SlideShare a Scribd company logo
1 of 3
AnishVikram
Address for Correspondence:
20-21, RZ-B,
Vishwas Park, Uttam Nagar,
New Delhi-110059(Delhi), India
Phone : +91 7053456331,9557698781
Email : anishrajput2010@gmail.com
To be a progressive part of Petroleum and Gas engineering field and to increase my knowledge, skills and experience and
contribute for the advancement of the industry along with my career growth.
Presently workingas Drill Log Analyst with Real Time Operation Company I.e. MOBLIZE INC., . Joined on 1st July, 2014 .
Job Responsibilities:
 Monitor & EvaluateReal time operation data Likewise; Real time log,DrillingDepth log & DrillingTimelog,
MWD & LWD Survey.
 Resolve by usingPhone, E-mail support & Technical supportto Clients duringtroubles related to real time
data of DrillingRigoperations.Resolving& Troubleshoot WITS and WITSML data issues duringthe shift.
 Monitoringof various plots likeTool Face, Connection, Torque/Drag and logs likeTime and depth to ensure
they are updatingproperly and all values arein range.
 Keep a track on all wells and maintain a record for each well spud. Co-ordinatewith the configuration team
to ensure a system Rig Up/configuringof well for monitoringpurpose on ProACT. Record the new
information/updateRegarding Resolution,Service Provider Change, rigmoved to other region.
 Proactivemonitoringof all wells to catch issues and informClientas and when necessary.
 UsingGateway Console& Darp Directsoftware duringRig-Up & Sync Time-Depth log.
CAREER OBJECTIVE
ACADEMIC BACKGROUND
Year(s)
Qualification – Degree /
Diploma / Certificate
Board/University
College
/ Institute/ University
Percentage /
CGPA
2010-2014
B. Tech Applied petroleum
Engineering(Specialization in
Gas)
University of Petroleum
and Energy Studies,
Dehradun
College of Engineering
Studies
2.21/4
2009 Class XII CBSE
Indian Public School,
Hajipur
67.6
2007 Class X CBSE
Indian Public School,
Hajipur
91.6
WORK EXPERIENCE
 Well Log Interpretation & Litho logy Interpretation of Active Exploration & Production Rigs,Inform to Client
as per requirements.
 Perform & Use different Information Technological Tasks;Webmail,LogmeIn, Darp Direct, Gateway
Console,ProTRAC, , Log Viewer, Outlook, lync,Dude etc.
 Deliver a Handover to Reliever which involves tellinghimaboutnew issues observed duringmonitoringand
followup of ExistingIssues.
SUMMER INTERNSHIP PROJECT 1: Duration: 3 weeks
Institution: ONGC Mehsana Asset
Project Title: Directional Drilling at ONGC Cambay Basin Onshore, Mehsana Asset.
Description:
 Observed how a well is given direction and sidetracked usingdown-hole mud motor and time drillingrespectively
and surveyingof the well path via magnetic multi shotsurvey tool.
 Learnt about the basic well planning(derivation of Lprofileand survey calculation usingaverageanglemethod) and
applied itto the well data of 3 wells and the comparison of the resultwas done.
 Analyzed the survey data of 3 wells and learntabout how changes in parameters (Weight on bit, RPM) aremade in
order to achievethe planned well path.
 Spent several days atthe rigand observed various operations as rotary drilling, Pull out opera tion, cementation and
acted as a roughneck and removed 4 stands of drill pipe during the pull out operation.
SUMMER INTERNSHIP PROJECT 2:
Institution: ONGC URAN PLANT
Project Title: OVERVIEW OF GAS PROCESSING PLANT & ACID GAS TREATMENT
Description: Gas from Onshore terminal is sent by a 26” submarine pipeline. The plant is used to clean up the gas from the
terminal to the plant using an expanded slug catcher. In terms of a balanced gas supply, it is important to clean up
the gas before sending it to the customers. At Uran Plant I observed and understood the basics of process plant,
utilities,environment system, and safety system. And different processes carried outfor crude stabilization, storage,
LPG recovery and processing, co-generation plant ,slug catcher unit, condensate fraction unit, gas sweetening unit,
ethane propane recovery unit and treatment of acid gas using various methods like absorption, adsorption,
permeation, and chemical conversions.
INDUSTRIAL TOURS
 GGS ( Group Gathering Station) , Sobhasna , Mehsana Asset ( Cambay Basin)
 ETP ( Effluent Treatment Plant),Sobhasna,Mehsana,(Cambay Basin)
 GGS (Group Gathering Station), Padra,Vadodra.
 Work Over Rig, Vadodra.
 Logging, Drilling, Casing tool yard, Mehsana.( Cambay Basin)
PROJECTS UNDERTAKEN:
 Project Topic: Artificial Gas lift
Institute: UPES, Dehradun
 Project Topic: Designing & Simulation of Crude distillation unit( CDU)
Institute: UPES,Dehradun
TRAININGS & PROJECTS UNDERTAKEN
ACADEMIC / EXTRA CURRICULAR ACHIEVEMENTS
 Presented a technical poster on “Photoelectric Effects”at UPES Campus on Physics day 2011.
 Presented a technical paper on “Prospects of Biofuels in India” at MNNIT Allahabad on Sept.23,2011.
 Organized an event “Atulya Bharat” at annual cultural festof University on October,2011.
 Organized an event “Intellectual Battle Ground” atUPES Campus on Engineers day,2012.
 An activemember of SPE Student Chapter.
 An activemember of PETROTECH Student Chapter.
Languages: C, C++
Software’s: MS Office (MS Word, MS Excel, MS Power Point), Solid-works Professional 2010, Aspen Plus.
Date of Birth (DD-MM-YYYY) : 26-02-1993
Father’s Name : Mr. Satish Kumar Singh
Mother’s Name : Mrs. Anima Singh
Category : General
Gender : Male
Nationality : Indian
Home Town : Hajipur
Permanent Address : Laxmi Nagar, near Shankar Talkies, Hajipur, District: Vaishali
Permanent Phone No. : +91 9771259089
Languages Known : Hindi and English
Mobility : Willing to relocate anywhere in India and overseas.
COMPUTER SKILLS
PERSONAL DETAILS

