Recent Project List
1. Bristol Place (Mezzo), Tampa, FL. Projectvalue $ 56,000.00. Delivered 3-09-
2015. Demolition of existing in-ground spa, concrete decking, irrigation,
plumbing, pavers & landscape. New installation of paver walkways, decks,
irrigation, outdoor shower & landscape. Completed projectin two weeks,
one week ahead of scheduleand under budget.
2. Lindru Gardens, Clearwater, FL. Projectvalue $ 640,000.00. Scheduled
delivery 6-15-2015. Completedemolition of decorative Concrete block, all
structural steel stairways, railings & aluminumscreen enclosures on 5
apartment buildings constructed in 1946. Repair/reconstruction and
installation of structuralmetal frame work & column posts, fabricateand
install 24 new stairways, landings, railings & aluminum screen enclosures.
Projectis currently tracking under budget & 2 weeks ahead of schedule.
3. The Cove at St. Johns (The Palazzo), Jacksonville, FL.
www.palazzostjohns.com anticipated completion spring 2016. Project
Value $ 25 Million. Roughly 280,000'squarefootprojectconsisting of , 4
mid-rise6 story concrete post-tension & masonry structures,a marina
amenity, fitness center, pool & cabana. This complex project encompasses
the restoration and mitigation of a partially completed condo project that
was started in 2006 construction stopped in 2007. The 1stof the 4 building
will be completed in June with anticipated TCO in early July 2014. ThePool
& cabana werecomplete July 2014. TheMarina & Building 2 are currently
in production with delivery scheduled for summer 2015. This project
includes: site development, marina construction, fitness center, pool,
cabana, build out & completion of 4 mid-risecondominiumbuildings.
4. Landmark at Vista Grande, OrangePark, FL. Scheduled delivery mid
September 2014. ProjectValue$ 485,000.00 Emergency fire& water
restoration of a 16 unit apartment building in a large apartment
community. Phase1 consisted of emergency mobilization to the fire
damaged building within 12 hours after the fire, securing & making safe the
structure, demo & water removal. Phase 2 assistwith the successful
estimate and bid packageand commence reconstruction of the fire
damaged units 8 in total. Bringing 8 of the buildings 16 units back to livable
condition within 72 hours of the fire, obtained the buildings release for
occupancy formthe governing authorities.
5. Lakes of Mayport, Atlantic Beach, FL. Delivered 10-16-2013. ProjectValue
$650,000.00. Exterior renovation of a 16 building apartment complex.
Renovation included replacement of damaged structurewood substrate&
lap siding, reconstruction of wood decks, stairways & railings, painting of all
buildings & Club house, construction of summer kitchen & parking lot
repair .
6. Wood Hollow Clubhouseremodel, Jacksonville, FL. Delivered 10-10-2013.
ProjectValue $ 135,000. 3 week 2100'squarefootapartment complex
Clubhouseremodel. Completed on time and under budget.
7. Landmark at Chelsea Commons, Chapel Hill, NC Delivered 6-12-2013.
ProjectValue $ 1.6 Million. Complete interior & exterior renovation of a
210 unit 96 % occupied apartment community. Construction included:
Clubhouserenovation, pool re-surfacing, installation of dog park, tennis
court & volley ball court. 210 unit interior renovations that included new
flooring , cabinets, plumbing fixtures, electrical fixtures, paint & tub re-
surfacing. Delivered on time and on budget.
8. Hobby Lobby Wausau, WI. Delivered 10-9-2012. ProjectValue$ 2.5 Million.
A 55,000’ squarefootground up cast-in-place concrete retail storebuilding.
Projectwas completed in 109 total days fromthe date of permit issue to
Certificate of Occupancy.
9. Hobby Lobby Marion, IN. Delivered 9-4-2012. ProjectValue$ 2.1 Million.
A 50,000’ squarefootground up cast-in-place concrete retail storebuilding.
Projectwas completed in 101 total days fromthe date of permit issue to
Certificate of Occupancy.
10.PetSmart Marion, IN. Delivered 9-19-2012. ProjectValue$ 1.6 Million.
A 12,000’ squarefootground up Masonry retail store at University
Marketplace (a town center type of development). Projectwas completed
on time and on budget.
11.TJ Maxx Marion, IN. Delivered 10-24-2012. ProjectValue$ 2 Million.
A 24,000’ squarefootground up Masonry retail store at University
Marketplace (a town center type of development). Projectwas completed
on time and on budget.
12.Area “E” Marion, IN. Delivered 9-19-2012. ProjectValue$ 600,000. Dollars.
A 12,000’ squarefootground up Masonry futureretail area (currently
white box) at University Marketplace (a town center type of development).
Projectwas completed on time and on budget.
13.University Market Place Marion, INphaseIV. A 23 acre site development
project: completed all site civil improvements and building pads for future
retail tenant improvements. Projectvalue $ 2.2 million Delivered 8-20-2012
14.Wards Do ItBest Center Hamburg, MI. A fire restoration/expansion project
added an additional 8,000 squarefeet completed in just90 days in winter
conditions. ProjectValue $ 507,000.Dollars. Delivered 3-1-2012on time
and at budget.
15.Zimmer Great Lakes Novi, MI. CorporateHeadquarters with Professional
office /warehousetenant improvement. Renovated existing 26,000 square
foot office/warehousebuilding for medical implement supplier. Project
Value $ 145,000. Dollars Delivered April2012.
16.Thomson Reuters Bingham Farms, MI. ProjectValue$ 2.3 Million Dollars a
36,000 Squarefootclass “A” professionalofficetenant improvementon the
3dr floor of an office building with no fright elevator (all building materials
were boughtin through exterior window openings that were removed and
reinstalled) this projectwas on a 60 day drop dead completion schedule.
Delivered December 2011 two days ahead of schedule.
17. AGM Global Headquarters Troy, MI. ProjectValue$ 2.8 Million Dollars a
56,000 Squarefoot R & D / Prototype facility with 6,000 Squarefeetof
class "A" professionalofficefinishes finished at budget and 3 weeks ahead
of schedule.

