Financial & Operational Guidelines of IREDA
A Presentation By:
EnvironmentFirst Energy Services (P) Ltd.
LOAN SCHEME FOR FINANCING GRID CONNECTED
ROOFTOP SOLAR PV POWER PROJECTS
(INDUSTRIAL, COMMERCIAL AND INSTITUTIONAL)
Project Monitoring & Provision of Lender’s Engineer
Salient Features of IREDA Loan Scheme
Very Low interest rates range from 9.9% to 10.75%
Minimum Capacity eligible for Loan is 1000 kWp with no restriction
on upper limit
With Moratorium of one year and repayment period of nine years
Loan is available up to 75% of project cost
Table of Contents
Set AchievedTargets
Rs. 6,85,000 Rs. 4,45,000Revenue
Rs. 6,25,000 Rs. 4,45,000Revised Revenue
9 3Non Revenue
Combined Target Achieved
52.2%
Travelling/Revenue Ratio
58.9%
1
2
3
4
Eligible Projects for Assistance
Application documentation guidelines
Credit Rating, Interest Rates etc.
Project Monitoring & provision of Lender’s Engineer
5 Other Guidelines/Norms
Eligible Projects for Assistance
Set AchievedTargets
Rs. 10,00,000 Rs. 6,42,000NBURs. 15,00,000 Rs. 11,13,700WBU
Combined Target Achieved
64.2%
Salary/Revenue Ratio
The NBU Marketing Team was directed to shore up its
efforts to ensure at least 90% target achievement by
virtue of which salary/revenue ratio adjusts reduces to
the desired levels.
Excessive Wind Revenue
Rs. 2,20,000
(Carried Forward to Q2)
Q2 onwards, 50% of the revenue
in excess of the cap would be adjusted.
(Salary + Travel)/Revenue
14.7%
1
2
3
4
All Grid connected/interactive Solar PV projects located on Rooftops
Applications can be submitted under Aggregator Category and Direct
Category.
Minimum project capacity to be submitted shall be at least 1000 kWp.
Minimum capacity of sub projects under Aggregator mode shall not be less
than 20 kWp.
5
Under Direct Category Applicants shall include projects from single roof
owners only with minimum 1000 kWp capacity
Eligible Projects for Assistance
Set AchievedTargets
Rs. 10,00,000 Rs. 6,42,000NBURs. 15,00,000 Rs. 11,13,700WBU
Combined Target Achieved
64.2%
Salary/Revenue Ratio
The NBU Marketing Team was directed to shore up its
efforts to ensure at least 90% target achievement by
virtue of which salary/revenue ratio adjusts reduces to
the desired levels.
Excessive Wind Revenue
Rs. 2,20,000
(Carried Forward to Q2)
Q2 onwards, 50% of the revenue
in excess of the cap would be adjusted.
(Salary + Travel)/Revenue
14.7%
1
a
b
c
Eligible Entities/ Categories as per IREDA norms shall include the
following.
Private Sector Companies/ firms
Central Public Sector Undertaking (CPSU)
State Utilities/ Discoms/ Transcos/ Gencos/ Corporations
d Joint Sector Companies
Eligible Projects for Assistance
Set AchievedTargets
Rs. 10,00,000 Rs. 6,42,000NBURs. 15,00,000 Rs. 11,13,700WBU
Combined Target Achieved
64.2%
Salary/Revenue Ratio
The NBU Marketing Team was directed to shore up its
efforts to ensure at least 90% target achievement by
virtue of which salary/revenue ratio adjusts reduces to
the desired levels.
Excessive Wind Revenue
Rs. 2,20,000
(Carried Forward to Q2)
Q2 onwards, 50% of the revenue
in excess of the cap would be adjusted.
(Salary + Travel)/Revenue
14.7%
1
2
3
4
All Grid connected/interactive Solar PV projects located on Rooftops
Applications can be submitted under Aggregator Category and Direct
Category.
Minimum project capacity to be submitted shall be at least 1000 kWp.
Minimum capacity of sub projects under Aggregator mode shall not be less
than 20 kWp.
5
Under Direct Category Applicants shall include projects from single roof
owners only with minimum 1000 kWp capacity
Application documentation guidelines
Marketing
Development
*on a scale of 5
3.6*
3.4*
1
2
3
4
Applicants shall be required to submit loan application
Applicants shall be required to submit external credit rating under Rooftop
Grading System
Projects shall be required to comply with minimum technical standards as
per MNRE /CEA guidelines for rooftop solar/distributed generation
Projects can be located on single or multiple roofs but should be located
within the geographical boundary of the single district/discom.
Credit Rating, Interest Rates etc.
Set AchievedTargets
Rs. 10,00,000 Rs. 6,42,000NBURs. 15,00,000 Rs. 11,13,700WBU
Combined Target Achieved
