Arthur C. Pennington
26564 Calle Lorenzo
San Juan Capistrano CA, 92675
949-374-7325 / kingart77662@yahoo.com
Project: Planner / Estimator / Scheduler
EXPERIENCE
Project Planner / Scheduler
The Worldwide Turnaround Management Company
Planning-Engineering-Management
Houston, TX – 2010-2016
• Responsible for Planning & Scheduling Several Major T/As @ Phillip 66 Wilmington/ Carson Ca.
• Built & Managing multiple small Projects in Primavera from 2010 - 2016.
• Scheduled in Field Change Order for Several Various Projects
• Building Piping & Equipment folder for upcoming Major T/A’s
• Using Primavera 7, SAP, Power Point, Excel and Word
Project Planner / Scheduler
The Turnaround Management Company
Planning-Engineering-Management
Houston, TX – 2008-2010
• Responsible for Planning / Scheduling the 2009 ESP Piping Tie-ins @ ExxonMobil Torrance Ca.
• In charge of Field Change Order planning in P-5 and Estimating Cost for 2009 FCC Major T/A
• Building Piping & Equipment folder for upcoming 2009 ESP Expansion Project
• Sketch piping per engineering for decommission and tie-ins
• Produce blinding point and build blind data base
• Producing WQCF documents for weld procedures
• Using Primavera 5.0 & 6.0, SAP, Access Data Base, Excel and Word 2003 /2007
Project Lead Planner
KAP PROJECT SERVICES
Planning-Engineering-Management
La Port, Texas – 2006-2008
• Responsible for planning the 2007 Coker Revamp @ Chevron El Segundo Ca.
• In charge of all planning and package building for 2007 Coker Revamp
• Using Primavera, Access Data Base, Excel and Word
• Building equipment and piping folder for upcoming 2007 Coker Revamp
• Sketch piping per engineering for decommission and tie-ins
• Produce blinding point and build blind data base
• Producing lift plans for multiple lifts
Project Planner
Fishbone Solutions, Ltd.
Planning-Engineering-Management
Kemah, Texas – 2004-2006
• Responsible for planning 2007 T/A @ Exxon Mobil, Beaumont Texas.
• Using Access Data Base, Excel and Word
• Building equipment and piping folder for upcoming TAR
• Sketch piping per engineering for decommission and tie-ins
• Produce blinding point and build blind data base
• Producing lift plans for multiple lifts
Project Planner
International Maintenance Company
A Turner Industries Company
Nederland, Texas - 2003-2004
• Responsible for planning 2004 T/A @ BASF Port Arthur TX.
• Building equipment and piping folder for upcoming TAR
• Sketch piping per engineering for decommission
• Produce Lock out Tag out procedures and blinding point for operation approval
Project General Forman
International Maintenance Company
A Turner Industries Company
Nederland, Texas - 2002-2003
• Responsible for overseeing construction of conveyor system @ BP Amoco, Texas City.
• Erected three convey section averaging 300’ per section
• Fabricated onsite 100 ton Coke Storage Bin
• Job duties required producing heavy lift plans for multiple lifts from 20-100 tons
• Job required heavy steel fabrication and revision onsite
Project Forman
International Maintenance Company
A Turner Industries Company
Nederland, Texas - 2001-2002
• Responsible for overseeing construction of Ammonia Compressor @ Dow Chemical, Sea Drift.
Texas
• Job duties included locating tie-points re-routing piping per engineering
• Responsible for all piping erection and steel erection
• Produced detail sketches on fabrication and engineering errors for client
• Oversee civil contractor for compressor foundation and pipe rack foundations
• Job duties required producing heavy lift plans for multiple lifts up to 20 tons
Quality Control
International Maintenance Company
A Turner Industries Company
Nederland, Texas - 2000-2001
• Reporting to the Beaumont Regional Operations Manager, responsible for managing all aspects of Lump-
Sum Estimating, Planning and Scheduling for Beaumont, Houston and Texas City Area with a 6-person
staff and a $460,000 operating budget
• Averaged $2.5 Million in Lump-Sum Estimating per month
• Developed detailed schedules for each estimate submitted. If awarded, fine-tuned the submitted
schedules for the clients’ approval
Piping Foreman
International Maintenance Company
A Turner Industries Company
Nederland, Texas - 1998-2000
• Supervised reactor installation and piping work an PVP Unit at ISP, Texas City, Texas
• Responsible for Fab Shop and all “as built” drawings
• Responsible for all hydro packages and testing
• Assisted with startup of new PVP Dryer and Reactor Piping
Maintenance Pipe Fabricator
International Maintenance Company
A Turner Industries Company
Nederland, Texas - 1994-1998
• Pipe Fabricator at Allied Signal, Orange Texas
• Responsible for taking engineering spec and producing pipe drawing for review and fabrication
• Extensive experience with jacket piping and conveyor bagging systems
Pipe fitter
Multiple Contractors
Houston, Beaumont Area - 1987-1994
EDUCATION
Graduate
Ball High School, Galveston Texas
SKILLS
MS Office 98, 2000, XP: (Excel, PowerPoint, Word, Access, Front Page)
Primavera 5.0, 6.0 & 7.0 Auto CAD and Cost-Track.

