SlideShare a Scribd company logo
1 of 5
Download to read offline
EnvironmentFirst
“Let the Environment be your first Inspiration”
Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.)
info@environmentfirst.in +91 731 6007860 www.environmentfirst.in
Our Locations: Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula Page 1
COMPETITIVE BIDDING BY MP POWER MANAGEMENT COMPANY LIMITED FOR
INSTALLATION OF 150 MW SOLAR POWER PROJECT IN MADHYA PRADESH
Summary
Bid Inviting Company MP power Management Company Ltd
Contract Period 25 Years
Total Capacity of The Bid 150 MW
Project awarding Method Bidding
Maximum Capacity to Bid 150 MW
Minimum Capacity to Bid 2 MW
Commissioning Deadline Up to 25 MW, 12 months and above 25 MW,
18 months
Submission Date 11.05.2015, Time: 15.00 Hrs
Amount of Bid Bond INR 20 Lakh/ MW in the Form of Bank
Guarantee
Cost Of Bid Document Rs. 25,000 or USD 500, in the form of a
demand draft / pay order
Bid Processing Fee Rs. 1,00,000 or USD 2000 per Generating
Source, in the form of a demand draft / pay
order
EnvironmentFirst
“Let the Environment be your first Inspiration”
Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.)
info@environmentfirst.in +91 731 6007860 www.environmentfirst.in
Our Locations: Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula Page 2
Bidding Process Expenses
Bid Document Fee Rs. 25,000 or USD 500, in the form of Demand
Draft, MP Power Management Co. Ltd.” Payable at
“Jabalpur”. Taxes if any shall be borne by the
Bidder.
Bid Processing fee Rs. 1, 00,000 or USD 2000, in the form of Demand
Draft, MP Power Management Co. Ltd.” Payable at
“Jabalpur”. Taxes if any, shall be borne by the
Bidder.
Bid Bond Rs. 2O Lakh/ MW to be submitted along with the
bid in the form of the bank guarantee. (Valid for
210 days from the bid deadline)
Contract Performance Guarantee Rs. 3O Lakh/ MW within 30 Days of award of LOI
Bid Submission address Chief General Manager (IPC)
MP Power Management Company Limited,
Block No 11, 1st Floor, Shakti Bhawan, Rampur,
Jabalpur, Madhya Pradesh (M.P), India- Pin 482008
Phone No. : +91-761-2667511, 2702400, 2702402
Fax No. : +91-761-2667511, 2661245, 2664653,
Email: rakesh.saxena@mppmcl.com
EnvironmentFirst
“Let the Environment be your first Inspiration”
Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.)
info@environmentfirst.in +91 731 6007860 www.environmentfirst.in
Our Locations: Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula Page 3
Eligibility
Net Worth Registered Company, 2 Crore per MW
For Capacity >5MW, pas experience into solar
is mandatory
Penalties
Delay In Commissioning Delay from 0-3 months: 1% per week, and,
thereafter,
Delay from 3-6 months: 2% per week, and,
thereafter.
Delay of more than 6 months: 3% per week.
From the Bank Guarantee amount
In case of financial closure not achieved in
180 days from PPA
Delay from 0-3 months – 1% per week, and,
thereafter,
Delay from 3-6 months - 2% per week, and,
thereafter,
Delay of more than 6 months – 3% per week.
From the Bank Guarantee amount
EnvironmentFirst
“Let the Environment be your first Inspiration”
Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.)
info@environmentfirst.in +91 731 6007860 www.environmentfirst.in
Our Locations: Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula Page 4
Due Dates
Date of issue of RFP T0 (March 30, 2015)
Submission of written clarification/
amendments if any, on the RFP/RFP
Documents by the Bidders.
T0 +18 Days
Pre-Bid Meeting(s) (if required) T0 +20 Days
Revision of RFP and RFP Documents (if
required) and issuance of revised RFP
and RFP Documents
T0 +35 Days
Bid submission and opening of Non
Financial Bid (Bid Deadline)
T0 + 60 days (T1) before 15:00 hrs &
opening 15.30 hrs
Short listing of Successful Bidder(s) and
issue of LOI
T1 +30 Days
Signing of RFP Documents T1 +60 Days
Method of Submission
Bids are to be submitted in a single closed cover envelope (as mentioned in Clause 2.10.2)
containing Envelope I (Non-Financial Bid) and Envelope II (Financial Bid) each one duly closed
separately. Envelope I (Non-Financial Bid) and Envelope II (Financial Bid) should be transcript in
the following way;
Envelope I (Non-Financial Bid)
RFP for procurement of Solar power for long term MP Power Management Company Limited
Superscript - “Request for proposal for procurement of 150 MW power from grid connected
solar energy sources for long term under tariff based competitive bidding process”
Name of the Bidder:
______________________
Due for Opening on:
______________________
EnvironmentFirst
“Let the Environment be your first Inspiration”
Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.)
info@environmentfirst.in +91 731 6007860 www.environmentfirst.in
Our Locations: Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula Page 5
Envelope I (Non-Financial Bid)”
Envelope II (Financial Bid)
Superscript -
“Request for proposal for procurement of 150 MW power from grid connected solar energy
sources for long term under tariff based competitive bidding process”
Name of the Bidder:
______________________
Due for Opening on:
______________________
Envelope II (Financial Bid)”
Other Provisions
1. Seller(s) shall be responsible for arranging transmission access from their Project to
the Delivery Point. Such arrangement shall be as per the regulations specified by the
MPERC, as amended from time to time.
2. The developer shall be responsible to arrange 33kV or above transmission line from
the Power Plant Generating Substation to nearest 132/33 kV or 220/132kV or
400/220/132kV CTU/STU Grid Sub Station. Cost of Transmission line will be borne by
developer.
3. The CDM benefit should be shared, on a gross basis, in proportion to the Contracted
Capacity from the Project, starting from 100% to developers in the first year after
commissioning and thereafter reducing by 10% every year till the sharing becomes
equal (50:50) between the developers and the licensees/consumers in the sixth year.
Thereafter, the sharing of CDM benefits should remain equal till the time that benefits
accrue. The developer shall disclose CDM benefits availed by them in the month of
March each year to the concerned Distribution Licensee.
4. Though No Ceiling has been mentioned in Tender, The Max Quote cannot be more
than 7.46 per kWh as per MPERC Order

