SlideShare a Scribd company logo
1 of 2
Samuel A. McBride
1350 Clinton Street, Aurora CO 80010
(720) 281-3513
Smcbride34@comcast.net
Principal Electrical, Instrumentation and Control Designer with 35 years of experience, 27 years in the
water/wastewater industry and 8 years in the gas and mining industry. My experience includes development of
Process and Instrumentation Diagrams, specifying and designing of plant and facility power distribution
systems including load calculations, develop power and instrumentation one line diagrams, assist process
mechanical in control strategy development, develop control wiring schematics, develop electrical and
instrumentation plan drawings, specify process instruments, develop instrumentation communication networks
such as ProfiBus, DeviceNet, Modbus and standard HART protocols, coordination with clients, other
disciplines, as well as construction phase assistance such as construction shop drawing submittal reviews,
responding to contractor requests for information and construction management electrical/instrumentation
inspection.
ProfessionalExperience:
Brown and Caldwell Golden, CO
Principal EI&C Designer January 1988 – Present
 Coordinate directly with Client electrical and instrumentation staff through out design process
 In conjunction with Process Mechanical Engineers, performed area classification analysis to determine
facility hazardous areas as defined in NFPA 820
 In conjunction with Process Mechanical Engineers, develop Process and Instrumentation Diagrams
 In conjunction with Process Mechanical Engineers, develop Process control narratives
 Design and develop electrical and instrumentation demolition drawings for EE review and approval
 Design and develop overall site power distribution one-line diagrams including load calculations for EE
review and approval.
 Design and develop individual facility power and instrumentation one-line diagrams, based on Process
Mechanical equipment list and Process and Instrumentation Diagrams, for EE review and approval
 Define electrical space requirements and design and develop electrical room layouts for EE review and
approval
 Design and develop site and individual facility plan drawings for EE review and approval
 Design and develop site and individual facility lighting plan drawings and schedules for EE review and
approval
 Design and develop control wiring schematics based on Process and Instrumentation Diagrams and
Process control narratives, for EE review and approval
 Develop electrical equipment specifications for EE review and approval
 Develop instrumentation equipment specifications for EE review and approval
 Design and develop site/facility fire alarm systems per NFPA 72 for EE review and approval
 Design and develop site/facility communication systems for EE review and approval
 Coordinate mechanical specifications for electrical and instrumentation requirements
 Respond to contractor request for information during construction phase
 Review electrical and instrumentation equipment submittals for conformance to the contract documents
 Review mechanical process equipment submittals for electrical and instrumentation requirement
conformance to the contract documents
 Provide field construction management electrical and instrumentation inspection to verify field
installation conformance to the contract documents
Kaiser Engineers, Inc Denver, CO
Electrical Design/Drafter July 84 – January 1988
 Drafted detailed electrical wiring diagrams from control schematics
 Produced lighting calculations and drafted lighting plans and panel schedules
 Drafted plan drawings including raceway layouts.
Darenco, Inc Wheat Ridge, CO
Process Piping Drafter January 1983 – July 84
 Drafted Process and Instrumentation Diagrams and Process Flow Diagrams
 Drafted process piping plan and elevation drawings
Ortloff Mountain States Corp. Golden, CO
Principal EI&C Designer July 1980 – January 1983
 From engineer’s sketches, drafted floor plans, elevations, sections and details for process skids, pipe
racks and supports, concrete slabs, pads and foundations as well as architectural plans and elevations.
TechnicalSkills:
AutoCAD – 2D plan drawings, one-lines, schematics, schedules
AutoCAD PID
Microsoft Office Word and Excel
SKM short circuit coordination and arc flash analysis
Education:
Diploma, Architectural/Structural Drafting – 1980
Arc Flash/Short Circuit – SKM Power Tools software training 2012
AutoCAD 2013 fundamentals training 2013

More Related Content

What's hot (17)

Dave B. Ramos CV
Dave B. Ramos CVDave B. Ramos CV
Dave B. Ramos CV
 
TECHNICAL SKILLS SUMMARY
TECHNICAL SKILLS SUMMARYTECHNICAL SKILLS SUMMARY
TECHNICAL SKILLS SUMMARY
 
G_123
G_123G_123
G_123
 
RESUM (1)
RESUM (1)RESUM (1)
RESUM (1)
 
Tyron Muller Curriculum Vitae
Tyron Muller Curriculum VitaeTyron Muller Curriculum Vitae
Tyron Muller Curriculum Vitae
 
Matt Watters Resume 2017
Matt Watters Resume 2017Matt Watters Resume 2017
Matt Watters Resume 2017
 
summary_analytical-services_yr_052314
summary_analytical-services_yr_052314summary_analytical-services_yr_052314
summary_analytical-services_yr_052314
 