More Related Content

What's hot

Dave B. Ramos CV
Dave B. Ramos CVDave B. Ramos CV
Dave B. Ramos CVDave Ramos
 
Critical path analysis
Critical path analysisCritical path analysis
Critical path analysisMd. Sohag Miah
 
William Power Resume
William Power ResumeWilliam Power Resume
William Power ResumeWilliam Power
 
Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)Eduardo Parisca
 
ICOM Schedule & Logistics (1)
ICOM Schedule & Logistics (1)ICOM Schedule & Logistics (1)
ICOM Schedule & Logistics (1)Jamal Nelson, CCM
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley ParsonsShane Reynolds
 
Franklin Ply resume1.
Franklin Ply resume1.Franklin Ply resume1.
Franklin Ply resume1.Franklin Ply
 
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski
 
Donald J resume Word 2 copy
Donald J resume Word 2 copyDonald J resume Word 2 copy
Donald J resume Word 2 copydon rawson
 
Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)Obi-Ugbo Alex
 
Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015Shahzad Mughal
 
Application Engineer Melissa Watts Résumé
Application Engineer Melissa Watts Résumé Application Engineer Melissa Watts Résumé
Application Engineer Melissa Watts Résumé Melissa Urdaneta Watts
 
Aaron Fischer Resume-02-2016
Aaron Fischer Resume-02-2016Aaron Fischer Resume-02-2016
Aaron Fischer Resume-02-2016Aaron Fischer
 

What's hot (20)

Ryan Arendse
Ryan ArendseRyan Arendse
Ryan Arendse
 
inayat ur rahman cv 1
inayat ur rahman cv 1inayat ur rahman cv 1
inayat ur rahman cv 1
 
Dave B. Ramos CV
Dave B. Ramos CVDave B. Ramos CV
Dave B. Ramos CV
 
Critical path analysis
Critical path analysisCritical path analysis
Critical path analysis
 
William Power Resume
William Power ResumeWilliam Power Resume
William Power Resume
 
Jason.Haraway, PE
Jason.Haraway, PEJason.Haraway, PE
Jason.Haraway, PE
 
Resume - Christopher Neil, PE
Resume - Christopher Neil, PEResume - Christopher Neil, PE
Resume - Christopher Neil, PE
 
Ron Richer CV
Ron Richer CVRon Richer CV
Ron Richer CV
 
Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)
 
Rick Pacheco
Rick PachecoRick Pacheco
Rick Pacheco
 
ICOM Schedule & Logistics (1)
ICOM Schedule & Logistics (1)ICOM Schedule & Logistics (1)
ICOM Schedule & Logistics (1)
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsons
 
Franklin Ply resume1.
Franklin Ply resume1.Franklin Ply resume1.
Franklin Ply resume1.
 
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16
 
rod wimberly
rod wimberlyrod wimberly
rod wimberly
 
Donald J resume Word 2 copy
Donald J resume Word 2 copyDonald J resume Word 2 copy
Donald J resume Word 2 copy
 
Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)
 
Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015
 
Application Engineer Melissa Watts Résumé
Application Engineer Melissa Watts Résumé Application Engineer Melissa Watts Résumé
Application Engineer Melissa Watts Résumé
 
Aaron Fischer Resume-02-2016
Aaron Fischer Resume-02-2016Aaron Fischer Resume-02-2016
Aaron Fischer Resume-02-2016
 

Viewers also liked

Raj babu principal solutions architect - BI, Data Lake, Big Data, Cloud
Raj babu   principal solutions architect - BI, Data Lake, Big Data, CloudRaj babu   principal solutions architect - BI, Data Lake, Big Data, Cloud
Raj babu principal solutions architect - BI, Data Lake, Big Data, CloudRaj Babu
 
Michael_Yang_-_General
Michael_Yang_-_GeneralMichael_Yang_-_General
Michael_Yang_-_GeneralMichael Yang
 
My resume 2016 07 14 v 12
My resume 2016 07 14 v 12My resume 2016 07 14 v 12
My resume 2016 07 14 v 12Jeff Abrahamson
 
KIM ALLISON KELLEY 2016 - NEW - Linkedin Resume as 10262016
KIM ALLISON KELLEY 2016 - NEW - Linkedin Resume as 10262016KIM ALLISON KELLEY 2016 - NEW - Linkedin Resume as 10262016
KIM ALLISON KELLEY 2016 - NEW - Linkedin Resume as 10262016Kim Kelley
 