64.2%
Salary/Revenue Ratio
The NBU Marketing Team was directed to shore up its
efforts to ensure at least 90% target achievement by
virtue of which salary/revenue ratio adjusts reduces to
the desired levels.
Excessive Wind Revenue
Rs. 2,20,000
(Carried Forward to Q2)
Q2 onwards, 50% of the revenue
in excess of the cap would be adjusted.
(Salary + Travel)/Revenue
14.7%
1
2
3
4
IREDA shall conduct credit rating for all projects in a band of 4 grades (I, II,
III & IV) based on the risk assessment
The applicable interest rates range from 9.9% to 10.75% and will be purely
dependent and linked with credit ratings
Additional Interest @ 0.50% over and above the applicable rate of interest
shall be charged till the date of commissioning of the project.
All applicants shall be required to obtain credit rating from rating agencies
under the IREDA Rooftop Rating Model from empanelled Rating Agencies.
5
Maximum repayment period for the loan shall be up to 9 years, with the
moratorium period of 12 months from the date of COD of the project.
6
Maximum construction period for the loan shall be up to 12 moths from the
date of first disbursement.
7
The loan equity ratio will be 70:30 However, IREDA may extend loan upto
75% on the basis of the creditworthiness and track record of the promoter
Project Monitoring & Provision of Lender’s Engineer
Provision of Lender’s Engineer
IREDA shall engage lender’s engineer from IREDA’s empanelled list of
Lender Engineers for monitoring and quality assurance, safety issues
in project construction and operational monitoring.
a) Lender’s engineer shall also provide its independent recommendations/comments on the
quality and performance of project for minimum three instances i.e. one each at
Presanction, during construction and project commissioning.
b) Lender’s Engineer shall review pre sanction techno commercial feasibility including existing
shadow profile, construction progress, and project commissioning & completion report.
c) Lender’s Engineer shall monitor compliance of applicable EHS norms including fire safety
clearance on project site during construction and post commissioning.
d) Lender’s Engineer shall submit performance review of commissioned projects vis a vis
envisaged at the time of appraisal/EPC contract and give its final Completion Report
including its Recommendations and Observations.
Provision of Lender’s Engineer
Other Guidelines/Norms
Eligible Revenue Models
CaptivePowerSaletoGrid
System aggregator and roof Owners shall enter into roof lease and
O&M agreement for guaranteed solar generation. Direct applicants
shall be required to submit O&M agreement for loan tenor or
performance guarantee if self.
Under Net Metering
Roof Owners enter into agreement with discom and aggregator as per
Net metering policy.
Under Gross Metering
Aggregator enters into agreement with discom/third party and roof
owner under Applicable solar Policy.
Eligible Revenue Models
Govt./Semi
Govtbodies
OtherRevenue
Models
The DISCOM/Govt/Semi Govt bodies may
appoint Aggregator to implement the Solar
Facilities on its behalf for implementing
projects.
Other revenue models shall also be
considered depending upon viability.
Documentation and Application
Saturdays are working days
A good quality Gensol T-Shirt will
be designed. It is optional for a
Team member to purchase it.
Hardship allowance has been
introduced.
Neha Singh to conduct a session for
TA/DA functionalities before 15th July
at WBU and before 1st Aug at NBU
Timely appraisals
would be ensured.
Quality of food has to be maintained.
If possible, company would bare the
expense for the same.
Total 48 Documents and Forms have
to be submitted to IREDA for getting
loan sanctioned
You can opt to be benefitted from our
value services for easy processing and
sanctioning procedure
Registered Office:
405 A, Prakrati Corporate, Y N Road, Indore
(INDIA) 452001 • +91-731-6007860
Chandigarh Office:
SCO 48, 2nd Floor, Opposite P.O., Sector-8,
Panchkula (INDIA) 134109 • +91-7696644244
Mumbai Office:
A1-1603, Runwal Garden City, Balkum, Thane
(W), Mumbai (INDIA) – 400607 •+91-9022437785
Other Representative Locations
Delhi, Chennai, Ahmadabad and Jaipur
Email ID: info@environmentfirst.in