More Related Content

What's hot

First School: Town Hall Presentation to Parish (June 2017)
First School: Town Hall Presentation to Parish (June 2017)First School: Town Hall Presentation to Parish (June 2017)
First School: Town Hall Presentation to Parish (June 2017)pennpadre
 
Old school analysis: bulletin version
Old school analysis: bulletin versionOld school analysis: bulletin version
Old school analysis: bulletin versionpennpadre
 
Lon Dunaway Resume
Lon Dunaway ResumeLon Dunaway Resume
Lon Dunaway ResumeLon Dunaway
 
VHD - FORMER MOWBRAY COLLEGE PATTERSON CAMPUS
VHD - FORMER MOWBRAY COLLEGE PATTERSON CAMPUSVHD - FORMER MOWBRAY COLLEGE PATTERSON CAMPUS
VHD - FORMER MOWBRAY COLLEGE PATTERSON CAMPUSGuy Murphy
 
William Pitt Union Energy Improvement Report
William Pitt Union Energy Improvement ReportWilliam Pitt Union Energy Improvement Report
William Pitt Union Energy Improvement ReportDejia Kong
 
Modern Bathroom Renovations by Eclectic Builders
Modern Bathroom Renovations by Eclectic BuildersModern Bathroom Renovations by Eclectic Builders
Modern Bathroom Renovations by Eclectic BuildersEclectic Builders
 
2016_S_LAA6654_Quintanilla_V_BlurbSubmissionPDF_OZER
2016_S_LAA6654_Quintanilla_V_BlurbSubmissionPDF_OZER2016_S_LAA6654_Quintanilla_V_BlurbSubmissionPDF_OZER
2016_S_LAA6654_Quintanilla_V_BlurbSubmissionPDF_OZERValeria Quintanilla Florián
 
Heritage sands edc january 2012
Heritage sands   edc january 2012Heritage sands   edc january 2012
Heritage sands edc january 2012Town of Dennis, MA
 
Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...
Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...
Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...Fairfax County
 
Housing Microfinanc: Addressing Home Improvements and Housing Needs
Housing Microfinanc: Addressing Home Improvements and Housing NeedsHousing Microfinanc: Addressing Home Improvements and Housing Needs
Housing Microfinanc: Addressing Home Improvements and Housing NeedsMABSIV
 

What's hot (20)

