SlideShare a Scribd company logo
1 of 3
Download to read offline
Eslam salah El-Snosy
Port said - bank Eleskan No.43 , Egypt.
Personal Information :
Birth Day : 5/10/1990 Telephone No : 066/3735655
Marital Status : Single Mobile No : +2 01285462524
Nationality : Egyptian : +2 01002273516
Religion : Muslim E-mail : EslamElsnosy_1990@yahoo.com
Egyptian driving license : Available
Career objective :
I’m aspiring for opportunities of learning, development and facing new challenges utilizing my technical &
social skills. Where I can develop and excel while achieving the goals of the organization I’m working for
Academic Qualification :
Qualification : July 2012 , B.sc of engineering ( Natural Gas & petroleum ) – port said
Engineering Faculty , Port said University.
Grade of graduation : Very Good ( 2.95 Cum . GPA )
Responsibilities :
 Report to the project manager or the general construction manager.
 Field management of piping construction activities
 Plan and supervise the major functions of the construction, which includes planning and co-
ordination of manpower and equipment, materials supply, and sub-contracted services; towards
the proper completion of the work on schedule with approved drawings, specifications, cost and
quality limitations.
 Monitor Sub-contractors at each stage of the work to ensure proper compliance with all
technical aspects of the contract through both individual contacts and co-ordination meetings.
 Check and authorize all claims for payment from all Sub-contractors involved in the project’s
sections to assure accuracy and that proper contractual obligations are met. Passes them to the
Commercial Manager/Control Manager for payment.
 Direct the procurement of permanent and non-permanent materials required for the proper
completion of the work on schedule.
 Review all engineering design drawings of my section of the project before passing them for use
to the group.
 Discuss and resolve daily site problems with site supervisors.
 Monitor construction progress on a daily, weekly and monthly basis, and provides input to the
regular reports of the Project Manager.
 Make future plans for the project related to the release of equipment and personnel employed.
 Take into account all relevant procedures, guidance etc. related to the work, which will ensure
compliance with the clients Safety Management System.
 Prepare the piping construction scope for man-hours and equipment, estimate and assist in the
review of proposed schedules.
 Being conversant and knowledgeable with respect to current and new legislation and standards
e.g., ASME, API, Client codes, standards and HS&E Regulations.
 Participate as necessary in discussions with Clients and visit job sites as required.
Experience :
01/9/2015 until Now
Company : General Petroleum Company .
Position : Area Manager.
Project : New Construction and Maintenance contract for tanks.
Main Contractor: Al-Ahram Construction Company
Scope of work :
1. Following up the daily progress of the Project in the branch of Tanks; to ensure the execution of the
design, specifications and procedures as per the Engineering Drawing.
2. Leveling underneath tanks to assure the Degree of the under Ground Slope.
3. Following up Fitters and Welders work, and visual inspection of Welding.
4. DE sludge The deposits From Tanks and Cleaning them
5. Sand sweeping Tanks to prepare it for third part inspection.
6. Sand blasting and painting All Systems of Paints (Salt & fresh Water , Under Ground System internal and
external painting)
7. Hydrostatic testing and checking the results.
8. Following up the daily productivity of the workshop for each material type C.S
9. Prioritizing and providing the site's requirements.
01/3/2015 until 01/12/2016
Company : Petro Dara And West-Bakr.
Position : Site Manager.
Project : Heat Treatment of Oil.
Main Contractor: Al-Ahram Construction Company
Scope of work :
1. Following up the daily progress of the Project involving the piping section to assure that the design,
specifications and procedures are considered as Engineering Drawing.
2. Issuing the required material for erection like valves, gaskets, stud bolts …etc.
3. Checking the finished loops and preparing the punch list to acquire a release for hydro-test.
4. Following up the hydrostatic test progress and checking the results.
5. Following the daily productivity of the workshop for each material type C.S
6. Following up the site requirements according to the priority.
7. Fabrication of 30,000 Dia. Inch of carbon steel
8. Fabrication of 200 pipe supports (Standard and Special).
