1. Adil Mansoor
Al Gihaz Co.
Olaya –Al-Oroba, Riyadh
(Saudi Arabia)
: +966-571789539
adil.mansoor26@gmail.com
Career Objective
• Looking for junior level managerial assignments in Project Management/Engineering with a growth oriented
organization, where my professional experience and skills will contribute towards achieving the goals and objectives
of the organization. Willing to work as a key player in challenging & creative environment & to contribute towards
the progress and growth of the organization using my personal and managerial skills.
Synopsis
• Working as a Project Development Engineer having more than 5 Years’ experience in Installing, Testing &
Commissioning of Internal Electrification and power Jobs (HT & LT with all internal & external electrification &
LV System) of Solar EPC projects, Hotels.
• A keen communicator having the ability to communicate to people across all hierarchical levels in the organization
and to create a healthy relationship with all the heads and managers to solicit their support in achieving the
functional and business goals of the organization.
Projects Execution.
• Responsible for Erection of Structures & Modules ,Combiner Boxes, Array Box by coordinating with Civil Team,
Structure Team and Contractors.
• Work with a team of engineers in designing, developing, testing and homologating solar photovoltaic systems,
support structures, solar panels, modules, batteries and electric power generation units for residential and light
commercial use.
• Prepare all pertinent documentation for each manufactured product like user’s manual, installation manual,
operations manual and technical reference manuals.
• Prepare, inspect and assemble solar panels, modules, panels and support structures, as prescribed in the assembly
instruction.
• Conduct site inspections to check on work progress and compliance to work specifications.
• Have experiences of module arrays connection, combiners boxes, cable laying calculation, inverters installation and
commissioning.
• Cable laying for array junction boxes and string combiner boxes till L.T. panels.
• Suggesting possible improvements that are technically feasible for future projects of the company.
• Testing and commissioning of inverter, transformer, switchgears and HT yards.
• Also responsible for action taken for the product degrading.
Page 1 of 6
2. • Performance testing of solar modules w.r.t. environment and as per datasheet of module.
• Responsible for preparing Daily Progress report and Monthly Progress reports against target as per define format.
• Lead a team of supervisors technicians for procurement of effective project tasks.
• Deft in overseeing project activities from conceptualization for execution including Preparation, Technical
specifications, stage inspections, progress monitoring, datasheets and commissioning.
Work Experience
Al-Gihaz Co. Holding- Riyadh
Founded by Saeed Ali Al-Angari in 1975, AlGihaz Company has grown from a small contracting firm to a multi-
billion Saudi Riyals group of companies. The group comprises of a number of firms, which collaborate to form a
prominent entity of various activities that include power, electrical, civil, environmental, structural, commercial,
industrial, high end technology products, information technology security and solution, communications, value
added services, geographic information systems (GIS), Value added Services (VAS), visualization and real estate
development.
Electrical Project development Engineer (June-2014 to present)
Job Profile Responsibilities
• Participating in project review meetings with clients for evaluating progress.
• Lead and direct safety meetings with the crew, ensuring strict compliance with approved safety practices and Saudi
Aramco standards.
• Prepare a compilation of periodic reports suggesting improvements to the power system.
• Provide support for the installation of new equipment, including working with the vendor to ensure that equipment
is installed according to drawings and specifications.
• Direct, supervise and provide consultation to the senior technicians for the preventive maintenance of the large and
complex power system equipment.
• Maintain a complete record of all scheduled and unscheduled outages in their area of operation.
• Coordination with Various departments related to project.
• Project document management system.
• Preparation of tender specification.
• Preparation of bid document.
• Prepare all pertinent documentation for each manufactured product like user’s manual, installation manual,
operations manual and technical reference manuals.
• Work with a team of engineers in designing, developing, testing and homologating solar photovoltaic systems,
support structures, solar panels, modules, batteries and electric power generation units for residential and light
commercial use.
• Prepare all pertinent documentation for each manufactured product like user’s manual, installation manual,
operations manual and technical reference manuals.
• Prepare, inspect and assemble solar panels, modules, panels and support structures, as prescribed in the assembly
instruction.
