Mr. Brian Young
[Flat 2]
21 Bar gate
Grimsby
[DN 34 4SS]
Email: brio.young@hotmail.co.uk
Mobile: 07824632944
Date: [10/08/2016]
Mechanical Maintenance SAP Planner / Scheduler
Dear sir/madam
Please accept this covering letter together with accompanying Curriculum Vitae as my
application for employment for vacancies which are current or becoming available.
My main body of work to date has been in the Petro Chemical and Oil and Gas sector.
I have over thirty years experience in the overhaul, maintenance and re-design of a broad range
of engineering applications within this industry.
I am safety focused after having gained my NEBOSH certificate with a strong mechanical
engineering background through my apprenticeship and previous employment which is
summarised in my Curriculum Vitae. In addition, I currently use SAP on a daily basis supported
by Excel; Power Point; Microsoft Projects and Word.
Enthusiastic, adaptable, hard working and easy to get on with it would be a delight to hear from
you.
Yours Sincerely,
Brian Young
CURRICULUM VITAE
Brian Young
[21 Bar-Gate]
Grimsby
[DN 34 4SS]
Email: brio.young@hotmail.co.uk
Mobile: 07824632944
Personal Summary
I am a Maintenance Planner looking to continue my current career path in Maintenance Planning.
With over thirty years experience in the overhaul, maintenance and re-design of a broad range of
engineering applications in the petro-chemical, oil and gas, and packaging industries supported
by an ability to communicate with personnel at all levels. Focusing on KPI’S (Routine’s; Statutory
Inspections; Emergent Work and Due Dates) I am able to use my initiative to plan and co-ordinate
work schedules and to meet tight deadlines and adapt to changes in priorities and daily work. I
currently use SAP on a daily basis to plan work. I also occasionally schedule the work.
Interests
Cycling ; Anything Historical
Qualifications
Nebosh General Certificate in Health and Safety
C&G Parts 1&2 Mechanical Engineering
NVQ3 in Mechanical Engineering
Mechanical Apprenticeship
Employment History
TOTAL FINA; Lindsey Oil Refinery:Immingham
Mechanical Planner;Role and Responsibilities.
[29/08 2010]-PRESENT
• My job role is to scope the mechanical maintenance work within my designated
area, plan the work in SAP, prepare the work packs which include Permit
Requests, Risk Assessments, Method Statements and Report sheets and transport
to Excel, the daily schedule when requested.
• ORGANISE the Monthly Inspection Dept Work-scope (IWS) Meeting. This is to
agree end dates by understanding the Engineering and Sub-Contractor restraints
which we may meet when undertaking the IWS requirements.
• SAFETY COMMITTEE; I am a member of the Zone 3 Safety Committee where
the Quarterly Safety Minutes are reviewed, the progress on issues discussed ,and
new actions implemented.
This role includes liaison with the Inspection Department, Area Engineers, Supervision, Area
Safety Advisors, Operations Department and Outside Contractors. Within this role, there is a
huge emphasis on the use of SAP database which is supported by the use of Outlook, Word
Processing, and spreadsheets. I am responsible for the planning of the Statutory Inspections on
our equipment and the implementation of these and the Routine Equipment Inspections.
Experienced in reading and understanding the P&ID’S which I use on a daily basis for providing
information to the various contractor and maintenance teams we use on the Refinery.
I currently use SAP on a daily basis to plan work and to deputise for our Scheduler during
holiday’s and sickness cover and also for the Purchasing of equipment.
Redhall Engineering:
CURRICULUM VITAE
Based on CONOCO PHILLIPS, Immingham for the outage.
Mechanical Technician
Shaw Group UK:
I was responsible for the layout, surveying and installation of Tube Bundles, Heat Exchangers,
Reformers (along with associated catalyst tubing), Pumps, Turbines and Cooling Fans; in
addition, hydrostatic testing of the pipework before commissioning.
Fabricom Suez:
Little-Brook Power Station Outage, Essex
My principle role was to train and instruct the Fabricom Personnel (including supervision) in the
strip down, overhaul and principles of operation of these units.
Centrica: Mechanical Technician
I had an active role in Reactive and Proactive maintenance alongside the three existing shift
teams. I was involved in the stripping down and overhaul of tube bundles and subsequent
hydrostatic test and drop testing.
Weir Turbo Machinery: Mechanical Technician
Based on TOTAL OIL Pembroke for the outage, my role was to completely overhaul the Dresser
Rand compressors on time and following all standards and safety legislation.
Aker Kvaerner: Mechanical Technician
I worked on various plants including Conoco Phillips and Total Lindsey Oil Refinery. My main
duties included pump Laser Alignments, Heat Exchanger overhauls and subsequent Hydrostatic
testing.
Fabricom:CONOCO REFINERY IMMINGHAM Mechanical Technician
Mainly Pump Alignment and Tube Bundle O’H and testing
Bayes Engineering: Mechanical Technician
I worked alongside a Siemens engineer on a 10MW Siemens steam turbine on a complete
overhaul, rebuild and alignment. I later transferred to LINPAC were I worked with conveyor belts
and their alignment and fault finding on their pneumatic systems.
I.C.I. Mechanical Technician
Sole responsibility for the maintenance of the Italian designed Nuovo Pignone compression
cylinders and Safety Valve Maintenance Testing and Inspection
References: On Request