9. Managing 15 Pipe Fitters, 25 Welders, 6 Pipe Support Fitters and around 150 Grinder and helper to
perform the fabrication activities.
10. Following Up the painting activities as per the priorities and deliver official Reports of Painting By
inspector.
11. Preparing the progress daily reports regarding fit up, welding, and shifting spools to the site
12. Fabricating and erecting 5 C.S Tanks with a volume of 5000 bbls which weighted more than 120 tons, and
repaired 5 tanks with a volume of 1000 bbls according to Codes API 650 and 653.
13. Fabrication and erection of a water firefighting network in all tanks, and coordinating, axing and leveling of
the Standard Firefighting Pumps according to the codes of NFPA.
01/06/2014 until 01/03/2015
Company: NREA (New and Renewable Energy Appearance).
Position: Site Manger.
Project: Wind Farm service Area Lot ( 3 ) – Gabl Elzet
Main Contractor: Cairo Construction Company.
Scope of work:
1. Construction and Completion of the Firefighting system with various types.
2. Fabrication and erection of Area piping activities and field welding DIA. Inch of 17,000.
3. Drawing workshop Design for Over-head crane (10-25/5 Tons), fabrication, and erection of more than 30
Tons.
4. Revision of the whole water firefighting system with Tie-ins and commissioning
5. Responsible for all Tie-Ins of existing Facilities of about 50 Tie-In Points.
6. Fabrication and erection of Pipe Racks and various shied shapes and checking alignments and axing of
more than 50 Tons of different sections of steel.
7. Installation, alignment, axing and leveling of 10 Tower vessels and more than 15 Pumps and erection all
its tie-ins.
8. Installation, alignment, axing and leveling of Puddle Flanges and tie-ins connections of firefighting
concrete tanks.
9. Fabrication , erection and Testing of the system of Firefighting like CO2 System , inergen and FM system ,
Water system , High Expansion Foam system , Low Expansion foam System And fire hydrant .
10. Finishing the under ground lines of Polyethylene with Tie-ins Connections with above ground lines C.S.
01/10/2012 until 01/06/2014
Company : TCI SANMAR Port-said .
Position : Mechanical Construction Engineer.
Project : New ALCO Ethylene Plant
Main Contractor: Al-Basmallah Construction Company
Scope of work :
1. Fabrication and erection of Area piping activities and field welding of DIA. Inch of 5,000.
2. Responsible for all Tie-Ins with existing Facilities for more than 70 Tie-Ins Points.
3. Fabrication and erection of Pipe Racks and various shapes of shied and checking alignments and axing for
more than 800 Tons with different sections of steel.
4. Installation, alignment, axing, and leveling of 10 Tower-vessels and more than 70 Pumps.
5. Installation, alignment, axing, and leveling Puddle Flanges and tie-in’s connections of treatment systems
in concrete tanks.
6. Responsible for Installation of more than 1000 pipe supports with several types with a total weight of 70-
Tons.
7. Fabrication and erection of a Steel building consisting of 5 levels that’s 48m high with a utility area with
total weight of more Than 700 Tons built up section and multi section of steel.
8. Responsible for the mechanical completion of test packages.
9. Responsible for the planning for all piping activities and the required manpower.
10. Monitoring the daily progress and comparing it with the plan and prepare the catch up plans if required.
Field of experience and other qualifications :
 Oil and gas/ Petrochemical construction project
 Steel structure fabrication & construction
 Mechanical equipment installation
 Technical office tasks.
 Piping fabrication and erection.
 Piping supports fabrication and erection.
 Equipment & pumps alignment.
 Water firefighting system.
 High expansion foam system for firefighting.
 Co2 system for firefighting.
 Overhead crane.
 New Construction Of Tanks
Program Skills:
1. Microsoft office 2003 , 2007 , 2010
2. Auto Cad ( Engineering Drawings )
3. 3D Plant ( GA Drawings )
Arabic: Mother tongue
English Speaking: Very Good Writing: Excellent
Personal Skills:
 Honest, Excellent interpersonal skills.
 Excellent communication skills.
 Team oriented, organized, Manage time well.
 Leadership skills, Enthusiastic.
 Friendly, presentation skills.
 Professional. Good organizational skills and have a good eye for detail
 Ability to hard work under stress
 Planning ahead to solve any future problems before taking place.
Thank you for giving me the opportunity
To be one of your teamwork. Eslam El-Snosy
Date : 2016
Languages:

