Performance Management:
 Project Management by
       Objectives
      14th September2011
        Ibadan, Nigeria
          Errol Goetsch
        +27 78 573 5046
         errol@xe4.org
       www.xmentors.us



                           1
Key Learning Points
      1 A of Projects 2 Q's of Objectives 3 Dimensions of Governance 4
      Elements of Excellence 7 Steps in Development 10 Physical Results

    1 The       Actual                           7 The                  Community
                         = 100 %
    Aim         Target                           Context              Benefits
                                                                 Projects
                                                              Agencies               Pay off
Q     2 The                                                                      Proof
                                                      Programmes
      Axes                         4 The                                     Progress
                                   Project        Intermediaries
                                                  Donors                  Products
         Q
                                     E                                Premises
            D                                                      Power         10 The
                          E                  E                 People            Results
                                    X=
            D                                              Payments
                                                      Payers
            D                        E
                                                   Policies
    3 The
    Organisation                                                             2
Errol Goetsch
 errol@xe4.org
Family                                      Founded
2 sons Adam (11) and Ethan (9)
Live: Johannesburg Born: Windhoek           PPASA Centre of Excellence
                                            The XE4 Foundation for Excellence
Studied                                     The Centre for Social Impact
BA Honours LLB MBA now PhD
Lecturer                                    Projects
Economics / Strategy / Project Management Zambia Commodity Exchange
Managerial Finance / Marketing            Swaziland Textile Industry revival
Organisational Behaviour / Politics       LoveLife HIV/Aids
                                          Durban Waterfront
Past Employ                               Cato Manor Land Scheme
Merchant Investors Group (London)         Ndwedwe Electrification Programme
Inkatha Institute                         Water 2000
Boland / Absa Group / Nedcor Banks        National Housing Conference
IQ Group                                  KwaZulu Local Economic Development
Various Consultancies                     Durban Ordnances Rewrite
                                          KwaZulu Finance Corporation collateralisation
Audited                                   East London Municipality HIV/Aids impact
100’s of projects                         Sedibeng District Municipality Service Level Protest
                                              Prediction and Management
Developed                                 Banking mergers
Software for auditing / managing          Corporate Governance
M&E Reports / Sustainability / Impact     Electronic banking systems
    Capacity / Balanced Scorecards / KAP Information system rollout
    tools / HIV Aids Impact

                                                                           3
Key Lessons
 The planning for projects is the same

1 - Aim of Project Management       Answer: Current Score
2 - Q’s of Project Measurement      Answer: Quantity and Quality
3 - Dimensions of Governance        Answer: Assessment
4 - Elements of Project Performance Answer: Excellence
5 - Results of Projects             Answer: Strategic & Operational Results
7 - Steps in Risk Profiling         Answer: Steps
10 - Physical Assets of Projects    Answer: Capacity




                                                          4
5
PROJECT PERFORMANCE
Project results are the aim of Management by Objectives


Project
Term-limited (defined end-date)
Special purpose (unique outcome)
Objectives (set targets) for cost, period, product and outcome
Results scores against targets
Risk
The COST of getting the project back on track
- in money – vs budget over-run
- in time – vs project plan delay
- in product – vs delivery shortfall
- in outcome – vs needs unmet
Quality
The VALUE of being on track
- in money – vs budget - Economy
- in time – vs project plan - Efficiency
- in productivity – vs delivery - Effectiveness
- in impact – vs cost benefit ratio - Equity

                                                                 6
PROJECT PERFORMANCE
Project results are the aim of Management by Objectives


Project
Term-limited (defined end-date)                                          %
Special purpose (unique outcome)
                                                              Actual
                                                                     =
Objectives (set targets) for cost, period, product and outcomeTarget
Results scores against targets
                                                                         Date
Risk
The COST of getting the project back on track
- in money – vs budget over-run
- in time – vs project plan delay
- in product – vs delivery shortfall
- in outcome – vs needs unmet
Quality
The VALUE of being on track
- in money – vs budget - Economy
- in time – vs project plan - Efficiency
- in productivity – vs delivery - Effectiveness
- in impact – vs cost benefit ratio - Equity