More Related Content

What's hot

New grid connected solar photo voltaic power projects 500 mw capacity under...
New grid connected solar photo voltaic power projects 500   mw capacity under...New grid connected solar photo voltaic power projects 500   mw capacity under...
New grid connected solar photo voltaic power projects 500 mw capacity under...ank_
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderGensol Engineering Limited
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Harish Sharma
 
RFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanRFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanHeadway Solar
 
RFP Document for Grid Connected Solar Power Project in Chhattisgarh
RFP Document for Grid Connected Solar Power Project in ChhattisgarhRFP Document for Grid Connected Solar Power Project in Chhattisgarh
RFP Document for Grid Connected Solar Power Project in ChhattisgarhHeadway Solar
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Gensol Engineering Limited
 
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...Harish Sharma
 
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIRfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIHarish Sharma
 
Eoi – uganda epc assignments for kikagati hydro power project uganda – 12 ...
Eoi – uganda   epc assignments for kikagati hydro power project  uganda – 12 ...Eoi – uganda   epc assignments for kikagati hydro power project  uganda – 12 ...
Eoi – uganda epc assignments for kikagati hydro power project uganda – 12 ...Josue Tandoum Waffo
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Gensol Engineering Limited
 
RERC Net metering Regulations 2015
RERC Net metering Regulations 2015RERC Net metering Regulations 2015
RERC Net metering Regulations 2015Headway Solar
 
HYDRO_POLICY_UK_2015
HYDRO_POLICY_UK_2015HYDRO_POLICY_UK_2015
HYDRO_POLICY_UK_2015Anil Khadka
 
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?madhavanvee
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India sanjeev jain
 
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...Bhalindra Bath - projects & M&A law
 
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Headway Solar
 
Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Gurparvesh kaur
 
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...zubeditufail
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012Bakul Haria
 

What's hot (20)

New grid connected solar photo voltaic power projects 500 mw capacity under...
New grid connected solar photo voltaic power projects 500   mw capacity under...New grid connected solar photo voltaic power projects 500   mw capacity under...
New grid connected solar photo voltaic power projects 500 mw capacity under...
 
Presentation by MNRE on Solar Parks
Presentation by MNRE on Solar ParksPresentation by MNRE on Solar Parks
Presentation by MNRE on Solar Parks
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
 
RFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanRFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project Rajasthan
 
RFP Document for Grid Connected Solar Power Project in Chhattisgarh
RFP Document for Grid Connected Solar Power Project in ChhattisgarhRFP Document for Grid Connected Solar Power Project in Chhattisgarh
RFP Document for Grid Connected Solar Power Project in Chhattisgarh
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019
 
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
 
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIRfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
 
Eoi – uganda epc assignments for kikagati hydro power project uganda – 12 ...
Eoi – uganda   epc assignments for kikagati hydro power project  uganda – 12 ...Eoi – uganda   epc assignments for kikagati hydro power project  uganda – 12 ...
Eoi – uganda epc assignments for kikagati hydro power project uganda – 12 ...
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
 
RERC Net metering Regulations 2015
RERC Net metering Regulations 2015RERC Net metering Regulations 2015
RERC Net metering Regulations 2015
 
HYDRO_POLICY_UK_2015
HYDRO_POLICY_UK_2015HYDRO_POLICY_UK_2015
HYDRO_POLICY_UK_2015
 
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India
 
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
 
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
 
Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )
 
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012
 

Viewers also liked

Solar mango corporate presentation
Solar mango   corporate presentationSolar mango   corporate presentation
Solar mango corporate presentationAnjali Khandelwal
 
Build a solar panel at home
Build a solar panel at homeBuild a solar panel at home
Build a solar panel at homeKaren Campbell
 
Transforum Sitzung Berlin, Juni 2016 - Translators Without Borders
Transforum Sitzung Berlin, Juni 2016 - Translators Without BordersTransforum Sitzung Berlin, Juni 2016 - Translators Without Borders
Transforum Sitzung Berlin, Juni 2016 - Translators Without BordersChristian Gericke
 
RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...Harish Sharma
 
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...Harish Sharma
 
Port of San Diego Public Parks (2012)
Port of San Diego Public Parks (2012)Port of San Diego Public Parks (2012)
Port of San Diego Public Parks (2012)Port of San Diego
 
