Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Francis jacob resume-may 2017
1. FRANCIS JACOB
Ph:91-9847901749
francisj807@gmail.com
Profile Summary
37 years experience in public and private sector organizations of electronics
industries,R&D and process industries.Involved in preparation of Project proposal,Project
estimation and Project planning.
Experience in Design,Development, Engineering,Project Management, System/Panel
Integration,Conducting IAT&FAT,Customer interaction,Installation and commissioning of
Control systems(PLC,SCADA & DCS System) for Thermal Power Plants,Fertilizer
Plants,Steel Plants, Atomic Power stations, Pulp and Paper Mills,Water Plants,Solar Power
Plant etc.
Co-ordinating with Purchase Department for materials procurement activities.
Responsibility for product manufacturing and its scheduling.
Interaction with 3rd party for localization of products.
Experience in data collection and data analysis for Retrofit projects.
Professional Experience
A. Present Role (February 2012 to April 2017)
Position: Senior Manager (Operations)
(System Engineering,Project Management,Interaction with Customer and Supplier)
Hitachi NeST Control Systems Pvt.Ltd.Bangalore,Karnataka
(Industry leader in all areas of Power, Water and Steel,including Solar Renewables)
Projects:
1. Supply of DDCMIS package with spares for NTPC 2x660 MW Thermal Power Plant
Projects in Solapur, Maharashtra-(Boiler Control System).
2. Supply of DDCMIS package with spares for NTPC 2x660 MW Thermal Power Plant
Projects in Meja, UP-(Boiler Control System)
3. Supply of DDCMIS package with spares for NTPC 2x800 MW Thermal Power Plant
Projects in Lara, Chhattisgarh-(Aux. Turbine Control System)
2. Scope of the Projects(Project-1,2,3):
Scope of work includes complete Design, Engineering, Manufacturing, Testing at works and
Supply of DDCMIS package and Mandatory Spares as per technical specifications.The DDCMIS
shall be manufactured & tested as per NTPC approved quality plan and test procedure.
The scope also includes commissioning assistance of Unit-1, Unit-II, Common and AMC for 3
Years.
My Responsibilities(1,2,3):
Overall project cycle management from Inquiry to Order and support the project
execution, deliverables and site support.
Preparation of Project proposal, Project estimation and Project schedule.
Customer requirement study, Data collection and finalization of User needs.
Preparation of BOM and procurement Activities.
Overall co-ordination of System Integration /IAT/FAT and execution of the project as per
customer requirement.
The Job also involves coordination with various Inter Departments, External Agencies
and Vendors for smooth execution of the implementation works.
4. Water SCADA System for Delhi Jal Board-Pitampura Water Supply
Delhi Jal Board planned to monitor/control for 7 Nos. of pumping stations at Pitampura UGR
and remote monitoring of DMA/Control points from 14 locations.
The scope of this project includes,Design,Development,Supply,installation and
commissioning of SCADA Server, SCADA Client, Data Collection Server,RTU/PLC.
My Responsibilities:
System Design and Engineering
Overall project cycle management from Inquiry to Order and support the project
execution, deliverables and site support.
Preparation of Project proposal, Project estimation and Project schedule.
Customer requirement study, Data collection and finalization of User needs.
Preparation of BOM and procurement Activities.
Overall co-ordination of System Integration /Configuration/IAT/FAT and execution of
the project as per customer requirement.
The Job also involves coordination with various Inter Departments, External Agencies
and Vendors for smooth execution of the implementation works.
3. 5. Automation and Upgradation of Continuous Galvanizing Line-2 for TATA Steel
Jamshedpur.
Tata Steel founded India’s first industrial city, now Jamshedpur, where it established India’s
first integrated steel plant in 1907. The Jamshedpur Works currently comprises of a 9.7 MTPA
crude steel production facility and a variety of finishing mills.
Scope of this project includes
Study of existing RIO-Panels at CGL2.
Design,Supply and commissioning support for RIO Panels(09 Nos.) at CGL2 plant in
TATA Steel, Jamshedpur.
My Responsibilities:
System Design and Engineering
Overall project cycle management from Inquiry to Order and support the project
execution, deliverables and site support.
Preparation of Project proposal, Project estimation and Project schedule.
Customer requirement study, Data collection and finalization of User needs.
Preparation of BOM and procurement Activities.
Overall co-ordination of System Integration /Configuration/IAT/FAT and execution of
the project as per customer requirement.
The Job also involves coordination with various Inter Departments, External Agencies
and Vendors for smooth execution of the implementation works.
6. Supply of wired Control Panels and Operator Consoles for ACCIL-Hariyana
ACCIL has one of the largest Cold Rolling Mill Complex with an installed capacity of 300000
MT per annum. ACCIL has the VISION to be a world class manufacturer of steel products and
play a pivotal role in the economic growth of the country.