                                                                 7
Risks: The Asset Register
The set of 10 Physical Results and their sources

Function        Activity: Workplan / Budget                      Quality

1 R&D           Why: Designing solutions to problems             Policy

2 Marketing     What for: Attracting people who care             Payers

3 Finance       What with: Budgets to match income to expenses   Payment

4 HR            Who with: Hiring people who work                 People

5 Facilities    Where: Getting places to work                    Premises

6 Procurement   How: Getting inputs that work                    Power

7 Project       When: Getting outputs on time                    Products

8 Quality       What if: Solving risks                           Progress

9 Information   What: Producing evidence                         Proof

10 Strategy     Who for: Satisfying stakeholders                 Payoff


                                                                    8
RISK CONTEXT: Cash Flow
    The 7 Steps in roles, tasks, and reports

           See SOLUTION
                                                                           Impact
Results     Community     change Actual direct + indirect beneficiaries    Assessment

Benefits                                                                   End-Term
             Benefits     deliver Set of products and services delivered   reports
      =
                                                                           Mid-Term
             Projects     design Delivery mechanism
                                                                           reports
                                                                           Progress
  Work       Agencies     decide    Designer and Implementer of Solution
                                                                           reports
   Time
           Programmes     choose Development priority                      Work Plans
      x
           Intermediaries collect   Government / Donor Agency / Bank       Budgets

 Money        Donors      care      Taxpayer / Shareholder / Benefactor    Receipts

  Costs    See PROBLEM                                                     Baseline

                                                                     9
CONSEQUENCE: Measuring Risk
When managers are missing or messing


The least cost for a      The least time for       The most delivery    The most impact
given level of output     a given level of         for a given cost /   for a given cost /
/ Target                  output / Target          Target               Target
Procurement               Human Resources          Project              Strategy

              COSTS                        Time                    BENEFITS
             Try reduce                    Work                    Try increase
                                      Organisations
              $                        Performance                            #
           Inputs                       Efficiency                         Outputs
       Factor Market                                                    Goods Market
                                               %
          Capacity                                                         Benefits
                                        Outcomes
          Economy                                                        Effectiveness
                                       Households
                                          Impact
                                        C/B Equity
                                                                    10
Costing Risk: Project Performance
The effect of risk on the project


Economy              Efficiency             Effectiveness       Cost/Benefit
                                                                Equity

X   = E       X     C       E        L      L       E       N       C          E

X   = %                     %                       %                          %

                                     Work
                                      50%

          Inputs                                                Outputs
          50%                                                    50%

                                    Outcomes
                                      50%

                                                            11
CONSEQUENCES: Results Audit
      Missing or Messing Managers don’t give questions or get answers


 100%




                            Perfect – Level - can carry load
Policy Payers Payments People Places          Power Products       Progress Proof Pay off

R&D     Marketing Finance   HR      Facilities Procur    Project   Risk    M&E    Strategy
                                               ement
Why     What     What       Who     Where How            When      What    What   Who
        for      with       with                                   If             For
                                                                      12
MEASUREMENT: Results
    The 2 Q’s of Results
                                                           Pass rate

                                                        XTarget = 100%
              100%
                                                         40 x 80 = 3200
                                                         20 x 40 = 800
Quantity                                                 Actual = 25%

Graduates                        25%
              50%                   X
How much               Success          Failure
Target = 40
Actual = 20




       Benefit:                          How well
       School        Quality      50%
                                         Target = 80%
                                         Actual = 40%
                                                        100%

       Graduates     Marks

                                                         13
MEASUREMENT: R&D
    R&D produces Policies
                                                            Policies

                                                         XTarget = 100%
               100%

                                                          10 x 30
Quantity
Problems                           25%
               50%                    X
How much                 Success          Failure
Target = 10
Actual = 5




              R&D                          How well
                      Quality       50%
                                           Target = 30
                                           Actual = 15
                                                         100%


                      Solutions

                                                          14
MEASUREMENT: Marketing
    Marketing produces Payers
                                                            Payers

                                                         XTarget = 100%
             100%

                                                          2 x 1000 000
Quantity
Donors                          25%
             50%                   X
How much              Success          Failure
Target = 2
Actual = 1




       Marketing                        How well
                    Quality      50%
                                        Target = 1000 000
                                        Actual = 500 000
                                                         100%


                    Donations

                                                         15
MEASUREMENT: Finance
     Finance produces Payments
                                                                      Payments

                                                                   XTarget = 100%
                 100%

                                                                    100% x 100%
Quantity
Income (payment in)                      25%
                 50%                        X
How much                   Success               Failure
Target = 2000 000
Actual = 500 000




           Finance                                How well
                        Quality            50%
                                                  Target = 500 000
                                                  Actual = 250 000
                                                                   100%


                        Expenses (payment out)