Soltech Corporate presentation
Soltech Corporate presentationSoltech Corporate presentation
Soltech Corporate presentationsoltechindia
 
S4 oman wind energy potential anemometers 2016
S4 oman wind energy potential   anemometers 2016S4 oman wind energy potential   anemometers 2016
S4 oman wind energy potential anemometers 2016CETN
 
Solar energy sources
Solar energy sourcesSolar energy sources
Solar energy sourceskarthhik101
 
PPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of KarnatakaPPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of KarnatakaHarish Sharma
 

Viewers also liked (20)

Solar mango corporate presentation
Solar mango   corporate presentationSolar mango   corporate presentation
Solar mango corporate presentation
 
Alhuda cibe - How analytics can help mfi's
Alhuda cibe - How analytics can help mfi'sAlhuda cibe - How analytics can help mfi's
Alhuda cibe - How analytics can help mfi's
 
2014 PV Performance Modeling Workshop: PV Module Characterization Methods at ...
2014 PV Performance Modeling Workshop: PV Module Characterization Methods at ...2014 PV Performance Modeling Workshop: PV Module Characterization Methods at ...
2014 PV Performance Modeling Workshop: PV Module Characterization Methods at ...
 
Build a solar panel at home
Build a solar panel at homeBuild a solar panel at home
Build a solar panel at home
 
Transforum Sitzung Berlin, Juni 2016 - Translators Without Borders
Transforum Sitzung Berlin, Juni 2016 - Translators Without BordersTransforum Sitzung Berlin, Juni 2016 - Translators Without Borders
Transforum Sitzung Berlin, Juni 2016 - Translators Without Borders
 
RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...
 
Solar Panel
Solar PanelSolar Panel
Solar Panel
 
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
 
Port of San Diego Public Parks (2012)
Port of San Diego Public Parks (2012)Port of San Diego Public Parks (2012)
Port of San Diego Public Parks (2012)
 
2014 PV Reliability, Operations & Maintenance Workshop: HelioSpec by DreamQii...
2014 PV Reliability, Operations & Maintenance Workshop: HelioSpec by DreamQii...2014 PV Reliability, Operations & Maintenance Workshop: HelioSpec by DreamQii...
2014 PV Reliability, Operations & Maintenance Workshop: HelioSpec by DreamQii...
 
2014 PV Distribution System Modeling Workshop: The IEA PVPS Task 14 High pen...
2014 PV Distribution System Modeling Workshop: The IEA PVPS Task 14  High pen...2014 PV Distribution System Modeling Workshop: The IEA PVPS Task 14  High pen...
2014 PV Distribution System Modeling Workshop: The IEA PVPS Task 14 High pen...
 
2014 PV Performance Modeling Workshop: PVSim Update: Mike Anderson, SunPower ...
2014 PV Performance Modeling Workshop: PVSim Update: Mike Anderson, SunPower ...2014 PV Performance Modeling Workshop: PVSim Update: Mike Anderson, SunPower ...
2014 PV Performance Modeling Workshop: PVSim Update: Mike Anderson, SunPower ...
 
2014 PV Distribution System Modeling Workshop: DOE Solar Energy Grid Integrat...
2014 PV Distribution System Modeling Workshop: DOE Solar Energy Grid Integrat...2014 PV Distribution System Modeling Workshop: DOE Solar Energy Grid Integrat...
2014 PV Distribution System Modeling Workshop: DOE Solar Energy Grid Integrat...
 
Soltech Corporate presentation
Soltech Corporate presentationSoltech Corporate presentation
Soltech Corporate presentation
 
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
 
S4 oman wind energy potential anemometers 2016
S4 oman wind energy potential   anemometers 2016S4 oman wind energy potential   anemometers 2016
S4 oman wind energy potential anemometers 2016
 
Dye-Sensitized Solar Cells, Portable Solar Panel, IDM8
Dye-Sensitized Solar Cells, Portable Solar Panel, IDM8Dye-Sensitized Solar Cells, Portable Solar Panel, IDM8
Dye-Sensitized Solar Cells, Portable Solar Panel, IDM8
 
Solar energy sources
Solar energy sourcesSolar energy sources
Solar energy sources
 
2014 PV Performance Modeling Workshop: SolarAnywhere: WebWeb-Accessible Irrad...
2014 PV Performance Modeling Workshop: SolarAnywhere: WebWeb-Accessible Irrad...2014 PV Performance Modeling Workshop: SolarAnywhere: WebWeb-Accessible Irrad...
2014 PV Performance Modeling Workshop: SolarAnywhere: WebWeb-Accessible Irrad...
 
PPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of KarnatakaPPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of Karnataka
 

Similar to LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS

Renewable Energy Feed-in Tarriff presentation
Renewable Energy Feed-in Tarriff presentationRenewable Energy Feed-in Tarriff presentation
Renewable Energy Feed-in Tarriff presentationJerry Sakala
 
IREDA Scheme for Loan for grid connected Solar PV rooftop plant
IREDA Scheme for Loan for grid connected Solar PV rooftop plant IREDA Scheme for Loan for grid connected Solar PV rooftop plant
IREDA Scheme for Loan for grid connected Solar PV rooftop plant Ashish Verma
 
Ireda solar-pv-loan-scheme
Ireda solar-pv-loan-schemeIreda solar-pv-loan-scheme
Ireda solar-pv-loan-schemeJay Ranvir
 
Sbi rooftop program
Sbi rooftop programSbi rooftop program
Sbi rooftop programJay Ranvir
 
IREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEIREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEHarish Sharma
 
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Harish Sharma
 
PNB_Roof Top Solar Power Presentation.pptx
PNB_Roof Top Solar Power Presentation.pptxPNB_Roof Top Solar Power Presentation.pptx
PNB_Roof Top Solar Power Presentation.pptxParamJothi
 
Right Direction Services Offered 28 Feb 10
Right Direction Services Offered 28 Feb 10Right Direction Services Offered 28 Feb 10
Right Direction Services Offered 28 Feb 10Constandinou
 
Financing Energy Optimization Projects
Financing Energy Optimization Projects Financing Energy Optimization Projects
Financing Energy Optimization Projects Avanceon
 
Corporate Profile 2023.pptx
Corporate Profile 2023.pptxCorporate Profile 2023.pptx
Corporate Profile 2023.pptxMayurHiwarkar4
 
2009 Sdge It Virtualization Presentation
2009 Sdge It Virtualization Presentation2009 Sdge It Virtualization Presentation
2009 Sdge It Virtualization Presentationfowlk9
 
Merc approach paper for determination of soalr tariff 2014
Merc approach paper for determination of soalr tariff 2014Merc approach paper for determination of soalr tariff 2014
Merc approach paper for determination of soalr tariff 2014indianpowerindustry.com
 
Decc discussion slides investor simulation workshop breakout_onshore small-sc...
Decc discussion slides investor simulation workshop breakout_onshore small-sc...Decc discussion slides investor simulation workshop breakout_onshore small-sc...
Decc discussion slides investor simulation workshop breakout_onshore small-sc...Department of Energy and Climate Change
 
Summary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind SolarSummary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind SolarPratap Malempati
 
India - Renewables - eligible overseas capital markets candidate 2015
India - Renewables - eligible overseas capital markets candidate 2015India - Renewables - eligible overseas capital markets candidate 2015
India - Renewables - eligible overseas capital markets candidate 2015Varun Sethi
 
XYZ solar power Global IPO
XYZ solar power   Global IPOXYZ solar power   Global IPO
XYZ solar power Global IPOVarun Sethi
 

Similar to LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS (20)

Renewable Energy Feed-in Tarriff presentation
Renewable Energy Feed-in Tarriff presentationRenewable Energy Feed-in Tarriff presentation
Renewable Energy Feed-in Tarriff presentation
 
IREDA Scheme for Loan for grid connected Solar PV rooftop plant
IREDA Scheme for Loan for grid connected Solar PV rooftop plant IREDA Scheme for Loan for grid connected Solar PV rooftop plant
IREDA Scheme for Loan for grid connected Solar PV rooftop plant
 
Ireda solar-pv-loan-scheme
Ireda solar-pv-loan-schemeIreda solar-pv-loan-scheme
Ireda solar-pv-loan-scheme
 
Sbi rooftop program
Sbi rooftop programSbi rooftop program
Sbi rooftop program
 
Sidbi presentation
Sidbi presentationSidbi presentation
Sidbi presentation
 
IREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEIREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEME
 
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
 
CK2017: SIDBI Initiatives on Clean Energy Adoption
CK2017: SIDBI Initiatives on Clean Energy Adoption CK2017: SIDBI Initiatives on Clean Energy Adoption
CK2017: SIDBI Initiatives on Clean Energy Adoption
 
