SlideShare a Scribd company logo
1 of 2
Mark T. Brock
3515 135th
Street Court N.W.
Gig Harbor, WA 98332
Buildermark@hotmail.com
Cell (253) 858-9177
#
Project
Name/ Location
Type of project
(structure,
scope of work,
etc.)
Delivery
Method
Role
Size Time Frame
Notes (skills used / developed, major challenges, accomplishments,
anecdotes)in $
in sq.
ft.
From To
1 Boeingplant 777Xupgrades, Fredrickson Industrial building
upgrades
Negotiated ProjectManager 600,000 NA 10/2015 3/2016 This was multiple individual contracts thatwhere issued and ran separate but
concurrently,the projects under my managementwherethe “lowerator” crane control
modifications, skin robotic sander & 6 drum vacuumseparator.Thisworkrequired
work to take place in an operating manufacturing facility.
2 Building 24-60 Spare rectifier, Fredrickson Industrial building
upgrades
Negotiated ProjectManager 705,000 NA 2/2015 3/2016 Installation of a new 20,000Amp /18V DC rectifier in an operating chemicaltank line
3 Building 17-06 Redundant rectifier, Auburn Industrial building
upgrades
Negotiated ProjectManager 765,000 12,000 2/2015 2/2016 Installation of a new 18,000Amp /15V DC rectifier in an operating chemicaltank line
4 Moonshine shoprelocation, Fredrickson Industrial building
upgrades
Negotiated ProjectManager 280,000 NA 12/2014 4/2015 Relocate tool making equipmentand install foundations and controls for 2 industrial
robots.
5 Stacker / loweratorcrane, Fredrickson Industrial building
upgrades
Design build ProjectManager 4,710,000 NA 2/2014 3/2015 Design and install 2 new 48,000lb industrial cranesincluding new 140ftrails in an
operating facility. Thesecranesare purpose build one offcranes with unique one ofa
kind anti sway mechanisms.
6 Tahoma Medical Clinic, Tukwila TI, Lab & MOB Design build ProjectManager 2,475,000 30,000 3/2012 8/2013 Convertoffice space into examrooms,Labs,retail spaceand research facilities. The
owner had limited knowledge ofconstruction and needed extensive advice to
complete design and constructthe desired finish project.
7 Cinema One Renovations @ NBK Bangor Interior
renovation
Negotiated ProjectManager /
Safety
250,000 5,000 10/2012 1/2013 Renovate the cinema with smallestimpactpossible to the operation.
8 Building 1101 OfficeRenovations @ NBK,
Bangor
Office interior
renovation
Negotiated ProjectManager /
Safety
108,000 <1000 3/2013 4/2013 Renovate office space in an operational office.
9 MOR & APU Upgrades @ Naval Hospital,
Bremerton
MOB interior
renovation
Negotiated ProjectManager /
Safety
145,000 <1000 1/2013 2/2013 This projecttook place throughoutthe hospital and consisted oflevels1, 2, & 4 ICRA
containment.
10 Childcare Development Center @ NBK,
Bremerton
Ground up
building w/
infrastructure
Design build ProjectManager 9,000,000 10,000 10/2009 11/2011 This was a modular building, made up of11 separate units. The projectwas
interrupted do to the discovery ofsoil contaminates thatneeded to be remediated
before the projectcould be completed.
11 George & Kimi Medical Clinic, Tacoma Ground up MOB
w/ infrastructure
Team Build ProjectManager 7,500,000 37,000 2008 2009 This structural steel multi story medical office space consisted ofexamrooms,
administrative offices,and Dental space constructed for a nonprofitorigination.
12 Gig Harbor MultiCareLinerAccelerator,
Gig Harbor
Medical
treatment/
radiation
shielding
Team Build ProjectManager 3,000,000 <1000 8/2008 11/2008 This included providing radioactive shielding for cancer treatmentand expansion of
the oncology sweetrequiring level 4 ICRAcontainment. The extreme pace ofthis
projectdid notallow for the completion ofdesign so changes were made thatrequired
the expediting ofrare materials.
13 YMCA ParkingExpansion,GigHarbor infrastructure Design Build ProjectManager /
Superintendent
145,000 NA 2008 2008 Design build expansionofparking lot
14 Verizon VHO #13 Everett Critical space TI Selectbidder ProjectManager 2,500,000 2,500 2008 2008 This was a fastpace critical space environmentrequire multiple safety and energy
backups.
15 MultiCare Medical Center,YMCA, Gig
Harbor
MOB TI Team Build ProjectManager 75,000 1,500 2006 2007 This is medical office space Ti thattook place concurrently as the finishes atthe
YMCA building.
16 YMCA, Gig Harbor Ground up
building w/
infrastructure
Team Build ProjectManager/
APM
13.5 M 78,000 2006 2007 Ground up construction including site developmentofthe YMCA started before
access to the site has in place (i.e. Nopower to the site), this projectalso took place
