ELECTRICAL ENGINEERING PROFESSIONAL
Strong track record of delivering challenging projects within defined cost and time parameters
PPRROOFFIILLEE
 Electrical Engineer, spearheading operations across functional sectors of Project Planning and
contracts management, Technical Evaluation, Maintenance, Client relationship management and
process management. Last spearheaded functions with Tech7Automation systems (i) pvt ltd as
Project Engineer.
 Core competencies in Designing , drawing , estimation and coasting, Panel board integration,
projects, sales , designing, scheduling and managing manpower, machines Technical problem
solving and materials resources to ensure project delivery within defined cost and timelines
 Demonstrated capabilities in designing, commissioning and testing of electrical LV, HVsystems and
installations.
 Capable of striking perfect coordination with all interest groups- clients, site engineers, vendors,
architects, consultants, subcontractors etc – to ensure hassle free work performance.
Core Competencies:
Designing♦ Estimation and coasting ♦ Drawing ♦ Power assessment ♦Project Management & Execution ♦ Site
Administration ♦ Resource Management♦ Work Measurements♦ Client/Subcontractors’ billing ♦ Electrical
Operations & Maintenance ♦ HT/LT panels and equipments erection and commissioning♦ Technical Evaluation/
Inspection/ Testing ♦ Liaison & Coordination Datacenters ♦Datacenter Development ♦ PLC ,control wiring ,Drive
& soft starter installation and commissioning. ♦33kv substation, HT/LT panels, transformers and other LT and HT
equipments installation and commissioning. ♦Datacenter electrical installations
PPRROOFFEESSSSIIOONNAALL EEXXPPEERRIIEENNCCEE
CCoonnssyysstt TTeecchhnnoollooggiieess ((ii)) PPvvtt LLttdd JJaann 22001166 ttoo CCoonnttiinnuuee……
SSrr..EElleeccttrriiccaall DDeessiiggnn EEnnggiinneeeerr
 Estimation and coasting for distribution panels,plc panels,substations,all other electrical turnkey
projects
 Project management, sales , designing, scheduling and managing manpower, machines
Technical problem solving and materials resources to ensure project delivery within defined
cost and timelines
 Project planning using primavera.
TTeecchh77 AAuuttoommaattiioonn SSyysstteemmss IInnddiiaa PPvvtt LLttdd NNoovv 22001133 ttoo DDeecc 22001155
PPrroojjeecctt EEnnggiinneeeerr
 Involved in turnkey solutions and wide range of power ,33kv substation ,Controlling, Fire, cooling
smart solution products
 Designing , drawing , estimation and coasting for substations , turnkey projects , distribution panels..
 Meeting customers ,finding markets ,and selling the solutions meeting customer expectation
and beating competitors solutions
 Sales order booking taking inputs from customer on plant load requirements, preliminary site
vist,site survey design and boq preparation meeting all datacenter standards , Crusher standards,
Spinning and weaving mill standards finalization of order and punching
 Entrusted with the responsibility during various stages of Design, Estimation, Execution, Cost
analysis , billing payment analysis and collection till delivery
 Reviewing project plans and activities schedules with execution team to accomplish project delivery
within agreed timelines.
 Erection and commissioning of all HV/LV panels ,equipments including Drive ,Soft starter, Control
panels and plc panels
 Project planning , executing ,commissioning of LT and HT electrical system, DG synchronization.
 Erection and commissioning of UPS system
 Conducted detailed study of tender drawings & specifications and prepared bill of quantities
considering scope of the project.
 Carried out technical and commercial evaluation of offers and facilitated award of subcontracts to the
qualified subcontractors.
Conventional datacenter
UUSSTT GGlloobbaall TTeecchhnnoollooggiieess TTrriivvaannddrruumm ::-- 77000000 SSqq..ffeeeett aarreeaa((OOnnee ooff tthhee bbiiggggeesstt ddaattaacceenntteerr))
TTIIEERR IIIIII ..
PPllaanntt SSoolluuttiioonnss
KKaakkkkaarraa ccrruusshheerrss ppvvtt llttdd ,,kkaannnnuurr
VVVV TTiittaanniiuumm,, TThhuutthhuukkuuddii
HHiittcchh rruubbbbeerrss ppvvtt llttdd,,ppeerruummbbaavvoooorr
MMootthheerr hhoossppiittaall AArreeaaccooddee
SSyysstteemm EExxppeerriieennccee
FFiirree && SSeeccuurriittyy SSyysstteemm -- FFiirree AAllaarrmm SSyysstteemm,,NNoovveeccSSyysstteemm ,,FFiirree ssuupppprreessssiioonn ssyysstteemm,,WWaatteerr lleeaakkaaggee
ssyysstteemm,,RRooddeenntt rreeppeelllleenntt ssyysstteemm
EElleeccttrriiccaall SSyysstteemm ––HHTT,,LLTT,, UUPPSS,, DDGG,, TTrraannssffoorrmmeerrss ,,MMoottoorrss,, DDrriivveess,, SSoofftt ssttaarrtteerrss ,, PPLLCC,, SSCCAADDAA