MM_SNOPUD_TRIFOLD
MM_SNOPUD_TRIFOLDMM_SNOPUD_TRIFOLD
MM_SNOPUD_TRIFOLD
 
PNB_Roof Top Solar Power Presentation.pptx
PNB_Roof Top Solar Power Presentation.pptxPNB_Roof Top Solar Power Presentation.pptx
PNB_Roof Top Solar Power Presentation.pptx
 
Right Direction Services Offered 28 Feb 10
Right Direction Services Offered 28 Feb 10Right Direction Services Offered 28 Feb 10
Right Direction Services Offered 28 Feb 10
 
Financing Energy Optimization Projects
Financing Energy Optimization Projects Financing Energy Optimization Projects
Financing Energy Optimization Projects
 
Final er slides 3 2 15_2_pm
Final er slides 3 2  15_2_pmFinal er slides 3 2  15_2_pm
Final er slides 3 2 15_2_pm
 
Corporate Profile 2023.pptx
Corporate Profile 2023.pptxCorporate Profile 2023.pptx
Corporate Profile 2023.pptx
 
2009 Sdge It Virtualization Presentation
2009 Sdge It Virtualization Presentation2009 Sdge It Virtualization Presentation
2009 Sdge It Virtualization Presentation
 
Merc approach paper for determination of soalr tariff 2014
Merc approach paper for determination of soalr tariff 2014Merc approach paper for determination of soalr tariff 2014
Merc approach paper for determination of soalr tariff 2014
 
Decc discussion slides investor simulation workshop breakout_onshore small-sc...
Decc discussion slides investor simulation workshop breakout_onshore small-sc...Decc discussion slides investor simulation workshop breakout_onshore small-sc...
Decc discussion slides investor simulation workshop breakout_onshore small-sc...
 
Summary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind SolarSummary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind Solar
 
India - Renewables - eligible overseas capital markets candidate 2015
India - Renewables - eligible overseas capital markets candidate 2015India - Renewables - eligible overseas capital markets candidate 2015
India - Renewables - eligible overseas capital markets candidate 2015
 
XYZ solar power Global IPO
XYZ solar power   Global IPOXYZ solar power   Global IPO
XYZ solar power Global IPO
 

More from Harish Sharma

MNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting SystemsMNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting SystemsHarish Sharma
 
MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...Harish Sharma
 
MNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC SystemMNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC SystemHarish Sharma
 
Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in IndiaHarish Sharma
 
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVRfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVHarish Sharma
 
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHHarish Sharma
 
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...Harish Sharma
 
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...Harish Sharma
 
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKARfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKAHarish Sharma
 
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...Harish Sharma
 
Water Benefit Standard (WBS)
Water Benefit Standard (WBS) Water Benefit Standard (WBS)
Water Benefit Standard (WBS) Harish Sharma
 
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...Harish Sharma
 
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...Harish Sharma
 
Bid Results for procurement of 215 MW Solar Power by UPNEDA
Bid Results for procurement of 215 MW Solar Power by UPNEDABid Results for procurement of 215 MW Solar Power by UPNEDA
Bid Results for procurement of 215 MW Solar Power by UPNEDAHarish Sharma
 
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...Harish Sharma
 
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantNet metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantHarish Sharma
 
20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDA20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDAHarish Sharma
 
150 MW Solar bid in Madha Pradesh (India) 2015
150 MW Solar bid in Madha Pradesh (India) 2015150 MW Solar bid in Madha Pradesh (India) 2015
150 MW Solar bid in Madha Pradesh (India) 2015Harish Sharma
 

More from Harish Sharma (18)

MNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting SystemsMNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting Systems
 
MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...
 
MNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC SystemMNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC System
 
Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in India
 
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVRfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
 
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
 
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
 
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
 
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKARfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
 
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
 
Water Benefit Standard (WBS)
Water Benefit Standard (WBS) Water Benefit Standard (WBS)
Water Benefit Standard (WBS)
 
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
 
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
 
Bid Results for procurement of 215 MW Solar Power by UPNEDA
Bid Results for procurement of 215 MW Solar Power by UPNEDABid Results for procurement of 215 MW Solar Power by UPNEDA
Bid Results for procurement of 215 MW Solar Power by UPNEDA
 
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
 
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantNet metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
 
20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDA20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDA
 