More Related Content

What's hot

Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping worksSurya Kant
 
Updated CV-Issam
Updated CV-IssamUpdated CV-Issam
Updated CV-Issamissam agha
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineerAhmed Hamdy
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1Mohamed Hashim
 
CV Alberto Uribe English
CV Alberto Uribe EnglishCV Alberto Uribe English
CV Alberto Uribe EnglishALBERTO URIBE
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineerahmedsgs
 
Mohamed farouk portfolio
Mohamed farouk portfolioMohamed farouk portfolio
Mohamed farouk portfolioMohamed Farouk
 
Saad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC EngineerSaad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC EngineerSaad mohamed gad
 
CV of Mr. NGUYEN VAN TRANG.doc
CV of Mr. NGUYEN VAN TRANG.docCV of Mr. NGUYEN VAN TRANG.doc
CV of Mr. NGUYEN VAN TRANG.docNguyenvan Trang
 
Cdms ccs master as at 131017
Cdms ccs master as at 131017Cdms ccs master as at 131017
Cdms ccs master as at 131017Damian Connelly
 
M.Udayakumar CV (1)
M.Udayakumar CV (1)M.Udayakumar CV (1)
M.Udayakumar CV (1)Udaya Kumar
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceSimon Lawrence
 
MaiVanBinh_CV
MaiVanBinh_CVMaiVanBinh_CV
MaiVanBinh_CVBINH MAI
 

What's hot (19)

Resume Khurshid
Resume KhurshidResume Khurshid
Resume Khurshid
 
Resume
ResumeResume
Resume
 
Hamdi.62016.PDF
Hamdi.62016.PDFHamdi.62016.PDF
Hamdi.62016.PDF
 
Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping works
 
Eng.mamdouh azab.
Eng.mamdouh azab.Eng.mamdouh azab.
Eng.mamdouh azab.
 
Updated CV-Issam
Updated CV-IssamUpdated CV-Issam
Updated CV-Issam
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineer
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
 
CV Alberto Uribe English
CV Alberto Uribe EnglishCV Alberto Uribe English
CV Alberto Uribe English
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 
Mohamed farouk portfolio
Mohamed farouk portfolioMohamed farouk portfolio
Mohamed farouk portfolio
 
Muhammed RAFI 2016 SD
Muhammed RAFI 2016 SDMuhammed RAFI 2016 SD
Muhammed RAFI 2016 SD
 
Saad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC EngineerSaad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC Engineer
 
CV of Mr. NGUYEN VAN TRANG.doc
CV of Mr. NGUYEN VAN TRANG.docCV of Mr. NGUYEN VAN TRANG.doc
CV of Mr. NGUYEN VAN TRANG.doc
 
Cdms ccs master as at 131017
Cdms ccs master as at 131017Cdms ccs master as at 131017
Cdms ccs master as at 131017
 
M.Udayakumar CV (1)
M.Udayakumar CV (1)M.Udayakumar CV (1)
M.Udayakumar CV (1)
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrence
 
MaiVanBinh_CV
MaiVanBinh_CVMaiVanBinh_CV
MaiVanBinh_CV
 

Viewers also liked

Діаграма
ДіаграмаДіаграма
ДіаграмаVita_yarova
 
Career magazines of pratiyogita darpan
 Career magazines of pratiyogita darpan  Career magazines of pratiyogita darpan
Career magazines of pratiyogita darpan pdgroupupkar
 
Los substantivos y sus generos
Los substantivos y sus generosLos substantivos y sus generos
Los substantivos y sus generosFranciane Pereira
 
Gacetilla nuestros perros y nuestros caballos
Gacetilla nuestros perros y nuestros caballosGacetilla nuestros perros y nuestros caballos
Gacetilla nuestros perros y nuestros caballosLegion Creativa
 