during one of the wettestyears in the pastcentury.
17 Grass Lake ElementarySeismic Upgrades,
Kent
interior
renovation
Hard Bid ProjectManager/
Estimator
400,000 NA 2006 2006 Perform seismic upgrades to multiple schools, all work needed to be performed in a
shorttimeframe.
Mark T. Brock
3515 135th
Street Court N.W.
Gig Harbor, WA 98332
Buildermark@hotmail.com
Cell (253) 858-9177
#
Project
Name/ Location
Type of project
(structure,
scope of work,
etc.)
Delivery
Method
Role
Size Time Frame
Notes (skills used / developed, major challenges, accomplishments,
anecdotes)in $
in sq.
ft.
From To
18 Black Lake Fire Department HQ Station,
Olympia
Ground up
building w/
infrastructure
Hard Bid ProjectManager/
Estimator
3,000,000 17,000 4/2005 4/2006 Constructa new fire station, with apparatus bay, 30,000 Gal water tank and 40,000
gal underground detention tanks.
19 Washington State OBIISeismic Upgrades,
Olympia
Office interior
renovation
Hard Bid Estimator 1,500,000 5,000 2005 2005 Perform seismic upgrades in Washington State Governmentslargestoffice building.
20 Sand Hill Ball Field, Belfair infrastructure Hard Bid Estimator 1,000,000 NA 2005 2006 Clear land and construct4 new ball fields.
21 Western State Hospital Building7
Upgrades, Steilacoom
interior
renovation
Hard Bid Estimator 700,000 NN 2005 2005 Removal ofplaster in stairwell and installation ofcarbon fiber reinforcement.
22 Pearson Elementary Asbestos Abatement
AndUpgrades, Poulsbo
interior
renovation
Hard Bid ProjectManager/
Estimator
2,100,000 10,000 5/2004 9/2004 This projectthad a very fastpassed scheduled including substantial time taken to
perform asbestos abatement.
23 National GuardArmory Remodel,Port
Orchard
interior
renovation
Hard Bid ProjectManager/
Estimator /
Superintendent
750,000 10,000 2003 2003 This was a complete renovation ofthe armory building thattook place whenthe guard
unit was preparing to deploy for Operation Enduring freedom.
24 Mason CountyPUD SubstationControl
Building, Belfair
Ground up
building w/
infrastructure
Hard Bid ProjectManager/
Estimator
135,000 <1000 2003 2003 This was a small CMUbuilding designed to house a generator,itwasa hard bid and
there was less than 1% lefton the table.
25 New Market Skills Center Remodel,
Tumwater
interior
renovation
Hard Bid ProjectManager 400,000 <1000 2002 2003 This projectconsisted ofupgrades throughoutthe entire campus with school in
session.
26 Mutual Materials,Port Orchard, WA Ground up
building w/
infrastructure
Negotiated Superintendent 1,500,000 2,000 2001 2002 Construction ofan approx. 2000 sfbrick sales building and 3 additional pre-
engineered building totaling 40,000 sf, the entire yard is paved with brickpavers.
27 Kitsap Bank Structural Upgrades,
Bainbridge Island, WA
Structural
Retrofits
Negotiated Superintendent 150,000 NA 2001 2001 Remove the tile roofand upgrade the roofstructure whale the bank still operate.The
existing roofstructure was failing al shoring needed to be placed around the entire
structure.
28 Multi-Phase Signal Family Residential
HousingCommunity,Milton, WA
Single Family Negotiated ProjectManager/
Superintendent
200,000 –
275,000
1,200
–
2,300
2000 2001 Semi-custom homes on a fastpace schedule
29 Bear Creek ElementaryUpgrades, Boulder,
CO
interior
renovation
Hard Bid ProjectManager/
Superintendent
1,500,000 NA 1999 2000 ADA upgrades to multiple elementary schoolsincluding installation of5 lifts
30 Municipal Office TI At Pearl Street Parking
Garage, Boulder, CO
Office space TI Hard Bid Superintendent 750,000 5,000 1999 1999 This was a high profile projectbuilton Boulders Pearl streetmall
31 Pearl Street Police Substation,Boulder, CO Office space TI Hard Bid Superintendent 125,000 1,200 1999 1999 Shortschedule, projecthad limited access
32 Multi-Phase Signal Family Residential
HousingCommunity,Multiple
Locations CO
Single Family Negotiated ProjectManager/
Superintendent
127,000 –
375,000
1,200
–
3,100
1997 1999 Semi-custom homes on a fastpace schedule
33 Rugger Residence, Wellington, CO Custom Home Negotiated Superintendent 14 M 15,000 1996 1997 A 15,000 sfhome on 120 acres with 36,000 sfriding arena,barns, trainers residents
and over 20 miles offence
34 Cash Residence, Fort Collins, CO Custom Home Negotiated Superintendent 7,000,000 7,500 1995 1996 This custom home hademany changes throughoutconstruction including the raising
of the roof 4ft after installed. The trim carpentry wasvery detailed and tootover 6
months to complete.