Casey Federman
Casey FedermanCasey Federman
Casey Federman
 
First School: Town Hall Presentation to Parish (June 2017)
First School: Town Hall Presentation to Parish (June 2017)First School: Town Hall Presentation to Parish (June 2017)
First School: Town Hall Presentation to Parish (June 2017)
 
Old school analysis: bulletin version
Old school analysis: bulletin versionOld school analysis: bulletin version
Old school analysis: bulletin version
 
Josh Benthein
Josh BentheinJosh Benthein
Josh Benthein
 
Madison Park Project Plans (Most Recent, All Documents, 1/12/17)
Madison Park Project Plans (Most Recent, All Documents, 1/12/17)Madison Park Project Plans (Most Recent, All Documents, 1/12/17)
Madison Park Project Plans (Most Recent, All Documents, 1/12/17)
 
Portfolio-2015-02-20-15
Portfolio-2015-02-20-15Portfolio-2015-02-20-15
Portfolio-2015-02-20-15
 
M+P Residential
M+P ResidentialM+P Residential
M+P Residential
 
Lon Dunaway Resume
Lon Dunaway ResumeLon Dunaway Resume
Lon Dunaway Resume
 
VHD - FORMER MOWBRAY COLLEGE PATTERSON CAMPUS
VHD - FORMER MOWBRAY COLLEGE PATTERSON CAMPUSVHD - FORMER MOWBRAY COLLEGE PATTERSON CAMPUS
VHD - FORMER MOWBRAY COLLEGE PATTERSON CAMPUS
 
Resume - 2016
Resume - 2016Resume - 2016
Resume - 2016
 
William Pitt Union Energy Improvement Report
William Pitt Union Energy Improvement ReportWilliam Pitt Union Energy Improvement Report
William Pitt Union Energy Improvement Report
 
Modern Bathroom Renovations by Eclectic Builders
Modern Bathroom Renovations by Eclectic BuildersModern Bathroom Renovations by Eclectic Builders
Modern Bathroom Renovations by Eclectic Builders
 
JG Molloy Brochure - Building On Our Reputation
JG Molloy Brochure - Building On Our ReputationJG Molloy Brochure - Building On Our Reputation
JG Molloy Brochure - Building On Our Reputation
 
Current Works
Current WorksCurrent Works
Current Works
 
2016_S_LAA6654_Quintanilla_V_BlurbSubmissionPDF_OZER
2016_S_LAA6654_Quintanilla_V_BlurbSubmissionPDF_OZER2016_S_LAA6654_Quintanilla_V_BlurbSubmissionPDF_OZER
2016_S_LAA6654_Quintanilla_V_BlurbSubmissionPDF_OZER
 
Heritage sands edc january 2012
Heritage sands   edc january 2012Heritage sands   edc january 2012
Heritage sands edc january 2012
 
Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...
Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...
Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...
 
ULX Sept 09
ULX Sept 09ULX Sept 09
ULX Sept 09
 
Housing Microfinanc: Addressing Home Improvements and Housing Needs
Housing Microfinanc: Addressing Home Improvements and Housing NeedsHousing Microfinanc: Addressing Home Improvements and Housing Needs
Housing Microfinanc: Addressing Home Improvements and Housing Needs
 
Sta brochure 10 30-12
Sta brochure 10 30-12Sta brochure 10 30-12
Sta brochure 10 30-12
 

Viewers also liked

Chel matóm mario abraham actividad 1.
Chel matóm mario abraham actividad 1.Chel matóm mario abraham actividad 1.
Chel matóm mario abraham actividad 1.abrahamchel
 
Comedk uget-brochure-2016-6th-february-copy-1
Comedk uget-brochure-2016-6th-february-copy-1Comedk uget-brochure-2016-6th-february-copy-1
Comedk uget-brochure-2016-6th-february-copy-1Sadiq Ur Rehman Sr.
 
presentacion 10-2
presentacion 10-2 presentacion 10-2
presentacion 10-2 joshe1998
 
Guia Sobre Como Tomar Las Mejores Fotos
Guia Sobre Como Tomar Las Mejores Fotos Guia Sobre Como Tomar Las Mejores Fotos
Guia Sobre Como Tomar Las Mejores Fotos noiselessknowle35
 