Jump Start Style Guide
Jump Start Style GuideJump Start Style Guide
Jump Start Style GuideMeg Stiven
 
Fotografía artística
Fotografía artísticaFotografía artística
Fotografía artísticaanitapau14
 
Cep 1986 revista_minera_nr_3
Cep 1986 revista_minera_nr_3Cep 1986 revista_minera_nr_3
Cep 1986 revista_minera_nr_3Walter Quiquinta
 
UBC Student Services Style Guide Intro
UBC Student Services Style Guide IntroUBC Student Services Style Guide Intro
UBC Student Services Style Guide IntroMeg Stiven
 

Viewers also liked (13)

Діаграма
ДіаграмаДіаграма
Діаграма
 
SUERESUME[1]
SUERESUME[1]SUERESUME[1]
SUERESUME[1]
 
Career magazines of pratiyogita darpan
 Career magazines of pratiyogita darpan  Career magazines of pratiyogita darpan
Career magazines of pratiyogita darpan
 
Power point
Power pointPower point
Power point
 
Los substantivos y sus generos
Los substantivos y sus generosLos substantivos y sus generos
Los substantivos y sus generos
 
атестація цесля о. д.
атестація цесля о. д.атестація цесля о. д.
атестація цесля о. д.
 
Gacetilla nuestros perros y nuestros caballos
Gacetilla nuestros perros y nuestros caballosGacetilla nuestros perros y nuestros caballos
Gacetilla nuestros perros y nuestros caballos
 
Glenn Cabayao
Glenn CabayaoGlenn Cabayao
Glenn Cabayao
 
Marca Personal
Marca Personal Marca Personal
Marca Personal
 
Jump Start Style Guide
Jump Start Style GuideJump Start Style Guide
Jump Start Style Guide
 
Fotografía artística
Fotografía artísticaFotografía artística
Fotografía artística
 
Cep 1986 revista_minera_nr_3
Cep 1986 revista_minera_nr_3Cep 1986 revista_minera_nr_3
Cep 1986 revista_minera_nr_3
 
UBC Student Services Style Guide Intro
UBC Student Services Style Guide IntroUBC Student Services Style Guide Intro
UBC Student Services Style Guide Intro
 

Similar to CV.Eslam-ELSNOSY.update

Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa Omar
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHesham Fathy, PMP
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)Ahmed Kamal
 
My CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMy CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMohammed ali
 
Project Mechanical Engineer C.V
Project Mechanical Engineer C.VProject Mechanical Engineer C.V
Project Mechanical Engineer C.Vali ibrahim
 
Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014Hazem Ouda
 
Eslam cv final 2016
Eslam cv final 2016Eslam cv final 2016
Eslam cv final 2016eslam orabi
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal EngineerAhmad Hassan
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa
 
Sobhy C V 2015 Rev Q S
Sobhy C V  2015 Rev  Q S  Sobhy C V  2015 Rev  Q S
Sobhy C V 2015 Rev Q S sobhey ahmed
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Ayman Mitkees
 

Similar to CV.Eslam-ELSNOSY.update (20)

Eng Ahmed Afifi final CV
Eng Ahmed Afifi final CVEng Ahmed Afifi final CV
Eng Ahmed Afifi final CV
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
Michael CV.
Michael CV.Michael CV.
Michael CV.
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
My CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMy CV, Shahar Ali tuhin
My CV, Shahar Ali tuhin
 
Project Mechanical Engineer C.V
Project Mechanical Engineer C.VProject Mechanical Engineer C.V
Project Mechanical Engineer C.V
 
Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014
 
Eslam cv final 2016
Eslam cv final 2016Eslam cv final 2016
Eslam cv final 2016
 
Antar Mustafa CV
Antar Mustafa CVAntar Mustafa CV
Antar Mustafa CV
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Sobhy C V 2015 Rev Q S
Sobhy C V  2015 Rev  Q S  Sobhy C V  2015 Rev  Q S
Sobhy C V 2015 Rev Q S
 