More Related Content

What's hot

Power Line Electric India Pvt. Ltd., Ghaziabad, Electrical Power Equipments
Power Line Electric India Pvt. Ltd., Ghaziabad, Electrical Power EquipmentsPower Line Electric India Pvt. Ltd., Ghaziabad, Electrical Power Equipments
Power Line Electric India Pvt. Ltd., Ghaziabad, Electrical Power EquipmentsIndiaMART InterMESH Limited
 
Solar Tenders by Maven PK
Solar Tenders by Maven PK Solar Tenders by Maven PK
Solar Tenders by Maven PK Maven PK
 
Introducing dayton solar power
Introducing dayton solar powerIntroducing dayton solar power
Introducing dayton solar powerBhaskar Mishra
 
Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516Ravinder Raina
 

What's hot (7)

Power Line Electric India Pvt. Ltd., Ghaziabad, Electrical Power Equipments
Power Line Electric India Pvt. Ltd., Ghaziabad, Electrical Power EquipmentsPower Line Electric India Pvt. Ltd., Ghaziabad, Electrical Power Equipments
Power Line Electric India Pvt. Ltd., Ghaziabad, Electrical Power Equipments
 
AMARJIT PAL -CV
AMARJIT PAL -CVAMARJIT PAL -CV
AMARJIT PAL -CV
 
cromton greaves ppt
cromton greaves pptcromton greaves ppt
cromton greaves ppt
 
Solar Tenders by Maven PK
Solar Tenders by Maven PK Solar Tenders by Maven PK
Solar Tenders by Maven PK
 
Introducing dayton solar power
Introducing dayton solar powerIntroducing dayton solar power
Introducing dayton solar power
 