Karla Capanni Resume
Karla Capanni ResumeKarla Capanni Resume
Karla Capanni ResumeKarla Capanni
 

Viewers also liked (6)

Raj babu principal solutions architect - BI, Data Lake, Big Data, Cloud
Raj babu   principal solutions architect - BI, Data Lake, Big Data, CloudRaj babu   principal solutions architect - BI, Data Lake, Big Data, Cloud
Raj babu principal solutions architect - BI, Data Lake, Big Data, Cloud
 
Michael_Yang_-_General
Michael_Yang_-_GeneralMichael_Yang_-_General
Michael_Yang_-_General
 
My resume 2016 07 14 v 12
My resume 2016 07 14 v 12My resume 2016 07 14 v 12
My resume 2016 07 14 v 12
 
Christina Medina Resume
Christina Medina Resume Christina Medina Resume
Christina Medina Resume
 
KIM ALLISON KELLEY 2016 - NEW - Linkedin Resume as 10262016
KIM ALLISON KELLEY 2016 - NEW - Linkedin Resume as 10262016KIM ALLISON KELLEY 2016 - NEW - Linkedin Resume as 10262016
KIM ALLISON KELLEY 2016 - NEW - Linkedin Resume as 10262016
 
Karla Capanni Resume
Karla Capanni ResumeKarla Capanni Resume
Karla Capanni Resume
 

Similar to ART Resume

Jose J Muraira LATEST Resume
Jose J  Muraira LATEST ResumeJose J  Muraira LATEST Resume
Jose J Muraira LATEST ResumeJose Muraira
 
WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1William Brown
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Malcolm Kiper
 
Michael Rhame RESUME 12-12
Michael Rhame RESUME 12-12Michael Rhame RESUME 12-12
Michael Rhame RESUME 12-12Michael Rhame
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designerbharath kumar
 
Everett Nichols_Resume_Dec_2015
Everett Nichols_Resume_Dec_2015Everett Nichols_Resume_Dec_2015
Everett Nichols_Resume_Dec_2015Everett Nichols
 
Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers
 
Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)Kirk Doerr
 
Resume - Timothy Fitch - Mech Design
Resume - Timothy Fitch - Mech DesignResume - Timothy Fitch - Mech Design
Resume - Timothy Fitch - Mech DesignTimothy Fitch
 
Koblinsky BW Resume 12-11 -14
Koblinsky BW Resume 12-11 -14Koblinsky BW Resume 12-11 -14
Koblinsky BW Resume 12-11 -14Bernard Koblinsky
 
CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15Dave Beveridge
 
resume-garychu
resume-garychuresume-garychu
resume-garychuGary Chu
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad GilbertThad Gilbert
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 SunocoKarl Keller
 

Similar to ART Resume (20)

AWalters Resume
AWalters ResumeAWalters Resume
AWalters Resume
 
Resume
ResumeResume
Resume
 
Jose J Muraira LATEST Resume
Jose J  Muraira LATEST ResumeJose J  Muraira LATEST Resume
Jose J Muraira LATEST Resume
 
WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015
 
Ismael_Lopez-Lara_Aug16
Ismael_Lopez-Lara_Aug16Ismael_Lopez-Lara_Aug16
Ismael_Lopez-Lara_Aug16
 
Michael Rhame RESUME 12-12
Michael Rhame RESUME 12-12Michael Rhame RESUME 12-12
Michael Rhame RESUME 12-12
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designer
 
Everett Nichols_Resume_Dec_2015
Everett Nichols_Resume_Dec_2015Everett Nichols_Resume_Dec_2015
Everett Nichols_Resume_Dec_2015
 
Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15
 
Resume_Lois-12-2015
Resume_Lois-12-2015Resume_Lois-12-2015
Resume_Lois-12-2015
 
Resume lois 12-2015
Resume lois 12-2015Resume lois 12-2015
Resume lois 12-2015
 
Mitra_Pratt
Mitra_PrattMitra_Pratt
Mitra_Pratt
 
Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)
 
Resume - Timothy Fitch - Mech Design
Resume - Timothy Fitch - Mech DesignResume - Timothy Fitch - Mech Design
Resume - Timothy Fitch - Mech Design
 
Koblinsky BW Resume 12-11 -14
Koblinsky BW Resume 12-11 -14Koblinsky BW Resume 12-11 -14
Koblinsky BW Resume 12-11 -14
 
CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15
 
resume-garychu
resume-garychuresume-garychu
resume-garychu
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad Gilbert
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
 