More Related Content

What's hot

K5 4 Wells Portal Success Story
K5 4 Wells Portal Success StoryK5 4 Wells Portal Success Story
K5 4 Wells Portal Success StoryDaljit Brar
 
updated Trupti Goswami_Resume 281015
updated Trupti Goswami_Resume 281015updated Trupti Goswami_Resume 281015
updated Trupti Goswami_Resume 281015Trupti Goswami
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.walaa ahmed ahmed attiia
 
IRJET- Study on Behaviour of Geopolymer Concrete by using Digital Image Corre...
IRJET- Study on Behaviour of Geopolymer Concrete by using Digital Image Corre...IRJET- Study on Behaviour of Geopolymer Concrete by using Digital Image Corre...
IRJET- Study on Behaviour of Geopolymer Concrete by using Digital Image Corre...IRJET Journal
 
ES&T - HDD as GSR Feature
ES&T - HDD as GSR FeatureES&T - HDD as GSR Feature
ES&T - HDD as GSR FeatureMike Lubrecht
 
CV_Jagannath Hosmani_10May2016
CV_Jagannath Hosmani_10May2016CV_Jagannath Hosmani_10May2016
CV_Jagannath Hosmani_10May2016Jagannath Hosmani
 

What's hot (12)

K5 4 Wells Portal Success Story
K5 4 Wells Portal Success StoryK5 4 Wells Portal Success Story
K5 4 Wells Portal Success Story
 
EWSO
EWSOEWSO
EWSO
 
updated Trupti Goswami_Resume 281015
updated Trupti Goswami_Resume 281015updated Trupti Goswami_Resume 281015
updated Trupti Goswami_Resume 281015
 
Trebble CV 2016
Trebble CV 2016Trebble CV 2016
Trebble CV 2016
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.
 