More Related Content

What's hot

CV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing SupervisorCV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing SupervisorAmine Halimi
 
Islam Kamel - Resume
Islam Kamel - ResumeIslam Kamel - Resume
Islam Kamel - ResumeIslam Kamel
 
Ian Powell CV 27:04:16
Ian Powell CV 27:04:16 Ian Powell CV 27:04:16
Ian Powell CV 27:04:16 Ian Powell
 
CV Colin Buick 3.8.15
CV Colin Buick 3.8.15CV Colin Buick 3.8.15
CV Colin Buick 3.8.15Colin Buick
 
Sarwar Uddin-CURRICULAM VITATE
Sarwar Uddin-CURRICULAM VITATESarwar Uddin-CURRICULAM VITATE
Sarwar Uddin-CURRICULAM VITATESarwar Uddin
 
Muhammad Awais mechanical
Muhammad Awais mechanicalMuhammad Awais mechanical
Muhammad Awais mechanicalMuhammad Awais
 
ResumeDavidClay090216 (1) (2)
ResumeDavidClay090216 (1) (2)ResumeDavidClay090216 (1) (2)
ResumeDavidClay090216 (1) (2)David Clay
 
Andy Crookes CV (2)
Andy Crookes CV (2)Andy Crookes CV (2)
Andy Crookes CV (2)Andy Crookes
 
Raveendran Pillai_7777 LinkedIn
Raveendran Pillai_7777 LinkedInRaveendran Pillai_7777 LinkedIn
Raveendran Pillai_7777 LinkedInRavi Pilla
 
MARIA AGNEL.M mechanical technician
MARIA AGNEL.M mechanical technicianMARIA AGNEL.M mechanical technician
MARIA AGNEL.M mechanical technicianagnel maria
 
Nasheem CV- Commissioning Technician
Nasheem CV- Commissioning TechnicianNasheem CV- Commissioning Technician
Nasheem CV- Commissioning TechnicianNaseem Ansari
 
Terry List Resume new manager
Terry List Resume new managerTerry List Resume new manager
Terry List Resume new managerterry list
 
Resume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisorResume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisornitin mokal
 
Assistant manager in maintenance
Assistant manager in maintenanceAssistant manager in maintenance
Assistant manager in maintenanceDivyeshVasvelia
 

What's hot (20)

CV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing SupervisorCV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing Supervisor
 
CVLA updated
CVLA updatedCVLA updated
CVLA updated
 
Islam Kamel - Resume
Islam Kamel - ResumeIslam Kamel - Resume
Islam Kamel - Resume
 
Ian Powell CV 27:04:16
Ian Powell CV 27:04:16 Ian Powell CV 27:04:16
Ian Powell CV 27:04:16
 