Page 2 of 6
3. • Conduct site inspections to check on work progress and compliance to work specifications.
• Prepare, inspect and assemble solar panels, modules, panels and support structures, as prescribed in the assembly
instruction.
• Handle the tasks of providing support in handling contract agreement with vendors
• Perform responsibilities of providing support in commissioning process and in evaluating design tools.
• Responsible for conducting performance analysis to provide long term performance of systems.
• In-depth knowledge of Solar power generation systems, application tools, and procedures.
• Comprehensive knowledge of electrical power systems, supervisory control and data acquisition systems.
• Extensive knowledge of renewable energy, instrumentation control systems, and data acquisition.
• Familiar with the standards and guidelines of power generation industry.
Sterling Wilson Ltd – Noida (Associate of Shapoorji Pallonji CO. Ltd.)
Established in 1927 as Wilson Electric Works by the Daruvala family, Sterling and Wilson was formed in 1971
with the Shapoorji Pallonji Group taking a 51% stake in the company.
Electrical Project Engineer– Project (May-2011 to June-2014)
Working as a team as per requirements and reporting to General Manager
1 Client : Easel Mining Industries Ltd.
Project : Development of 15 MW (DC) Solar Power Project in Alladurg Telangana
Employer : Sterling Wilson Ltd. (Associate of Shapoorji Pallonji Co. Ltd.)
Position : Electrical Engineer - Project
Role : Planning of Work, Manage/Execute of all Electrical jobs.
Project Cost : 1.10 Billions.
2 Client : Arihant Agro farms
Project : Development of 30 MW (AC) Solar Power Project in Rajasthan
Employer : Sterling Wilson Ltd. (Associate of Shapoorji Pallonji Co. Ltd.)
Position : Electrical Engineer - Project
Role : Planning of Work, Manage/Execute of all Electrical jobs.
Project Cost : 3. 10 Billions.
3 Client : Malpani Group (Giriraj Enterprise)
Project : Development of 14 MW +19 MW (AC) Solar Power Project in Rajasthan
Employer : Sterling Wilson Ltd. (Associate of Shapoorji Pallonji Co. Ltd.)
Position : Electrical Engineer - Project
Role : Planning of Work, Manage/Execute of all Electrical jobs
Project Cost : 3.55 Billions.
4 Client : North West Energy Pvt. Ltd.
Project : 5.5 MW Solar Power Plant, Jodhpur, Rajasthan
Employer : Sterling Wilson Ltd. (Associate of Shapoorji Pallonji Co. Ltd.)
Position : Electrical Engineer - Project
Role : Planning of Work, Manage/Execute of all Electrical jobs, Attend meeting with client,
Drawing Preparation, Stock management, Billing Etc.
Project Cost : 1.8 Hundred millions.
Page 3 of 6
4. 5 Client : Viraj Renewable Energy Pvt. Ltd.
Project : 5.5 MW Solar Power Plant, Jodhpur, Rajasthan
Employer : Sterling Wilson Ltd. (Associate of Shapoorji Pallonji Co. Ltd.)
Position : Electrical Engineer - Project
Role : Planning of Work, Manage/Execute of all Electrical jobs, Attend meeting with client,
Drawing Preparation, Stock management, Billing Etc.
Project Cost : 1.9 Hundred millions.
6 Client : BHARAT HOTEL
Project : Complete Electrical Work, Jaipur, Rajasthan
Employer : Sterling Wilson Ltd. (Associate of Shapoorji Pallonji Co. Ltd.)
Position : Electrical Engineer - Project
Role : Planning of Work, Manage/Execute of all Electrical jobs, Attend meeting with client,
Drawing Preparation, Stock management, Billing Etc.
Project Cost : 10 millions.
Job Profile Responsibilities
• Responsible for identifying requirements to meet the project delivery schedules and in determining solutions, if any
• Handle responsibilities of providing technical guidance to the staff in power system startup and commissioning
• Handle the tasks of monitoring solar power performance and record metrics of the same
• Perform research on best techniques and strategies to provide full support in all phase of the project
• Perform operation and maintenance of power systems to ensure quality control Responsible for analyzing project
development documents and provide recommendations, if required
• Handle the tasks of preparing work scope and request of proposal for various power energy projects and responsible
for calculating energy consumption.