150 MW Solar bid in Madha Pradesh (India) 2015
150 MW Solar bid in Madha Pradesh (India) 2015150 MW Solar bid in Madha Pradesh (India) 2015
150 MW Solar bid in Madha Pradesh (India) 2015
 

Recently uploaded

Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 

Recently uploaded (20)

Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 

LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS

  • 1. Financial & Operational Guidelines of IREDA A Presentation By: EnvironmentFirst Energy Services (P) Ltd. LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS (INDUSTRIAL, COMMERCIAL AND INSTITUTIONAL)
  • 2. Project Monitoring & Provision of Lender’s Engineer Salient Features of IREDA Loan Scheme Very Low interest rates range from 9.9% to 10.75% Minimum Capacity eligible for Loan is 1000 kWp with no restriction on upper limit With Moratorium of one year and repayment period of nine years Loan is available up to 75% of project cost
  • 3. Table of Contents Set AchievedTargets Rs. 6,85,000 Rs. 4,45,000Revenue Rs. 6,25,000 Rs. 4,45,000Revised Revenue 9 3Non Revenue Combined Target Achieved 52.2% Travelling/Revenue Ratio 58.9% 1 2 3 4 Eligible Projects for Assistance Application documentation guidelines Credit Rating, Interest Rates etc. Project Monitoring & provision of Lender’s Engineer 5 Other Guidelines/Norms
  • 4. Eligible Projects for Assistance Set AchievedTargets Rs. 10,00,000 Rs. 6,42,000NBURs. 15,00,000 Rs. 11,13,700WBU Combined Target Achieved 64.2% Salary/Revenue Ratio The NBU Marketing Team was directed to shore up its efforts to ensure at least 90% target achievement by virtue of which salary/revenue ratio adjusts reduces to the desired levels. Excessive Wind Revenue Rs. 2,20,000 (Carried Forward to Q2) Q2 onwards, 50% of the revenue in excess of the cap would be adjusted. (Salary + Travel)/Revenue 14.7% 1 2 3 4 All Grid connected/interactive Solar PV projects located on Rooftops Applications can be submitted under Aggregator Category and Direct Category. Minimum project capacity to be submitted shall be at least 1000 kWp. Minimum capacity of sub projects under Aggregator mode shall not be less than 20 kWp. 5 Under Direct Category Applicants shall include projects from single roof owners only with minimum 1000 kWp capacity
  • 5. Eligible Projects for Assistance Set AchievedTargets Rs. 10,00,000 Rs. 6,42,000NBURs. 15,00,000 Rs. 11,13,700WBU Combined Target Achieved 64.2% Salary/Revenue Ratio The NBU Marketing Team was directed to shore up its efforts to ensure at least 90% target achievement by virtue of which salary/revenue ratio adjusts reduces to the desired levels. Excessive Wind Revenue Rs. 2,20,000 (Carried Forward to Q2) Q2 onwards, 50% of the revenue in excess of the cap would be adjusted. (Salary + Travel)/Revenue 14.7% 1 a b c Eligible Entities/ Categories as per IREDA norms shall include the following. Private Sector Companies/ firms Central Public Sector Undertaking (CPSU) State Utilities/ Discoms/ Transcos/ Gencos/ Corporations d Joint Sector Companies
  • 6. Eligible Projects for Assistance Set AchievedTargets Rs. 10,00,000 Rs. 6,42,000NBURs. 15,00,000 Rs. 11,13,700WBU Combined Target Achieved 64.2% Salary/Revenue Ratio The NBU Marketing Team was directed to shore up its efforts to ensure at least 90% target achievement by virtue of which salary/revenue ratio adjusts reduces to the desired levels. Excessive Wind Revenue Rs. 2,20,000 (Carried Forward to Q2) Q2 onwards, 50% of the revenue in excess of the cap would be adjusted. (Salary + Travel)/Revenue 14.7% 1 2 3 4 All Grid connected/interactive Solar PV projects located on Rooftops Applications can be submitted under Aggregator Category and Direct Category. Minimum project capacity to be submitted shall be at least 1000 kWp. Minimum capacity of sub projects under Aggregator mode shall not be less than 20 kWp. 5 Under Direct Category Applicants shall include projects from single roof owners only with minimum 1000 kWp capacity
  • 7. Application documentation guidelines Marketing Development *on a scale of 5 3.6* 3.4* 1 2 3 4 Applicants shall be required to submit loan application Applicants shall be required to submit external credit rating under Rooftop Grading System Projects shall be required to comply with minimum technical standards as per MNRE /CEA guidelines for rooftop solar/distributed generation Projects can be located on single or multiple roofs but should be located within the geographical boundary of the single district/discom.