                                                                   16
MEASUREMENT: HR
    HR produces People
                                                               People

                                                            XTarget = 100%
                  100%

                                                             10 000
Quantity
Staff                                 25%
                  50%                    X
How much                    Success          Failure
Target = 20
Actual = 10




              Human                           How well
              Results    Quality       50%
                                              Target = 10
                                              Actual = 5
                                                            100%


                         Skills

                                                             17
MEASUREMENT: Facilities
    Facilities produces Premises
                                                               Premises

                                                            XTarget = 100%
                  100%

                                                             1 000 x 10
Quantity
Locations                             25%
                  50%                    X
How much                    Success          Failure
Target = 1000m2
Actual = 500m2




        Facilities                            How well
                         Quality       50%
                                              Target = 10
                                              Actual = 5
                                                            100%


                         Features

                                                             18
MEASUREMENT: Procurement
    Procurement produces Power
                                                            Power

                                                         XTarget = 100%
               100%

                                                          1 000
Quantity
Inputs                             25%
               50%                    X
How much                 Success          Failure
Target = 100
Actual = 50




    Procurement                            How well
                      Quality       50%
                                           Target = 10
                                           Actual = 5
                                                         100%


                      Features

                                                          19
MEASUREMENT: Project
    Project produces Products
                                                               Products

                                                            XTarget = 100%
                100%

                                                             2 000
Quantity
Outputs                                25%
                50%                       X
How much                  Success             Failure
Target = 1000
Actual = 500




         Project                               How well
      Production       Quality          50%
                                               Target = 2
                                               Actual = 1
                                                            100%


                       Functionality

                                                             20
MEASUREMENT: Quality
    Quality produces Progress
                                                                     Progress

                                                                  XTarget = 100%
                  100%

                                                                   10 000
Quantity
Benefits                                 25%
                  50%                       X
How much                    Success             Failure
Target = 10
Actual = 5




                Risk                             How well
              Quality    Quality          50%
                                                 Target = 1 000
                                                 Actual = 500
                                                                  100%


                         Beneficiaries

                                                                   21
MEASUREMENT: Audit / Info / M&E
    M&E produces Proof
                                                          Proof

                                                       XTarget = 100%
              100%

                                                        200
Quantity
Reports                          25%
              50%                   X
How much               Success          Failure
Target = 20
Actual = 10




      Information                        How well
      Audit / M&E    Quality      50%
                                         Target = 10
                                         Actual = 5
                                                       100%


                     Coverage

                                                        22
MEASUREMENT: Strategy
    Strategy produces Payoffs
                                                                Payoff

                                                             X
                100%                                          Target = 100%

                                                              10 000
Quantity
Stakeholders                          25%
                50%                      X
How much                  Success            Failure
Target = 1500
Actual = 750




         Strategy                             How well
                       Quality         50%
                                              Target = 5
                                              Actual = 2.5
                                                             100%


                       Satisfaction

                                                              23
CURES: Corporate Governance
The 3 Dimensions of Results - in the organisation




      Who / Where       Do / Need What         Result

       Directors       Decide Strategy        TARGETS
       Board Room      balance / authority    questions

                                                           Actuals
       Managers        Design System          SCORE                  = Score %
       Head Office     Organisation / skill
                                                           Targets
       Staff           Deliver Operations     ACTUALS
       Field Office    work / effort          answers



          Corporate Governance =
          ability to get good Decisions, Designs and Delivery


                                                                24

More Related Content

What's hot

Project Management Foundations Series Course 102 - Project Management Processes
Project Management Foundations Series Course 102 - Project Management ProcessesProject Management Foundations Series Course 102 - Project Management Processes
Project Management Foundations Series Course 102 - Project Management ProcessesThink For A Change
 
Understanding Agile Project Management (APM)
Understanding Agile Project Management (APM)Understanding Agile Project Management (APM)
Understanding Agile Project Management (APM)Ahmed Alnaqaa
 
Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Jeremy Jay Lim
 
IBM - The 7 Keys to Success - MoMoDar
IBM - The 7 Keys to Success - MoMoDarIBM - The 7 Keys to Success - MoMoDar
IBM - The 7 Keys to Success - MoMoDarHamisi Kibonde
 
How to Start a Project
How to Start a ProjectHow to Start a Project
How to Start a ProjectCraig Brown
 
Project Management 2.0
Project Management 2.0Project Management 2.0
Project Management 2.0Wrike
 
The Agile PMO (fall 2014 version)
The Agile PMO (fall 2014 version)The Agile PMO (fall 2014 version)
The Agile PMO (fall 2014 version)Gilt Tech Talks
 