Scope of project includes preparation of BOM, estimation, preparation of sequence drawing,
Panel manufacturing, assembling, testing and delivery of panels(Drive linkage cubicle-2 Nos.,
Solenoid valve cubicle-3 Nos.,OMD Console panel-3 Nos.and OSR Console panel -3 Nos.). on
Ex-works, HNC Works, Bangalore.
My Responsibilities:
System Design and Engineering
Overall project cycle management from Inquiry to Order and support the project
execution, deliverables and site support.
Preparation of Project proposal, Project estimation and Project schedule.
4. Customer requirement study, Data collection and finalization of User needs.
Preparation of BOM and procurement Activities.
Overall co-ordination of System Integration /Configuration/IAT/FAT and execution of
the project as per customer requirement.
The Job also involves coordination with various Inter Departments, External Agencies
and Vendors for smooth execution of the implementation works.
7. SCADA System for 25MW Solar Power Plant for ACME Telepower Ltd. Kilichipur,
Madhya Pradesh
The scope of this project involves
Procurement and supply of required hardware modules like, RTU/PLC, Server
machines/Clients and networking components.
Supply of SCADA software-Eagle with required mimics and reports as per standard PV
Solar Plant monitoring.
Control logic development in selected PLC(PLC Programming)
Preparation of wiring diagram for field instruments and PV station cabinets .
FAT at HNC, Bangalore
Procurement of and commissioning of the weather station, Pyranometer and module
temperature sensor.
Integration & commissioning of SCADA system with RTU/PLC and field equipments
SAT
Documentation & Training to customer
Warranty support
My Responsibilities:
System Design and Engineering
Overall project cycle management from Inquiry to Order and support the project
execution, deliverables and site support.
Preparation of Project proposal, Project estimation and Project schedule.
Customer requirement study, Data collection and finalization of User needs.
Preparation of BOM and procurement Activities.
Overall co-ordination of System Integration /Configuration/IAT/FAT and execution of
the project as per customer requirement.
The Job also involves coordination with various Inter Departments, External Agencies
and Vendors for smooth execution of the implementation works.
5. 8. Renovation and Modernization of HIACS-3000 to HIACS-5000 in Mejia(West Bengal)
Thermal Power Station-Unit #1
The scope of this project includes upgradation of existing DOS/UNIX based Hitachi Distributed
Control System to latest FDDI based Distributed Digital Control System in Unit #4
9. Renovation and Modernization of HIACS-3000 to HIACS-5000 in Tuticorin Thermal
Power Station-Unit #4
The scope of this project includes upgradation of existing DOS/UNIX based Hitachi Distributed
Control System to latest FDDI based Distributed Digital Control System in Unit #4
My Responsibilities(Project-8,9):
Overall project cycle management from Inquiry to Order and support the project
execution, deliverables and site support.
Preparation of Project proposal, Project estimation and Project schedule.
Customer requirement study, Data collection and finalization of User needs.
Preparation of BOM and procurement Activities.
Overall co-ordination of System Integration /Configuration/IAT/FAT and execution of
the project as per customer requirement.
The Job also involves coordination with various Inter Departments, External Agencies
and Vendors for smooth execution of the implementation works.
B. Previous Role (March 2005 to February 2012)
Position: Assistan Manager (System Integration)
(System Engineering,Project Management,Interaction with Customer and Supplier)
NeST, Techno Park,Trivandrum,Kerala
(Industry leader in Manufacturing Services,Product & Technologies,Engineering & Software and
System Integration)
Projects:
1. Renovation and Modernization of HIACS-3000 to HIACS-5000 in Tuticorin Thermal
Power Station-Unit #5
The scope of this project includes upgradation of existing DOS/UNIX based Hitachi Distributed
Control System to latest FDDI based Distributed Digital Control System in Unit #4
6. 2. Renovation and Modernization of HIACS-3000 to HIACS-5000 in Mettur Thermal
Power Station-Unit #3 & Unit #4
The scope of this project includes upgradation of existing DOS/UNIX based Hitachi Distributed
Control System to latest FDDI based Distributed Digital Control System in Unit #4
My Responsibilities(Project-1,2):
Overall project cycle management from Inquiry to Order and support the project
execution, deliverables and site support.
Preparation of Project proposal, Project estimation and Project schedule.
Customer requirement study, Data collection and finalization of User needs.
Preparation of BOM and procurement Activities.
Overall co-ordination of System Integration /Configuration/IAT/FAT and execution of
the project as per customer requirement.
The Job also involves coordination with various Inter Departments, External Agencies
and Vendors for smooth execution of the implementation works.
