: Top WebSphere Problem Determination FeaturesChris Bailey
 
Orcanos QPack ALM Tool
Orcanos QPack ALM ToolOrcanos QPack ALM Tool
Orcanos QPack ALM Toolorcanos
 
Hands-On Lab: Managing and Monitoring Node.js Made Easy with CA Application P...
Hands-On Lab: Managing and Monitoring Node.js Made Easy with CA Application P...Hands-On Lab: Managing and Monitoring Node.js Made Easy with CA Application P...
Hands-On Lab: Managing and Monitoring Node.js Made Easy with CA Application P...CA Technologies
 
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...VMworld
 
Craig Williams Resume_rev3
Craig Williams Resume_rev3Craig Williams Resume_rev3
Craig Williams Resume_rev3Craig Williams
 
Deep Dive Series #3: Schema Validation + Structured Audit Logs
Deep Dive Series #3: Schema Validation + Structured Audit LogsDeep Dive Series #3: Schema Validation + Structured Audit Logs
Deep Dive Series #3: Schema Validation + Structured Audit Logsconfluent
 
Maximizing Your CA Datacom® Investment for the New Application Economy (Part 2)
Maximizing Your CA Datacom® Investment for the New Application Economy (Part 2)Maximizing Your CA Datacom® Investment for the New Application Economy (Part 2)
Maximizing Your CA Datacom® Investment for the New Application Economy (Part 2)CA Technologies
 
ABAP Test Cockpit in action with Doctor ZedGe and abap2xlsx
ABAP Test Cockpit in action with Doctor ZedGe and abap2xlsxABAP Test Cockpit in action with Doctor ZedGe and abap2xlsx
ABAP Test Cockpit in action with Doctor ZedGe and abap2xlsxIvan Femia
 
Bringing the JAMstack to the Enterprise
Bringing the JAMstack to the EnterpriseBringing the JAMstack to the Enterprise
Bringing the JAMstack to the EnterpriseJamund Ferguson
 
Sue Keohan presents at BPX Day: Successful Collaboration between Business and IT
Sue Keohan presents at BPX Day: Successful Collaboration between Business and ITSue Keohan presents at BPX Day: Successful Collaboration between Business and IT
Sue Keohan presents at BPX Day: Successful Collaboration between Business and ITMarilyn Pratt
 

Similar to Work clearance management config and steps (20)

Venkateswarlu Thandlam_SAP
Venkateswarlu Thandlam_SAPVenkateswarlu Thandlam_SAP
Venkateswarlu Thandlam_SAP
 
The New CA Vantage™ Storage Resource Manager Storage Management Like You’ve N...
The New CA Vantage™ Storage Resource Manager Storage Management Like You’ve N...The New CA Vantage™ Storage Resource Manager Storage Management Like You’ve N...
The New CA Vantage™ Storage Resource Manager Storage Management Like You’ve N...
 
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
 
Testing Process
Testing ProcessTesting Process
Testing Process
 
Clients in sap
Clients in sapClients in sap
Clients in sap
 
Puppet on a string
Puppet on a stringPuppet on a string
Puppet on a string
 
WebSphere Technical University: Top WebSphere Problem Determination Features
WebSphere Technical University: Top WebSphere Problem Determination FeaturesWebSphere Technical University: Top WebSphere Problem Determination Features
WebSphere Technical University: Top WebSphere Problem Determination Features
 
Orcanos QPack ALM Tool
Orcanos QPack ALM ToolOrcanos QPack ALM Tool
Orcanos QPack ALM Tool
 
QSpiders - Installation and Brief Dose of Load Runner
QSpiders - Installation and Brief Dose of Load RunnerQSpiders - Installation and Brief Dose of Load Runner
QSpiders - Installation and Brief Dose of Load Runner
 
Gowtham_resume
Gowtham_resumeGowtham_resume
Gowtham_resume
 
Hands-On Lab: Managing and Monitoring Node.js Made Easy with CA Application P...
Hands-On Lab: Managing and Monitoring Node.js Made Easy with CA Application P...Hands-On Lab: Managing and Monitoring Node.js Made Easy with CA Application P...
Hands-On Lab: Managing and Monitoring Node.js Made Easy with CA Application P...
 