Effective project management: Traditional, Agile, Extreme
Effective project management: Traditional, Agile, ExtremeEffective project management: Traditional, Agile, Extreme
Effective project management: Traditional, Agile, ExtremeLong Thang Pham
 
IT Services Delivery - Program Management Office (PMO)
IT Services Delivery - Program Management Office (PMO)IT Services Delivery - Program Management Office (PMO)
IT Services Delivery - Program Management Office (PMO)VSR *
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-managementPinta Florin
 
Introduction to Project Management (workshop) - v.2
Introduction to Project Management (workshop) - v.2Introduction to Project Management (workshop) - v.2
Introduction to Project Management (workshop) - v.2Mena M. Eissa
 
Project management 101
Project management 101Project management 101
Project management 101Sujatha TS
 
PMI-ACP - Agile Framework
PMI-ACP - Agile FrameworkPMI-ACP - Agile Framework
PMI-ACP - Agile FrameworkWafi Mohtaseb
 
Building a pmo
Building a pmoBuilding a pmo
Building a pmoemre_demir
 

What's hot (20)

Project Management Foundations Series Course 102 - Project Management Processes
Project Management Foundations Series Course 102 - Project Management ProcessesProject Management Foundations Series Course 102 - Project Management Processes
Project Management Foundations Series Course 102 - Project Management Processes
 
Understanding Agile Project Management (APM)
Understanding Agile Project Management (APM)Understanding Agile Project Management (APM)
Understanding Agile Project Management (APM)
 
Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)
 
IBM - The 7 Keys to Success - MoMoDar
IBM - The 7 Keys to Success - MoMoDarIBM - The 7 Keys to Success - MoMoDar
IBM - The 7 Keys to Success - MoMoDar
 
How to Start a Project
How to Start a ProjectHow to Start a Project
How to Start a Project
 
Project Management 2.0
Project Management 2.0Project Management 2.0
Project Management 2.0
 
The Agile PMO (fall 2014 version)
The Agile PMO (fall 2014 version)The Agile PMO (fall 2014 version)
The Agile PMO (fall 2014 version)
 
Effective project management: Traditional, Agile, Extreme
Effective project management: Traditional, Agile, ExtremeEffective project management: Traditional, Agile, Extreme
Effective project management: Traditional, Agile, Extreme
 
Ibm projectmgmt-1
Ibm  projectmgmt-1Ibm  projectmgmt-1
Ibm projectmgmt-1
 
IT Services Delivery - Program Management Office (PMO)
IT Services Delivery - Program Management Office (PMO)IT Services Delivery - Program Management Office (PMO)
IT Services Delivery - Program Management Office (PMO)
 
Guide to Project Portfolio Management
Guide to Project Portfolio ManagementGuide to Project Portfolio Management
Guide to Project Portfolio Management
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-management
 
The PMO in practice
The PMO in practiceThe PMO in practice
The PMO in practice
 
Balanced scorecard for effective project selection process
Balanced scorecard for effective project selection processBalanced scorecard for effective project selection process
Balanced scorecard for effective project selection process
 
Introduction to Project Management (workshop) - v.2
Introduction to Project Management (workshop) - v.2Introduction to Project Management (workshop) - v.2
Introduction to Project Management (workshop) - v.2
 
Project management 101
Project management 101Project management 101
Project management 101
 
PMI-ACP - Agile Framework
PMI-ACP - Agile FrameworkPMI-ACP - Agile Framework
PMI-ACP - Agile Framework
 
Project governance
Project governanceProject governance
Project governance
 
Building a pmo
Building a pmoBuilding a pmo
Building a pmo
 
Project Portfolio Selection Model - Voice narrated
Project Portfolio Selection Model - Voice narratedProject Portfolio Selection Model - Voice narrated
Project Portfolio Selection Model - Voice narrated
 

Viewers also liked

Project Management
Project ManagementProject Management
Project Managementleen
 
Mid Term Review Report for the DFID Funded CFSL Project in Malindi by Anyona ...
Mid Term Review Report for the DFID Funded CFSL Project in Malindi by Anyona ...Mid Term Review Report for the DFID Funded CFSL Project in Malindi by Anyona ...
Mid Term Review Report for the DFID Funded CFSL Project in Malindi by Anyona ...anyonasimon
 
presentation of the project coordination and its objecitives
presentation of the project coordination and its objecitivespresentation of the project coordination and its objecitives
presentation of the project coordination and its objecitivespfrehe
 