More Related Content

What's hot

Completed project list for mark shaw 160614
Completed project list for mark shaw 160614Completed project list for mark shaw 160614
Completed project list for mark shaw 160614Mark Shaw
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2john rhynold
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller
 
Current Construction Projects, City of Chicago, August 21, 2008
Current Construction Projects, City of Chicago, August 21, 2008Current Construction Projects, City of Chicago, August 21, 2008
Current Construction Projects, City of Chicago, August 21, 2008Daniel X. O'Neil
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1Dan Caouette
 
Kevin J Hill S3
Kevin J Hill S3Kevin J Hill S3
Kevin J Hill S3Kevin Hill
 
Adrian Navarro Architectural Technologist Portfolio
Adrian Navarro Architectural Technologist PortfolioAdrian Navarro Architectural Technologist Portfolio
Adrian Navarro Architectural Technologist PortfolioAdrian Navarro
 
Gen geot cs_sscanada_16.1
Gen geot cs_sscanada_16.1Gen geot cs_sscanada_16.1
Gen geot cs_sscanada_16.1Tensar
 
William Pitt Union Energy Improvement Report
William Pitt Union Energy Improvement ReportWilliam Pitt Union Energy Improvement Report
William Pitt Union Energy Improvement ReportDejia Kong
 
Restoration of Clarendon Hotel St Clairsville Ohio
Restoration of Clarendon Hotel St Clairsville OhioRestoration of Clarendon Hotel St Clairsville Ohio
Restoration of Clarendon Hotel St Clairsville OhioHeritage Ohio
 

What's hot (20)

RCS Project Profiles
RCS Project ProfilesRCS Project Profiles
RCS Project Profiles
 
Completed project list for mark shaw 160614
Completed project list for mark shaw 160614Completed project list for mark shaw 160614
Completed project list for mark shaw 160614
 
Eschenburg Resume 1
Eschenburg  Resume 1Eschenburg  Resume 1
Eschenburg Resume 1
 
Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
 
WALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom CompWALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom Comp
 
NJ Projects - Anthony Pagnotta
NJ Projects - Anthony PagnottaNJ Projects - Anthony Pagnotta
NJ Projects - Anthony Pagnotta
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015
 
Michael Sackler AIA_Portfolio
Michael Sackler AIA_PortfolioMichael Sackler AIA_Portfolio
Michael Sackler AIA_Portfolio
 
Current Construction Projects, City of Chicago, August 21, 2008
Current Construction Projects, City of Chicago, August 21, 2008Current Construction Projects, City of Chicago, August 21, 2008
Current Construction Projects, City of Chicago, August 21, 2008
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1
 
02 Chicago Teaming Presentation Part 2
02 Chicago Teaming Presentation Part 202 Chicago Teaming Presentation Part 2
02 Chicago Teaming Presentation Part 2
 
Resume 11.2.16
Resume 11.2.16Resume 11.2.16
Resume 11.2.16
 
Kevin J Hill S3
Kevin J Hill S3Kevin J Hill S3
Kevin J Hill S3
 
Adrian Navarro Architectural Technologist Portfolio
Adrian Navarro Architectural Technologist PortfolioAdrian Navarro Architectural Technologist Portfolio
Adrian Navarro Architectural Technologist Portfolio
 