Alimentos para bajar el colesterol
Alimentos para bajar el colesterolAlimentos para bajar el colesterol
Alimentos para bajar el colesterollimpol
 
Las TIC en el Nivel Inicial
Las TIC en el Nivel InicialLas TIC en el Nivel Inicial
Las TIC en el Nivel InicialRomi Gudiño
 
Thermodynamics Hw#4
Thermodynamics Hw#4Thermodynamics Hw#4
Thermodynamics Hw#4littlepine13
 
MSDS Cosmesome (NE, Not containing ethanol)
MSDS Cosmesome (NE, Not containing ethanol)MSDS Cosmesome (NE, Not containing ethanol)
MSDS Cosmesome (NE, Not containing ethanol)Encapsula NanoSciences
 
Greater Sage Grouse Response to Season-long and Prescribed Rotational Livesto...
Greater Sage Grouse Response to Season-long and Prescribed Rotational Livesto...Greater Sage Grouse Response to Season-long and Prescribed Rotational Livesto...
Greater Sage Grouse Response to Season-long and Prescribed Rotational Livesto...Utah Section Society for Range Management
 

Viewers also liked (11)

Ensayo María Betania Jordan
Ensayo María Betania JordanEnsayo María Betania Jordan
Ensayo María Betania Jordan
 
Chel matóm mario abraham actividad 1.
Chel matóm mario abraham actividad 1.Chel matóm mario abraham actividad 1.
Chel matóm mario abraham actividad 1.
 
Comedk uget-brochure-2016-6th-february-copy-1
Comedk uget-brochure-2016-6th-february-copy-1Comedk uget-brochure-2016-6th-february-copy-1
Comedk uget-brochure-2016-6th-february-copy-1
 
presentacion 10-2
presentacion 10-2 presentacion 10-2
presentacion 10-2
 
Guia Sobre Como Tomar Las Mejores Fotos
Guia Sobre Como Tomar Las Mejores Fotos Guia Sobre Como Tomar Las Mejores Fotos
Guia Sobre Como Tomar Las Mejores Fotos
 
Alimentos para bajar el colesterol
Alimentos para bajar el colesterolAlimentos para bajar el colesterol
Alimentos para bajar el colesterol
 
Las TIC en el Nivel Inicial
Las TIC en el Nivel InicialLas TIC en el Nivel Inicial
Las TIC en el Nivel Inicial
 
Carlos Carrrasco
Carlos CarrrascoCarlos Carrrasco
Carlos Carrrasco
 
Thermodynamics Hw#4
Thermodynamics Hw#4Thermodynamics Hw#4
Thermodynamics Hw#4
 
MSDS Cosmesome (NE, Not containing ethanol)
MSDS Cosmesome (NE, Not containing ethanol)MSDS Cosmesome (NE, Not containing ethanol)
MSDS Cosmesome (NE, Not containing ethanol)
 
Greater Sage Grouse Response to Season-long and Prescribed Rotational Livesto...
Greater Sage Grouse Response to Season-long and Prescribed Rotational Livesto...Greater Sage Grouse Response to Season-long and Prescribed Rotational Livesto...
Greater Sage Grouse Response to Season-long and Prescribed Rotational Livesto...
 

Similar to Recent Project List 4-2015

Project Portfolio Powerpoint
Project Portfolio PowerpointProject Portfolio Powerpoint
Project Portfolio Powerpointwdemshar
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1Eamon Hannaway
 
CM&B Construction Overview
CM&B Construction OverviewCM&B Construction Overview
CM&B Construction OverviewLeah Blackman
 
Project List
Project ListProject List
Project ListJim Ryan
 
Arl Project List
Arl Project ListArl Project List
Arl Project Listanthee13
 
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-builtStephen Matkovits
 
Chris coonan project list november 1 2020
Chris coonan project list november 1 2020Chris coonan project list november 1 2020
Chris coonan project list november 1 2020Chris Coonan
 
Titusville FL Talking Points January 2017
Titusville FL Talking Points   January 2017Titusville FL Talking Points   January 2017
Titusville FL Talking Points January 2017Edyie McCall
 
O.H. Platt HS additions & renovations
O.H. Platt HS additions & renovationsO.H. Platt HS additions & renovations
O.H. Platt HS additions & renovationsSteve Baranello
 
