SlideShare a Scribd company logo
1 of 26
Role of Project Engineering in
Project Management
Dr. P. M. Deshpande
Ph.D.(Chem), M. Tech. Energy System (IIT),
Chartered Engineer ,Fellow of IE India
Engineering and Infrastructure Project
• To develop the facility for product
– Generation of Electricity
– Transmission of Electricity
– Water treatment plant
– Waste water treatment plant
– Automobile factory
• To develop the facility for service
– Air port
– High ways
– Ports
6/13/2019 2Project Managers Cliub of PUNE
Definition
• The word project comes from
the Latin word projectum from the Latin
verb proicere, "before an action"
• In turn comes from pro-, which denotes
precedence, something that comes before
something else in time
• paralleling the Greek πρό and iacere, "to do".
The word "project" thus originally meant
"before an action".
6/13/2019 3Project Managers Cliub of PUNE
Principle of Project
The principle is Concept To Completion
1st step DEFINE THE GOLE
2nd step DEVELP CONCEPT
3rd step DEVELP PRELIMINARY DESIGN
4TH step STUDY THE FESIBLITY –Techno -
Economics
5TH step DETAIED OUT ENGGINEERING DESIGH
PPF-PF-PD-PE-PH-PO
6/13/2019 4Project Managers Cliub of PUNE
6/13/2019 5Project Managers Cliub of PUNE
6/13/2019 6Project Managers Cliub of PUNE
Deign Engineering Process
• Develop the preliminary design (Basic Engineering)
– for engineering feasibility
– Based on standard engineering practice
• System engineering ( Process Design- PFD/ SFD)
– Defining System
– Defining size
Process Design Drawing
• Detail Engineering
– System engineering
– Product, Process Equipment Detailing
– Plant layout
• Different engineering drawings
– Bill of Material
– Specifications
6/13/2019 7Project Managers Cliub of PUNE
Project Engineering
• Study of engineering specification
• Bill of material BOM
• Convert to BOQ based on wastage, process,
– Example is bar bending
• Study the plant layout
• Define the erection/ contraction /method
• Identify and define
civil/mechanical/electrical/instrumentation scope
• Define/redefine WBS for constructability
• Identify the resources
- unskilled/ skilled/semi-skilled/technical
List out the requirements to convert design in to work for
the development of facility
6/13/2019 8Project Managers Cliub of PUNE
Scope of Project
The project goal is achieved if the scope of project is
detailed out in different phases of project
• Project Feasibility
• Project Development
• Project Execution
• Project Handing over
• Project Operation
Project scope is defined by project engineering in
terms of engineering details , specification , resources
The successes of project in terms of cost, time, and
different factors depends on implementation of
project management principles
6/13/2019 9Project Managers Cliub of PUNE
Project Development
Project development is based of Project Feasibility DPR
– To develop project for capacity as per project goal
– Detailed out design to achieve project goal
– To define the scope and its specification
– Define the required resources for project
– Define the knowledge, technology, engineering, construction
needs
– Define WBS
– Define mechanical, electrical, civil , instrumentation and allied
work based on project
– Develop Construction plan
– All these activates are based on Project Engineering Inputs
• ALL OUTPUTS OF THESE ACTIVITEIES LEADS TO
SPECIFICATIO, QUANTITY, ACTIVITY FOR
CONSTUCTION AS INPUT FOR PROJECT
PLANNING AND SUBSEQUET REVISIONS
6/13/2019 10Project Managers Cliub of PUNE
Stack holders Aspects Phase of Project Tender
Bidding
Finance Scope of project Project
Feasibility
Scope
Definition
Client legal Project
Development
Planning/sch
eduling
PMC /EPC Commercial Project
Execution
Contracting
Technology
Provider
Finanancial
Social
Project
Handover
Execution
Contractor Planning Project
Operation
Cost
estimation
Engineering
Contractor
Safety, Risk Project Handover Funding
Overview of Project Management Environment
6/13/2019 11Project Managers Cliub of PUNE
Corporate Project Stage Different contributes
Client Preliminary stage Design
Consultant Project Feasibility Scope
Technology Provider Project Development Tender, Contract
EPC/PMC Project Execution Cost estimation
Contractor Project Handover Planning Scheduling
Project OPERATI On Finanace,Execution
Responsibilities of stack holder
6/13/2019 12Project Managers Cliub of PUNE
Project Management –PMBOK approach
• Project Stack holder
• Project Organization
• Project management process
• Project integration
• Project scope management
• Project time management
• Project cost management
• Project quality management
• Project human resource management
• Project communication management
• Project procure management
• Project sack holder management
6/13/2019 13Project Managers Cliub of PUNE
PROJECT ENGINEERING
• Detailed Project Engineering is core activity
• The scope and service by engineers are Integrated by
engineering
• It is a multi disciplinary engineering team activity
• Ensure seamless integration project phases
• Helps in understanding interface activities and scope
• Plant design , plant O&M needs (productivity, design
duties) and engineering requirements are integrated
• Contribution of project engineers of stack holds ensure
timely completion of project
• Project Planning and project performance improve
• Leads to higher proficiency of project management
6/13/2019 14Project Managers Cliub of PUNE
Mechanical
• Prepare final layout and flow sheet based on the main
machinery selected, with proper code.
• Review and approve data and drawings from suppliers.
• Prepare general arrangement drawings for ducting and
chutes.
• Review & approve fabrication drawings (steel GAs) for
all chutes, ducts. Belt conveyor galleries, trestles, short
supports, foundations and transfer towers.