HVAC System -Split Unit,Ductabile AC PAC
Monitoring System SCADA, PLC,
Enclosures System-, Rimatrix solution –Rittal
AABBHHIINNAAYYAA EELLEECCTTRRIICCAALL CCOONNTTRRAACCTTSS MMaarr22001133--NNoovv 22001133
PPrroojjeecctt EEnnggiinneeeerr
 Involved in turnkey solutions in mills projects
 Meeting customers ,finding markets ,and selling the solutions meeting customer expectation and
beating competitors solutions
 Booking an order taking inputs from customer plant requirements, preliminary site vist,site survey
design and boq preparation meeting all datacenter standards ,finalization of order and punching
 Entrusted with the responsibility during various stages of Design, Estimation, Execution, Cost
analysis , billing payment analysis and collection till delivery
 Reviewing project plans and activities schedules with execution team to accomplish project delivery
within agreed timelines.
 Managed entire resources at site and administered works execution in accordance with laid pout
project plan.
 Conducted detailed study of tender drawings & specifications and prepared bill of quantities
considering scope of the project.
 Carried out technical and commercial evaluation of offers and facilitated award of subcontracts to the
qualified subcontractors.
 Regularly follow up with vendors and ensured availability of required inputs at site as per schedule.
Reconciled the Materials delivery with the records and highlighted variances for replenishment
 Carried out work measurements and recorded actual work accomplishments on Day to Day basis.
 Maintained close Co-ordination with all interest groups including - Clients, Architects, Consultants,
PMC & Vendors to ensure bottleneck free work execution.
 Supervised entire commissioning activities of the HT/LT panels and 33kv substation systems and
carried out testing before handover.
 Prepared bills for submission to clients and verified subcontractors’ bills for remittance as per
contract terms.
Completed entire documentation related to projects
PPrroojjeeccttss
RRaammccoo cceemmeennttss llttdd,,GGuunnttuurr
TThhaalllluurrii ssppiinnnniinngg mmiillllss llttdd,, kkhhaammmmaamm
KKaallllaamm wweeaavviinngg uunniitt,, oonnggoollee
SSJJVV BBrreevvaarriieesscchheennggaallppeett,, CChheennnnaaii
USHA ELCTRONICS LIGHTS INDIA PVT LTD Jun
2011- Mar 2013
Electrical Engineer
 Entrusted with the responsibility for Production planning and supervising
 Drawn up Material plans and activities schedules to accomplish material delivery within agreed
timelines.
 Managed entire resources at site and administered works execution.
 Generating of idea and developing of new coast effective and low power consumption lights .
 Conducted detailed study of tender drawings & specifications and prepared bill of quantities
considering scope of the project.
 Carried out technical and commercial evaluation of offers and facilitated award of subcontracts to the
qualified subcontractors.
 Checking of row material availability and purchasing .
 Carried out work measurements and recorded actual work accomplishments on Day to Day basis.
 Supervised entire commissioning activities of the systems and carried out testing before handover.
 Prepared bills for submission to clients.
 Completed entire documentation related to take over & Handing over of the projects.
 Troubleshooting of Electronic boards , finding and correcting the faults..
 Meticulously kept maintenance record of all equipments and productively utilized it for resolving
operating issues.
 Mapped requirements of spares and ensured availability of reasonable inventory of critical spares at
all times.
 Controlled wastage and other resources by introducing monthly material control list & Quantity
survey list
 Strictly complied with the established ISO 9001: 2000 standards.
 Ensured safety of the workers and controlled safety regulation.
MALABAR CEMENTS LTD Oct 2010- Dec 2010
Engineering main project
Topic: AUTOMATION OF HOT ESP AND ITS RELATED ACCESSORIES
EEDDUUCCAATTIIOONNAALL && PPRROOFFEESSSSIIOONNAALL CCRREEDDEENNTTIIAALLSS
B.Tech Electrical &Electronics, 2011Calicut University, Kozhikode
AUTO CADD CADDCentre, Palakkad
PERSONAL DETAILS
Date of Birth : March 15, 1990
Nationality : Indian
Languages : English, Hindi, Malayalam, Tamil, Thelugu
Place of Birth : Katampazhipuram
Fathers Name : CK Sreedharan
Marital Status : Single
Passport No :K 3070202
Place of issue :Malappuram
Date of Expiry : 10-08-2022
I do hereby confirm that the information given above is true and correct to the best of
my knowledge.
Place:
Date: [Sreekanth.c.k]
Sreekanth CV-1