  • 8. Credit Rating, Interest Rates etc. Set AchievedTargets Rs. 10,00,000 Rs. 6,42,000NBURs. 15,00,000 Rs. 11,13,700WBU Combined Target Achieved 64.2% Salary/Revenue Ratio The NBU Marketing Team was directed to shore up its efforts to ensure at least 90% target achievement by virtue of which salary/revenue ratio adjusts reduces to the desired levels. Excessive Wind Revenue Rs. 2,20,000 (Carried Forward to Q2) Q2 onwards, 50% of the revenue in excess of the cap would be adjusted. (Salary + Travel)/Revenue 14.7% 1 2 3 4 IREDA shall conduct credit rating for all projects in a band of 4 grades (I, II, III & IV) based on the risk assessment The applicable interest rates range from 9.9% to 10.75% and will be purely dependent and linked with credit ratings Additional Interest @ 0.50% over and above the applicable rate of interest shall be charged till the date of commissioning of the project. All applicants shall be required to obtain credit rating from rating agencies under the IREDA Rooftop Rating Model from empanelled Rating Agencies. 5 Maximum repayment period for the loan shall be up to 9 years, with the moratorium period of 12 months from the date of COD of the project. 6 Maximum construction period for the loan shall be up to 12 moths from the date of first disbursement. 7 The loan equity ratio will be 70:30 However, IREDA may extend loan upto 75% on the basis of the creditworthiness and track record of the promoter
  • 9. Project Monitoring & Provision of Lender’s Engineer Provision of Lender’s Engineer IREDA shall engage lender’s engineer from IREDA’s empanelled list of Lender Engineers for monitoring and quality assurance, safety issues in project construction and operational monitoring.
  • 10. a) Lender’s engineer shall also provide its independent recommendations/comments on the quality and performance of project for minimum three instances i.e. one each at Presanction, during construction and project commissioning. b) Lender’s Engineer shall review pre sanction techno commercial feasibility including existing shadow profile, construction progress, and project commissioning & completion report. c) Lender’s Engineer shall monitor compliance of applicable EHS norms including fire safety clearance on project site during construction and post commissioning. d) Lender’s Engineer shall submit performance review of commissioned projects vis a vis envisaged at the time of appraisal/EPC contract and give its final Completion Report including its Recommendations and Observations. Provision of Lender’s Engineer
  • 12. Eligible Revenue Models CaptivePowerSaletoGrid System aggregator and roof Owners shall enter into roof lease and O&M agreement for guaranteed solar generation. Direct applicants shall be required to submit O&M agreement for loan tenor or performance guarantee if self. Under Net Metering Roof Owners enter into agreement with discom and aggregator as per Net metering policy. Under Gross Metering Aggregator enters into agreement with discom/third party and roof owner under Applicable solar Policy.
  • 13. Eligible Revenue Models Govt./Semi Govtbodies OtherRevenue Models The DISCOM/Govt/Semi Govt bodies may appoint Aggregator to implement the Solar Facilities on its behalf for implementing projects. Other revenue models shall also be considered depending upon viability.
  • 14. Documentation and Application Saturdays are working days A good quality Gensol T-Shirt will be designed. It is optional for a Team member to purchase it. Hardship allowance has been introduced. Neha Singh to conduct a session for TA/DA functionalities before 15th July at WBU and before 1st Aug at NBU Timely appraisals would be ensured. Quality of food has to be maintained. If possible, company would bare the expense for the same. Total 48 Documents and Forms have to be submitted to IREDA for getting loan sanctioned You can opt to be benefitted from our value services for easy processing and sanctioning procedure
  • 15. Registered Office: 405 A, Prakrati Corporate, Y N Road, Indore (INDIA) 452001 • +91-731-6007860 Chandigarh Office: SCO 48, 2nd Floor, Opposite P.O., Sector-8, Panchkula (INDIA) 134109 • +91-7696644244 Mumbai Office: A1-1603, Runwal Garden City, Balkum, Thane (W), Mumbai (INDIA) – 400607 •+91-9022437785 Other Representative Locations Delhi, Chennai, Ahmadabad and Jaipur Email ID: info@environmentfirst.in