Ashutosh Mishra DOC
Ashutosh Mishra DOCAshutosh Mishra DOC
Ashutosh Mishra DOC
 
Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516
 

Viewers also liked

Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012Headway Solar
 
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...iassrmohanty
 
PROPOSED STATE ROAD CORPORATION
PROPOSED STATE ROAD CORPORATIONPROPOSED STATE ROAD CORPORATION
PROPOSED STATE ROAD CORPORATIONSaumil Sharma
 
Rural Electrification Cooperative Model (Solar-PV) In Madhya Pradesh
Rural Electrification Cooperative Model (Solar-PV) In Madhya Pradesh Rural Electrification Cooperative Model (Solar-PV) In Madhya Pradesh
Rural Electrification Cooperative Model (Solar-PV) In Madhya Pradesh Najib Altawell
 
Build a solar panel at home
Build a solar panel at homeBuild a solar panel at home
Build a solar panel at homeKaren Campbell
 
RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...Harish Sharma
 
Transforum Sitzung Berlin, Juni 2016 - Translators Without Borders
Transforum Sitzung Berlin, Juni 2016 - Translators Without BordersTransforum Sitzung Berlin, Juni 2016 - Translators Without Borders
Transforum Sitzung Berlin, Juni 2016 - Translators Without BordersChristian Gericke
 
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...Harish Sharma
 
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabHarish Sharma
 
Port of San Diego Public Parks (2012)
Port of San Diego Public Parks (2012)Port of San Diego Public Parks (2012)
Port of San Diego Public Parks (2012)Port of San Diego
 
Soltech Corporate presentation
Soltech Corporate presentationSoltech Corporate presentation
Soltech Corporate presentationsoltechindia
 

Viewers also liked (20)

Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012
 
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
 
Madhya Pradesh State Report - October 2016
Madhya Pradesh State Report - October 2016Madhya Pradesh State Report - October 2016
Madhya Pradesh State Report - October 2016
 
Mp High Lights
Mp High LightsMp High Lights
Mp High Lights
 
PROPOSED STATE ROAD CORPORATION
PROPOSED STATE ROAD CORPORATIONPROPOSED STATE ROAD CORPORATION
PROPOSED STATE ROAD CORPORATION
 
Rural Electrification Cooperative Model (Solar-PV) In Madhya Pradesh
Rural Electrification Cooperative Model (Solar-PV) In Madhya Pradesh Rural Electrification Cooperative Model (Solar-PV) In Madhya Pradesh
Rural Electrification Cooperative Model (Solar-PV) In Madhya Pradesh
 
Build a solar panel at home
Build a solar panel at homeBuild a solar panel at home
Build a solar panel at home
 
2014 PV Performance Modeling Workshop: PV Module Characterization Methods at ...
2014 PV Performance Modeling Workshop: PV Module Characterization Methods at ...2014 PV Performance Modeling Workshop: PV Module Characterization Methods at ...
2014 PV Performance Modeling Workshop: PV Module Characterization Methods at ...
 
RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...
 
Transforum Sitzung Berlin, Juni 2016 - Translators Without Borders
Transforum Sitzung Berlin, Juni 2016 - Translators Without BordersTransforum Sitzung Berlin, Juni 2016 - Translators Without Borders
Transforum Sitzung Berlin, Juni 2016 - Translators Without Borders
 
Solar Panel
Solar PanelSolar Panel
Solar Panel
 
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
 
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
 
Port of San Diego Public Parks (2012)
Port of San Diego Public Parks (2012)Port of San Diego Public Parks (2012)
Port of San Diego Public Parks (2012)
 
2014 PV Distribution System Modeling Workshop: The IEA PVPS Task 14 High pen...
2014 PV Distribution System Modeling Workshop: The IEA PVPS Task 14  High pen...2014 PV Distribution System Modeling Workshop: The IEA PVPS Task 14  High pen...
2014 PV Distribution System Modeling Workshop: The IEA PVPS Task 14 High pen...
 
2014 PV Reliability, Operations & Maintenance Workshop: HelioSpec by DreamQii...
2014 PV Reliability, Operations & Maintenance Workshop: HelioSpec by DreamQii...2014 PV Reliability, Operations & Maintenance Workshop: HelioSpec by DreamQii...
2014 PV Reliability, Operations & Maintenance Workshop: HelioSpec by DreamQii...
 