Recommendations
RecommendationsRecommendations
Recommendationsjimmorris
 
Anyona S. Gichuru, Value Chain Analysis of Beekeeping Wool Spinning & Ecotour...
Anyona S. Gichuru, Value Chain Analysis of Beekeeping Wool Spinning & Ecotour...Anyona S. Gichuru, Value Chain Analysis of Beekeeping Wool Spinning & Ecotour...
Anyona S. Gichuru, Value Chain Analysis of Beekeeping Wool Spinning & Ecotour...anyonasimon
 
K.Grieser - Trees for Tribs Update
K.Grieser - Trees for Tribs UpdateK.Grieser - Trees for Tribs Update
K.Grieser - Trees for Tribs Updatejgrieser
 
Sustainable agriculture development in Ethiopia
Sustainable agriculture development in EthiopiaSustainable agriculture development in Ethiopia
Sustainable agriculture development in EthiopiaIFOAM
 
Emerging distribution models
Emerging distribution modelsEmerging distribution models
Emerging distribution modelsBrahm Sharma
 
Setting smart objectives
Setting smart objectivesSetting smart objectives
Setting smart objectivesDr.Yaser Aref
 
FIFA World Cup 2014
FIFA World Cup 2014FIFA World Cup 2014
FIFA World Cup 2014Mayank Pahwa
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project ManagementRodolfo Siles
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 20173 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 2017Drift
 

Viewers also liked (20)

Khuznudzan
KhuznudzanKhuznudzan
Khuznudzan
 
Project Management
Project ManagementProject Management
Project Management
 
Mid Term Review Report for the DFID Funded CFSL Project in Malindi by Anyona ...
Mid Term Review Report for the DFID Funded CFSL Project in Malindi by Anyona ...Mid Term Review Report for the DFID Funded CFSL Project in Malindi by Anyona ...
Mid Term Review Report for the DFID Funded CFSL Project in Malindi by Anyona ...
 
Dino Martins - People, plants and pollinators
Dino Martins - People, plants and pollinatorsDino Martins - People, plants and pollinators
Dino Martins - People, plants and pollinators
 
Summary
SummarySummary
Summary
 
presentation of the project coordination and its objecitives
presentation of the project coordination and its objecitivespresentation of the project coordination and its objecitives
presentation of the project coordination and its objecitives
 
Recommendations
RecommendationsRecommendations
Recommendations
 
cresume
cresumecresume
cresume
 
LinkedIn Resume
LinkedIn ResumeLinkedIn Resume
LinkedIn Resume
 
Anyona S. Gichuru, Value Chain Analysis of Beekeeping Wool Spinning & Ecotour...
Anyona S. Gichuru, Value Chain Analysis of Beekeeping Wool Spinning & Ecotour...Anyona S. Gichuru, Value Chain Analysis of Beekeeping Wool Spinning & Ecotour...
Anyona S. Gichuru, Value Chain Analysis of Beekeeping Wool Spinning & Ecotour...
 
K.Grieser - Trees for Tribs Update
K.Grieser - Trees for Tribs UpdateK.Grieser - Trees for Tribs Update
K.Grieser - Trees for Tribs Update
 
A king for_israel
A king for_israelA king for_israel
A king for_israel
 
Sustainable agriculture development in Ethiopia
Sustainable agriculture development in EthiopiaSustainable agriculture development in Ethiopia
Sustainable agriculture development in Ethiopia
 
Marketing associate job description
Marketing associate job descriptionMarketing associate job description
Marketing associate job description
 
Emerging distribution models
Emerging distribution modelsEmerging distribution models
Emerging distribution models
 
Example Skill Based CV
Example Skill Based CVExample Skill Based CV
Example Skill Based CV
 
Setting smart objectives
Setting smart objectivesSetting smart objectives
Setting smart objectives
 
FIFA World Cup 2014
FIFA World Cup 2014FIFA World Cup 2014
FIFA World Cup 2014
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 20173 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 2017
 

Similar to The diagram shows the relationship between project inputs, work processes, outputs and outcomes. It illustrates how risks can impact the key dimensions of project performance:- Economy (cost of inputs) - Efficiency (work processes)- Effectiveness (outputs achieved)- Equity (outcomes / impact on beneficiaries)Managing risks helps minimize negative impacts and maximize positive results across these four dimensions of project performance

Practical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar SlidesPractical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar SlidesPM Solutions
 
Eservices project planning
Eservices project planningEservices project planning
Eservices project planningChetan Manchanda
 
Vietnam value chain development planning
Vietnam value chain development planningVietnam value chain development planning
Vietnam value chain development planningILRI
 