Gen geot cs_sscanada_16.1
Gen geot cs_sscanada_16.1Gen geot cs_sscanada_16.1
Gen geot cs_sscanada_16.1
 
sariki profile
sariki profilesariki profile
sariki profile
 
Ag Star Presentation 2011
Ag Star Presentation 2011Ag Star Presentation 2011
Ag Star Presentation 2011
 
William Pitt Union Energy Improvement Report
William Pitt Union Energy Improvement ReportWilliam Pitt Union Energy Improvement Report
William Pitt Union Energy Improvement Report
 
Restoration of Clarendon Hotel St Clairsville Ohio
Restoration of Clarendon Hotel St Clairsville OhioRestoration of Clarendon Hotel St Clairsville Ohio
Restoration of Clarendon Hotel St Clairsville Ohio
 

Viewers also liked

ISU Davis Field Presentation - FINAL
ISU Davis Field Presentation - FINALISU Davis Field Presentation - FINAL
ISU Davis Field Presentation - FINALJamal Nelson, CCM
 
Efficient project delivery joc focus - 20141030
Efficient project delivery   joc focus - 20141030Efficient project delivery   joc focus - 20141030
Efficient project delivery joc focus - 20141030Peter Cholakis
 
The Design Assist Method of Project Delivery
The Design Assist Method of Project DeliveryThe Design Assist Method of Project Delivery
The Design Assist Method of Project DeliverySHKLaw
 
Novel Research Data Delivery System Using REDCap 20131211
Novel Research Data Delivery System Using REDCap 20131211Novel Research Data Delivery System Using REDCap 20131211
Novel Research Data Delivery System Using REDCap 20131211Travis H Nagler, MS, CPHIMS
 
Agile Trends in Government
Agile Trends in GovernmentAgile Trends in Government
Agile Trends in GovernmentLitheSpeed
 
6 Alternative Construction Project Delivery Methods
6 Alternative Construction Project Delivery Methods6 Alternative Construction Project Delivery Methods
6 Alternative Construction Project Delivery MethodsMcCarthy Holdings, Inc.
 
PEB construction-Mukesh Bhavsar
PEB construction-Mukesh BhavsarPEB construction-Mukesh Bhavsar
PEB construction-Mukesh BhavsarMukesh Bhavsar
 
lean construction and integrated project delivery
lean construction and integrated project delivery lean construction and integrated project delivery
lean construction and integrated project delivery Mahendra Bhuva
 
Designing a Manufacturing Supermarket - November 2016
Designing a Manufacturing Supermarket - November 2016Designing a Manufacturing Supermarket - November 2016
Designing a Manufacturing Supermarket - November 2016W3 Group Canada Inc.
 
Passive House In Depth for Professionals
Passive House In Depth for ProfessionalsPassive House In Depth for Professionals
Passive House In Depth for Professionalsdylamar
 
Capital Budgeting
Capital BudgetingCapital Budgeting
Capital BudgetingDayasagar S
 
payroll process
payroll processpayroll process
payroll processonearbaein
 

Viewers also liked (16)

ISU Davis Field Presentation - FINAL
ISU Davis Field Presentation - FINALISU Davis Field Presentation - FINAL
ISU Davis Field Presentation - FINAL
 
Efficient project delivery joc focus - 20141030
Efficient project delivery   joc focus - 20141030Efficient project delivery   joc focus - 20141030
Efficient project delivery joc focus - 20141030
 
The Design Assist Method of Project Delivery
The Design Assist Method of Project DeliveryThe Design Assist Method of Project Delivery
The Design Assist Method of Project Delivery
 
Novel Research Data Delivery System Using REDCap 20131211
Novel Research Data Delivery System Using REDCap 20131211Novel Research Data Delivery System Using REDCap 20131211
Novel Research Data Delivery System Using REDCap 20131211
 
Project Delivery Method Selection Tool
Project Delivery Method Selection ToolProject Delivery Method Selection Tool
Project Delivery Method Selection Tool
 
Method of Delivery
Method of DeliveryMethod of Delivery
Method of Delivery
 
Agile Trends in Government
Agile Trends in GovernmentAgile Trends in Government
Agile Trends in Government
 
6 Alternative Construction Project Delivery Methods
6 Alternative Construction Project Delivery Methods6 Alternative Construction Project Delivery Methods
6 Alternative Construction Project Delivery Methods
 