CV Colin Buick 3.8.15
CV Colin Buick 3.8.15CV Colin Buick 3.8.15
CV Colin Buick 3.8.15
 
Sarwar Uddin-CURRICULAM VITATE
Sarwar Uddin-CURRICULAM VITATESarwar Uddin-CURRICULAM VITATE
Sarwar Uddin-CURRICULAM VITATE
 
Muhammad Awais mechanical
Muhammad Awais mechanicalMuhammad Awais mechanical
Muhammad Awais mechanical
 
ResumeDavidClay090216 (1) (2)
ResumeDavidClay090216 (1) (2)ResumeDavidClay090216 (1) (2)
ResumeDavidClay090216 (1) (2)
 
Andy Crookes CV (2)
Andy Crookes CV (2)Andy Crookes CV (2)
Andy Crookes CV (2)
 
Raveendran Pillai_7777 LinkedIn
Raveendran Pillai_7777 LinkedInRaveendran Pillai_7777 LinkedIn
Raveendran Pillai_7777 LinkedIn
 
Kevin D resume (1)
Kevin D resume (1)Kevin D resume (1)
Kevin D resume (1)
 
Sundar Resume
Sundar ResumeSundar Resume
Sundar Resume
 
MARIA AGNEL.M mechanical technician
MARIA AGNEL.M mechanical technicianMARIA AGNEL.M mechanical technician
MARIA AGNEL.M mechanical technician
 
Nasheem CV- Commissioning Technician
Nasheem CV- Commissioning TechnicianNasheem CV- Commissioning Technician
Nasheem CV- Commissioning Technician
 
Terry List Resume new manager
Terry List Resume new managerTerry List Resume new manager
Terry List Resume new manager
 
2 CV Engineer
2 CV Engineer2 CV Engineer
2 CV Engineer
 
mechanical technician (1)
mechanical technician (1)mechanical technician (1)
mechanical technician (1)
 
Resume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisorResume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisor
 
Assistant manager in maintenance
Assistant manager in maintenanceAssistant manager in maintenance
Assistant manager in maintenance
 
Nizami_CV
Nizami_CVNizami_CV
Nizami_CV
 

Viewers also liked

Viewers also liked (20)

Aquarela Paulistana - Bom Retiro
Aquarela Paulistana - Bom RetiroAquarela Paulistana - Bom Retiro
Aquarela Paulistana - Bom Retiro
 
A
AA
A
 
Equipo de gestión holanda
Equipo de  gestión  holandaEquipo de  gestión  holanda
Equipo de gestión holanda
 
Prueba1
Prueba1Prueba1
Prueba1
 
Portada la tercera 21.11.12
Portada la tercera 21.11.12Portada la tercera 21.11.12
Portada la tercera 21.11.12
 
Trial pic
Trial picTrial pic
Trial pic
 
Kingston
KingstonKingston
Kingston
 
Curso de Shell Script 10/11
Curso de Shell Script 10/11Curso de Shell Script 10/11
Curso de Shell Script 10/11
 
Leo
LeoLeo
Leo
 
Vision
VisionVision
Vision
 
Hindi eng
Hindi engHindi eng
Hindi eng
 
Index
IndexIndex
Index
 
Euclides matemtica
Euclides matemticaEuclides matemtica
Euclides matemtica
 
Ação Paulinha X Yura e Evandro
Ação Paulinha X Yura e EvandroAção Paulinha X Yura e Evandro
Ação Paulinha X Yura e Evandro
 
Catálogo
CatálogoCatálogo
Catálogo
 
Trabajo camilo caranton lineas
Trabajo camilo caranton  lineasTrabajo camilo caranton  lineas
Trabajo camilo caranton lineas
 
PFI Mantenimiento UF2 Práctica 3
PFI Mantenimiento UF2 Práctica 3PFI Mantenimiento UF2 Práctica 3
PFI Mantenimiento UF2 Práctica 3
 