India value chain development planning
India value chain development planningIndia value chain development planning
India value chain development planningILRI
 
Project management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standardsProject management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standardsJayesh Khatri
 
2011 10 30 Gordon Culpan Resume
2011 10 30 Gordon Culpan Resume2011 10 30 Gordon Culpan Resume
2011 10 30 Gordon Culpan Resumegculpan
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)mandrew182
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)mandrew182
 
Project Management . The Change Agent
Project Management . The Change AgentProject Management . The Change Agent
Project Management . The Change AgentSoftServe
 
Project Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMPProject Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMPSoftServe
 
Brantley.wayne
Brantley.wayneBrantley.wayne
Brantley.wayneNASAPMC
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Farha Sharmin
 
Charles Watt - The argument for supporting Open Access to incumbent shareholders
Charles Watt - The argument for supporting Open Access to incumbent shareholdersCharles Watt - The argument for supporting Open Access to incumbent shareholders
Charles Watt - The argument for supporting Open Access to incumbent shareholdersimec.archive
 

Similar to The diagram shows the relationship between project inputs, work processes, outputs and outcomes. It illustrates how risks can impact the key dimensions of project performance:- Economy (cost of inputs) - Efficiency (work processes)- Effectiveness (outputs achieved)- Equity (outcomes / impact on beneficiaries)Managing risks helps minimize negative impacts and maximize positive results across these four dimensions of project performance (20)

Result-Driven Project Team Synergy
Result-Driven Project Team SynergyResult-Driven Project Team Synergy
Result-Driven Project Team Synergy
 
Practical M&E
Practical M&EPractical M&E
Practical M&E
 
M&E Project (Africa) Presentation
M&E Project (Africa) PresentationM&E Project (Africa) Presentation
M&E Project (Africa) Presentation
 
Practical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar SlidesPractical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar Slides
 
U1 - S1 - Modern Project Management.pdf
U1 - S1 - Modern Project Management.pdfU1 - S1 - Modern Project Management.pdf
U1 - S1 - Modern Project Management.pdf
 
Eservices project planning
Eservices project planningEservices project planning
Eservices project planning
 
Vietnam value chain development planning
Vietnam value chain development planningVietnam value chain development planning
Vietnam value chain development planning
 
India value chain development planning
India value chain development planningIndia value chain development planning
India value chain development planning
 
Does the project manager stand a chance?
Does the project manager stand a chance?Does the project manager stand a chance?
Does the project manager stand a chance?
 
Project management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standardsProject management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standards
 
2011 10 30 Gordon Culpan Resume
2011 10 30 Gordon Culpan Resume2011 10 30 Gordon Culpan Resume
2011 10 30 Gordon Culpan Resume
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
 
Project Management . The Change Agent
Project Management . The Change AgentProject Management . The Change Agent
Project Management . The Change Agent
 
Project Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMPProject Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMP
 
Brantley.wayne
Brantley.wayneBrantley.wayne
Brantley.wayne
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1
 
2012-10-11 Solutions for Proj Driven Orgs
2012-10-11 Solutions for Proj Driven Orgs2012-10-11 Solutions for Proj Driven Orgs
2012-10-11 Solutions for Proj Driven Orgs
 
Charles Watt - The argument for supporting Open Access to incumbent shareholders
Charles Watt - The argument for supporting Open Access to incumbent shareholdersCharles Watt - The argument for supporting Open Access to incumbent shareholders
Charles Watt - The argument for supporting Open Access to incumbent shareholders
 
Pmo
PmoPmo
Pmo
 

Recently uploaded

Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Neo4j
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsPrecisely
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 

Recently uploaded (20)

Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power Systems
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 

The diagram shows the relationship between project inputs, work processes, outputs and outcomes. It illustrates how risks can impact the key dimensions of project performance:- Economy (cost of inputs) - Efficiency (work processes)- Effectiveness (outputs achieved)- Equity (outcomes / impact on beneficiaries)Managing risks helps minimize negative impacts and maximize positive results across these four dimensions of project performance