2014 PV Performance Modeling Workshop: PVSim Update: Mike Anderson, SunPower ...
2014 PV Performance Modeling Workshop: PVSim Update: Mike Anderson, SunPower ...2014 PV Performance Modeling Workshop: PVSim Update: Mike Anderson, SunPower ...
2014 PV Performance Modeling Workshop: PVSim Update: Mike Anderson, SunPower ...
 
2014 PV Distribution System Modeling Workshop: DOE Solar Energy Grid Integrat...
2014 PV Distribution System Modeling Workshop: DOE Solar Energy Grid Integrat...2014 PV Distribution System Modeling Workshop: DOE Solar Energy Grid Integrat...
2014 PV Distribution System Modeling Workshop: DOE Solar Energy Grid Integrat...
 
Soltech Corporate presentation
Soltech Corporate presentationSoltech Corporate presentation
Soltech Corporate presentation
 
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
 

Similar to 150 MW Solar bid in Madha Pradesh (India) 2015

150 MW Solar RfP by MPPMCL under reverse bidding
150 MW Solar RfP by MPPMCL under reverse bidding150 MW Solar RfP by MPPMCL under reverse bidding
150 MW Solar RfP by MPPMCL under reverse biddingHarish Sharma
 
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...Harish Sharma
 
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...Harish Sharma
 
Epc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateEpc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateSaurabh Parihar
 
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHHarish Sharma
 
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIRfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIHarish Sharma
 
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...Harish Sharma
 
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVRfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVHarish Sharma
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Gensol Engineering Limited
 
HYDRO_POLICY_UK_2015
HYDRO_POLICY_UK_2015HYDRO_POLICY_UK_2015
HYDRO_POLICY_UK_2015Anil Khadka
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabHeadway Solar
 
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...Harish Sharma
 
Andhra bank fire safety and energy audit new delhi zone
Andhra bank fire safety and energy audit new delhi zoneAndhra bank fire safety and energy audit new delhi zone
Andhra bank fire safety and energy audit new delhi zoneKumar Ramaiah
 
MP-SLDC-DSM Account of Wind and Solar PSS for April, 2019
MP-SLDC-DSM Account of Wind and Solar PSS for April, 2019MP-SLDC-DSM Account of Wind and Solar PSS for April, 2019
MP-SLDC-DSM Account of Wind and Solar PSS for April, 2019Das A. K.
 
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...Harish Sharma
 
Navi mumbai metro new
Navi mumbai metro newNavi mumbai metro new
Navi mumbai metro newRashid Kaskar
 
O&M and Troubleshooting Hydro Power Plants
O&M and Troubleshooting Hydro Power PlantsO&M and Troubleshooting Hydro Power Plants
O&M and Troubleshooting Hydro Power PlantsMarcep Inc.
 

Similar to 150 MW Solar bid in Madha Pradesh (India) 2015 (20)

Nit xxxv
Nit xxxvNit xxxv
Nit xxxv
 
150 MW Solar RfP by MPPMCL under reverse bidding
150 MW Solar RfP by MPPMCL under reverse bidding150 MW Solar RfP by MPPMCL under reverse bidding
150 MW Solar RfP by MPPMCL under reverse bidding
 
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
 
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
 
Epc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateEpc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard template
 
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
 
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIRfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
 
RFQ NRSS XXXVI
RFQ NRSS XXXVIRFQ NRSS XXXVI
RFQ NRSS XXXVI
 
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
 
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVRfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
 
HYDRO_POLICY_UK_2015
HYDRO_POLICY_UK_2015HYDRO_POLICY_UK_2015
HYDRO_POLICY_UK_2015
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in Punjab
 
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
 
Andhra bank fire safety and energy audit new delhi zone
Andhra bank fire safety and energy audit new delhi zoneAndhra bank fire safety and energy audit new delhi zone
Andhra bank fire safety and energy audit new delhi zone
 
MP-SLDC-DSM Account of Wind and Solar PSS for April, 2019
MP-SLDC-DSM Account of Wind and Solar PSS for April, 2019MP-SLDC-DSM Account of Wind and Solar PSS for April, 2019
MP-SLDC-DSM Account of Wind and Solar PSS for April, 2019
 
