1. Francisco Quintana
Project / Construction Manager
Select Project Experience:
Universidad del Este, Carolina, PR, Biblioteca y Anfiteatro Jesus T. Piñero
Project Manager for the Construction of a 22,000 sq ft building. Library,
Offices, Amphitheater, facilities are distributed in this new concrete
structure.
Cooper Vision Expansion Project West Wing, Juana Diaz, PR
Construction Manager for the construction phase of a 96,000 SF. Packaging
& Warehouse, Offices expansion plant under a construction management
contract.
Universidad del Turabo, Caguas, PR, Construction of Building
Project Manager for the Construction of a 20,150 sq ft building. 15
classrooms and laboratory facilities are distributed I n this new concrete
structure.
Universidad del Turabo, Caguas, PR, Library And Museum Pedro Rosello
Project Manager for the Construction of a 12,150 sq ft building. Library and
Museum facilities are distributed in this new concrete structure.
Army Reserve Training Facility, Juana Diaz, PR
Presently Senior Project Manager for this $2.5 million training facility. The
scope of works for this project includes Site-Works, Foundations and Tilt-up
panels. With a construction schedule of 9 months this facility, located at
Fort Allen Army base, will be used to train Army reserve members.
W Retreat and Spa, Vieques Island
W Retreat & Spa is a 156 guestroom five star hotel located in Vieques, PR. It
consists of approximately 195,000 SF of air conditioned space. The Hotel
facility compromise of nine (9) Guestroom buildings, seven (7) Villa buildings,
Great House (Lobby, Restaurant, Kitchen, Guest Bar, and Convention
Center/Meeting Rooms), SPA, Gym, Bodega and Kids area, and Airport
Lounge area). In addition, the property will boast the provision of two (2)
pools and pool grill area.
North Tract Shell, Caguas
A 68,600 SF shell building to house Best Buy (Retail A) and Office Depot
(Retail B) at Las Catalinas North Tract in Caguas, PR. The Shell Building
Structure consists of concrete tilt-up panels with structural steel/metal deck
and buildup roofing. The project’s aggressive 5 months schedule was
achieved through close coordination with the owner, designer and Aireko.
San Juan Industrial Park Building A, San Juan
Project Manager for the construction of a 96,000 sf warehouse building
consisting of structural steel framing and standing seam roof with 15’ high
concrete cast-in-place walls and metal siding.
University Gardens High School, San Juan
Project Manager for this six building campus facility carefully built within a
50-year old residential community in the San Juan Metro area. Extensive use
of architectural exposed concrete is a design highlight of this specialized
Math and Sciences school in PR.
Name:
Francisco Quintana Anzures
Experience:
35 years Total Construction
Experience
13 years with Aireko Construction in
Puerto Rico, plus 2 years in Mexico
Experience Highlights
Extensive experience in preparing
estimates, planning, cost control,
hotels, and industrial sectors, health
care construction, management of
multidisciplinary projects, and
project controls manager in the
Mexican and Puerto Rican
construction market.
Education
“Escuela Superior de Ingeniería y
Arquitectura IPN” “Unidad
profesional Tecamachalco, Mexico
1978, Engineer Architect Title
Phone:
787-381-0522, 787-420-2104
2. Francisco Quintana
Project / Construction Manager
Cooper Vision Phase B, Juana Diaz
Project Engneer for this $4MM MEP and architectural interiors expansion to
add manufacturing equipment for contact lenses.
Ocular Sciences Expansion Project Phase A, Juana Diaz
Project Engineer for the construction phase of a 56,000SF clean room
manufacturing and 10,000 sf office expansion plant under a construction
management contract.
Wyeth Packaging and Filling Project, Mexico City
Superintendent for this construction management project that entailed
the conversion of an existing 10,500SF warehouse area into a production
area for new packaging lines. Wyeth’s standards were accomplished
using a combined team with AMS expertise, and local talent.
Wyeth New Warehouse Project, Mexico City
Directed this CM project consisting of a new 40,000SF nine-pallet high,
super flat floor warehouse construction at Wyeth’s Mexico City
manufacturing facility, included value engineering for various warehouse
structural system options and construction methods. Cost: $5.1MM.
Hotel Fiesta Inn, Acapulco, Guerrero
Project Superintendent for the reshuffle of 102 room hotel.
Hotel Habitab, Polanco D.F.
Project Manager for the construction of this 60 room hotel.
Automotores General Motors, Silao Guanajuato MX
Supervised construction of a 400,000 SF vehicle assembly plant for GM.
Restaurante VIPS, Acapulco Guerrero, MX
Project Superintendent for this prestigious restaurant located in the Acapulco
Tower. A remodeling project included demolition, architectural, carpentry,
plumbing,
Ambulante Module, Quebrada Edo. MX
Construction of building for the General Care Hospital of Zone # 57 IMSS.
Superintendent of the building structure architectural finishes as well as all
electro-mechanical work.
Warehouse for Mobil Oil Empty Vessels, DF MX
Supervised the expansion to existing warehouse, which entailed a
concrete and metal structure and finishes.
American British Cowdray Hospital, MX
Supervised the construction of the magnetic wave building and the
remodeling of the first floor bed wing. Work included demolition,
fabrication and installation of structural steel building, pre-cast panels,
and interior finishes.
Rural Health Center, Puebla, MX
Supervised the construction of nine new health centers, which consisted
of the structural and architectural work, as well as finishes and electro-
mechanical work.
3. Francisco Quintana
Project / Construction Manager
Terminal Building for Puebla Airport, Huejotzingo, MX
Project superintendent for the interior finishes and electrical work at this
airport.
General Hospital, Puebla, MX
Project Manager for the construction of new 180 bed hospital building.
Training center for Aeromexico Pilots, Mexico
Project resident engineer for a 60,000SF building located at the Mexico
International Airport. Construction work included piling, structural work,
all electrical and mechanical systems and finishes.
Centro de Villas de Club Med, Guayamas Sonora MX
Project Resident Engineer for the construction of 450 hotel room units
totaling 140,000SF of construction area.
Cía. Colchones Atlas, Lerma MX
Project resident engineer for the construction of an added industrial bay
for the manufacturing area expansion.