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
 
Craig Williams Resume_rev3
Craig Williams Resume_rev3Craig Williams Resume_rev3
Craig Williams Resume_rev3
 
Deep Dive Series #3: Schema Validation + Structured Audit Logs
Deep Dive Series #3: Schema Validation + Structured Audit LogsDeep Dive Series #3: Schema Validation + Structured Audit Logs
Deep Dive Series #3: Schema Validation + Structured Audit Logs
 
Maximizing Your CA Datacom® Investment for the New Application Economy (Part 2)
Maximizing Your CA Datacom® Investment for the New Application Economy (Part 2)Maximizing Your CA Datacom® Investment for the New Application Economy (Part 2)
Maximizing Your CA Datacom® Investment for the New Application Economy (Part 2)
 
Workflow Automation in SolidWorks Enterprise PDM
Workflow Automation in SolidWorks Enterprise PDMWorkflow Automation in SolidWorks Enterprise PDM
Workflow Automation in SolidWorks Enterprise PDM
 
ABAP Test Cockpit in action with Doctor ZedGe and abap2xlsx
ABAP Test Cockpit in action with Doctor ZedGe and abap2xlsxABAP Test Cockpit in action with Doctor ZedGe and abap2xlsx
ABAP Test Cockpit in action with Doctor ZedGe and abap2xlsx
 
Bringing the JAMstack to the Enterprise
Bringing the JAMstack to the EnterpriseBringing the JAMstack to the Enterprise
Bringing the JAMstack to the Enterprise
 
Scott McParland 2016
Scott McParland 2016Scott McParland 2016
Scott McParland 2016
 
Sue Keohan presents at BPX Day: Successful Collaboration between Business and IT
Sue Keohan presents at BPX Day: Successful Collaboration between Business and ITSue Keohan presents at BPX Day: Successful Collaboration between Business and IT
Sue Keohan presents at BPX Day: Successful Collaboration between Business and IT
 

Recently uploaded

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 

Recently uploaded (20)