Id cindy paula
Id cindy paulaId cindy paula
Id cindy paula
 
SAIU RESULTADO FINAL DO CONCURSO DA DEFENSORIA PÚBLICA DO ESTADO DE RONDÔNIA
SAIU RESULTADO FINAL DO CONCURSO DA DEFENSORIA PÚBLICA DO ESTADO DE RONDÔNIASAIU RESULTADO FINAL DO CONCURSO DA DEFENSORIA PÚBLICA DO ESTADO DE RONDÔNIA
SAIU RESULTADO FINAL DO CONCURSO DA DEFENSORIA PÚBLICA DO ESTADO DE RONDÔNIA
 
Aspire Brochure Front
Aspire Brochure FrontAspire Brochure Front
Aspire Brochure Front
 

Similar to Mechanical Maintenance Planner Seeks New Opportunity

Similar to Mechanical Maintenance Planner Seeks New Opportunity (20)

Stephen Robertson_MARCH_2016_CV
Stephen Robertson_MARCH_2016_CVStephen Robertson_MARCH_2016_CV
Stephen Robertson_MARCH_2016_CV
 
D.Manning CV
D.Manning CVD.Manning CV
D.Manning CV
 
Fayez Resume1
Fayez Resume1Fayez Resume1
Fayez Resume1
 
Jim Cv
Jim Cv Jim Cv
Jim Cv
 
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
 
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
 
dfdfdfddfdfdfasdf answers to querries fgfg fg
dfdfdfddfdfdfasdf answers to querries fgfg fgdfdfdfddfdfdfasdf answers to querries fgfg fg
dfdfdfddfdfdfasdf answers to querries fgfg fg
 
My cv 14 02-18
My cv 14 02-18My cv 14 02-18
My cv 14 02-18
 
resume.gerry[1]
resume.gerry[1]resume.gerry[1]
resume.gerry[1]
 
CV Chris Davies 18.04.2016 Master copy
CV Chris Davies 18.04.2016 Master copyCV Chris Davies 18.04.2016 Master copy
CV Chris Davies 18.04.2016 Master copy
 
Henrys Resume 2016 Q3
Henrys Resume 2016 Q3Henrys Resume 2016 Q3
Henrys Resume 2016 Q3
 
Mike Botham cv
Mike Botham cvMike Botham cv
Mike Botham cv
 
Ng onga Mazimba CV
Ng onga Mazimba CVNg onga Mazimba CV
Ng onga Mazimba CV
 
Brajesh Resume
Brajesh ResumeBrajesh Resume
Brajesh Resume
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resume
 
jeff hayner resume[1]
jeff hayner resume[1]jeff hayner resume[1]
jeff hayner resume[1]
 
Bob Kendall Resume 2015 current
Bob Kendall Resume 2015 currentBob Kendall Resume 2015 current
Bob Kendall Resume 2015 current
 
Cv of yasser_alammari
Cv of yasser_alammari Cv of yasser_alammari
Cv of yasser_alammari
 