ART Resume

  • 1. Arthur C. Pennington 26564 Calle Lorenzo San Juan Capistrano CA, 92675 949-374-7325 / kingart77662@yahoo.com Project: Planner / Estimator / Scheduler EXPERIENCE Project Planner / Scheduler The Worldwide Turnaround Management Company Planning-Engineering-Management Houston, TX – 2010-2016 • Responsible for Planning & Scheduling Several Major T/As @ Phillip 66 Wilmington/ Carson Ca. • Built & Managing multiple small Projects in Primavera from 2010 - 2016. • Scheduled in Field Change Order for Several Various Projects • Building Piping & Equipment folder for upcoming Major T/A’s • Using Primavera 7, SAP, Power Point, Excel and Word Project Planner / Scheduler The Turnaround Management Company Planning-Engineering-Management Houston, TX – 2008-2010 • Responsible for Planning / Scheduling the 2009 ESP Piping Tie-ins @ ExxonMobil Torrance Ca. • In charge of Field Change Order planning in P-5 and Estimating Cost for 2009 FCC Major T/A • Building Piping & Equipment folder for upcoming 2009 ESP Expansion Project • Sketch piping per engineering for decommission and tie-ins • Produce blinding point and build blind data base • Producing WQCF documents for weld procedures • Using Primavera 5.0 & 6.0, SAP, Access Data Base, Excel and Word 2003 /2007 Project Lead Planner KAP PROJECT SERVICES Planning-Engineering-Management La Port, Texas – 2006-2008 • Responsible for planning the 2007 Coker Revamp @ Chevron El Segundo Ca. • In charge of all planning and package building for 2007 Coker Revamp • Using Primavera, Access Data Base, Excel and Word • Building equipment and piping folder for upcoming 2007 Coker Revamp • Sketch piping per engineering for decommission and tie-ins
  • 2. • Produce blinding point and build blind data base • Producing lift plans for multiple lifts Project Planner Fishbone Solutions, Ltd. Planning-Engineering-Management Kemah, Texas – 2004-2006 • Responsible for planning 2007 T/A @ Exxon Mobil, Beaumont Texas. • Using Access Data Base, Excel and Word • Building equipment and piping folder for upcoming TAR • Sketch piping per engineering for decommission and tie-ins • Produce blinding point and build blind data base • Producing lift plans for multiple lifts Project Planner International Maintenance Company A Turner Industries Company Nederland, Texas - 2003-2004 • Responsible for planning 2004 T/A @ BASF Port Arthur TX. • Building equipment and piping folder for upcoming TAR • Sketch piping per engineering for decommission • Produce Lock out Tag out procedures and blinding point for operation approval Project General Forman International Maintenance Company A Turner Industries Company Nederland, Texas - 2002-2003 • Responsible for overseeing construction of conveyor system @ BP Amoco, Texas City. • Erected three convey section averaging 300’ per section • Fabricated onsite 100 ton Coke Storage Bin • Job duties required producing heavy lift plans for multiple lifts from 20-100 tons • Job required heavy steel fabrication and revision onsite Project Forman International Maintenance Company A Turner Industries Company Nederland, Texas - 2001-2002 • Responsible for overseeing construction of Ammonia Compressor @ Dow Chemical, Sea Drift. Texas • Job duties included locating tie-points re-routing piping per engineering • Responsible for all piping erection and steel erection • Produced detail sketches on fabrication and engineering errors for client • Oversee civil contractor for compressor foundation and pipe rack foundations
  • 3. • Job duties required producing heavy lift plans for multiple lifts up to 20 tons Quality Control International Maintenance Company A Turner Industries Company Nederland, Texas - 2000-2001 • Reporting to the Beaumont Regional Operations Manager, responsible for managing all aspects of Lump- Sum Estimating, Planning and Scheduling for Beaumont, Houston and Texas City Area with a 6-person staff and a $460,000 operating budget • Averaged $2.5 Million in Lump-Sum Estimating per month • Developed detailed schedules for each estimate submitted. If awarded, fine-tuned the submitted schedules for the clients’ approval Piping Foreman International Maintenance Company A Turner Industries Company Nederland, Texas - 1998-2000 • Supervised reactor installation and piping work an PVP Unit at ISP, Texas City, Texas • Responsible for Fab Shop and all “as built” drawings • Responsible for all hydro packages and testing • Assisted with startup of new PVP Dryer and Reactor Piping Maintenance Pipe Fabricator International Maintenance Company A Turner Industries Company Nederland, Texas - 1994-1998 • Pipe Fabricator at Allied Signal, Orange Texas • Responsible for taking engineering spec and producing pipe drawing for review and fabrication • Extensive experience with jacket piping and conveyor bagging systems Pipe fitter Multiple Contractors Houston, Beaumont Area - 1987-1994 EDUCATION Graduate Ball High School, Galveston Texas SKILLS MS Office 98, 2000, XP: (Excel, PowerPoint, Word, Access, Front Page) Primavera 5.0, 6.0 & 7.0 Auto CAD and Cost-Track.