3. Engineering and Hardware integration of Gas Turbine Control System (GTCS) for
Alstom, Switzerland
Alstom, Switzerland has arrived at an agreement with NeST, Trivandrum for Manufacturing
and Integrating Control System for their Gas Turbine, as per their directions and specifications
given; the project is titled as Turboline 3000. The major scope of this work covers
Engineering
Hardware procurement
Control cubicle manufacturing
Panel assembly and wiring
Developing application software
Total integrated testing.
My Responsibilities:
1. System Study, Requirements Specification Review and Freezing.
2. Preparation of Project proposal, Project estimation and Project schedule.
3. Preparation of BOM and procurement Activities.
4. Preparation of process flow and QA documentation and its approval
5. Overall coordination of cubicle integration at SFO-Kochi, IAT & FAT
6. The Job also involves coordination with various inter departments, External Agencies
and Vendors for smooth execution of the project.
7. 4. WIP-Tracker System for SFO-Technologies, Kochi
The scope of this project includes the Data collection, Data analysis, System design, System
development, Testing, System engineering and Installation and Commissioning at SFO-Kochi.
WIP Tracking System envisaged as a dedicated system to capture the different stages of PCBs
in the lines with Barcode/RFID readers. Stored these data on the server and making multiple
reports for the different levels of management.
My Responsibilities:
Plant Study, Data collection and finalization of User needs.
Preparation of Project proposal, Project estimation and Project schedule.
Preparation of BOM and procurement Activities.
Overall co-ordination of WIP-Tracker System developed at NeST.
The Job also involves coordination with various inter departments, External Agencies
and Vendors for smooth execution of the project.
Overall coordination of System integration, testing and commissioning on site.
Documentation.
5. Deployment of MMCS (Mill Monitoring and Control System)
The scope of the project includes design and development of SCADA System, installation and
commissioning and integration of the system at Oil Mills (in Malaysia) with interfaces like
uploading of important data from the Mills to their Head Quarter through dial-up, PDA
interfaces for raw material quality checking and weigh bridge interfaces for raw material
entry and product outgoing.
My Responsibilities:
System Design and Engineering.
Plant Study, Data collection and finalization of User needs.
Customer Interaction.
Overall supervision of a SCADA package developed at NeST.
Preparation of signal list.
Formulation of monitoring points and Control logics.
Overall coordination of System integration, testing and commissioning on site.
Documentation.
8. C. Previous Role (April 1988 to March 2005)
Position: Senior Technical Officer(Process Automation Group)
(System Engineering,Project Management,Interaction with Customer and Supplier)
C-DAC, Vellayambalam,Trivandrum,Kerala
(Centre for Development of Advanced Computing (C-DAC) is the premier R&D organization of
the Ministry of Electronics and Information Technology (MeitY) for carrying out R&D in IT,
Electronics and associated areas).
Projects:
1. Development and implementation of Scalable, Distributed Intelligent SCADA for retrofit
and it enabling of Hydel Power Plants and Implementation in Teesta Canal Fall Hydel
Project Power Stations- 2 &3(TCFHP ps-2 & ps3) for West Bengal Electricity board,
Siluguri.
The overall philosophy for system development and implementation is one of hierarchical,
distributed, intelligent, building block based SCADA with redundancy built in all levels. This
power station consists of 9MW of 6 generators.
My Responsibilities:
Site study and finalization of signals for the SCADA systems in PS-2 &PS-3
System design,preparation of engineering documents and get approval from the
customer.
Finalization of BOM and wiring diagrams for Field transmitters, Junction boxes, RTU
panels, Power supply distribution and Network architecture.
Overall supervision of Cabling and Installation.
Design and Integration of control strategy.
System integration, testing and commissioning at site.
System configuration, Loop configuration, Report configuration,Alarm configuration,
HMI configuration etc.
2. Waste Immobilization Plant Control System for BARC-Bombay
The scope of this project involves design, development and implementation of Control
System for Wate immobilization plant comprising mainly of acquiring furnace data and
controlling the furnace temperature in different zones according to the set points given
through the system.Those set points are depend upon the radiation parameters given by the
process experts.
9. My Responsibilities:
Site study and finalization of signals.
System design,preparation of engineering documents and get approval from the
customer.
Finalization of BOM and wiring diagrams..
Design and Integration of control strategy.
System integration, testing and commissioning at site.
System configuration, Loop configuration, Report configuration,Alarm configuration,
HMI configuration etc.
3. Water Filter Bed Automation System for Water Treatment Plant #3 ,KWA-Aluva
The project involves design, development and implementation of Filter Bed Automation
System comprising mainly of acquiring filter bed parameters and controlling flow through the
beds and advising appropriate time for manual back – wash.
My Responsibilities:
Site study and finalization of signals.
System design,preparation of engineering documents and get approval from the
customer.
Finalization of BOM and wiring diagrams..
Overall supervision of Cabling and Installation.