PEB construction-Mukesh Bhavsar
PEB construction-Mukesh BhavsarPEB construction-Mukesh Bhavsar
PEB construction-Mukesh Bhavsar
 
lean construction and integrated project delivery
lean construction and integrated project delivery lean construction and integrated project delivery
lean construction and integrated project delivery
 
Designing a Manufacturing Supermarket - November 2016
Designing a Manufacturing Supermarket - November 2016Designing a Manufacturing Supermarket - November 2016
Designing a Manufacturing Supermarket - November 2016
 
Passive House In Depth for Professionals
Passive House In Depth for ProfessionalsPassive House In Depth for Professionals
Passive House In Depth for Professionals
 
Prince2 Methodology
Prince2 MethodologyPrince2 Methodology
Prince2 Methodology
 
Pectinase
PectinasePectinase
Pectinase
 
Capital Budgeting
Capital BudgetingCapital Budgeting
Capital Budgeting
 
payroll process
payroll processpayroll process
payroll process
 

Similar to Mark Brock Project list

Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1Eamon Hannaway
 
Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Ron White
 
Nuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKeeNuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKeedignagni
 
James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0James Lee
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 SunocoKarl Keller
 
James Elser Project List 2009
James Elser Project List 2009James Elser Project List 2009
James Elser Project List 2009jelser4228
 
Jim markey thru 2011
Jim markey thru 2011Jim markey thru 2011
Jim markey thru 2011j4359markey
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15Roman Rozek
 
TJ Dickey Resume.docx complete
TJ Dickey Resume.docx completeTJ Dickey Resume.docx complete
TJ Dickey Resume.docx completeTj Dickey
 
Rick Stinnett Projects
Rick Stinnett ProjectsRick Stinnett Projects
Rick Stinnett Projectsrstinnett
 
Project List 10-31-2016
Project List 10-31-2016Project List 10-31-2016
Project List 10-31-2016Kevin Seyko
 
CV 160105 Paul Magee
CV 160105 Paul MageeCV 160105 Paul Magee
CV 160105 Paul MageePaul Magee
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightPatrice Gagnon
 

Similar to Mark Brock Project list (20)

STC Projects
STC ProjectsSTC Projects
STC Projects
 
Jabez Corp Flyer
Jabez Corp FlyerJabez Corp Flyer
Jabez Corp Flyer
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1
 
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
 
Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Master_Resume__Ron_White_9
Master_Resume__Ron_White_9
 
Nuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKeeNuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKee
 
James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
 
0609_PenRen
0609_PenRen0609_PenRen
0609_PenRen
 
James Elser Project List 2009
James Elser Project List 2009James Elser Project List 2009
James Elser Project List 2009
 
Jim markey thru 2011
Jim markey thru 2011Jim markey thru 2011
Jim markey thru 2011
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15
 
TJ Dickey Resume.docx complete
TJ Dickey Resume.docx completeTJ Dickey Resume.docx complete
TJ Dickey Resume.docx complete
 
Rick Stinnett Projects
Rick Stinnett ProjectsRick Stinnett Projects
Rick Stinnett Projects
 
Project List 10-31-2016
Project List 10-31-2016Project List 10-31-2016
Project List 10-31-2016
 
CV 160105 Paul Magee
CV 160105 Paul MageeCV 160105 Paul Magee
CV 160105 Paul Magee
 
Linkedin-Doc
Linkedin-DocLinkedin-Doc
Linkedin-Doc
 
Appendices
AppendicesAppendices
Appendices
 
CV GM 050116
CV GM 050116CV GM 050116
CV GM 050116
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 light
 