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
 
AHMED MOHIY 21
AHMED MOHIY 21 AHMED MOHIY 21
AHMED MOHIY 21
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
 

CV.Eslam-ELSNOSY.update

  • 1. Eslam salah El-Snosy Port said - bank Eleskan No.43 , Egypt. Personal Information : Birth Day : 5/10/1990 Telephone No : 066/3735655 Marital Status : Single Mobile No : +2 01285462524 Nationality : Egyptian : +2 01002273516 Religion : Muslim E-mail : EslamElsnosy_1990@yahoo.com Egyptian driving license : Available Career objective : I’m aspiring for opportunities of learning, development and facing new challenges utilizing my technical & social skills. Where I can develop and excel while achieving the goals of the organization I’m working for Academic Qualification : Qualification : July 2012 , B.sc of engineering ( Natural Gas & petroleum ) – port said Engineering Faculty , Port said University. Grade of graduation : Very Good ( 2.95 Cum . GPA ) Responsibilities :  Report to the project manager or the general construction manager.  Field management of piping construction activities  Plan and supervise the major functions of the construction, which includes planning and co- ordination of manpower and equipment, materials supply, and sub-contracted services; towards the proper completion of the work on schedule with approved drawings, specifications, cost and quality limitations.  Monitor Sub-contractors at each stage of the work to ensure proper compliance with all technical aspects of the contract through both individual contacts and co-ordination meetings.  Check and authorize all claims for payment from all Sub-contractors involved in the project’s sections to assure accuracy and that proper contractual obligations are met. Passes them to the Commercial Manager/Control Manager for payment.  Direct the procurement of permanent and non-permanent materials required for the proper completion of the work on schedule.  Review all engineering design drawings of my section of the project before passing them for use to the group.  Discuss and resolve daily site problems with site supervisors.  Monitor construction progress on a daily, weekly and monthly basis, and provides input to the regular reports of the Project Manager.  Make future plans for the project related to the release of equipment and personnel employed.  Take into account all relevant procedures, guidance etc. related to the work, which will ensure compliance with the clients Safety Management System.  Prepare the piping construction scope for man-hours and equipment, estimate and assist in the review of proposed schedules.  Being conversant and knowledgeable with respect to current and new legislation and standards e.g., ASME, API, Client codes, standards and HS&E Regulations.  Participate as necessary in discussions with Clients and visit job sites as required.
  • 2. Experience : 01/9/2015 until Now Company : General Petroleum Company . Position : Area Manager. Project : New Construction and Maintenance contract for tanks. Main Contractor: Al-Ahram Construction Company Scope of work : 1. Following up the daily progress of the Project in the branch of Tanks; to ensure the execution of the design, specifications and procedures as per the Engineering Drawing. 2. Leveling underneath tanks to assure the Degree of the under Ground Slope. 3. Following up Fitters and Welders work, and visual inspection of Welding. 4. DE sludge The deposits From Tanks and Cleaning them 5. Sand sweeping Tanks to prepare it for third part inspection. 6. Sand blasting and painting All Systems of Paints (Salt & fresh Water , Under Ground System internal and external painting) 7. Hydrostatic testing and checking the results. 8. Following up the daily productivity of the workshop for each material type C.S 9. Prioritizing and providing the site's requirements. 01/3/2015 until 01/12/2016 Company : Petro Dara And West-Bakr. Position : Site Manager. Project : Heat Treatment of Oil. Main Contractor: Al-Ahram Construction Company Scope of work : 1. Following up the daily progress of the Project involving the piping section to assure that the design, specifications and procedures are considered as Engineering Drawing. 2. Issuing the required material for erection like valves, gaskets, stud bolts …etc. 3. Checking the finished loops and preparing the punch list to acquire a release for hydro-test. 4. Following up the hydrostatic test progress and checking the results. 5. Following the daily productivity of the workshop for each material type C.S 6. Following up the site requirements according to the priority. 