ERICK RENALDI REZAL CV
ERICK RENALDI REZAL CVERICK RENALDI REZAL CV
ERICK RENALDI REZAL CV
 
Dana Medway HR
Dana Medway HRDana Medway HR
Dana Medway HR
 
PClayton_accomplishments
PClayton_accomplishmentsPClayton_accomplishments
PClayton_accomplishments
 
MOHAMED HELMY_CV_2016_UPDATED
MOHAMED HELMY_CV_2016_UPDATED MOHAMED HELMY_CV_2016_UPDATED
MOHAMED HELMY_CV_2016_UPDATED
 
IRJET- Study on Behaviour of Geopolymer Concrete by using Digital Image Corre...
IRJET- Study on Behaviour of Geopolymer Concrete by using Digital Image Corre...IRJET- Study on Behaviour of Geopolymer Concrete by using Digital Image Corre...
IRJET- Study on Behaviour of Geopolymer Concrete by using Digital Image Corre...
 
ES&T - HDD as GSR Feature
ES&T - HDD as GSR FeatureES&T - HDD as GSR Feature
ES&T - HDD as GSR Feature
 
CV_Jagannath Hosmani_10May2016
CV_Jagannath Hosmani_10May2016CV_Jagannath Hosmani_10May2016
CV_Jagannath Hosmani_10May2016
 

Similar to anish vikram CV exp 6 months

Kelvin - Geophysical - Formal
Kelvin - Geophysical - FormalKelvin - Geophysical - Formal
Kelvin - Geophysical - FormalKelvin Soice
 
Mohamed Shady_C.V_Jan. 2016
Mohamed Shady_C.V_Jan. 2016Mohamed Shady_C.V_Jan. 2016
Mohamed Shady_C.V_Jan. 2016Mohamed Shady
 
Mesbah_Elazrig_Sr Drilling Eng
Mesbah_Elazrig_Sr Drilling EngMesbah_Elazrig_Sr Drilling Eng
Mesbah_Elazrig_Sr Drilling EngMesbah Elazrig
 
George Soliman Basta-CV
George Soliman Basta-CVGeorge Soliman Basta-CV
George Soliman Basta-CVGeorge Basta
 
Vikas_Bajpai_090915
Vikas_Bajpai_090915Vikas_Bajpai_090915
Vikas_Bajpai_090915Vikas Bajpai
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CVAli Khidr
 
Kenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) UpdatedKenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) UpdatedKenneth Ezeukwu
 
Lewis Chapman Resume
Lewis Chapman ResumeLewis Chapman Resume
Lewis Chapman ResumeLewis Chapman
 
Goliat Field Trip
Goliat Field TripGoliat Field Trip
Goliat Field TripEni
 
0.1 Muaz Hassan Resume
0.1 Muaz Hassan  Resume0.1 Muaz Hassan  Resume
0.1 Muaz Hassan ResumeMuaz Hassan
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh
 

Similar to anish vikram CV exp 6 months (20)

Kelvin - Geophysical - Formal
Kelvin - Geophysical - FormalKelvin - Geophysical - Formal
Kelvin - Geophysical - Formal
 
HaithaM Al-Arabi Resume
HaithaM Al-Arabi ResumeHaithaM Al-Arabi Resume
HaithaM Al-Arabi Resume
 
Mohamed Shady_C.V_Jan. 2016
Mohamed Shady_C.V_Jan. 2016Mohamed Shady_C.V_Jan. 2016
Mohamed Shady_C.V_Jan. 2016
 
Mesbah_Elazrig_Sr Drilling Eng
Mesbah_Elazrig_Sr Drilling EngMesbah_Elazrig_Sr Drilling Eng
Mesbah_Elazrig_Sr Drilling Eng
 