More Related Content

What's hot (19)

Samir Patil 16 YRs EXP
Samir Patil 16 YRs EXPSamir Patil 16 YRs EXP
Samir Patil 16 YRs EXP
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
SSNair-CV-Latest-2016
SSNair-CV-Latest-2016SSNair-CV-Latest-2016
SSNair-CV-Latest-2016
 
Ska5
Ska5Ska5
Ska5
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
Comprehensive resume online version
Comprehensive resume   online versionComprehensive resume   online version
Comprehensive resume online version
 
Bill resume
Bill resumeBill resume
Bill resume
 
OST Energy - Global Services
OST Energy - Global Services OST Energy - Global Services
OST Energy - Global Services
 
Ska3
Ska3Ska3
Ska3
 
AK+CV
AK+CVAK+CV
AK+CV
 
CV of Dinesh
CV of DineshCV of Dinesh
CV of Dinesh
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
Pes profile
Pes profilePes profile
Pes profile
 
Arul.s.r project sales & estimation engineer
Arul.s.r project sales  & estimation engineerArul.s.r project sales  & estimation engineer
Arul.s.r project sales & estimation engineer
 
Oficina de proyectos de plataformas marinas
Oficina de proyectos de plataformas marinasOficina de proyectos de plataformas marinas
Oficina de proyectos de plataformas marinas
 
DCP_RESUME
DCP_RESUMEDCP_RESUME
DCP_RESUME
 
promotion_company profile and services
promotion_company profile and servicespromotion_company profile and services
promotion_company profile and services
 
Nitin cv 25 07-16
Nitin cv 25 07-16Nitin cv 25 07-16
Nitin cv 25 07-16
 

Similar to Sreekanth CV-1 (20)

CV _ Azhar Ansari
CV _ Azhar AnsariCV _ Azhar Ansari
CV _ Azhar Ansari
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
PREMENDRA CV Apr 6
PREMENDRA CV Apr 6PREMENDRA CV Apr 6
PREMENDRA CV Apr 6
 
SNM CV NEW-1
SNM CV NEW-1SNM CV NEW-1
SNM CV NEW-1
 
Latest resume
Latest resumeLatest resume
Latest resume
 
Latest resume
Latest resumeLatest resume
Latest resume
 
Latest resume
Latest resumeLatest resume
Latest resume
 
Suvajit_Resume
Suvajit_ResumeSuvajit_Resume
Suvajit_Resume
 
Resume_-_Sourav_Sengupta
Resume_-_Sourav_SenguptaResume_-_Sourav_Sengupta
Resume_-_Sourav_Sengupta
 
Resume Baru
Resume BaruResume Baru
Resume Baru
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project Engineer
 
F. CV
F. CVF. CV
F. CV
 
Aftab resume
Aftab resumeAftab resume
Aftab resume
 
RESUME BHAGATSINH VERMA
RESUME BHAGATSINH VERMA RESUME BHAGATSINH VERMA
RESUME BHAGATSINH VERMA
 
CV
CVCV
CV
 
krishnajith_original
krishnajith_originalkrishnajith_original
krishnajith_original
 
Malikjan Resume New
Malikjan Resume NewMalikjan Resume New
Malikjan Resume New
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 