Mark Brock Project list

  • 1. Mark T. Brock 3515 135th Street Court N.W. Gig Harbor, WA 98332 Buildermark@hotmail.com Cell (253) 858-9177 # Project Name/ Location Type of project (structure, scope of work, etc.) Delivery Method Role Size Time Frame Notes (skills used / developed, major challenges, accomplishments, anecdotes)in $ in sq. ft. From To 1 Boeingplant 777Xupgrades, Fredrickson Industrial building upgrades Negotiated ProjectManager 600,000 NA 10/2015 3/2016 This was multiple individual contracts thatwhere issued and ran separate but concurrently,the projects under my managementwherethe “lowerator” crane control modifications, skin robotic sander & 6 drum vacuumseparator.Thisworkrequired work to take place in an operating manufacturing facility. 2 Building 24-60 Spare rectifier, Fredrickson Industrial building upgrades Negotiated ProjectManager 705,000 NA 2/2015 3/2016 Installation of a new 20,000Amp /18V DC rectifier in an operating chemicaltank line 3 Building 17-06 Redundant rectifier, Auburn Industrial building upgrades Negotiated ProjectManager 765,000 12,000 2/2015 2/2016 Installation of a new 18,000Amp /15V DC rectifier in an operating chemicaltank line 4 Moonshine shoprelocation, Fredrickson Industrial building upgrades Negotiated ProjectManager 280,000 NA 12/2014 4/2015 Relocate tool making equipmentand install foundations and controls for 2 industrial robots. 5 Stacker / loweratorcrane, Fredrickson Industrial building upgrades Design build ProjectManager 4,710,000 NA 2/2014 3/2015 Design and install 2 new 48,000lb industrial cranesincluding new 140ftrails in an operating facility. Thesecranesare purpose build one offcranes with unique one ofa kind anti sway mechanisms. 6 Tahoma Medical Clinic, Tukwila TI, Lab & MOB Design build ProjectManager 2,475,000 30,000 3/2012 8/2013 Convertoffice space into examrooms,Labs,retail spaceand research facilities. The owner had limited knowledge ofconstruction and needed extensive advice to complete design and constructthe desired finish project. 7 Cinema One Renovations @ NBK Bangor Interior renovation Negotiated ProjectManager / Safety 250,000 5,000 10/2012 1/2013 Renovate the cinema with smallestimpactpossible to the operation. 8 Building 1101 OfficeRenovations @ NBK, Bangor Office interior renovation Negotiated ProjectManager / Safety 108,000 <1000 3/2013 4/2013 Renovate office space in an operational office. 9 MOR & APU Upgrades @ Naval Hospital, Bremerton MOB interior renovation Negotiated ProjectManager / Safety 145,000 <1000 1/2013 2/2013 This projecttook place throughoutthe hospital and consisted oflevels1, 2, & 4 ICRA containment. 10 Childcare Development Center @ NBK, Bremerton Ground up building w/ infrastructure Design build ProjectManager 9,000,000 10,000 10/2009 11/2011 This was a modular building, made up of11 separate units. The projectwas interrupted do to the discovery ofsoil contaminates thatneeded to be remediated before the projectcould be completed. 11 George & Kimi Medical Clinic, Tacoma Ground up MOB w/ infrastructure Team Build ProjectManager 7,500,000 37,000 2008 2009 This structural steel multi story medical office space consisted ofexamrooms, administrative offices,and Dental space constructed for a nonprofitorigination. 12 Gig Harbor MultiCareLinerAccelerator, Gig Harbor Medical treatment/ radiation shielding Team Build ProjectManager 3,000,000 <1000 8/2008 11/2008 This included providing radioactive shielding for cancer treatmentand expansion of the oncology sweetrequiring level 4 ICRAcontainment. The extreme pace ofthis projectdid notallow for the completion ofdesign so changes were made thatrequired the expediting ofrare materials. 13 YMCA ParkingExpansion,GigHarbor infrastructure Design Build ProjectManager / Superintendent 145,000 NA 2008 2008 Design build expansionofparking lot 14 Verizon VHO #13 Everett Critical space TI Selectbidder ProjectManager 2,500,000 2,500 2008 2008 This was a fastpace critical space environmentrequire multiple safety and energy backups. 15 MultiCare Medical Center,YMCA, Gig Harbor MOB TI Team Build ProjectManager 75,000 1,500 2006 2007 This is medical office space Ti thattook place concurrently as the finishes atthe YMCA building. 16 YMCA, Gig Harbor Ground up building w/ infrastructure Team Build ProjectManager/ APM 13.5 M 78,000 2006 2007 Ground up construction including site developmentofthe YMCA started before access to the site has in place (i.e. Nopower to the site), this projectalso took place during one of the wettestyears in the pastcentury. 17 Grass Lake ElementarySeismic Upgrades, Kent interior renovation Hard Bid ProjectManager/ Estimator 400,000 NA 2006 2006 Perform seismic upgrades to multiple schools, all work needed to be performed in a shorttimeframe.