• Project Management including Co-ordination of Man, Materials Equipments, Quantity Estimation according to
Drawings/BOQ, and Execution as per Site requirements and Drawings.
• Supervise, direct and provide ultimate solutions to senior technicians and operators for the operation, installation,
testing, commissioning, troubleshooting, repairing and maintenance of the power distribution equipment, including
power system relays, power transformers, air/gas/vacuum/oil circuit breakers, reactors, load break switches/
disconnect switches, power cables and overhead lines.
• Lead and direct safety meetings with the crew, ensuring strict compliance with approved safety practices.
• Prepare a compilation of periodic reports suggesting improvements to the power system.
• Provide support for the installation of new equipment, including working with the vendor to ensure that equipment
is installed according to drawings and specifications.
• Review test results carried out by lower level technicians during maintenance.
• Direct, supervise and provide consultation to the senior technicians for the preventive maintenance of the large and
complex power system equipment.
• Develop preventive maintenance procedures for new equipment in their area of operation.
• Direct continuous monitoring and control of the power distribution system within their area for optimum overall
system reliability.
• Maintain a complete record of all scheduled and unscheduled outages in their area of operation.
• Preparation of Pert Chart as per scope of work and time.
Page 4 of 6
5. • Installation, Testing commissioning of Distribution Transformer, HT LT Panels and cables laying .all electrical
equipment, Main distribution panel ,Sub distribution panel, UPS And DBs.
• Installation of cable trays, trenches, Hume Pipes G.I Pipes for Cables Laying and termination for above panels.
• Installation, Testing commissioning Of Earth Pits Laying of Earth strips/Cables for Body Earthing of all electrical
panels Transformer, Neutral Earthing of transformer/DG and Dedicated Earthing of UPS, Earthing for the
protection of building against Lightening.
• Installation of Conduits Race ways and Wiring, Ferruling DB dressing for internal electrification.
• Responsible for QA/QC inspection correspondence and coordination works.
• Preparation of necessary documents/correspondence letter for Approval and Hand over of the project.
• Prepares contractor progress analysis related with construction recovery schedule, monitoring of daily actual work
activities.
A Complete knowledge of DC cables , Ac cables , SMU, AJB, INVERTERS, H.T Panel, L.T Panel, H.T cable,
Transformers, HT jointing (state through End terminations) DC cable jointing, also involved in the operation and
Maintenance work including the responsibility for giving the GENERATION for the plant.
Providing technical reports and documentation, according to company standards.
Preparing OM schedule, Check sheet, Formats as per contract of all equipments.
• Prepare daily manpower schedule and submit to consultant and Client for monitoring.
Professional Academic Qualification
Standard/Branch 10th Standard Intermediate Degree (B.Tech) in
Electrical Electronics Engg.
Board/University/Institu
te
Noida Public School,
Noida
Noida Public School, Noida Maharishi Dayanand
University, Rohtak
Year of Passing March 2005 March 2007 May 2011
Percentage 78.5% 72.5% 68.50%
Technical Knowledge
GUI’s : Windows Ms-Office – 2007 (Word, Excel, PowerPoint)
Packages : Internet, E-mail
Hobbies
Watching cricket
Listening of music
Surfing on internet
Page 5 of 6
6. Personal Information
Name : Adil Mansoor
Father’s name : Mohd. Mansoor Alam
Father’s occupation : Semi Govt. Employee
Date of Birth : June 23, 1990
Marital status : Single
Gender : Male
Languages known : Hindi, English Urdu.
Permanent address : H-363 block-H Jaitpur Extn. Part-2
Badarpur - 110044
(New Delhi)
Phone: 0555395794, +919711732561,+919717956556
Passport No. : J0947169
Dear Sir / Madam,
If given opportunity to work with your prestigious organization, I assure you of dedication, patience and team spirit
from my side I may be able to prove my self to give the maximum professional services.
Date: - (Adil Mansoor)
Place:-
Page 6 of 6