Sreekanth CV-1

  • 1. SREEKANTH CK Kanneri (ho), Mannampatta (po), Palakkad, Kerala -678633 Contact: +91 9446106222;E-mail: sreekanthkanneri@gmail.com ELECTRICAL ENGINEERING PROFESSIONAL Strong track record of delivering challenging projects within defined cost and time parameters PPRROOFFIILLEE  Electrical Engineer, spearheading operations across functional sectors of Project Planning and contracts management, Technical Evaluation, Maintenance, Client relationship management and process management. Last spearheaded functions with Tech7Automation systems (i) pvt ltd as Project Engineer.  Core competencies in Designing , drawing , estimation and coasting, Panel board integration, projects, sales , designing, scheduling and managing manpower, machines Technical problem solving and materials resources to ensure project delivery within defined cost and timelines  Demonstrated capabilities in designing, commissioning and testing of electrical LV, HVsystems and installations.  Capable of striking perfect coordination with all interest groups- clients, site engineers, vendors, architects, consultants, subcontractors etc – to ensure hassle free work performance. Core Competencies: Designing♦ Estimation and coasting ♦ Drawing ♦ Power assessment ♦Project Management & Execution ♦ Site Administration ♦ Resource Management♦ Work Measurements♦ Client/Subcontractors’ billing ♦ Electrical Operations & Maintenance ♦ HT/LT panels and equipments erection and commissioning♦ Technical Evaluation/ Inspection/ Testing ♦ Liaison & Coordination Datacenters ♦Datacenter Development ♦ PLC ,control wiring ,Drive & soft starter installation and commissioning. ♦33kv substation, HT/LT panels, transformers and other LT and HT equipments installation and commissioning. ♦Datacenter electrical installations PPRROOFFEESSSSIIOONNAALL EEXXPPEERRIIEENNCCEE CCoonnssyysstt TTeecchhnnoollooggiieess ((ii)) PPvvtt LLttdd JJaann 22001166 ttoo CCoonnttiinnuuee…… SSrr..EElleeccttrriiccaall DDeessiiggnn EEnnggiinneeeerr  Estimation and coasting for distribution panels,plc panels,substations,all other electrical turnkey projects  Project management, sales , designing, scheduling and managing manpower, machines Technical problem solving and materials resources to ensure project delivery within defined cost and timelines  Project planning using primavera. TTeecchh77 AAuuttoommaattiioonn SSyysstteemmss IInnddiiaa PPvvtt LLttdd NNoovv 22001133 ttoo DDeecc 22001155 PPrroojjeecctt EEnnggiinneeeerr  Involved in turnkey solutions and wide range of power ,33kv substation ,Controlling, Fire, cooling smart solution products  Designing , drawing , estimation and coasting for substations , turnkey projects , distribution panels..
  • 2.  Meeting customers ,finding markets ,and selling the solutions meeting customer expectation and beating competitors solutions  Sales order booking taking inputs from customer on plant load requirements, preliminary site vist,site survey design and boq preparation meeting all datacenter standards , Crusher standards, Spinning and weaving mill standards finalization of order and punching  Entrusted with the responsibility during various stages of Design, Estimation, Execution, Cost analysis , billing payment analysis and collection till delivery  Reviewing project plans and activities schedules with execution team to accomplish project delivery within agreed timelines.  Erection and commissioning of all HV/LV panels ,equipments including Drive ,Soft starter, Control panels and plc panels  Project planning , executing ,commissioning of LT and HT electrical system, DG synchronization.  Erection and commissioning of UPS system  Conducted detailed study of tender drawings & specifications and prepared bill of quantities considering scope of the project.  Carried out technical and commercial evaluation of offers and facilitated award of subcontracts to the qualified subcontractors. Conventional datacenter UUSSTT GGlloobbaall TTeecchhnnoollooggiieess TTrriivvaannddrruumm ::-- 77000000 SSqq..ffeeeett aarreeaa((OOnnee ooff tthhee bbiiggggeesstt ddaattaacceenntteerr)) TTIIEERR IIIIII .. PPllaanntt SSoolluuttiioonnss KKaakkkkaarraa ccrruusshheerrss ppvvtt llttdd ,,kkaannnnuurr VVVV TTiittaanniiuumm,, TThhuutthhuukkuuddii HHiittcchh rruubbbbeerrss ppvvtt llttdd,,ppeerruummbbaavvoooorr MMootthheerr hhoossppiittaall AArreeaaccooddee SSyysstteemm EExxppeerriieennccee FFiirree && SSeeccuurriittyy SSyysstteemm -- FFiirree AAllaarrmm SSyysstteemm,,NNoovveeccSSyysstteemm ,,FFiirree ssuupppprreessssiioonn ssyysstteemm,,WWaatteerr lleeaakkaaggee ssyysstteemm,,RRooddeenntt rreeppeelllleenntt ssyysstteemm EElleeccttrriiccaall SSyysstteemm ––HHTT,,LLTT,, UUPPSS,, DDGG,, TTrraannssffoorrmmeerrss ,,MMoottoorrss,, DDrriivveess,, SSoofftt ssttaarrtteerrss ,, PPLLCC,, SSCCAADDAA HVAC System -Split Unit,Ductabile AC PAC Monitoring System SCADA, PLC, Enclosures System-, Rimatrix solution –Rittal