My Resume
My ResumeMy Resume
My Resume
 
George Soliman Basta-CV
George Soliman Basta-CVGeorge Soliman Basta-CV
George Soliman Basta-CV
 
Vikas_Bajpai_090915
Vikas_Bajpai_090915Vikas_Bajpai_090915
Vikas_Bajpai_090915
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CV
 
RESUME SAMI RASSAS
RESUME SAMI RASSASRESUME SAMI RASSAS
RESUME SAMI RASSAS
 
Danish Khan CV
Danish Khan CVDanish Khan CV
Danish Khan CV
 
Austin Okwordu CV PDF
Austin Okwordu CV PDFAustin Okwordu CV PDF
Austin Okwordu CV PDF
 
Kenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) UpdatedKenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) Updated
 
Lewis Chapman Resume
Lewis Chapman ResumeLewis Chapman Resume
Lewis Chapman Resume
 
Resume Leyla Clothier
Resume Leyla ClothierResume Leyla Clothier
Resume Leyla Clothier
 
CeeVee-10th January 2017_update
CeeVee-10th January 2017_updateCeeVee-10th January 2017_update
CeeVee-10th January 2017_update
 
Goliat Field Trip
Goliat Field TripGoliat Field Trip
Goliat Field Trip
 
0.1 Muaz Hassan Resume
0.1 Muaz Hassan  Resume0.1 Muaz Hassan  Resume
0.1 Muaz Hassan Resume
 
CV Seismic
CV SeismicCV Seismic
CV Seismic
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gas
 
Saurabh_Saksena-Resume
Saurabh_Saksena-ResumeSaurabh_Saksena-Resume
Saurabh_Saksena-Resume
 