  • 1. Performance Management: Project Management by Objectives 14th September2011 Ibadan, Nigeria Errol Goetsch +27 78 573 5046 errol@xe4.org www.xmentors.us 1
  • 2. Key Learning Points 1 A of Projects 2 Q's of Objectives 3 Dimensions of Governance 4 Elements of Excellence 7 Steps in Development 10 Physical Results 1 The Actual 7 The Community = 100 % Aim Target Context Benefits Projects Agencies Pay off Q 2 The Proof Programmes Axes 4 The Progress Project Intermediaries Donors Products Q E Premises D Power 10 The E E People Results X= D Payments Payers D E Policies 3 The Organisation 2
  • 3. Errol Goetsch errol@xe4.org Family Founded 2 sons Adam (11) and Ethan (9) Live: Johannesburg Born: Windhoek PPASA Centre of Excellence The XE4 Foundation for Excellence Studied The Centre for Social Impact BA Honours LLB MBA now PhD Lecturer Projects Economics / Strategy / Project Management Zambia Commodity Exchange Managerial Finance / Marketing Swaziland Textile Industry revival Organisational Behaviour / Politics LoveLife HIV/Aids Durban Waterfront Past Employ Cato Manor Land Scheme Merchant Investors Group (London) Ndwedwe Electrification Programme Inkatha Institute Water 2000 Boland / Absa Group / Nedcor Banks National Housing Conference IQ Group KwaZulu Local Economic Development Various Consultancies Durban Ordnances Rewrite KwaZulu Finance Corporation collateralisation Audited East London Municipality HIV/Aids impact 100’s of projects Sedibeng District Municipality Service Level Protest Prediction and Management Developed Banking mergers Software for auditing / managing Corporate Governance M&E Reports / Sustainability / Impact Electronic banking systems Capacity / Balanced Scorecards / KAP Information system rollout tools / HIV Aids Impact 3
  • 4. Key Lessons The planning for projects is the same 1 - Aim of Project Management Answer: Current Score 2 - Q’s of Project Measurement Answer: Quantity and Quality 3 - Dimensions of Governance Answer: Assessment 4 - Elements of Project Performance Answer: Excellence 5 - Results of Projects Answer: Strategic & Operational Results 7 - Steps in Risk Profiling Answer: Steps 10 - Physical Assets of Projects Answer: Capacity 4
  • 5. 5
  • 6. PROJECT PERFORMANCE Project results are the aim of Management by Objectives Project Term-limited (defined end-date) Special purpose (unique outcome) Objectives (set targets) for cost, period, product and outcome Results scores against targets Risk The COST of getting the project back on track - in money – vs budget over-run - in time – vs project plan delay - in product – vs delivery shortfall - in outcome – vs needs unmet Quality The VALUE of being on track - in money – vs budget - Economy - in time – vs project plan - Efficiency - in productivity – vs delivery - Effectiveness - in impact – vs cost benefit ratio - Equity 6
  • 7. PROJECT PERFORMANCE Project results are the aim of Management by Objectives Project Term-limited (defined end-date) % Special purpose (unique outcome) Actual = Objectives (set targets) for cost, period, product and outcomeTarget Results scores against targets Date Risk The COST of getting the project back on track - in money – vs budget over-run - in time – vs project plan delay - in product – vs delivery shortfall - in outcome – vs needs unmet Quality The VALUE of being on track - in money – vs budget - Economy - in time – vs project plan - Efficiency - in productivity – vs delivery - Effectiveness - in impact – vs cost benefit ratio - Equity 7
  • 8. Risks: The Asset Register The set of 10 Physical Results and their sources Function Activity: Workplan / Budget Quality 1 R&D Why: Designing solutions to problems Policy 2 Marketing What for: Attracting people who care Payers 3 Finance What with: Budgets to match income to expenses Payment 4 HR Who with: Hiring people who work People 5 Facilities Where: Getting places to work Premises 6 Procurement How: Getting inputs that work Power 7 Project When: Getting outputs on time Products 8 Quality What if: Solving risks Progress 9 Information What: Producing evidence Proof 10 Strategy Who for: Satisfying stakeholders Payoff 8
  • 9. RISK CONTEXT: Cash Flow The 7 Steps in roles, tasks, and reports See SOLUTION Impact Results Community change Actual direct + indirect beneficiaries Assessment Benefits End-Term Benefits deliver Set of products and services delivered reports = Mid-Term Projects design Delivery mechanism reports Progress Work Agencies decide Designer and Implementer of Solution reports Time Programmes choose Development priority Work Plans x Intermediaries collect Government / Donor Agency / Bank Budgets Money Donors care Taxpayer / Shareholder / Benefactor Receipts Costs See PROBLEM Baseline 9