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
 
MYC Power Sector Services proposal
MYC Power Sector Services proposal MYC Power Sector Services proposal
MYC Power Sector Services proposal
 
Navi mumbai metro new
Navi mumbai metro newNavi mumbai metro new
Navi mumbai metro new
 
O&M and Troubleshooting Hydro Power Plants
O&M and Troubleshooting Hydro Power PlantsO&M and Troubleshooting Hydro Power Plants
O&M and Troubleshooting Hydro Power Plants
 

More from Harish Sharma

MNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting SystemsMNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting SystemsHarish Sharma
 
MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...Harish Sharma
 
MNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC SystemMNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC SystemHarish Sharma
 
Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in IndiaHarish Sharma
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Harish Sharma
 
PPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of KarnatakaPPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of KarnatakaHarish Sharma
 
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...Harish Sharma
 
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKARfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKAHarish Sharma
 
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.Harish Sharma
 
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Harish Sharma
 
Water Benefit Standard (WBS)
Water Benefit Standard (WBS) Water Benefit Standard (WBS)
Water Benefit Standard (WBS) Harish Sharma
 
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Harish Sharma
 
Draft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmersDraft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmersHarish Sharma
 
IREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEIREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEHarish Sharma
 
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS Harish Sharma
 
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...Harish Sharma
 
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantNet metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantHarish Sharma
 
20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDA20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDAHarish Sharma
 

More from Harish Sharma (18)

MNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting SystemsMNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting Systems
 
MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...
 
MNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC SystemMNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC System
 
Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in India
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
 
PPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of KarnatakaPPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of Karnataka
 
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
 
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKARfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
 
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
 
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
 
Water Benefit Standard (WBS)
Water Benefit Standard (WBS) Water Benefit Standard (WBS)
Water Benefit Standard (WBS)
 
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
 
Draft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmersDraft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmers
 
IREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEIREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEME
 
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
 
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
 
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantNet metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
 
20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDA20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDA
 