Meamarian,Nasser_ShortprojectList
Meamarian,Nasser_ShortprojectListMeamarian,Nasser_ShortprojectList
Meamarian,Nasser_ShortprojectListNasser Meamarian
 
Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Ron White
 
Optimum CM presentation
Optimum CM presentationOptimum CM presentation
Optimum CM presentationTomKummer
 
Troy Norris.Project List
Troy Norris.Project ListTroy Norris.Project List
Troy Norris.Project Listrmbtroy
 

Similar to Recent Project List 4-2015 (20)

Francisco Quintana Resume
Francisco Quintana Resume Francisco Quintana Resume
Francisco Quintana Resume
 
Project Portfolio Powerpoint
Project Portfolio PowerpointProject Portfolio Powerpoint
Project Portfolio Powerpoint
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1
 
Long Resume
Long ResumeLong Resume
Long Resume
 
CM&B Construction Overview
CM&B Construction OverviewCM&B Construction Overview
CM&B Construction Overview
 
Project List
Project ListProject List
Project List
 
Arl Project List
Arl Project ListArl Project List
Arl Project List
 
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built
 
Residential
ResidentialResidential
Residential
 
Chris coonan project list november 1 2020
Chris coonan project list november 1 2020Chris coonan project list november 1 2020
Chris coonan project list november 1 2020
 
New Jersey Projects
New Jersey ProjectsNew Jersey Projects
New Jersey Projects
 
Titusville FL Talking Points January 2017
Titusville FL Talking Points   January 2017Titusville FL Talking Points   January 2017
Titusville FL Talking Points January 2017
 
O.H. Platt HS additions & renovations
O.H. Platt HS additions & renovationsO.H. Platt HS additions & renovations
O.H. Platt HS additions & renovations
 
Meamarian,Nasser_ShortprojectList
Meamarian,Nasser_ShortprojectListMeamarian,Nasser_ShortprojectList
Meamarian,Nasser_ShortprojectList
 
###RESUME###
###RESUME######RESUME###
###RESUME###
 
Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Master_Resume__Ron_White_9
Master_Resume__Ron_White_9
 
Optimum CM presentation
Optimum CM presentationOptimum CM presentation
Optimum CM presentation
 
T pstrt11 15
T pstrt11 15T pstrt11 15
T pstrt11 15
 
Green leed projects
Green leed projectsGreen leed projects
Green leed projects
 
Troy Norris.Project List
Troy Norris.Project ListTroy Norris.Project List
Troy Norris.Project List
 