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 

Work clearance management config and steps

  • 1. Work Clearance Management:ConfigurationGuide Configuration:- DefiningApplicationProfile DefiningEnhancementModel DefiningAdditional ApplicationforHotWork DefiningNumberRange forWorkApproval DefiningNumberRange forApplication DefiningNumberRange forWC Documents DefiningNumberRange forTags AssigningNumberRanges MaintainingUsage forWork Approval DefiningDefaultUsage forWork Approval MaintainingUsage forApplications DefiningDefaultUsage forApplication DefiningCode GroupforCatalogTypes - DefiningCode Group DefiningCode GroupforCatalogTypes - DefiningCodes DefiningCatalogProfile - Catalog DefiningCatalogProfile - Catalogs/Code Groups AssigningCatalogTypesandCatalogProfile CopyingSAPScriptFormsfromClient GeneratingPrintSettings 0 DefiningShopPapersandLayoutforPrintout GeneratingBasicSettingforData Transfer DefiningPermitCategories MaintainingApprovalsforWCMObjects MaintainingUsage forWork Clearance Documents DefiningDefaultUsage forWork Clearance Documents AssigningApprovals DefiningBlockIssuingof Approval DependentonSystemStatus DefiningHierarchyforApprovals DefiningCross-DocumentApproval Process ActivatingWork Clearance ManagementforMaintenance Orders DefiningOperational Groups0 DefiningOperational Conditions0 DefiningOperational Types MaintainingOperationalConditions(CombinedwithOperationalType)
  • 2. DefiningPrintFormatforOperational Tags MaintainingConflictRules DefiningUserFieldProfile DefiningWorkstationApplication DownloadingOperationalDocumenttoLocal PC Master Data CreatingDocumentMasterRecordfor WCD CreatingWorkClearance Document(WCD) Template - Header Maintenance Screenof WCD Template CreatingTaskList Group - Header Creating Task List Group - Operation Process Overview Table:- Process step External process reference Business condition Business role Trans- action code Expected results Creating Maintenance Order with WCM Requirement Chemicals: Maintenance Specialist IW31 Maintenance order is created. Creating Work Approval from Maintenance Order Chemicals: Maintenance Specialist IW32 The work approval is created. Creating Work Clearance Application (WCA) from Work Approval (WAP) PM-WCM: Maintenance Planner WCTB The WC application is created Creating an Additional Application for Hot Work from WAP PM-WCM: Maintenance Planner WCTB The application for hot work is created. Creating Operational Work Clearance Document (WCD) from WCA PM-WCM: Maintenance Planner WCTL Operational WCD is created.
  • 3. Process step External process reference Business condition Business role Trans- action code Expected results Assigning External Document to Operational WCD PM-WCM: Maintenance Planner WCT7 External document is link to operational WCD. Setting WAP to "Prepared" PM-WCM: Maintenance Planner WCTB The WAP is set to "PREP". Setting WCA to "Prepared" PM-WCM: Maintenance Planner WCTL The WCA is set to PREP. Setting the Hot Work Application to "Prepared" PM-WCM: Maintenance Planner WCTI The Hot work is set to Prepared Approving Tagging for WCA before Hot work is Approved PM-WCM: Maintenance Planner WCTL The permit YU_TAGAPRcannot be issued if hot work has not been approved yet. Approving Hot Work Permit PM-WCM: Maintenance Planner WCTI In Hot Work, all permits are issued and traffic light turns green Approving Tagging for WCA after Hot Work is Approved PM-WCM: Maintenance Planner WCTL The permit YU_TAGAPRwas issued. Setting WCD to "Prepared" to Start Tagging PM-WCM: Maintenance Planner WCT7 The Operational WCD is set to PREP. Performing Tagging PM-WCM: Maintenance Planner WCT7 In WCD, all permits are issued and traffic light turns green. Approving Safety Measurement in WCA PM-WCM: Maintenance Planner WCTL In WCA, all permits are issued and traffic light turns green. Printing Work Permit PM-WCM: Maintenance Planner WCTL The work permit is printed. Releasing Execution for Work Order Chemicals: Maintenance Specialist IW32 The work order is released.
  • 4. Process step External process reference Business condition Business role Trans- action code Expected results Performing Test Cycle PM-WCM: Maintenance Planner WCTL The test cycle is completed. Setting Work Order to "Work Completed" Chemicals: Maintenance Specialist IW32 The WOCO status is active for the order. Setting Work Approval to "Closed" PM-WCM: Maintenance Planner WCTB The WAP is set to Closed. Setting Application for Hot Work to "Closed" PM-WCM: Maintenance Planner WCTI The Hot work is set to Closed. Setting WCA to "Closed" PM-WCM: Maintenance Planner WCTL The WCA is set to Closed. Perform Untagging PM-WCM: Maintenance Planner WCT7 Untagging is completed. Setting WCD to " Closed " PM-WCM: Maintenance Planner WCT7 The WCD is set to completed. Technically Completing the Order See Operation Maintenance (929) Settling the Order See Operation Maintenance (929) Closing the Order See Operation Maintenance (929) Creating Maintenance Plan Chemicals: Maintenance Specialist IP41 Maintenance plan has been created. Scheduling Maintenance Plan Chemicals: Maintenance Specialist IP10 Maintenance plan has been scheduled. Running Program RIWC0016 to Generate IT Administrator (Professional User) SE38 The planned maintenance order with WCM control key has generated related WCM objects.
  • 5. Process step External process reference Business condition Business role Trans- action code Expected results WCM Objects Checking Call Object Chemicals: Maintenance Specialist IP10 A work approvalis created and then assigned to the maintenance order automatically. 1likes