anish vikram CV exp 6 months

  • 1. AnishVikram Address for Correspondence: 20-21, RZ-B, Vishwas Park, Uttam Nagar, New Delhi-110059(Delhi), India Phone : +91 7053456331,9557698781 Email : anishrajput2010@gmail.com To be a progressive part of Petroleum and Gas engineering field and to increase my knowledge, skills and experience and contribute for the advancement of the industry along with my career growth. Presently workingas Drill Log Analyst with Real Time Operation Company I.e. MOBLIZE INC., . Joined on 1st July, 2014 . Job Responsibilities:  Monitor & EvaluateReal time operation data Likewise; Real time log,DrillingDepth log & DrillingTimelog, MWD & LWD Survey.  Resolve by usingPhone, E-mail support & Technical supportto Clients duringtroubles related to real time data of DrillingRigoperations.Resolving& Troubleshoot WITS and WITSML data issues duringthe shift.  Monitoringof various plots likeTool Face, Connection, Torque/Drag and logs likeTime and depth to ensure they are updatingproperly and all values arein range.  Keep a track on all wells and maintain a record for each well spud. Co-ordinatewith the configuration team to ensure a system Rig Up/configuringof well for monitoringpurpose on ProACT. Record the new information/updateRegarding Resolution,Service Provider Change, rigmoved to other region.  Proactivemonitoringof all wells to catch issues and informClientas and when necessary.  UsingGateway Console& Darp Directsoftware duringRig-Up & Sync Time-Depth log. CAREER OBJECTIVE ACADEMIC BACKGROUND Year(s) Qualification – Degree / Diploma / Certificate Board/University College / Institute/ University Percentage / CGPA 2010-2014 B. Tech Applied petroleum Engineering(Specialization in Gas) University of Petroleum and Energy Studies, Dehradun College of Engineering Studies 2.21/4 2009 Class XII CBSE Indian Public School, Hajipur 67.6 2007 Class X CBSE Indian Public School, Hajipur 91.6 WORK EXPERIENCE
  • 2.  Well Log Interpretation & Litho logy Interpretation of Active Exploration & Production Rigs,Inform to Client as per requirements.  Perform & Use different Information Technological Tasks;Webmail,LogmeIn, Darp Direct, Gateway Console,ProTRAC, , Log Viewer, Outlook, lync,Dude etc.  Deliver a Handover to Reliever which involves tellinghimaboutnew issues observed duringmonitoringand followup of ExistingIssues. SUMMER INTERNSHIP PROJECT 1: Duration: 3 weeks Institution: ONGC Mehsana Asset Project Title: Directional Drilling at ONGC Cambay Basin Onshore, Mehsana Asset. Description:  Observed how a well is given direction and sidetracked usingdown-hole mud motor and time drillingrespectively and surveyingof the well path via magnetic multi shotsurvey tool.  Learnt about the basic well planning(derivation of Lprofileand survey calculation usingaverageanglemethod) and applied itto the well data of 3 wells and the comparison of the resultwas done.  Analyzed the survey data of 3 wells and learntabout how changes in parameters (Weight on bit, RPM) aremade in order to achievethe planned well path.  Spent several days atthe rigand observed various operations as rotary drilling, Pull out opera tion, cementation and acted as a roughneck and removed 4 stands of drill pipe during the pull out operation. SUMMER INTERNSHIP PROJECT 2: Institution: ONGC URAN PLANT Project Title: OVERVIEW OF GAS PROCESSING PLANT & ACID GAS TREATMENT Description: Gas from Onshore terminal is sent by a 26” submarine pipeline. The plant is used to clean up the gas from the terminal to the plant using an expanded slug catcher. In terms of a balanced gas supply, it is important to clean up the gas before sending it to the customers. At Uran Plant I observed and understood the basics of process plant, utilities,environment system, and safety system. And different processes carried outfor crude stabilization, storage, LPG recovery and processing, co-generation plant ,slug catcher unit, condensate fraction unit, gas sweetening unit, ethane propane recovery unit and treatment of acid gas using various methods like absorption, adsorption, permeation, and chemical conversions. INDUSTRIAL TOURS  GGS ( Group Gathering Station) , Sobhasna , Mehsana Asset ( Cambay Basin)  ETP ( Effluent Treatment Plant),Sobhasna,Mehsana,(Cambay Basin)  GGS (Group Gathering Station), Padra,Vadodra.  Work Over Rig, Vadodra.  Logging, Drilling, Casing tool yard, Mehsana.( Cambay Basin) PROJECTS UNDERTAKEN:  Project Topic: Artificial Gas lift Institute: UPES, Dehradun  Project Topic: Designing & Simulation of Crude distillation unit( CDU) Institute: UPES,Dehradun TRAININGS & PROJECTS UNDERTAKEN ACADEMIC / EXTRA CURRICULAR ACHIEVEMENTS
  • 3.  Presented a technical poster on “Photoelectric Effects”at UPES Campus on Physics day 2011.  Presented a technical paper on “Prospects of Biofuels in India” at MNNIT Allahabad on Sept.23,2011.  Organized an event “Atulya Bharat” at annual cultural festof University on October,2011.  Organized an event “Intellectual Battle Ground” atUPES Campus on Engineers day,2012.  An activemember of SPE Student Chapter.  An activemember of PETROTECH Student Chapter. Languages: C, C++ Software’s: MS Office (MS Word, MS Excel, MS Power Point), Solid-works Professional 2010, Aspen Plus. Date of Birth (DD-MM-YYYY) : 26-02-1993 Father’s Name : Mr. Satish Kumar Singh Mother’s Name : Mrs. Anima Singh Category : General Gender : Male Nationality : Indian Home Town : Hajipur Permanent Address : Laxmi Nagar, near Shankar Talkies, Hajipur, District: Vaishali Permanent Phone No. : +91 9771259089 Languages Known : Hindi and English Mobility : Willing to relocate anywhere in India and overseas. COMPUTER SKILLS PERSONAL DETAILS