Recent Project List 4-2015

  • 1. Recent Project List 1. Bristol Place (Mezzo), Tampa, FL. Projectvalue $ 56,000.00. Delivered 3-09- 2015. Demolition of existing in-ground spa, concrete decking, irrigation, plumbing, pavers & landscape. New installation of paver walkways, decks, irrigation, outdoor shower & landscape. Completed projectin two weeks, one week ahead of scheduleand under budget. 2. Lindru Gardens, Clearwater, FL. Projectvalue $ 640,000.00. Scheduled delivery 6-15-2015. Completedemolition of decorative Concrete block, all structural steel stairways, railings & aluminumscreen enclosures on 5 apartment buildings constructed in 1946. Repair/reconstruction and installation of structuralmetal frame work & column posts, fabricateand install 24 new stairways, landings, railings & aluminum screen enclosures. Projectis currently tracking under budget & 2 weeks ahead of schedule. 3. The Cove at St. Johns (The Palazzo), Jacksonville, FL. www.palazzostjohns.com anticipated completion spring 2016. Project Value $ 25 Million. Roughly 280,000'squarefootprojectconsisting of , 4 mid-rise6 story concrete post-tension & masonry structures,a marina amenity, fitness center, pool & cabana. This complex project encompasses the restoration and mitigation of a partially completed condo project that was started in 2006 construction stopped in 2007. The 1stof the 4 building will be completed in June with anticipated TCO in early July 2014. ThePool & cabana werecomplete July 2014. TheMarina & Building 2 are currently in production with delivery scheduled for summer 2015. This project includes: site development, marina construction, fitness center, pool, cabana, build out & completion of 4 mid-risecondominiumbuildings. 4. Landmark at Vista Grande, OrangePark, FL. Scheduled delivery mid September 2014. ProjectValue$ 485,000.00 Emergency fire& water restoration of a 16 unit apartment building in a large apartment community. Phase1 consisted of emergency mobilization to the fire damaged building within 12 hours after the fire, securing & making safe the structure, demo & water removal. Phase 2 assistwith the successful
  • 2. estimate and bid packageand commence reconstruction of the fire damaged units 8 in total. Bringing 8 of the buildings 16 units back to livable condition within 72 hours of the fire, obtained the buildings release for occupancy formthe governing authorities. 5. Lakes of Mayport, Atlantic Beach, FL. Delivered 10-16-2013. ProjectValue $650,000.00. Exterior renovation of a 16 building apartment complex. Renovation included replacement of damaged structurewood substrate& lap siding, reconstruction of wood decks, stairways & railings, painting of all buildings & Club house, construction of summer kitchen & parking lot repair . 6. Wood Hollow Clubhouseremodel, Jacksonville, FL. Delivered 10-10-2013. ProjectValue $ 135,000. 3 week 2100'squarefootapartment complex Clubhouseremodel. Completed on time and under budget. 7. Landmark at Chelsea Commons, Chapel Hill, NC Delivered 6-12-2013. ProjectValue $ 1.6 Million. Complete interior & exterior renovation of a 210 unit 96 % occupied apartment community. Construction included: Clubhouserenovation, pool re-surfacing, installation of dog park, tennis court & volley ball court. 210 unit interior renovations that included new flooring , cabinets, plumbing fixtures, electrical fixtures, paint & tub re- surfacing. Delivered on time and on budget. 8. Hobby Lobby Wausau, WI. Delivered 10-9-2012. ProjectValue$ 2.5 Million. A 55,000’ squarefootground up cast-in-place concrete retail storebuilding. Projectwas completed in 109 total days fromthe date of permit issue to Certificate of Occupancy. 9. Hobby Lobby Marion, IN. Delivered 9-4-2012. ProjectValue$ 2.1 Million. A 50,000’ squarefootground up cast-in-place concrete retail storebuilding. Projectwas completed in 101 total days fromthe date of permit issue to Certificate of Occupancy. 10.PetSmart Marion, IN. Delivered 9-19-2012. ProjectValue$ 1.6 Million. A 12,000’ squarefootground up Masonry retail store at University Marketplace (a town center type of development). Projectwas completed on time and on budget. 11.TJ Maxx Marion, IN. Delivered 10-24-2012. ProjectValue$ 2 Million.
  • 3. A 24,000’ squarefootground up Masonry retail store at University Marketplace (a town center type of development). Projectwas completed on time and on budget. 12.Area “E” Marion, IN. Delivered 9-19-2012. ProjectValue$ 600,000. Dollars. A 12,000’ squarefootground up Masonry futureretail area (currently white box) at University Marketplace (a town center type of development). Projectwas completed on time and on budget. 13.University Market Place Marion, INphaseIV. A 23 acre site development project: completed all site civil improvements and building pads for future retail tenant improvements. Projectvalue $ 2.2 million Delivered 8-20-2012 14.Wards Do ItBest Center Hamburg, MI. A fire restoration/expansion project added an additional 8,000 squarefeet completed in just90 days in winter conditions. ProjectValue $ 507,000.Dollars. Delivered 3-1-2012on time and at budget. 15.Zimmer Great Lakes Novi, MI. CorporateHeadquarters with Professional office /warehousetenant improvement. Renovated existing 26,000 square foot office/warehousebuilding for medical implement supplier. Project Value $ 145,000. Dollars Delivered April2012. 16.Thomson Reuters Bingham Farms, MI. ProjectValue$ 2.3 Million Dollars a 36,000 Squarefootclass “A” professionalofficetenant improvementon the 3dr floor of an office building with no fright elevator (all building materials were boughtin through exterior window openings that were removed and reinstalled) this projectwas on a 60 day drop dead completion schedule. Delivered December 2011 two days ahead of schedule. 17. AGM Global Headquarters Troy, MI. ProjectValue$ 2.8 Million Dollars a 56,000 Squarefoot R & D / Prototype facility with 6,000 Squarefeetof class "A" professionalofficefinishes finished at budget and 3 weeks ahead of schedule.