  • 10. CONSEQUENCE: Measuring Risk When managers are missing or messing The least cost for a The least time for The most delivery The most impact given level of output a given level of for a given cost / for a given cost / / Target output / Target Target Target Procurement Human Resources Project Strategy COSTS Time BENEFITS Try reduce Work Try increase Organisations $ Performance # Inputs Efficiency Outputs Factor Market Goods Market % Capacity Benefits Outcomes Economy Effectiveness Households Impact C/B Equity 10
  • 11. Costing Risk: Project Performance The effect of risk on the project Economy Efficiency Effectiveness Cost/Benefit Equity X = E X C E L L E N C E X = % % % % Work 50% Inputs Outputs 50% 50% Outcomes 50% 11
  • 12. CONSEQUENCES: Results Audit Missing or Messing Managers don’t give questions or get answers 100% Perfect – Level - can carry load Policy Payers Payments People Places Power Products Progress Proof Pay off R&D Marketing Finance HR Facilities Procur Project Risk M&E Strategy ement Why What What Who Where How When What What Who for with with If For 12
  • 13. MEASUREMENT: Results The 2 Q’s of Results Pass rate XTarget = 100% 100% 40 x 80 = 3200 20 x 40 = 800 Quantity Actual = 25% Graduates 25% 50% X How much Success Failure Target = 40 Actual = 20 Benefit: How well School Quality 50% Target = 80% Actual = 40% 100% Graduates Marks 13
  • 14. MEASUREMENT: R&D R&D produces Policies Policies XTarget = 100% 100% 10 x 30 Quantity Problems 25% 50% X How much Success Failure Target = 10 Actual = 5 R&D How well Quality 50% Target = 30 Actual = 15 100% Solutions 14
  • 15. MEASUREMENT: Marketing Marketing produces Payers Payers XTarget = 100% 100% 2 x 1000 000 Quantity Donors 25% 50% X How much Success Failure Target = 2 Actual = 1 Marketing How well Quality 50% Target = 1000 000 Actual = 500 000 100% Donations 15
  • 16. MEASUREMENT: Finance Finance produces Payments Payments XTarget = 100% 100% 100% x 100% Quantity Income (payment in) 25% 50% X How much Success Failure Target = 2000 000 Actual = 500 000 Finance How well Quality 50% Target = 500 000 Actual = 250 000 100% Expenses (payment out) 16
  • 17. MEASUREMENT: HR HR produces People People XTarget = 100% 100% 10 000 Quantity Staff 25% 50% X How much Success Failure Target = 20 Actual = 10 Human How well Results Quality 50% Target = 10 Actual = 5 100% Skills 17
  • 18. MEASUREMENT: Facilities Facilities produces Premises Premises XTarget = 100% 100% 1 000 x 10 Quantity Locations 25% 50% X How much Success Failure Target = 1000m2 Actual = 500m2 Facilities How well Quality 50% Target = 10 Actual = 5 100% Features 18
  • 19. MEASUREMENT: Procurement Procurement produces Power Power XTarget = 100% 100% 1 000 Quantity Inputs 25% 50% X How much Success Failure Target = 100 Actual = 50 Procurement How well Quality 50% Target = 10 Actual = 5 100% Features 19
  • 20. MEASUREMENT: Project Project produces Products Products XTarget = 100% 100% 2 000 Quantity Outputs 25% 50% X How much Success Failure Target = 1000 Actual = 500 Project How well Production Quality 50% Target = 2 Actual = 1 100% Functionality 20
  • 21. MEASUREMENT: Quality Quality produces Progress Progress XTarget = 100% 100% 10 000 Quantity Benefits 25% 50% X How much Success Failure Target = 10 Actual = 5 Risk How well Quality Quality 50% Target = 1 000 Actual = 500 100% Beneficiaries 21
  • 22. MEASUREMENT: Audit / Info / M&E M&E produces Proof Proof XTarget = 100% 100% 200 Quantity Reports 25% 50% X How much Success Failure Target = 20 Actual = 10 Information How well Audit / M&E Quality 50% Target = 10 Actual = 5 100% Coverage 22
  • 23. MEASUREMENT: Strategy Strategy produces Payoffs Payoff X 100% Target = 100% 10 000 Quantity Stakeholders 25% 50% X How much Success Failure Target = 1500 Actual = 750 Strategy How well Quality 50% Target = 5 Actual = 2.5 100% Satisfaction 23
  • 24. CURES: Corporate Governance The 3 Dimensions of Results - in the organisation Who / Where Do / Need What Result Directors Decide Strategy TARGETS Board Room balance / authority questions Actuals Managers Design System SCORE = Score % Head Office Organisation / skill Targets Staff Deliver Operations ACTUALS Field Office work / effort answers Corporate Governance = ability to get good Decisions, Designs and Delivery 24