PRADEEP BALAN
PRADEEP BALANPRADEEP BALAN
PRADEEP BALAN
 
Maverick consulting
Maverick consulting Maverick consulting
Maverick consulting
 

Mechanical Maintenance Planner Seeks New Opportunity

  • 1. Mr. Brian Young [Flat 2] 21 Bar gate Grimsby [DN 34 4SS] Email: brio.young@hotmail.co.uk Mobile: 07824632944 Date: [10/08/2016] Mechanical Maintenance SAP Planner / Scheduler Dear sir/madam Please accept this covering letter together with accompanying Curriculum Vitae as my application for employment for vacancies which are current or becoming available. My main body of work to date has been in the Petro Chemical and Oil and Gas sector. I have over thirty years experience in the overhaul, maintenance and re-design of a broad range of engineering applications within this industry. I am safety focused after having gained my NEBOSH certificate with a strong mechanical engineering background through my apprenticeship and previous employment which is summarised in my Curriculum Vitae. In addition, I currently use SAP on a daily basis supported by Excel; Power Point; Microsoft Projects and Word. Enthusiastic, adaptable, hard working and easy to get on with it would be a delight to hear from you. Yours Sincerely, Brian Young
  • 2. CURRICULUM VITAE Brian Young [21 Bar-Gate] Grimsby [DN 34 4SS] Email: brio.young@hotmail.co.uk Mobile: 07824632944 Personal Summary I am a Maintenance Planner looking to continue my current career path in Maintenance Planning. With over thirty years experience in the overhaul, maintenance and re-design of a broad range of engineering applications in the petro-chemical, oil and gas, and packaging industries supported by an ability to communicate with personnel at all levels. Focusing on KPI’S (Routine’s; Statutory Inspections; Emergent Work and Due Dates) I am able to use my initiative to plan and co-ordinate work schedules and to meet tight deadlines and adapt to changes in priorities and daily work. I currently use SAP on a daily basis to plan work. I also occasionally schedule the work. Interests Cycling ; Anything Historical Qualifications Nebosh General Certificate in Health and Safety C&G Parts 1&2 Mechanical Engineering NVQ3 in Mechanical Engineering Mechanical Apprenticeship Employment History TOTAL FINA; Lindsey Oil Refinery:Immingham Mechanical Planner;Role and Responsibilities. [29/08 2010]-PRESENT • My job role is to scope the mechanical maintenance work within my designated area, plan the work in SAP, prepare the work packs which include Permit Requests, Risk Assessments, Method Statements and Report sheets and transport to Excel, the daily schedule when requested. • ORGANISE the Monthly Inspection Dept Work-scope (IWS) Meeting. This is to agree end dates by understanding the Engineering and Sub-Contractor restraints which we may meet when undertaking the IWS requirements. • SAFETY COMMITTEE; I am a member of the Zone 3 Safety Committee where the Quarterly Safety Minutes are reviewed, the progress on issues discussed ,and new actions implemented. This role includes liaison with the Inspection Department, Area Engineers, Supervision, Area Safety Advisors, Operations Department and Outside Contractors. Within this role, there is a huge emphasis on the use of SAP database which is supported by the use of Outlook, Word Processing, and spreadsheets. I am responsible for the planning of the Statutory Inspections on our equipment and the implementation of these and the Routine Equipment Inspections. Experienced in reading and understanding the P&ID’S which I use on a daily basis for providing information to the various contractor and maintenance teams we use on the Refinery. I currently use SAP on a daily basis to plan work and to deputise for our Scheduler during holiday’s and sickness cover and also for the Purchasing of equipment. Redhall Engineering:
  • 3. CURRICULUM VITAE Based on CONOCO PHILLIPS, Immingham for the outage. Mechanical Technician Shaw Group UK: I was responsible for the layout, surveying and installation of Tube Bundles, Heat Exchangers, Reformers (along with associated catalyst tubing), Pumps, Turbines and Cooling Fans; in addition, hydrostatic testing of the pipework before commissioning. Fabricom Suez: Little-Brook Power Station Outage, Essex My principle role was to train and instruct the Fabricom Personnel (including supervision) in the strip down, overhaul and principles of operation of these units. Centrica: Mechanical Technician I had an active role in Reactive and Proactive maintenance alongside the three existing shift teams. I was involved in the stripping down and overhaul of tube bundles and subsequent hydrostatic test and drop testing. Weir Turbo Machinery: Mechanical Technician Based on TOTAL OIL Pembroke for the outage, my role was to completely overhaul the Dresser Rand compressors on time and following all standards and safety legislation. Aker Kvaerner: Mechanical Technician I worked on various plants including Conoco Phillips and Total Lindsey Oil Refinery. My main duties included pump Laser Alignments, Heat Exchanger overhauls and subsequent Hydrostatic testing. Fabricom:CONOCO REFINERY IMMINGHAM Mechanical Technician Mainly Pump Alignment and Tube Bundle O’H and testing Bayes Engineering: Mechanical Technician I worked alongside a Siemens engineer on a 10MW Siemens steam turbine on a complete overhaul, rebuild and alignment. I later transferred to LINPAC were I worked with conveyor belts and their alignment and fault finding on their pneumatic systems. I.C.I. Mechanical Technician Sole responsibility for the maintenance of the Italian designed Nuovo Pignone compression cylinders and Safety Valve Maintenance Testing and Inspection References: On Request