Recently uploaded

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 

150 MW Solar bid in Madha Pradesh (India) 2015

  • 1. EnvironmentFirst “Let the Environment be your first Inspiration” Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.) info@environmentfirst.in +91 731 6007860 www.environmentfirst.in Our Locations: Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula Page 1 COMPETITIVE BIDDING BY MP POWER MANAGEMENT COMPANY LIMITED FOR INSTALLATION OF 150 MW SOLAR POWER PROJECT IN MADHYA PRADESH Summary Bid Inviting Company MP power Management Company Ltd Contract Period 25 Years Total Capacity of The Bid 150 MW Project awarding Method Bidding Maximum Capacity to Bid 150 MW Minimum Capacity to Bid 2 MW Commissioning Deadline Up to 25 MW, 12 months and above 25 MW, 18 months Submission Date 11.05.2015, Time: 15.00 Hrs Amount of Bid Bond INR 20 Lakh/ MW in the Form of Bank Guarantee Cost Of Bid Document Rs. 25,000 or USD 500, in the form of a demand draft / pay order Bid Processing Fee Rs. 1,00,000 or USD 2000 per Generating Source, in the form of a demand draft / pay order
  • 2. EnvironmentFirst “Let the Environment be your first Inspiration” Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.) info@environmentfirst.in +91 731 6007860 www.environmentfirst.in Our Locations: Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula Page 2 Bidding Process Expenses Bid Document Fee Rs. 25,000 or USD 500, in the form of Demand Draft, MP Power Management Co. Ltd.” Payable at “Jabalpur”. Taxes if any shall be borne by the Bidder. Bid Processing fee Rs. 1, 00,000 or USD 2000, in the form of Demand Draft, MP Power Management Co. Ltd.” Payable at “Jabalpur”. Taxes if any, shall be borne by the Bidder. Bid Bond Rs. 2O Lakh/ MW to be submitted along with the bid in the form of the bank guarantee. (Valid for 210 days from the bid deadline) Contract Performance Guarantee Rs. 3O Lakh/ MW within 30 Days of award of LOI Bid Submission address Chief General Manager (IPC) MP Power Management Company Limited, Block No 11, 1st Floor, Shakti Bhawan, Rampur, Jabalpur, Madhya Pradesh (M.P), India- Pin 482008 Phone No. : +91-761-2667511, 2702400, 2702402 Fax No. : +91-761-2667511, 2661245, 2664653, Email: rakesh.saxena@mppmcl.com
  • 3. EnvironmentFirst “Let the Environment be your first Inspiration” Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.) info@environmentfirst.in +91 731 6007860 www.environmentfirst.in Our Locations: Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula Page 3 Eligibility Net Worth Registered Company, 2 Crore per MW For Capacity >5MW, pas experience into solar is mandatory Penalties Delay In Commissioning Delay from 0-3 months: 1% per week, and, thereafter, Delay from 3-6 months: 2% per week, and, thereafter. Delay of more than 6 months: 3% per week. From the Bank Guarantee amount In case of financial closure not achieved in 180 days from PPA Delay from 0-3 months – 1% per week, and, thereafter, Delay from 3-6 months - 2% per week, and, thereafter, Delay of more than 6 months – 3% per week. From the Bank Guarantee amount
  • 4. EnvironmentFirst “Let the Environment be your first Inspiration” Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.) info@environmentfirst.in +91 731 6007860 www.environmentfirst.in Our Locations: Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula Page 4 Due Dates Date of issue of RFP T0 (March 30, 2015) Submission of written clarification/ amendments if any, on the RFP/RFP Documents by the Bidders. T0 +18 Days Pre-Bid Meeting(s) (if required) T0 +20 Days Revision of RFP and RFP Documents (if required) and issuance of revised RFP and RFP Documents T0 +35 Days Bid submission and opening of Non Financial Bid (Bid Deadline) T0 + 60 days (T1) before 15:00 hrs & opening 15.30 hrs Short listing of Successful Bidder(s) and issue of LOI T1 +30 Days Signing of RFP Documents T1 +60 Days Method of Submission Bids are to be submitted in a single closed cover envelope (as mentioned in Clause 2.10.2) containing Envelope I (Non-Financial Bid) and Envelope II (Financial Bid) each one duly closed separately. Envelope I (Non-Financial Bid) and Envelope II (Financial Bid) should be transcript in the following way; Envelope I (Non-Financial Bid) RFP for procurement of Solar power for long term MP Power Management Company Limited Superscript - “Request for proposal for procurement of 150 MW power from grid connected solar energy sources for long term under tariff based competitive bidding process” Name of the Bidder: ______________________ Due for Opening on: ______________________
  • 5. EnvironmentFirst “Let the Environment be your first Inspiration” Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.) info@environmentfirst.in +91 731 6007860 www.environmentfirst.in Our Locations: Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula Page 5 Envelope I (Non-Financial Bid)” Envelope II (Financial Bid) Superscript - “Request for proposal for procurement of 150 MW power from grid connected solar energy sources for long term under tariff based competitive bidding process” Name of the Bidder: ______________________ Due for Opening on: ______________________ Envelope II (Financial Bid)” Other Provisions 1. Seller(s) shall be responsible for arranging transmission access from their Project to the Delivery Point. Such arrangement shall be as per the regulations specified by the MPERC, as amended from time to time. 2. The developer shall be responsible to arrange 33kV or above transmission line from the Power Plant Generating Substation to nearest 132/33 kV or 220/132kV or 400/220/132kV CTU/STU Grid Sub Station. Cost of Transmission line will be borne by developer. 3. The CDM benefit should be shared, on a gross basis, in proportion to the Contracted Capacity from the Project, starting from 100% to developers in the first year after commissioning and thereafter reducing by 10% every year till the sharing becomes equal (50:50) between the developers and the licensees/consumers in the sixth year. Thereafter, the sharing of CDM benefits should remain equal till the time that benefits accrue. The developer shall disclose CDM benefits availed by them in the month of March each year to the concerned Distribution Licensee. 4. Though No Ceiling has been mentioned in Tender, The Max Quote cannot be more than 7.46 per kWh as per MPERC Order