  • 3. AABBHHIINNAAYYAA EELLEECCTTRRIICCAALL CCOONNTTRRAACCTTSS MMaarr22001133--NNoovv 22001133 PPrroojjeecctt EEnnggiinneeeerr  Involved in turnkey solutions in mills projects  Meeting customers ,finding markets ,and selling the solutions meeting customer expectation and beating competitors solutions  Booking an order taking inputs from customer plant requirements, preliminary site vist,site survey design and boq preparation meeting all datacenter standards ,finalization of order and punching  Entrusted with the responsibility during various stages of Design, Estimation, Execution, Cost analysis , billing payment analysis and collection till delivery  Reviewing project plans and activities schedules with execution team to accomplish project delivery within agreed timelines.  Managed entire resources at site and administered works execution in accordance with laid pout project plan.  Conducted detailed study of tender drawings & specifications and prepared bill of quantities considering scope of the project.  Carried out technical and commercial evaluation of offers and facilitated award of subcontracts to the qualified subcontractors.  Regularly follow up with vendors and ensured availability of required inputs at site as per schedule. Reconciled the Materials delivery with the records and highlighted variances for replenishment  Carried out work measurements and recorded actual work accomplishments on Day to Day basis.  Maintained close Co-ordination with all interest groups including - Clients, Architects, Consultants, PMC & Vendors to ensure bottleneck free work execution.  Supervised entire commissioning activities of the HT/LT panels and 33kv substation systems and carried out testing before handover.  Prepared bills for submission to clients and verified subcontractors’ bills for remittance as per contract terms. Completed entire documentation related to projects PPrroojjeeccttss RRaammccoo cceemmeennttss llttdd,,GGuunnttuurr TThhaalllluurrii ssppiinnnniinngg mmiillllss llttdd,, kkhhaammmmaamm KKaallllaamm wweeaavviinngg uunniitt,, oonnggoollee SSJJVV BBrreevvaarriieesscchheennggaallppeett,, CChheennnnaaii USHA ELCTRONICS LIGHTS INDIA PVT LTD Jun 2011- Mar 2013 Electrical Engineer  Entrusted with the responsibility for Production planning and supervising  Drawn up Material plans and activities schedules to accomplish material delivery within agreed timelines.  Managed entire resources at site and administered works execution.  Generating of idea and developing of new coast effective and low power consumption lights .  Conducted detailed study of tender drawings & specifications and prepared bill of quantities considering scope of the project.  Carried out technical and commercial evaluation of offers and facilitated award of subcontracts to the qualified subcontractors.  Checking of row material availability and purchasing .  Carried out work measurements and recorded actual work accomplishments on Day to Day basis.
  • 4.  Supervised entire commissioning activities of the systems and carried out testing before handover.  Prepared bills for submission to clients.  Completed entire documentation related to take over & Handing over of the projects.  Troubleshooting of Electronic boards , finding and correcting the faults..  Meticulously kept maintenance record of all equipments and productively utilized it for resolving operating issues.  Mapped requirements of spares and ensured availability of reasonable inventory of critical spares at all times.  Controlled wastage and other resources by introducing monthly material control list & Quantity survey list  Strictly complied with the established ISO 9001: 2000 standards.  Ensured safety of the workers and controlled safety regulation. MALABAR CEMENTS LTD Oct 2010- Dec 2010 Engineering main project Topic: AUTOMATION OF HOT ESP AND ITS RELATED ACCESSORIES EEDDUUCCAATTIIOONNAALL && PPRROOFFEESSSSIIOONNAALL CCRREEDDEENNTTIIAALLSS B.Tech Electrical &Electronics, 2011Calicut University, Kozhikode AUTO CADD CADDCentre, Palakkad PERSONAL DETAILS Date of Birth : March 15, 1990 Nationality : Indian Languages : English, Hindi, Malayalam, Tamil, Thelugu Place of Birth : Katampazhipuram Fathers Name : CK Sreedharan Marital Status : Single Passport No :K 3070202 Place of issue :Malappuram Date of Expiry : 10-08-2022 I do hereby confirm that the information given above is true and correct to the best of my knowledge. Place: Date: [Sreekanth.c.k]