Sajeer mohmamed
Sajeer mohmamedSajeer mohmamed
Sajeer mohmamed
 
M Halsey CV
M Halsey CVM Halsey CV
M Halsey CV
 
Schmidt_Resume
Schmidt_ResumeSchmidt_Resume
Schmidt_Resume
 
Hernandez Priscila_C and I_20161005
Hernandez  Priscila_C and I_20161005Hernandez  Priscila_C and I_20161005
Hernandez Priscila_C and I_20161005
 
MOHAMMED SAMEER.docx
MOHAMMED SAMEER.docxMOHAMMED SAMEER.docx
MOHAMMED SAMEER.docx
 
Walter Lethermon's Resume
Walter Lethermon's ResumeWalter Lethermon's Resume
Walter Lethermon's Resume
 
WGauthier Resume
WGauthier ResumeWGauthier Resume
WGauthier Resume
 
TED_BEERY_RESUME
TED_BEERY_RESUMETED_BEERY_RESUME
TED_BEERY_RESUME
 
Pigott Construction Ltd
Pigott Construction LtdPigott Construction Ltd
Pigott Construction Ltd
 
Planning of erosti communications on the basis of building standards in the p...
Planning of erosti communications on the basis of building standards in the p...Planning of erosti communications on the basis of building standards in the p...
Planning of erosti communications on the basis of building standards in the p...
 

Viewers also liked

Proyecto lenguaje gomez
Proyecto lenguaje gomezProyecto lenguaje gomez
Proyecto lenguaje gomezmanuelage
 
визитная карточка РБ
визитная карточка РБвизитная карточка РБ
визитная карточка РБgans1k
 
Financial accounting 2014
Financial accounting 2014Financial accounting 2014
Financial accounting 2014Magdy Sadek
 
Los géneros literarios
Los géneros literariosLos géneros literarios
Los géneros literariosJenny HB
 
Cara menambah record
Cara menambah recordCara menambah record
Cara menambah recordiswan_di
 
Tugas 3 pembuatan leaflet
Tugas 3 pembuatan leafletTugas 3 pembuatan leaflet
Tugas 3 pembuatan leafletiswan_di
 

Viewers also liked (10)

Chto nuzhno znat o cataloge №2'2016
Chto nuzhno znat o cataloge №2'2016Chto nuzhno znat o cataloge №2'2016
Chto nuzhno znat o cataloge №2'2016
 
Proyecto lenguaje gomez
Proyecto lenguaje gomezProyecto lenguaje gomez
Proyecto lenguaje gomez
 
визитная карточка РБ
визитная карточка РБвизитная карточка РБ
визитная карточка РБ
 
Presentación1
Presentación1Presentación1
Presentación1
 
Financial accounting 2014
Financial accounting 2014Financial accounting 2014
Financial accounting 2014
 
Los géneros literarios
Los géneros literariosLos géneros literarios
Los géneros literarios
 
Plaquette_EPET_2015
Plaquette_EPET_2015Plaquette_EPET_2015
Plaquette_EPET_2015
 
Modul 5
Modul 5Modul 5
Modul 5
 
Cara menambah record
Cara menambah recordCara menambah record
Cara menambah record
 
Tugas 3 pembuatan leaflet
Tugas 3 pembuatan leafletTugas 3 pembuatan leaflet
Tugas 3 pembuatan leaflet
 

Similar to Samuel A McBride Resume 1-13-15

Similar to Samuel A McBride Resume 1-13-15 (20)

Godbee_Richard_orig
Godbee_Richard_origGodbee_Richard_orig
Godbee_Richard_orig
 
CV
CVCV
CV
 
Electrical Deliverables - Interdisciplinary Interfaces
Electrical Deliverables - Interdisciplinary InterfacesElectrical Deliverables - Interdisciplinary Interfaces
Electrical Deliverables - Interdisciplinary Interfaces
 
Resume-Rajib Sharma
Resume-Rajib SharmaResume-Rajib Sharma
Resume-Rajib Sharma
 
Resume-Rajib Sharma(L)
Resume-Rajib Sharma(L)Resume-Rajib Sharma(L)
Resume-Rajib Sharma(L)
 
CV
CVCV
CV
 
Benton Falgout_resume
Benton Falgout_resumeBenton Falgout_resume
Benton Falgout_resume
 
Resume_Rangarajan (1)
Resume_Rangarajan (1)Resume_Rangarajan (1)
Resume_Rangarajan (1)
 