7. Fabrication of 30,000 Dia. Inch of carbon steel 8. Fabrication of 200 pipe supports (Standard and Special). 9. Managing 15 Pipe Fitters, 25 Welders, 6 Pipe Support Fitters and around 150 Grinder and helper to perform the fabrication activities. 10. Following Up the painting activities as per the priorities and deliver official Reports of Painting By inspector. 11. Preparing the progress daily reports regarding fit up, welding, and shifting spools to the site 12. Fabricating and erecting 5 C.S Tanks with a volume of 5000 bbls which weighted more than 120 tons, and repaired 5 tanks with a volume of 1000 bbls according to Codes API 650 and 653. 13. Fabrication and erection of a water firefighting network in all tanks, and coordinating, axing and leveling of the Standard Firefighting Pumps according to the codes of NFPA. 01/06/2014 until 01/03/2015 Company: NREA (New and Renewable Energy Appearance). Position: Site Manger. Project: Wind Farm service Area Lot ( 3 ) – Gabl Elzet Main Contractor: Cairo Construction Company. Scope of work: 1. Construction and Completion of the Firefighting system with various types. 2. Fabrication and erection of Area piping activities and field welding DIA. Inch of 17,000. 3. Drawing workshop Design for Over-head crane (10-25/5 Tons), fabrication, and erection of more than 30 Tons. 4. Revision of the whole water firefighting system with Tie-ins and commissioning 5. Responsible for all Tie-Ins of existing Facilities of about 50 Tie-In Points. 6. Fabrication and erection of Pipe Racks and various shied shapes and checking alignments and axing of more than 50 Tons of different sections of steel. 7. Installation, alignment, axing and leveling of 10 Tower vessels and more than 15 Pumps and erection all its tie-ins. 8. Installation, alignment, axing and leveling of Puddle Flanges and tie-ins connections of firefighting concrete tanks. 9. Fabrication , erection and Testing of the system of Firefighting like CO2 System , inergen and FM system , Water system , High Expansion Foam system , Low Expansion foam System And fire hydrant . 10. Finishing the under ground lines of Polyethylene with Tie-ins Connections with above ground lines C.S.
  • 3. 01/10/2012 until 01/06/2014 Company : TCI SANMAR Port-said . Position : Mechanical Construction Engineer. Project : New ALCO Ethylene Plant Main Contractor: Al-Basmallah Construction Company Scope of work : 1. Fabrication and erection of Area piping activities and field welding of DIA. Inch of 5,000. 2. Responsible for all Tie-Ins with existing Facilities for more than 70 Tie-Ins Points. 3. Fabrication and erection of Pipe Racks and various shapes of shied and checking alignments and axing for more than 800 Tons with different sections of steel. 4. Installation, alignment, axing, and leveling of 10 Tower-vessels and more than 70 Pumps. 5. Installation, alignment, axing, and leveling Puddle Flanges and tie-in’s connections of treatment systems in concrete tanks. 6. Responsible for Installation of more than 1000 pipe supports with several types with a total weight of 70- Tons. 7. Fabrication and erection of a Steel building consisting of 5 levels that’s 48m high with a utility area with total weight of more Than 700 Tons built up section and multi section of steel. 8. Responsible for the mechanical completion of test packages. 9. Responsible for the planning for all piping activities and the required manpower. 10. Monitoring the daily progress and comparing it with the plan and prepare the catch up plans if required. Field of experience and other qualifications :  Oil and gas/ Petrochemical construction project  Steel structure fabrication & construction  Mechanical equipment installation  Technical office tasks.  Piping fabrication and erection.  Piping supports fabrication and erection.  Equipment & pumps alignment.  Water firefighting system.  High expansion foam system for firefighting.  Co2 system for firefighting.  Overhead crane.  New Construction Of Tanks Program Skills: 1. Microsoft office 2003 , 2007 , 2010 2. Auto Cad ( Engineering Drawings ) 3. 3D Plant ( GA Drawings ) Arabic: Mother tongue English Speaking: Very Good Writing: Excellent Personal Skills:  Honest, Excellent interpersonal skills.  Excellent communication skills.  Team oriented, organized, Manage time well.  Leadership skills, Enthusiastic.  Friendly, presentation skills.  Professional. Good organizational skills and have a good eye for detail  Ability to hard work under stress  Planning ahead to solve any future problems before taking place. Thank you for giving me the opportunity To be one of your teamwork. Eslam El-Snosy Date : 2016 Languages: