SlideShare a Scribd company logo
1 of 27
Financial Mechanism by GOLD STANDARD
A Presentation By: Harish Sharma
EnvironmentFirst Energy Services (P) Ltd.
Water Benefit Certificates
(AN OPPORTUNITY FOR INDUSTRIAL, RESIDENTIAL, AGRICULTURE, HORTICULTURE, INSTITUTIONAL WATER
EFFICIENT AND WASTE WATER TREATMENT PROJECTS)
Water Benefit Certificates (WBC)
Harish Sharma
EnvironmentFirst Energy Services (P) Ltd.
The Water Benefit Standard is a results-
based finance mechanism to drive funding
for water supply, purification and
conservation projects. These projects help
maintain the water balance within a
watershed, encourage local stakeholder
engagement and consultation, promote
sustainable development, ensure
environmental integrity and prepare
water users to contend with a world of
increasing water scarcity.
Water
Benefit
Standard
Water Benefit Certificate (WBC):
A unit of water outcome (or
benefit) representing that a certain
volume of water has been
sustainably supplied, purified
and/or conserved by a given project
during a specific period of time.
Projects are issued Water Benefit
Certificates (WBCs) according to the
volume of water benefits they
generate per year.
Project Must Address
Water balance Water scarcity
Water
sensitivity
Environmental
integrity
sustainable
development
Eligibility Requirements
Water supply Water purification Water conservation
Two types of certification are possible
under the WBS
1. Regular project certification
2. Retroactive project
certification
Project Selection
A WBC is a volumetric unit of account.
The basic unit that holds across all
projects is set as 1 WBC = 1 cubic meter
of water supplied, purified or conserved.
However, due to the wide spread of
volumes between very small and very
large projects, the Water Benefit
Standard applies discount factors to
project volumes that exceed certain
thresholds in order to encourage
economies of scale.
Calculating
WBCs
As a project grows, the amount of water
needed to generate one WBC increases
For volumes up to 40.000 m3 p.a., 1
m3 is worth 1 WBC
For additional volumes greater than
40.000 m3 but less than 1.300.000
m3 p.a., 10 m3 are worth 1 WBC
For additional volumes greater than
1.300.000 m3 p.a., 100 m3 are
worth 1 WBC
Categorization
Sustainability
• Sustainability ensures that projects are
designed and implemented in a
sustainable and participatory way. to
assess the risk the projects may pose to
the project's area of influence and to
ensure the projects meet the sustainable
development requirements of the Gold
Standard. Projects shall provide clear
evidence that there are no negative
impacts in set socio-economic and
environmental criteria.
1
Watershed Risk Assessment
• The Watershed Risk Assessment assesses the risks that
may be faced in implementing projects within a specific
watershed or basin and determines whether additional
monitoring may be required based on water scarcity,
vulnerability, or areas and species of high environmental
value. Each criteria is addressed with a 'yes' or 'no'
response with justification provided as to why the
response has been entered.
Sustainability Assessment
• to assess the risk the projects may pose to the project's
area of influence and to ensure the projects meet the
sustainable development requirements of the Gold
Standard. Projects shall provide clear evidence that there
are no negative impacts in set socio-economic and
environmental criteria.
2
• Each requirement is assessed according to the following
criteria.
• Negative (-): There is a risk that the project will negatively
impact the requirement. Mitigation is required and will be
monitored for the duration of the project.
• Neutral (0): The project will not have any impact on the
requirement. Mitigation is not required.
• Positive (+): The project will positively impact the requirement
and will be monitored for the duration of the project.
• Enhance (E): The indicator is neutral, but can be improved
over the lifetime of the project and become positive. Requires
monitoring for the duration of the project.
• Not Relevant (NR): The requirement is not relevant to the
project methodology and/or design. Mitigation is not
required.
Sustainability
Assessment
3
Human rights and socio-economic
situation
The project respects internationally proclaimed human rights including
Universal access to water, and dignity.
Cultural property and uniqueness of indigenous people.
Legal rights, customary rights, special cultural
ecological, economic, religious or spiritual significance
4
The project don’t have any negative
Impact on
Good Working condition
Food Security
Water Quality
Pollution Level
Ecology
5
Demonstration of
Financial
Additionality
• Projects that issue Water Benefit Certificates via the Water
Benefit Standard must demonstrate that they are beyond
business as usual, meaning that they would not have been
implemented without the Water Benefit Standard. The
project developer proves this by conducting a Financial
Needs Assessment (FNA) as part of the initial certification.
The FNA can be completed in one of two ways:
• Compliance with a positive list of preferred technologies,
methods or geographical regions that permits the project to
per se pass the FNA. Such projects must still disclose a
financial forecast over the project period.
• If a project does not comply with the positive list, a formal
financial analysis must be conducted to demonstrate that
the revenue from WBCs is required to make the project
financially feasible.
6
Real, Measurable and
Verifiable
• First, a baseline methodology estimates the state
of water use in the absence of the project. Then a
monitoring methodology calculates the actual
water benefits directly resulting from the project,
taking into account any water benefits from
sources within the project boundary. By
determining both the baseline and project
scenario, water benefits are objectively verified in
a transparent way. Due to the variety and
complexity of project types and location, there is
likely to be additional criteria that are not
specified in the universal Water Benefit Standard.
7
How is this different from other initiatives?
• The primary difference is the Water Benefit Standard’s focus on
catalysing finance for water projects and making the most of these funds.
While the other initiatives provide methods for measuring a water
footprint or define specific water stewardship actions, the Water Benefit
Standard is designed to make funding flow to critical water projects and
to ensure that every dollar makes the greatest impact.
What type of projects are eligible?
• The Water Benefit Standard is open to any technologies and measures
that address locally defined water issues and create verifiable benefits to
natural and human environments according to an approved
methodology.
Who Audits the Outcome?
• Pre-Feasibility Assessment (Gold Standard Foundation) After completing the project
documentation, The Gold Standard conducts a desk review assesses whether the project is
likely to comply with its requirements.
• Initial Certification (Independent Auditor) An independent auditor determines whether the
project adheres to the rules of the Standard and is thus eligible to be registered as a Gold
Standard project.
• Performance Certification (Independent Auditor) After each year of monitoring the
registered project, the independent auditor verifies the outcomes. This reviews the water
benefits that occurred over the previous year, and determine the number of WBCs to be
issued.
How Long is project cycle?
• A regular project term is either 10 years or 3x7 years using a flexible baseline approach after
each 7 year period. For projects that are part of a programme of activities (PoA), the project
term is up to 28 years. All outcomes, including sustainable development metrics, are audited
and reported in a transparent public registry each year.
Who is going to buy Water Benefit Certificates?
• Corporates, governments and public institutions, NGOs and concerned
citizens that want to make the greatest impact with every dollar they
invest in water initiatives. Several corporate buyers have already
committed to purchasing Water Benefit Certificates. Like these
companies, corporate buyers will have an interest in good water
stewardship as part of their corporate social responsibility programmes
and/or to preserve the basins that support their supply chains.
How are Water Benefit Certificates priced?
• By 2016, an anticipated 10-15 projects will have Water Benefit Certificates
available for sale covering WASH, water-efficient agriculture, household and
industrial wastewater treatment, irrigation techniques and more. Currently
WBCs have traded in the range of 7-10 US$ per Certificate.
How do Water Benefit Certificates fit into Organization's CSR strategy?
•Corporates are encouraged to responsibly manage and reduce their own water footprint wherever
possible. But recognizing that most organizations cannot reduce to zero, Water Benefit Certificates
are a way to invest in water security. It is important to consider that water is inherently a local
resource, such that a cubic metre of water from a project in Canada is qualitatively vastly different
from a cubic metre of water from a project in the Sahel. Further, water has value on multiple levels,
ranging from economic to social to cultural. Therefore, in order to make purchases of WBCs
credible, it is important that they be used as one component of a larger, comprehensive water
stewardship strategy, and that the desired outcomes from purchasing WBCs are communicated
appropriately and effectively.
How are sustainable development principles measured and managed?
•Unlike many donor/ public funded efforts where sustainable development outcomes are often
unclear or anecdotal, all projects under the Water Benefit Standard must first be evaluated for
sustainable development outcomes and these must then be tracked and measured on an annual
basis. Any negative impacts must be mitigated whilst all neutral and positive impacts are monitored
for project duration. This process involves local stakeholder consultation and is reviewed externally,
and all reports are transparent and publicly available online.
Registered Office:
Abhishek Kumar Mazumdar
405 A, Prakrati Corporate, Y N Road, Indore
(INDIA) 452001 • +91-731-6007860
Chandigarh Office:
Harish Sharma
SCO 48, 2nd Floor, Opposite P.O., Sector-8,
Panchkula (INDIA) 134109 • +91-7696644244
Mumbai Office:
Anand Pandey
A1-1603, Runwal Garden City, Balkum, Thane
(W), Mumbai (INDIA) – 400607 •+91-9699559222
Other Representative Locations
Delhi, Chennai, Ahmadabad and Jaipur
Email ID: info@environmentfirst.in

More Related Content

What's hot

Water scarcity by Group 4
Water scarcity by Group 4Water scarcity by Group 4
Water scarcity by Group 4Erasmus+
 
The Alliance for Water Stewardship
The Alliance for Water StewardshipThe Alliance for Water Stewardship
The Alliance for Water StewardshipCTAgua
 
water crisis ppt
water crisis ppt water crisis ppt
water crisis ppt Abhay sonone
 
Water scarcity
Water scarcityWater scarcity
Water scarcitymayasubodh22
 
Chapter 12 iwrm as a tool for cc adaptation.ppt
Chapter 12 iwrm as  a tool for cc adaptation.pptChapter 12 iwrm as  a tool for cc adaptation.ppt
Chapter 12 iwrm as a tool for cc adaptation.pptMohammed Salahat
 
Introduction to Water Resource Management
Introduction to Water Resource ManagementIntroduction to Water Resource Management
Introduction to Water Resource ManagementKaium Chowdhury
 
Sanitation Issues In The Developing World
Sanitation Issues In The Developing WorldSanitation Issues In The Developing World
Sanitation Issues In The Developing Worldsag6661
 
Water Management
Water ManagementWater Management
Water ManagementMadhukar Priya
 
Water and sanitation and their impact on health
Water and sanitation and their impact on healthWater and sanitation and their impact on health
Water and sanitation and their impact on healthmeducationdotnet
 
WATER SCARCITY
WATER SCARCITYWATER SCARCITY
WATER SCARCITYLai Han
 
The Problem with Water
The Problem with WaterThe Problem with Water
The Problem with WaterAl Bonner
 
BOREWELL RECHARGE TREATMENT METHODS BY POOJA K
BOREWELL   RECHARGE TREATMENT METHODS BY POOJA KBOREWELL   RECHARGE TREATMENT METHODS BY POOJA K
BOREWELL RECHARGE TREATMENT METHODS BY POOJA KHARISH J
 
Safe drinking water and sanitation
Safe drinking water and sanitationSafe drinking water and sanitation
Safe drinking water and sanitationMuhammad Amin Jan
 
clean water and sanitation
clean water and sanitation clean water and sanitation
clean water and sanitation MuhammadMobeen18
 
Water scarcity in india
Water scarcity in indiaWater scarcity in india
Water scarcity in indiachhavi kumawat
 
Water and sustainable development
Water and sustainable developmentWater and sustainable development
Water and sustainable developmentSaisujan Piriya
 

What's hot (20)

Water scarcity by Group 4
Water scarcity by Group 4Water scarcity by Group 4
Water scarcity by Group 4
 
Water scarcity
Water scarcityWater scarcity
Water scarcity
 
The Alliance for Water Stewardship
The Alliance for Water StewardshipThe Alliance for Water Stewardship
The Alliance for Water Stewardship
 
Water crisis?
Water crisis?Water crisis?
Water crisis?
 
water crisis ppt
water crisis ppt water crisis ppt
water crisis ppt
 
Water scarcity
Water scarcityWater scarcity
Water scarcity
 
Introduction to IWRM
Introduction to IWRM Introduction to IWRM
Introduction to IWRM
 
Chapter 12 iwrm as a tool for cc adaptation.ppt
Chapter 12 iwrm as  a tool for cc adaptation.pptChapter 12 iwrm as  a tool for cc adaptation.ppt
Chapter 12 iwrm as a tool for cc adaptation.ppt
 
Introduction to Water Resource Management
Introduction to Water Resource ManagementIntroduction to Water Resource Management
Introduction to Water Resource Management
 
Sanitation Issues In The Developing World
Sanitation Issues In The Developing WorldSanitation Issues In The Developing World
Sanitation Issues In The Developing World
 
Water Management
Water ManagementWater Management
Water Management
 
Water and the Sustainable Development Goals (SDGs)
Water and the Sustainable Development Goals (SDGs)Water and the Sustainable Development Goals (SDGs)
Water and the Sustainable Development Goals (SDGs)
 
Water and sanitation and their impact on health
Water and sanitation and their impact on healthWater and sanitation and their impact on health
Water and sanitation and their impact on health
 
WATER SCARCITY
WATER SCARCITYWATER SCARCITY
WATER SCARCITY
 
The Problem with Water
The Problem with WaterThe Problem with Water
The Problem with Water
 
BOREWELL RECHARGE TREATMENT METHODS BY POOJA K
BOREWELL   RECHARGE TREATMENT METHODS BY POOJA KBOREWELL   RECHARGE TREATMENT METHODS BY POOJA K
BOREWELL RECHARGE TREATMENT METHODS BY POOJA K
 
Safe drinking water and sanitation
Safe drinking water and sanitationSafe drinking water and sanitation
Safe drinking water and sanitation
 
clean water and sanitation
clean water and sanitation clean water and sanitation
clean water and sanitation
 
Water scarcity in india
Water scarcity in indiaWater scarcity in india
Water scarcity in india
 
Water and sustainable development
Water and sustainable developmentWater and sustainable development
Water and sustainable development
 

Similar to Water Benefit Standard (WBS)

BWP-LG-Webinar
BWP-LG-WebinarBWP-LG-Webinar
BWP-LG-WebinarJoshua Grant
 
Lode verstraeten kbc bank agoria presentation v15
Lode verstraeten kbc bank agoria presentation v15Lode verstraeten kbc bank agoria presentation v15
Lode verstraeten kbc bank agoria presentation v15Agoria
 
Asset_Management_Council_1405_Asset_Management_Conference_2014_Paper_1833
Asset_Management_Council_1405_Asset_Management_Conference_2014_Paper_1833Asset_Management_Council_1405_Asset_Management_Conference_2014_Paper_1833
Asset_Management_Council_1405_Asset_Management_Conference_2014_Paper_1833david zhang
 
The Water Imperative: New Standards in Corporate Water Leadership
The Water Imperative:  New Standards in Corporate Water LeadershipThe Water Imperative:  New Standards in Corporate Water Leadership
The Water Imperative: New Standards in Corporate Water LeadershipCoro Strandberg
 
ESG Compliance & Project Financing
ESG Compliance & Project FinancingESG Compliance & Project Financing
ESG Compliance & Project FinancingLR Consultants
 
Distributional aspects of water pollution control programs delhi
Distributional aspects of water pollution control programs delhiDistributional aspects of water pollution control programs delhi
Distributional aspects of water pollution control programs delhiRupa D
 
Water.org approach and activities to promote microfinance for sanitation (Dar...
Water.org approach and activities to promote microfinance for sanitation (Dar...Water.org approach and activities to promote microfinance for sanitation (Dar...
Water.org approach and activities to promote microfinance for sanitation (Dar...Trémolet Consulting
 
Business: Paul Reig, WRI, 16th January UN Water Zaragoza Conference 2015
Business: Paul Reig, WRI, 16th January UN Water Zaragoza Conference 2015Business: Paul Reig, WRI, 16th January UN Water Zaragoza Conference 2015
Business: Paul Reig, WRI, 16th January UN Water Zaragoza Conference 2015water-decade
 
New Jersey - Financing Urban Water Infrastructure
New Jersey - Financing Urban Water InfrastructureNew Jersey - Financing Urban Water Infrastructure
New Jersey - Financing Urban Water InfrastructureNew Jersey Future
 
The Rivers Trust Autumn Conference: Day 2 - Session 3
The Rivers Trust Autumn Conference: Day 2 - Session 3The Rivers Trust Autumn Conference: Day 2 - Session 3
The Rivers Trust Autumn Conference: Day 2 - Session 3Westcountry Rivers Trust
 
MR12CD Tuesday 13h00 - Sayed
MR12CD Tuesday 13h00 - SayedMR12CD Tuesday 13h00 - Sayed
MR12CD Tuesday 13h00 - Sayed7391456
 
Citizen act ang_equator_principles
Citizen act ang_equator_principlesCitizen act ang_equator_principles
Citizen act ang_equator_principlesCITIZEN ACT
 
Making blended finance work for water and sanitation green talks webinar
Making blended finance work for water and sanitation green talks webinarMaking blended finance work for water and sanitation green talks webinar
Making blended finance work for water and sanitation green talks webinarOECD Environment
 
Ecocentra Brochure_2015
Ecocentra Brochure_2015Ecocentra Brochure_2015
Ecocentra Brochure_2015Lama Bashour
 
PBL_Civil_Engineering.pdf
PBL_Civil_Engineering.pdfPBL_Civil_Engineering.pdf
PBL_Civil_Engineering.pdfDurgaSharma21
 
Presentation- Fourth Roundtable on Financing Water- Wiebke Bartz-Zuccala
Presentation- Fourth Roundtable on Financing Water- Wiebke Bartz-ZuccalaPresentation- Fourth Roundtable on Financing Water- Wiebke Bartz-Zuccala
Presentation- Fourth Roundtable on Financing Water- Wiebke Bartz-ZuccalaOECD Environment
 

Similar to Water Benefit Standard (WBS) (20)

BWP-LG-Webinar
BWP-LG-WebinarBWP-LG-Webinar
BWP-LG-Webinar
 
Lode verstraeten kbc bank agoria presentation v15
Lode verstraeten kbc bank agoria presentation v15Lode verstraeten kbc bank agoria presentation v15
Lode verstraeten kbc bank agoria presentation v15
 
Asset_Management_Council_1405_Asset_Management_Conference_2014_Paper_1833
Asset_Management_Council_1405_Asset_Management_Conference_2014_Paper_1833Asset_Management_Council_1405_Asset_Management_Conference_2014_Paper_1833
Asset_Management_Council_1405_Asset_Management_Conference_2014_Paper_1833
 
The Water Imperative: New Standards in Corporate Water Leadership
The Water Imperative:  New Standards in Corporate Water LeadershipThe Water Imperative:  New Standards in Corporate Water Leadership
The Water Imperative: New Standards in Corporate Water Leadership
 
ESG Compliance & Project Financing
ESG Compliance & Project FinancingESG Compliance & Project Financing
ESG Compliance & Project Financing
 
Distributional aspects of water pollution control programs delhi
Distributional aspects of water pollution control programs delhiDistributional aspects of water pollution control programs delhi
Distributional aspects of water pollution control programs delhi
 
Water.org approach and activities to promote microfinance for sanitation (Dar...
Water.org approach and activities to promote microfinance for sanitation (Dar...Water.org approach and activities to promote microfinance for sanitation (Dar...
Water.org approach and activities to promote microfinance for sanitation (Dar...
 
Revitalization cdbg block grant aug2012
Revitalization cdbg block grant aug2012Revitalization cdbg block grant aug2012
Revitalization cdbg block grant aug2012
 
Business: Paul Reig, WRI, 16th January UN Water Zaragoza Conference 2015
Business: Paul Reig, WRI, 16th January UN Water Zaragoza Conference 2015Business: Paul Reig, WRI, 16th January UN Water Zaragoza Conference 2015
Business: Paul Reig, WRI, 16th January UN Water Zaragoza Conference 2015
 
New Jersey - Financing Urban Water Infrastructure
New Jersey - Financing Urban Water InfrastructureNew Jersey - Financing Urban Water Infrastructure
New Jersey - Financing Urban Water Infrastructure
 
The Rivers Trust Autumn Conference: Day 2 - Session 3
The Rivers Trust Autumn Conference: Day 2 - Session 3The Rivers Trust Autumn Conference: Day 2 - Session 3
The Rivers Trust Autumn Conference: Day 2 - Session 3
 
MR12CD Tuesday 13h00 - Sayed
MR12CD Tuesday 13h00 - SayedMR12CD Tuesday 13h00 - Sayed
MR12CD Tuesday 13h00 - Sayed
 
Great Lakes Corporate Water Stewardship
Great Lakes Corporate Water StewardshipGreat Lakes Corporate Water Stewardship
Great Lakes Corporate Water Stewardship
 
14 DOH.ppt
14 DOH.ppt14 DOH.ppt
14 DOH.ppt
 
Citizen act ang_equator_principles
Citizen act ang_equator_principlesCitizen act ang_equator_principles
Citizen act ang_equator_principles
 
Making blended finance work for water and sanitation green talks webinar
Making blended finance work for water and sanitation green talks webinarMaking blended finance work for water and sanitation green talks webinar
Making blended finance work for water and sanitation green talks webinar
 
Financial Management And Business Planning
Financial Management And Business PlanningFinancial Management And Business Planning
Financial Management And Business Planning
 
Ecocentra Brochure_2015
Ecocentra Brochure_2015Ecocentra Brochure_2015
Ecocentra Brochure_2015
 
PBL_Civil_Engineering.pdf
PBL_Civil_Engineering.pdfPBL_Civil_Engineering.pdf
PBL_Civil_Engineering.pdf
 
Presentation- Fourth Roundtable on Financing Water- Wiebke Bartz-Zuccala
Presentation- Fourth Roundtable on Financing Water- Wiebke Bartz-ZuccalaPresentation- Fourth Roundtable on Financing Water- Wiebke Bartz-Zuccala
Presentation- Fourth Roundtable on Financing Water- Wiebke Bartz-Zuccala
 

More from Harish Sharma

MNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting SystemsMNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting SystemsHarish Sharma
 
MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...Harish Sharma
 
MNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC SystemMNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC SystemHarish Sharma
 
Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in IndiaHarish Sharma
 
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVRfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVHarish Sharma
 
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...Harish Sharma
 
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIRfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIHarish Sharma
 
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHHarish Sharma
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Harish Sharma
 
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...Harish Sharma
 
PPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of KarnatakaPPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of KarnatakaHarish Sharma
 
RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...Harish Sharma
 
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...Harish Sharma
 
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKARfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKAHarish Sharma
 
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.Harish Sharma
 
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Harish Sharma
 
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabHarish Sharma
 
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...Harish Sharma
 
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Harish Sharma
 
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...Harish Sharma
 

More from Harish Sharma (20)

MNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting SystemsMNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting Systems
 
MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...
 
MNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC SystemMNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC System
 
Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in India
 
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVRfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
 
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
 
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIRfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
 
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
 
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
 
PPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of KarnatakaPPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of Karnataka
 
RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...
 
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
 
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKARfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
 
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
 
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
 
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
 
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
 
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
 
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
 

Recently uploaded

Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Trucks in Minnesota
 

Recently uploaded (20)

Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 

Water Benefit Standard (WBS)

  • 1. Financial Mechanism by GOLD STANDARD A Presentation By: Harish Sharma EnvironmentFirst Energy Services (P) Ltd. Water Benefit Certificates (AN OPPORTUNITY FOR INDUSTRIAL, RESIDENTIAL, AGRICULTURE, HORTICULTURE, INSTITUTIONAL WATER EFFICIENT AND WASTE WATER TREATMENT PROJECTS)
  • 2. Water Benefit Certificates (WBC) Harish Sharma EnvironmentFirst Energy Services (P) Ltd.
  • 3.
  • 4.
  • 5. The Water Benefit Standard is a results- based finance mechanism to drive funding for water supply, purification and conservation projects. These projects help maintain the water balance within a watershed, encourage local stakeholder engagement and consultation, promote sustainable development, ensure environmental integrity and prepare water users to contend with a world of increasing water scarcity. Water Benefit Standard
  • 6. Water Benefit Certificate (WBC): A unit of water outcome (or benefit) representing that a certain volume of water has been sustainably supplied, purified and/or conserved by a given project during a specific period of time. Projects are issued Water Benefit Certificates (WBCs) according to the volume of water benefits they generate per year.
  • 7. Project Must Address Water balance Water scarcity Water sensitivity Environmental integrity sustainable development Eligibility Requirements Water supply Water purification Water conservation
  • 8. Two types of certification are possible under the WBS 1. Regular project certification 2. Retroactive project certification
  • 10.
  • 11. A WBC is a volumetric unit of account. The basic unit that holds across all projects is set as 1 WBC = 1 cubic meter of water supplied, purified or conserved. However, due to the wide spread of volumes between very small and very large projects, the Water Benefit Standard applies discount factors to project volumes that exceed certain thresholds in order to encourage economies of scale. Calculating WBCs
  • 12. As a project grows, the amount of water needed to generate one WBC increases For volumes up to 40.000 m3 p.a., 1 m3 is worth 1 WBC For additional volumes greater than 40.000 m3 but less than 1.300.000 m3 p.a., 10 m3 are worth 1 WBC For additional volumes greater than 1.300.000 m3 p.a., 100 m3 are worth 1 WBC
  • 14.
  • 15. Sustainability • Sustainability ensures that projects are designed and implemented in a sustainable and participatory way. to assess the risk the projects may pose to the project's area of influence and to ensure the projects meet the sustainable development requirements of the Gold Standard. Projects shall provide clear evidence that there are no negative impacts in set socio-economic and environmental criteria. 1
  • 16. Watershed Risk Assessment • The Watershed Risk Assessment assesses the risks that may be faced in implementing projects within a specific watershed or basin and determines whether additional monitoring may be required based on water scarcity, vulnerability, or areas and species of high environmental value. Each criteria is addressed with a 'yes' or 'no' response with justification provided as to why the response has been entered. Sustainability Assessment • to assess the risk the projects may pose to the project's area of influence and to ensure the projects meet the sustainable development requirements of the Gold Standard. Projects shall provide clear evidence that there are no negative impacts in set socio-economic and environmental criteria. 2
  • 17. • Each requirement is assessed according to the following criteria. • Negative (-): There is a risk that the project will negatively impact the requirement. Mitigation is required and will be monitored for the duration of the project. • Neutral (0): The project will not have any impact on the requirement. Mitigation is not required. • Positive (+): The project will positively impact the requirement and will be monitored for the duration of the project. • Enhance (E): The indicator is neutral, but can be improved over the lifetime of the project and become positive. Requires monitoring for the duration of the project. • Not Relevant (NR): The requirement is not relevant to the project methodology and/or design. Mitigation is not required. Sustainability Assessment 3
  • 18. Human rights and socio-economic situation The project respects internationally proclaimed human rights including Universal access to water, and dignity. Cultural property and uniqueness of indigenous people. Legal rights, customary rights, special cultural ecological, economic, religious or spiritual significance 4
  • 19. The project don’t have any negative Impact on Good Working condition Food Security Water Quality Pollution Level Ecology 5
  • 20. Demonstration of Financial Additionality • Projects that issue Water Benefit Certificates via the Water Benefit Standard must demonstrate that they are beyond business as usual, meaning that they would not have been implemented without the Water Benefit Standard. The project developer proves this by conducting a Financial Needs Assessment (FNA) as part of the initial certification. The FNA can be completed in one of two ways: • Compliance with a positive list of preferred technologies, methods or geographical regions that permits the project to per se pass the FNA. Such projects must still disclose a financial forecast over the project period. • If a project does not comply with the positive list, a formal financial analysis must be conducted to demonstrate that the revenue from WBCs is required to make the project financially feasible. 6
  • 21. Real, Measurable and Verifiable • First, a baseline methodology estimates the state of water use in the absence of the project. Then a monitoring methodology calculates the actual water benefits directly resulting from the project, taking into account any water benefits from sources within the project boundary. By determining both the baseline and project scenario, water benefits are objectively verified in a transparent way. Due to the variety and complexity of project types and location, there is likely to be additional criteria that are not specified in the universal Water Benefit Standard. 7
  • 22.
  • 23. How is this different from other initiatives? • The primary difference is the Water Benefit Standard’s focus on catalysing finance for water projects and making the most of these funds. While the other initiatives provide methods for measuring a water footprint or define specific water stewardship actions, the Water Benefit Standard is designed to make funding flow to critical water projects and to ensure that every dollar makes the greatest impact. What type of projects are eligible? • The Water Benefit Standard is open to any technologies and measures that address locally defined water issues and create verifiable benefits to natural and human environments according to an approved methodology.
  • 24. Who Audits the Outcome? • Pre-Feasibility Assessment (Gold Standard Foundation) After completing the project documentation, The Gold Standard conducts a desk review assesses whether the project is likely to comply with its requirements. • Initial Certification (Independent Auditor) An independent auditor determines whether the project adheres to the rules of the Standard and is thus eligible to be registered as a Gold Standard project. • Performance Certification (Independent Auditor) After each year of monitoring the registered project, the independent auditor verifies the outcomes. This reviews the water benefits that occurred over the previous year, and determine the number of WBCs to be issued. How Long is project cycle? • A regular project term is either 10 years or 3x7 years using a flexible baseline approach after each 7 year period. For projects that are part of a programme of activities (PoA), the project term is up to 28 years. All outcomes, including sustainable development metrics, are audited and reported in a transparent public registry each year.
  • 25. Who is going to buy Water Benefit Certificates? • Corporates, governments and public institutions, NGOs and concerned citizens that want to make the greatest impact with every dollar they invest in water initiatives. Several corporate buyers have already committed to purchasing Water Benefit Certificates. Like these companies, corporate buyers will have an interest in good water stewardship as part of their corporate social responsibility programmes and/or to preserve the basins that support their supply chains. How are Water Benefit Certificates priced? • By 2016, an anticipated 10-15 projects will have Water Benefit Certificates available for sale covering WASH, water-efficient agriculture, household and industrial wastewater treatment, irrigation techniques and more. Currently WBCs have traded in the range of 7-10 US$ per Certificate.
  • 26. How do Water Benefit Certificates fit into Organization's CSR strategy? •Corporates are encouraged to responsibly manage and reduce their own water footprint wherever possible. But recognizing that most organizations cannot reduce to zero, Water Benefit Certificates are a way to invest in water security. It is important to consider that water is inherently a local resource, such that a cubic metre of water from a project in Canada is qualitatively vastly different from a cubic metre of water from a project in the Sahel. Further, water has value on multiple levels, ranging from economic to social to cultural. Therefore, in order to make purchases of WBCs credible, it is important that they be used as one component of a larger, comprehensive water stewardship strategy, and that the desired outcomes from purchasing WBCs are communicated appropriately and effectively. How are sustainable development principles measured and managed? •Unlike many donor/ public funded efforts where sustainable development outcomes are often unclear or anecdotal, all projects under the Water Benefit Standard must first be evaluated for sustainable development outcomes and these must then be tracked and measured on an annual basis. Any negative impacts must be mitigated whilst all neutral and positive impacts are monitored for project duration. This process involves local stakeholder consultation and is reviewed externally, and all reports are transparent and publicly available online.
  • 27. Registered Office: Abhishek Kumar Mazumdar 405 A, Prakrati Corporate, Y N Road, Indore (INDIA) 452001 • +91-731-6007860 Chandigarh Office: Harish Sharma SCO 48, 2nd Floor, Opposite P.O., Sector-8, Panchkula (INDIA) 134109 • +91-7696644244 Mumbai Office: Anand Pandey A1-1603, Runwal Garden City, Balkum, Thane (W), Mumbai (INDIA) – 400607 •+91-9699559222 Other Representative Locations Delhi, Chennai, Ahmadabad and Jaipur Email ID: info@environmentfirst.in