SlideShare a Scribd company logo
1 of 6
RESUME
Fayez A. Al-Talib
P.O.Box 1036
Eastern province 31972
Saudi Arabia
Mobil: +966 5 0382-2751
E-mail: fayez1920003@yahoo.com
FAYEZALTALIB@eaton.COM
Dear Sir,
Please accept the enclosed resume as an expression of interest in exploring
employment opportunities with in your organization.
Through my resume are brief details, which demonstrate some of the manner in which I
can achieve success. However, through years of hard work with several companies I
gain lots of experiences in several fields.
I enjoy a challenge and work hard to attain my goals. Constant communication with all
levels of management has strengthened my interpersonal skills, and ability to work in a
team environment
I would welcome an interviewing opportunity at your earliest convenience.
Thank you for your time and consideration. I am certain that I can be a contributing
member of your company.
Sincerely,
Fayez A. Al-Talib
1
RESUME
P.O. BOX 1036 • Eastern province, 31972 • SAUDI ARABIA
• CELL 0503822751
E-MAILS- FAYEZ1920003@YAHOO.COM
Fayezaltalib@eaton.com
FAYEZ AL-TALIB
OBJECTIVE
A challenging position that allows me to have a good involvement and experience
that leads me to a successful engineering career.
PROFESSIONAL EXPERIENCE
Cooper Industries (EATON) Electrical Production Sup.
July 2012-up to date
-Assures product and process quality by designing testing methods
-Provides manufacturing decision-making information by calculating production, labor,
and material costs; reviewing production schedules.
-Maintains product and process data base by writing computer programs; entering data.
-Completes design and development projects by training and guiding technicians.
-Maintains professional and technical knowledge by attending educational workshops
-Maintains staff by recruiting, selecting, orienting, and training employees; developing
-personal growth opportunities
-Maintains safe and clean work environment by educating and directing personnel on the
use of all control points
Aramco KHURSANIYAH Gas Producing Facilities Div. Project
Site Superintendent Engineer III, April 18, 2009-June 5, 2012
- Loop Folders Shooting,
-Functional Testing responsibility among Aramco Standers familiarity.
-Loop Folders systematize,
-Instrument Installations verify P&ID walkthroughs.
-Contractor site construction follow ups.
Fluor Arabia
Instrumentation Engineer II, October 18, 2007-March 31,2009
Sipchem (Saudi International Petrochemical Company)
- I was hired as Instrumentation Engineer III.
- Assigned to review submittals,
-Coordinate with the design contractor,
2
RESUME
-Conduct technical meetings providing solutions to numerals work issues,
-inspect the contractor work flow as the project progress,
- review RFI’s, and preparing a leader work schedule procedure.
Al-Hugayet Company
Electrical Field Engineer, Aug 2003- Oct 2007
UPGRADE SANITARY WASTEWATER TREATMENT FACILITIES, DH/
BI-10-00466
In this project I was evolved in the early design stage to work along with the
designer contractor office in designing this project. However, this experience
gave me the opportunity to gain more knowledge of a flow of a project, plan
through out the project, estimate the total cost of the project.
DH LAP R&D project/ BI-10-3313
I was involved with following up contractor’s weekly progress. Moreover,
reviewing technical submittals, advising contractor, writing daily reports, plan
through out the project, and estimating the cost of the project, conducting
meetings with contractor, vendors, designer and assuring safe and successful
works.
ABQAIQ LAP/ BI-10-3420
I was working as Site Superintendent for Six months. Covering the place of Civil,
Mechanical and Electrical Engineer. I gain the opportunity to deal with more
electrical equipments such: 200KVA transformers, Stand-alone UPS’s, and
testing/commissioning electrical cables.
SUP (Security Upgrading Project) BI-10-00221
In this project, I was involved in providing Electrical power to the CCTV System,
street lighting, Guard houses, and all associate (trenching, terminating, testing,
and commissioning). Thus, install new Electrical devices such as: Fiber optic
Mesh, and Security Cameras around communities. However, this project
increased my knowledge in coordination with other Aramco departments.
Jeraisy Company
Consultant for Aramco Company, Feb 2003 — July 2003
• CA/FAS (Facilities Services) Unit, Bldg-84O
During my Six months with CA/Facilities Services Unit I was involve in doing the
PM (Preventive Maintenance) for the rectifiers, inverters and other electrical
equipments. Moreover, I was heavily involved in maintaining all Bldg 840 DH
facilities, fire alarm disabling, AC conditioners maintenance, smoke detectors,
inside/outside Bldg projects, tracing and labeling receptacles, and also writing
maintenance reports.
3
RESUME
• CA/OSP (Out side Plant) Unit. B-3163, July 2002— Jan 2003
During my seven months with the Central Area OSP Unit, I was given different
duties and responsibilities such as writing and reviewing technical writing reports,