  • 2. Mark T. Brock 3515 135th Street Court N.W. Gig Harbor, WA 98332 Buildermark@hotmail.com Cell (253) 858-9177 # Project Name/ Location Type of project (structure, scope of work, etc.) Delivery Method Role Size Time Frame Notes (skills used / developed, major challenges, accomplishments, anecdotes)in $ in sq. ft. From To 18 Black Lake Fire Department HQ Station, Olympia Ground up building w/ infrastructure Hard Bid ProjectManager/ Estimator 3,000,000 17,000 4/2005 4/2006 Constructa new fire station, with apparatus bay, 30,000 Gal water tank and 40,000 gal underground detention tanks. 19 Washington State OBIISeismic Upgrades, Olympia Office interior renovation Hard Bid Estimator 1,500,000 5,000 2005 2005 Perform seismic upgrades in Washington State Governmentslargestoffice building. 20 Sand Hill Ball Field, Belfair infrastructure Hard Bid Estimator 1,000,000 NA 2005 2006 Clear land and construct4 new ball fields. 21 Western State Hospital Building7 Upgrades, Steilacoom interior renovation Hard Bid Estimator 700,000 NN 2005 2005 Removal ofplaster in stairwell and installation ofcarbon fiber reinforcement. 22 Pearson Elementary Asbestos Abatement AndUpgrades, Poulsbo interior renovation Hard Bid ProjectManager/ Estimator 2,100,000 10,000 5/2004 9/2004 This projectthad a very fastpassed scheduled including substantial time taken to perform asbestos abatement. 23 National GuardArmory Remodel,Port Orchard interior renovation Hard Bid ProjectManager/ Estimator / Superintendent 750,000 10,000 2003 2003 This was a complete renovation ofthe armory building thattook place whenthe guard unit was preparing to deploy for Operation Enduring freedom. 24 Mason CountyPUD SubstationControl Building, Belfair Ground up building w/ infrastructure Hard Bid ProjectManager/ Estimator 135,000 <1000 2003 2003 This was a small CMUbuilding designed to house a generator,itwasa hard bid and there was less than 1% lefton the table. 25 New Market Skills Center Remodel, Tumwater interior renovation Hard Bid ProjectManager 400,000 <1000 2002 2003 This projectconsisted ofupgrades throughoutthe entire campus with school in session. 26 Mutual Materials,Port Orchard, WA Ground up building w/ infrastructure Negotiated Superintendent 1,500,000 2,000 2001 2002 Construction ofan approx. 2000 sfbrick sales building and 3 additional pre- engineered building totaling 40,000 sf, the entire yard is paved with brickpavers. 27 Kitsap Bank Structural Upgrades, Bainbridge Island, WA Structural Retrofits Negotiated Superintendent 150,000 NA 2001 2001 Remove the tile roofand upgrade the roofstructure whale the bank still operate.The existing roofstructure was failing al shoring needed to be placed around the entire structure. 28 Multi-Phase Signal Family Residential HousingCommunity,Milton, WA Single Family Negotiated ProjectManager/ Superintendent 200,000 – 275,000 1,200 – 2,300 2000 2001 Semi-custom homes on a fastpace schedule 29 Bear Creek ElementaryUpgrades, Boulder, CO interior renovation Hard Bid ProjectManager/ Superintendent 1,500,000 NA 1999 2000 ADA upgrades to multiple elementary schoolsincluding installation of5 lifts 30 Municipal Office TI At Pearl Street Parking Garage, Boulder, CO Office space TI Hard Bid Superintendent 750,000 5,000 1999 1999 This was a high profile projectbuilton Boulders Pearl streetmall 31 Pearl Street Police Substation,Boulder, CO Office space TI Hard Bid Superintendent 125,000 1,200 1999 1999 Shortschedule, projecthad limited access 32 Multi-Phase Signal Family Residential HousingCommunity,Multiple Locations CO Single Family Negotiated ProjectManager/ Superintendent 127,000 – 375,000 1,200 – 3,100 1997 1999 Semi-custom homes on a fastpace schedule 33 Rugger Residence, Wellington, CO Custom Home Negotiated Superintendent 14 M 15,000 1996 1997 A 15,000 sfhome on 120 acres with 36,000 sfriding arena,barns, trainers residents and over 20 miles offence 34 Cash Residence, Fort Collins, CO Custom Home Negotiated Superintendent 7,000,000 7,500 1995 1996 This custom home hademany changes throughoutconstruction including the raising of the roof 4ft after installed. The trim carpentry wasvery detailed and tootover 6 months to complete.