Erwin E. Bluemke has experience in several construction project roles:
1) As an assistant project engineer for a slab caster construction project, he assisted with design revision control, coordinating sub-trades, and implementing safety processes.
2) As a senior field engineer for an incinerator project, he supervised structural steel and deck construction as well as underground electrical and mechanical work.
3) As an assistant field engineer for a bridge twinning project, he supervised field crews in layout work including column, construction line, control and pile placement.
1. Erwin E. Bluemke, P.Eng.
Specific Related Job Descriptions
Assistant Project Engineer - Stelco Hilton Works - Slab Caster Construction
Project, Pigott Construction Limited, Hamilton, Ontario, (1986)
Assisted the site superintendent with coordination of extensive design & drawing revision
control for the civil works. Coordinated complex building processes between multiple sub-
trades and Stelco personnel. Implemented a Hazardous Materials Handling process for
the general contractor.
Created and implemented a Quality Assurance program for Pigott and sub-trade work to
the satisfaction of the Stelco supervision staff. Assisted the Project Engineer with on-site
cost control, quantity surveying and engineering documentation.
Senior Field Engineer - Incinerator Heat Transfer Building Construction
Project at Metro Toronto Main Sewage Treatment Plant, Pigott Construction
Limited, Toronto, (1984)
Supervised the construction of structural steel and concrete composite deck for the
general contractor.
Supervised the underground electrical plant control services and the mechanical work.
Provided engineering layout and quantity surveying for the general contractor.
Provided as-built drawings for certification by the Project Management Team. These were
very complex and included high voltage power location, water lines and computer control
networks.
Assistant Field Engineer - Twinning of the Burlington Skyway Bridge Construction
Project, Pigott Construction Limited, Toronto, (1983)
Supervised and assisted a field crew in the layout of the Skyway Bridge Twinning Project,
more specifically: location of all columns, layout of the construction line, horizontal and
vertical control, and pile layout.
Student - Copps Coliseum Construction Project (1982)
Assisted the estimation department for Pigott Construction with the organization of sub-
trade bids as part of the team providing the successful tender for construction. Assisted
the project engineer work out the project schedule and partitioning of concrete formwork.