reviewing the OSP’s designs, coordinating the bi-monthly OSP M-job meeting,
finalize the minutes report of the M-job meeting and following up on contractors’
workers on the field. In addition, helping on doing a Cut over sheets in
preparation of cables pair’s transfer, keeping and tracking daily T.T. and S.O. for
OSP Unit. Conducting a site surveys with OSP Engineers and contractors before
starting and after completing any job, to insure that the job was implemented as it
was planed.
Schlumberger, June 2001- Nov. 2001
Working as MWD/LWD Engineer
• Oil Industry Production
Baker Hughes Intec, 2000-2001
• Drilling Oil wells
EDUCATI ON
A&M University Of Alabama, Huntsville, AL USA
Bachelor of Science in Electrical Engineering Technology
[1996-2000]
• GPA 3.20
LANGUAGES
Fluent English & Arabic
SKILLS
Aramco Standers familiarization, Sipchem Standards familiarization, good
locations adaptabilities, excellent with team communication, SAK work
locations familiars, Leadership skills, Technical work scope classifying, Good
inclement in Microsoft Office, Networking, Fortran program, Micro computer
Concepts,
TRAINING
1- PMP (Project Management Program).
It is a five days course where I concentrate all my knowledge with Projects. It
allows me to focus more and get wide vision about projects.
2- SAP
This is was inside training at the company (Cooper Industries) for two months.
4
RESUME
3- FAS: (Facility Advance System)
Trained to maintain and repair critical equipments such as UPS (Un-interrupted
Power Source), rectifiers, inverters and soothe electrical equipment. Also, I’m
trained to follow up with T.T. and S.O. that are related to facility unit at Bldg 840,
Dhahran. Thus, maintaining the PM (Preventive Maintenance), assigning work to
Sub-contractor for Bldg. projects. Moreover, had some courses while in facility
unit such as:
4. DIP (Driving Improvement Program) at DH Driving School and pass with excellent
grade.
5. Three days lecture about Aramco Ten roles and improvement set by Dr. Almushai
(Communication and Technology VP)
• Baker Hughes Intec
A performance drilling engineer / Coring engineer, that’s deals with vertical wells
drilling and taking samples from layers of formations and calculate the Hydraulics
Proposals.
1. (H2S) training on how to breathe and act under a leaking gas situation.
• Schlumberger
MWD (measurement while drilling)/ LWD (logging while drilling) Engineer, this
deals a lot with providing the client with the well logs and type of formation.
Also reading the signals of radiations coming from the ground.
2. CPR training: Where we learned how to deal in situation of emergences
or accidents or even body bums.
3. Basic Fire Fighting
4. Basic Medic First Aid
REFRANCES
Communication Dept (DH): Ismail, Ali J, Tell. 876-4363 or Email at
ALI.ISMAIL.5@ARAMCO.COM
PMT Dept (East Park BI Projects) Darwish, Hilal H, Tell. 862-5431 or Email at
HILAL.DARWISH@ARAMCO.COM
PMT (Mega Project KGP) Hamidaddin, Alradhi A Tell. 677-3247 or Email at
ALRADHI.HAMIDADDIN@ARAMCO.COM
PMT (Mega Project RTDB2 &DR2) Balharith, Hammad Tell. 8621320 or Email at
Hamad.balhareth.2@aramco.com
Eaton Tony Thomas Tell:8121291 or Email
TonyTMThomas@Eaton.com
5
RESUME
3- FAS: (Facility Advance System)
Trained to maintain and repair critical equipments such as UPS (Un-interrupted
Power Source), rectifiers, inverters and soothe electrical equipment. Also, I’m
trained to follow up with T.T. and S.O. that are related to facility unit at Bldg 840,
Dhahran. Thus, maintaining the PM (Preventive Maintenance), assigning work to
Sub-contractor for Bldg. projects. Moreover, had some courses while in facility
unit such as:
4. DIP (Driving Improvement Program) at DH Driving School and pass with excellent
grade.
5. Three days lecture about Aramco Ten roles and improvement set by Dr. Almushai
(Communication and Technology VP)
• Baker Hughes Intec
A performance drilling engineer / Coring engineer, that’s deals with vertical wells
drilling and taking samples from layers of formations and calculate the Hydraulics
Proposals.
1. (H2S) training on how to breathe and act under a leaking gas situation.
• Schlumberger
MWD (measurement while drilling)/ LWD (logging while drilling) Engineer, this
deals a lot with providing the client with the well logs and type of formation.
Also reading the signals of radiations coming from the ground.
2. CPR training: Where we learned how to deal in situation of emergences
or accidents or even body bums.
3. Basic Fire Fighting
4. Basic Medic First Aid
REFRANCES
Communication Dept (DH): Ismail, Ali J, Tell. 876-4363 or Email at
ALI.ISMAIL.5@ARAMCO.COM
PMT Dept (East Park BI Projects) Darwish, Hilal H, Tell. 862-5431 or Email at
HILAL.DARWISH@ARAMCO.COM
PMT (Mega Project KGP) Hamidaddin, Alradhi A Tell. 677-3247 or Email at
ALRADHI.HAMIDADDIN@ARAMCO.COM
PMT (Mega Project RTDB2 &DR2) Balharith, Hammad Tell. 8621320 or Email at
Hamad.balhareth.2@aramco.com
Eaton Tony Thomas Tell:8121291 or Email
TonyTMThomas@Eaton.com
5

More Related Content

What's hot

What's hot (19)

Resume avinash 142015
Resume avinash 142015Resume avinash 142015
Resume avinash 142015
 
jameen new senior instrument cv
jameen new senior instrument cvjameen new senior instrument cv
jameen new senior instrument cv
 
Firoz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu K - Sr. Mechanical Engineer - CVFiroz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu K - Sr. Mechanical Engineer - CV
 
TOM'S report
TOM'S reportTOM'S report
TOM'S report
 
JAYSON GAMIL (Mech. Foreman)
JAYSON  GAMIL (Mech. Foreman)JAYSON  GAMIL (Mech. Foreman)
JAYSON GAMIL (Mech. Foreman)
 
Resume - Maj Dev Raj Verma (Linked)
Resume - Maj Dev Raj Verma (Linked)Resume - Maj Dev Raj Verma (Linked)
Resume - Maj Dev Raj Verma (Linked)
 
CV1
CV1CV1
CV1
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANAN
 
ZS CV final
ZS CV finalZS CV final
ZS CV final
 
Arshad CV O
Arshad CV OArshad CV O
Arshad CV O
 
Alex Resume 1
Alex Resume 1Alex Resume 1
Alex Resume 1
 
USAJobsres
USAJobsresUSAJobsres
USAJobsres
 
D.Manning CV
D.Manning CVD.Manning CV
D.Manning CV
 
Yuthasil-CV-June-2016-pic
Yuthasil-CV-June-2016-picYuthasil-CV-June-2016-pic
Yuthasil-CV-June-2016-pic
 
James (RICK) Pridgen Safety Resume June 2015
James (RICK) Pridgen Safety Resume June 2015James (RICK) Pridgen Safety Resume June 2015
James (RICK) Pridgen Safety Resume June 2015
 
Resume
ResumeResume
Resume
 
Maintenance Manager - CV
Maintenance Manager - CVMaintenance Manager - CV
Maintenance Manager - CV
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M Rico
 
Ac technician (1)
Ac technician (1)Ac technician (1)
Ac technician (1)
 

Viewers also liked

Viewers also liked (20)

ANALISIS POLA INTERAKSI GENOTIPE X LINGKUNGAN UNTUK STABILITAS HASIL DAN ADAP...
ANALISIS POLA INTERAKSI GENOTIPE X LINGKUNGAN UNTUK STABILITAS HASIL DAN ADAP...ANALISIS POLA INTERAKSI GENOTIPE X LINGKUNGAN UNTUK STABILITAS HASIL DAN ADAP...
ANALISIS POLA INTERAKSI GENOTIPE X LINGKUNGAN UNTUK STABILITAS HASIL DAN ADAP...
 
Ch09 4e
Ch09 4eCh09 4e
Ch09 4e
 
Novedades lij dic.16
Novedades lij dic.16Novedades lij dic.16
Novedades lij dic.16
 
FandyPratama-TIF2010B-1412100101
FandyPratama-TIF2010B-1412100101FandyPratama-TIF2010B-1412100101
FandyPratama-TIF2010B-1412100101
 
Ms. amrhein
Ms. amrheinMs. amrhein
Ms. amrhein
 
XẠ HÌNH PHỔI
XẠ HÌNH PHỔIXẠ HÌNH PHỔI
XẠ HÌNH PHỔI
 
bioteknologi HPT cabai
bioteknologi HPT cabaibioteknologi HPT cabai
bioteknologi HPT cabai
 
Isi
IsiIsi
Isi
 
Fracture Mechanics & Failure Analysis Lecture 1
Fracture Mechanics & Failure Analysis Lecture 1Fracture Mechanics & Failure Analysis Lecture 1
Fracture Mechanics & Failure Analysis Lecture 1
 
Vacuum Metallurgy Lecture 2
Vacuum Metallurgy Lecture 2Vacuum Metallurgy Lecture 2
Vacuum Metallurgy Lecture 2
 
Advances in Special Steel: Maraging steel updated 2016
Advances in Special Steel: Maraging steel updated 2016Advances in Special Steel: Maraging steel updated 2016
Advances in Special Steel: Maraging steel updated 2016
 
ADDITIVE MAIN EFFECTS AND MULTIPLICATIVE INTERACTION (AMMI) BIPLOT ANALYSIS F...
ADDITIVE MAIN EFFECTS AND MULTIPLICATIVE INTERACTION (AMMI) BIPLOT ANALYSIS F...ADDITIVE MAIN EFFECTS AND MULTIPLICATIVE INTERACTION (AMMI) BIPLOT ANALYSIS F...
ADDITIVE MAIN EFFECTS AND MULTIPLICATIVE INTERACTION (AMMI) BIPLOT ANALYSIS F...
 
La cantada de don rodrigo diaz de
La cantada de don rodrigo diaz deLa cantada de don rodrigo diaz de
La cantada de don rodrigo diaz de
 
Gp
GpGp
Gp
 
Fraudes y delitos en el ámbito tecnológico
Fraudes y delitos en el ámbito tecnológicoFraudes y delitos en el ámbito tecnológico
Fraudes y delitos en el ámbito tecnológico
 
Atribucion
AtribucionAtribucion
Atribucion
 
David breton ibañez_p2
David breton ibañez_p2David breton ibañez_p2
David breton ibañez_p2
 
El mercantilismo
El mercantilismoEl mercantilismo
El mercantilismo
 
LA CELULA
LA CELULA LA CELULA
LA CELULA
 
Mele sebastian
Mele sebastianMele sebastian
Mele sebastian
 

Similar to Fayez Resume1

Similar to Fayez Resume1 (20)

CURRICULAM VITAE for Jomy@25-04-2016
CURRICULAM VITAE for Jomy@25-04-2016CURRICULAM VITAE for Jomy@25-04-2016
CURRICULAM VITAE for Jomy@25-04-2016
 
CURRICULAM VITAE for Jomy@25-04-2016
CURRICULAM VITAE for Jomy@25-04-2016CURRICULAM VITAE for Jomy@25-04-2016
CURRICULAM VITAE for Jomy@25-04-2016
 
Ahmed abd elazim c.v
Ahmed abd elazim c.vAhmed abd elazim c.v
Ahmed abd elazim c.v
 
aravind ..
aravind ..aravind ..
aravind ..
 
DKSHAH RESUME
DKSHAH RESUMEDKSHAH RESUME
DKSHAH RESUME
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_
 
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
 
RAOUF CURRICULUM VITAE 2016 Oil & Gas
RAOUF CURRICULUM VITAE 2016 Oil & GasRAOUF CURRICULUM VITAE 2016 Oil & Gas
RAOUF CURRICULUM VITAE 2016 Oil & Gas
 
ronald coventry cv n5
ronald coventry cv n5ronald coventry cv n5
ronald coventry cv n5
 
dvmabina Resume
dvmabina Resumedvmabina Resume
dvmabina Resume
 
kiran New
kiran Newkiran New
kiran New
 
Kenny Alberto's Résumé (1)
Kenny Alberto's Résumé (1)Kenny Alberto's Résumé (1)
Kenny Alberto's Résumé (1)
 
Brian Young CV + covering letter
Brian Young CV + covering letterBrian Young CV + covering letter
Brian Young CV + covering letter
 
Circulem viate
Circulem viateCirculem viate
Circulem viate
 
Mechanical Engineer CV.1
Mechanical Engineer  CV.1Mechanical Engineer  CV.1
Mechanical Engineer CV.1
 
C.V.Haider-2015 Last Final Augest-15
C.V.Haider-2015 Last  Final Augest-15C.V.Haider-2015 Last  Final Augest-15
C.V.Haider-2015 Last Final Augest-15
 
Prabhakar_CV
Prabhakar_CVPrabhakar_CV
Prabhakar_CV
 
Millar_CV_WE
Millar_CV_WEMillar_CV_WE
Millar_CV_WE
 
Paul Battersby CV 2016
Paul Battersby CV 2016Paul Battersby CV 2016
Paul Battersby CV 2016
 
Simab CV sup.
Simab CV sup.Simab CV sup.
Simab CV sup.
 

Fayez Resume1

  • 1. RESUME Fayez A. Al-Talib P.O.Box 1036 Eastern province 31972 Saudi Arabia Mobil: +966 5 0382-2751 E-mail: fayez1920003@yahoo.com FAYEZALTALIB@eaton.COM Dear Sir, Please accept the enclosed resume as an expression of interest in exploring employment opportunities with in your organization. Through my resume are brief details, which demonstrate some of the manner in which I can achieve success. However, through years of hard work with several companies I gain lots of experiences in several fields. I enjoy a challenge and work hard to attain my goals. Constant communication with all levels of management has strengthened my interpersonal skills, and ability to work in a team environment I would welcome an interviewing opportunity at your earliest convenience. Thank you for your time and consideration. I am certain that I can be a contributing member of your company. Sincerely, Fayez A. Al-Talib 1
  • 2. RESUME P.O. BOX 1036 • Eastern province, 31972 • SAUDI ARABIA • CELL 0503822751 E-MAILS- FAYEZ1920003@YAHOO.COM Fayezaltalib@eaton.com FAYEZ AL-TALIB OBJECTIVE A challenging position that allows me to have a good involvement and experience that leads me to a successful engineering career. PROFESSIONAL EXPERIENCE Cooper Industries (EATON) Electrical Production Sup. July 2012-up to date -Assures product and process quality by designing testing methods -Provides manufacturing decision-making information by calculating production, labor, and material costs; reviewing production schedules. -Maintains product and process data base by writing computer programs; entering data. -Completes design and development projects by training and guiding technicians. -Maintains professional and technical knowledge by attending educational workshops -Maintains staff by recruiting, selecting, orienting, and training employees; developing -personal growth opportunities -Maintains safe and clean work environment by educating and directing personnel on the use of all control points Aramco KHURSANIYAH Gas Producing Facilities Div. Project Site Superintendent Engineer III, April 18, 2009-June 5, 2012 - Loop Folders Shooting, -Functional Testing responsibility among Aramco Standers familiarity. -Loop Folders systematize, -Instrument Installations verify P&ID walkthroughs. -Contractor site construction follow ups. Fluor Arabia Instrumentation Engineer II, October 18, 2007-March 31,2009 Sipchem (Saudi International Petrochemical Company) - I was hired as Instrumentation Engineer III. - Assigned to review submittals, -Coordinate with the design contractor, 2
  • 3. RESUME -Conduct technical meetings providing solutions to numerals work issues, -inspect the contractor work flow as the project progress, - review RFI’s, and preparing a leader work schedule procedure. Al-Hugayet Company Electrical Field Engineer, Aug 2003- Oct 2007 UPGRADE SANITARY WASTEWATER TREATMENT FACILITIES, DH/ BI-10-00466 In this project I was evolved in the early design stage to work along with the designer contractor office in designing this project. However, this experience gave me the opportunity to gain more knowledge of a flow of a project, plan through out the project, estimate the total cost of the project. DH LAP R&D project/ BI-10-3313 I was involved with following up contractor’s weekly progress. Moreover, reviewing technical submittals, advising contractor, writing daily reports, plan through out the project, and estimating the cost of the project, conducting meetings with contractor, vendors, designer and assuring safe and successful works. ABQAIQ LAP/ BI-10-3420 I was working as Site Superintendent for Six months. Covering the place of Civil, Mechanical and Electrical Engineer. I gain the opportunity to deal with more electrical equipments such: 200KVA transformers, Stand-alone UPS’s, and testing/commissioning electrical cables. SUP (Security Upgrading Project) BI-10-00221 In this project, I was involved in providing Electrical power to the CCTV System, street lighting, Guard houses, and all associate (trenching, terminating, testing, and commissioning). Thus, install new Electrical devices such as: Fiber optic Mesh, and Security Cameras around communities. However, this project increased my knowledge in coordination with other Aramco departments. Jeraisy Company Consultant for Aramco Company, Feb 2003 — July 2003 • CA/FAS (Facilities Services) Unit, Bldg-84O During my Six months with CA/Facilities Services Unit I was involve in doing the PM (Preventive Maintenance) for the rectifiers, inverters and other electrical equipments. Moreover, I was heavily involved in maintaining all Bldg 840 DH facilities, fire alarm disabling, AC conditioners maintenance, smoke detectors, inside/outside Bldg projects, tracing and labeling receptacles, and also writing maintenance reports. 3
  • 4. RESUME • CA/OSP (Out side Plant) Unit. B-3163, July 2002— Jan 2003 During my seven months with the Central Area OSP Unit, I was given different duties and responsibilities such as writing and reviewing technical writing reports, reviewing the OSP’s designs, coordinating the bi-monthly OSP M-job meeting, finalize the minutes report of the M-job meeting and following up on contractors’ workers on the field. In addition, helping on doing a Cut over sheets in preparation of cables pair’s transfer, keeping and tracking daily T.T. and S.O. for OSP Unit. Conducting a site surveys with OSP Engineers and contractors before starting and after completing any job, to insure that the job was implemented as it was planed. Schlumberger, June 2001- Nov. 2001 Working as MWD/LWD Engineer • Oil Industry Production Baker Hughes Intec, 2000-2001 • Drilling Oil wells EDUCATI ON A&M University Of Alabama, Huntsville, AL USA Bachelor of Science in Electrical Engineering Technology [1996-2000] • GPA 3.20 LANGUAGES Fluent English & Arabic SKILLS Aramco Standers familiarization, Sipchem Standards familiarization, good locations adaptabilities, excellent with team communication, SAK work locations familiars, Leadership skills, Technical work scope classifying, Good inclement in Microsoft Office, Networking, Fortran program, Micro computer Concepts, TRAINING 1- PMP (Project Management Program). It is a five days course where I concentrate all my knowledge with Projects. It allows me to focus more and get wide vision about projects. 2- SAP This is was inside training at the company (Cooper Industries) for two months. 4
  • 5. RESUME 3- FAS: (Facility Advance System) Trained to maintain and repair critical equipments such as UPS (Un-interrupted Power Source), rectifiers, inverters and soothe electrical equipment. Also, I’m trained to follow up with T.T. and S.O. that are related to facility unit at Bldg 840, Dhahran. Thus, maintaining the PM (Preventive Maintenance), assigning work to Sub-contractor for Bldg. projects. Moreover, had some courses while in facility unit such as: 4. DIP (Driving Improvement Program) at DH Driving School and pass with excellent grade. 5. Three days lecture about Aramco Ten roles and improvement set by Dr. Almushai (Communication and Technology VP) • Baker Hughes Intec A performance drilling engineer / Coring engineer, that’s deals with vertical wells drilling and taking samples from layers of formations and calculate the Hydraulics Proposals. 1. (H2S) training on how to breathe and act under a leaking gas situation. • Schlumberger MWD (measurement while drilling)/ LWD (logging while drilling) Engineer, this deals a lot with providing the client with the well logs and type of formation. Also reading the signals of radiations coming from the ground. 2. CPR training: Where we learned how to deal in situation of emergences or accidents or even body bums. 3. Basic Fire Fighting 4. Basic Medic First Aid REFRANCES Communication Dept (DH): Ismail, Ali J, Tell. 876-4363 or Email at ALI.ISMAIL.5@ARAMCO.COM PMT Dept (East Park BI Projects) Darwish, Hilal H, Tell. 862-5431 or Email at HILAL.DARWISH@ARAMCO.COM PMT (Mega Project KGP) Hamidaddin, Alradhi A Tell. 677-3247 or Email at ALRADHI.HAMIDADDIN@ARAMCO.COM PMT (Mega Project RTDB2 &DR2) Balharith, Hammad Tell. 8621320 or Email at Hamad.balhareth.2@aramco.com Eaton Tony Thomas Tell:8121291 or Email TonyTMThomas@Eaton.com 5
  • 6. RESUME 3- FAS: (Facility Advance System) Trained to maintain and repair critical equipments such as UPS (Un-interrupted Power Source), rectifiers, inverters and soothe electrical equipment. Also, I’m trained to follow up with T.T. and S.O. that are related to facility unit at Bldg 840, Dhahran. Thus, maintaining the PM (Preventive Maintenance), assigning work to Sub-contractor for Bldg. projects. Moreover, had some courses while in facility unit such as: 4. DIP (Driving Improvement Program) at DH Driving School and pass with excellent grade. 5. Three days lecture about Aramco Ten roles and improvement set by Dr. Almushai (Communication and Technology VP) • Baker Hughes Intec A performance drilling engineer / Coring engineer, that’s deals with vertical wells drilling and taking samples from layers of formations and calculate the Hydraulics Proposals. 1. (H2S) training on how to breathe and act under a leaking gas situation. • Schlumberger MWD (measurement while drilling)/ LWD (logging while drilling) Engineer, this deals a lot with providing the client with the well logs and type of formation. Also reading the signals of radiations coming from the ground. 2. CPR training: Where we learned how to deal in situation of emergences or accidents or even body bums. 3. Basic Fire Fighting 4. Basic Medic First Aid REFRANCES Communication Dept (DH): Ismail, Ali J, Tell. 876-4363 or Email at ALI.ISMAIL.5@ARAMCO.COM PMT Dept (East Park BI Projects) Darwish, Hilal H, Tell. 862-5431 or Email at HILAL.DARWISH@ARAMCO.COM PMT (Mega Project KGP) Hamidaddin, Alradhi A Tell. 677-3247 or Email at ALRADHI.HAMIDADDIN@ARAMCO.COM PMT (Mega Project RTDB2 &DR2) Balharith, Hammad Tell. 8621320 or Email at Hamad.balhareth.2@aramco.com Eaton Tony Thomas Tell:8121291 or Email TonyTMThomas@Eaton.com 5