[DESCRIPTION of WORK DUTIES] Antwan Nathaniel Mallory
[DESCRIPTION of WORK DUTIES] Antwan Nathaniel Mallory[DESCRIPTION of WORK DUTIES] Antwan Nathaniel Mallory
[DESCRIPTION of WORK DUTIES] Antwan Nathaniel Mallory
 
abell_resume 2016
abell_resume 2016abell_resume 2016
abell_resume 2016
 
Nadim Siddique CV
Nadim Siddique CVNadim Siddique CV
Nadim Siddique CV
 
Electrical_Designer_10_11_2015
Electrical_Designer_10_11_2015Electrical_Designer_10_11_2015
Electrical_Designer_10_11_2015
 
Process & power plants
Process & power plantsProcess & power plants
Process & power plants
 
My resume 2015
My resume 2015My resume 2015
My resume 2015
 
Resume37
Resume37Resume37
Resume37
 
2015 Resume
2015 Resume2015 Resume
2015 Resume
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KB
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Omorogiuwa bateson(et)
Omorogiuwa bateson(et)Omorogiuwa bateson(et)
Omorogiuwa bateson(et)
 
Athavulla khan (2)
Athavulla khan (2)Athavulla khan (2)
Athavulla khan (2)
 

Samuel A McBride Resume 1-13-15

  • 1. Samuel A. McBride 1350 Clinton Street, Aurora CO 80010 (720) 281-3513 Smcbride34@comcast.net Principal Electrical, Instrumentation and Control Designer with 35 years of experience, 27 years in the water/wastewater industry and 8 years in the gas and mining industry. My experience includes development of Process and Instrumentation Diagrams, specifying and designing of plant and facility power distribution systems including load calculations, develop power and instrumentation one line diagrams, assist process mechanical in control strategy development, develop control wiring schematics, develop electrical and instrumentation plan drawings, specify process instruments, develop instrumentation communication networks such as ProfiBus, DeviceNet, Modbus and standard HART protocols, coordination with clients, other disciplines, as well as construction phase assistance such as construction shop drawing submittal reviews, responding to contractor requests for information and construction management electrical/instrumentation inspection. ProfessionalExperience: Brown and Caldwell Golden, CO Principal EI&C Designer January 1988 – Present  Coordinate directly with Client electrical and instrumentation staff through out design process  In conjunction with Process Mechanical Engineers, performed area classification analysis to determine facility hazardous areas as defined in NFPA 820  In conjunction with Process Mechanical Engineers, develop Process and Instrumentation Diagrams  In conjunction with Process Mechanical Engineers, develop Process control narratives  Design and develop electrical and instrumentation demolition drawings for EE review and approval  Design and develop overall site power distribution one-line diagrams including load calculations for EE review and approval.  Design and develop individual facility power and instrumentation one-line diagrams, based on Process Mechanical equipment list and Process and Instrumentation Diagrams, for EE review and approval  Define electrical space requirements and design and develop electrical room layouts for EE review and approval  Design and develop site and individual facility plan drawings for EE review and approval  Design and develop site and individual facility lighting plan drawings and schedules for EE review and approval  Design and develop control wiring schematics based on Process and Instrumentation Diagrams and Process control narratives, for EE review and approval  Develop electrical equipment specifications for EE review and approval  Develop instrumentation equipment specifications for EE review and approval  Design and develop site/facility fire alarm systems per NFPA 72 for EE review and approval  Design and develop site/facility communication systems for EE review and approval  Coordinate mechanical specifications for electrical and instrumentation requirements  Respond to contractor request for information during construction phase  Review electrical and instrumentation equipment submittals for conformance to the contract documents
  • 2.  Review mechanical process equipment submittals for electrical and instrumentation requirement conformance to the contract documents  Provide field construction management electrical and instrumentation inspection to verify field installation conformance to the contract documents Kaiser Engineers, Inc Denver, CO Electrical Design/Drafter July 84 – January 1988  Drafted detailed electrical wiring diagrams from control schematics  Produced lighting calculations and drafted lighting plans and panel schedules  Drafted plan drawings including raceway layouts. Darenco, Inc Wheat Ridge, CO Process Piping Drafter January 1983 – July 84  Drafted Process and Instrumentation Diagrams and Process Flow Diagrams  Drafted process piping plan and elevation drawings Ortloff Mountain States Corp. Golden, CO Principal EI&C Designer July 1980 – January 1983  From engineer’s sketches, drafted floor plans, elevations, sections and details for process skids, pipe racks and supports, concrete slabs, pads and foundations as well as architectural plans and elevations. TechnicalSkills: AutoCAD – 2D plan drawings, one-lines, schematics, schedules AutoCAD PID Microsoft Office Word and Excel SKM short circuit coordination and arc flash analysis Education: Diploma, Architectural/Structural Drafting – 1980 Arc Flash/Short Circuit – SKM Power Tools software training 2012 AutoCAD 2013 fundamentals training 2013