Design and Integration of control strategy.
System integration, testing and commissioning at site.
System configuration, Loop configuration, Report configuration,Alarm configuration,
HMI configuration etc.
4. Development and implementation of Paper Pulp-Shade Monitoring and Control
System (Vercos) for M/S.Seshasayee Paper and Boards Ltd., Erode-Tamil Nadu.
Versatile Colour Sensor(VERCOS) developed by Electronics Research and Development
Centre, Thiruvananthapuram for sensing the shade(color) of pulp to produce quality paper.
The optical sensor (VERCOS), used for sensing the color, works as per the theory of reflection
of light. This sensor needs to be integrated with a control system, which can incorporate the
advanced control strategies to take care the inherent time constant and dead time of the
process.
10. My Responsibilities:
System Design and Engineering
Field trial of VERCOS at a paper mill
Formulation of Control logics.
Preparation of wiring diagram for the control system.
System integration, testing and commissioning at M/S. Seshasayee Paper and Boards
Ltd.,Erode-Tamilnadu.
Training for the operation of the system was given to the Engineers/Operators.
Benefit analysis of the shade control system.
Documentation
5. Programmable Governor control system(PGCS-1) for M/S. Aanveri
HydroElectricProject, Banglore and Bhivpuri Hydro Electric project, Bombay.
PGCS-1 is a Microprocessor based Programmable Governor Control System.It is an indigenous
replacement for electronic governors used in Mini/Micro hydroelectric stations. The scope of
the project includes design and development of Programmable Governor control system
,supply of PGCS-1, installation and commissioning and integration of the system with
software for achieving constant Turbine speed regulation, flow regulation, Power regulation.
6. Unified boiler control system for M/S.Seshasayee Paper and Boards Ltd., Erode-
Tamilnadu
The scope of the project includes design and development of advanced process control
system, components of control loops, supply of PC based control system, installation and
commissioning and integration of the system with developed unified boiler control software
for achieving constant header pressure,3 element drum level control and efficient
combustion control.
My Responsibilities(Project-5,6):
System Engineering.
Preparation of wiring diagram for the control system.
Formulation of Control logics.
System integration, testing and commissioning at site
Training for the operation of the system was given to the Engineers/Operators.
Documentation
11. 7. Optimization of Ammonium Bicarbonate plant at RCF-Bombay
The project was implemented on turn-key basis, which includes design, development and
commissioning of the Advanced Process Control System, procurement, erection and
commissioning of the system with developed optimization software for achieving higher
production and modernization of the existing Ammonium Bicarbonate plant in RCF-Bombay.
My Responsibilities:
System Engineering.
Overall supervision of Cabling and Installation.
Preparation of wiring diagram for the control system.
Formulation of Control logics.
Preparation of hook-up drawings, cable routing drawings, loop drawings, and bill of
materials for field instruments.
System integration, testing and commissioning at RCF-Bombay.
Training for the operation of the system was given to the Engineers/Operators.
Documentation.
D. Previous Role (March 1983to April 1988)
Position: Senior Technical Assistant(Materials Development Centre)
(Development and pilot plant production of materials for Electronic Components)
(ER DCI),Trivandrum,Kerala
(ER & DCI), Thiruvananthapuram, is a Scientific Society of the Department of Information
Technology, Ministry of Communications & Information Technology, Government of India. It is a
National Centre of Excellence, pioneering application oriented research, design and development
in Electronics and Information Technology).
My Responsibilities:
Development of dielectric compositions for NTC and PTC Thermistors,Ceramic
Capacitors and Stabilized Zirconia for Oxygen Sensors
E. Previous Role (October 1982 to March 1983)
Position: Supervisor
Public Health Engineering Department,Kerala
12. My Responsibilities:
Supervision for Erection and commissioning of water supply line for Public Health
Engineering Department,Govt.Of Kerala.
F. Previous Role (August 1979 to October 1982)
Position: Shift-in-Charge
(Development and pilot plant production of materials for Electronic Components)
M/S.Gwalior Rayons,Pulp Division,Mavoor,Kozhikode,Kerala
(Manufacturing unit for producing Rayon grade pulp for Fabric).
My Responsibilities:
Evaluate and control each process stages in Soda Recovery Plant and Causticizing Plant
by LAB results and direct process monitoring. Accordingly gave guidance to operators
for better production and smooth running of the plant.
Mechanical /Electrical/Electronics maintenance was carried out by the concerned
departments.
Lead a team of 40 workers for controlling the plant, trouble free and economical.
Education& Training
Diploma in Chemical Engineering from Kerala Govt.Polytechnic,Kozhikode,Technical
Education Board of Kerala.
Training on indigenous Control System Developed by ER & DCI for general purpose.
DCS training on Hitachi Control System for Thermal Power Plant.