• Prepare steel GA’s for any interface areas, where
required.
• Procurement Services - Mechanical Contractor.
6/13/2019 15Project Managers Cliub of PUNE
Electrical
• System design for power system, Earthing system and
lightning protection system for the plant, based on the
machinery selected, approved layout/ flow-sheet and
to keep the capital and operating costs at the optimum
level.
• Procurement Services – Electrical Equipment.
• Scrutinize the GA drawings, power and control
schematics and design details for the equipment
submitted by the suppliers.
• Prepare layout drawings and general arrangement with
fixing detail for various electrical systems in the plant.
• Procurement Services - Electrical Contractor.
6/13/2019 16Project Managers Cliub of PUNE
Instrumentation and safety
• Prepare control concept of the plant, identify number of
control rooms, type of microprocessor controls, control
loops for optimised operation of the plant, system
architecture for central control based on latest
programmable controllers available.
• Procurement Services - total C&I system as a single
turnkey package.
• Scrutinize the GA drawings, control schematics,
interface/inter-connection diagrams, I/O addresses etc
submitted by the supplier.
• Prepare detailed design and schemes for various
components of the C&I system for the entire plant.
6/13/2019 17Project Managers Cliub of PUNE
Civil and Structural
• Prepare specifications for releasing to tenders for carrying out soil
investigation and topographic survey work to the extent required. Supervise
and evaluate soil investigation results and topographic survey carried out by
independent external specialist agencies.
• Design foundations, buildings and structural's in conformity with the project
engineering and general arrangement drawings for the process departments
and material handling sections. Foundations will be designed on the load data
provided by different suppliers of the machinery.
• The design of all duct supports, conveyor belt supports / foundations, bins
and hoppers, stacks, stairs, platforms, railing etc shall form part of civil
design scope.
• Prepare RCC working drawings to enable the civil contractor(s) to prepare
bar bending schedule and execute the work at site.
• Prepare structural steel drawings (Steel GA’s only) “Good for fabrication”
giving details of structural system, shape and size of members, splices details
for the members to enable the fabricator to prepare shop floor details.
• Prepare schematic drawings for the plant services within the plant area such
as Roads, drainage, Sanitary system etc.
• Procurement Services - Civil and structural Contractor.
6/13/2019 18Project Managers Cliub of PUNE
Provide requisite technical support for obtaining clearances from
relevant statutory agencies /authorities.
Coverage Greenfield Brownfield
Moderniza
tion
Rehabilitat
ion
Process Engineering √ √ √ √
Mechanical Engineering √ √ √ √
Electrical Engineering √ √ √ √
Instrument & Control Engineering √ √ √ √
Civil & Structural Engineering √ √ √ √
6/13/2019 19Project Managers Cliub of PUNE
Methodology:
• Mechanical, Electrical, Instrumentation & control
and Civil & Structural engineering follows clearly
established guidelines and practices align with
applicable statutory norms/ standards.
• Identify scope
• Indentify interface
– Engineering
– Scope
– Alignment
6/13/2019 20Project Managers Cliub of PUNE
Benefits:
• Access to Holtec’s vast database for advance engineering
and early lead of civil works construction drawings.
• Cross benefit from knowledge of different engineering
standards & practices of global cement manufacturing
players.
• Availability of integrated multi disciplinary engineering
team under one roof.
• Streamlined co-ordination with one lead manager.
• Arresting omissions/ commissions at design stage.
• Cross benefits due to incorporation of solutions
implemented in other projects with resultant benefit both for
CAPEX as well as O&M.
6/13/2019 21Project Managers Cliub of PUNE
Case study –Power plant cooling tower project
Process Principle -Basic Engineering
In this process cooling water is circulated across the cooling tower to remove the
heat generated in process plant equipments. The cooling water from cooling
tower is supplied to process equipments of plant; and returned to cooling tower
from process as closed loop water system. This system maintains the
temperature of process. The cooling water picks up the heat from process
equipments; this results in rise in temperature of cooling water. This heat is
rejecting to environment in cooling tower. The cooling water temperature is
reduced by3-7 oC depending on ambient conditions of project site. This drop in
temperature depends on geographical local conditions such as ambient
temperature, humidity and its variation during the day and different seasons.
6/13/2019 22Project Managers Cliub of PUNE
Case-Project Engineering
• Process steps - basic engineering
• Process detailing - Sizing of equipment
– Cooling tower
– Pump
– Heat exchanger
– Piping
– Instrumentation
• Detail engineering
– Detailing of Components of cooling tower
– Different sizes pipe rooting
– Electrical system detailing
– Plant layout
• Specifications of plant
– Civil, Mechanical ,electrical instrumentation
6/13/2019 23Project Managers Cliub of PUNE
Cooling Tower system
1. Civil Engineering Scope
2. Mechanical Engineering scope
3. Electrical Engineering Scope
4. Instrumentation Engineering Scope
5. Interface engineering activities
6. Resources for work and interface
Onion Model for Engineering Projects
6/13/2019 24Project Managers Cliub of PUNE
Civil work Mechanical Work Electrical work Instrumentation
work
Design conditions
check with site
conditions
Design ,fabrication
and installation of
fame for fan
Pump and motor
assembly
Control Logic
design, installation
and commissioning
Civil work of
cooling water room
Installation of fan Fan and motor
assembly
Installation of
instruments on
piping system
Civil work for
Chimney
Alignment of fan
and motor
Local control panel Positioning of
instrument and its
erection
commissioning
Foundation work for
CWC pump
Water distribution
system in cooling
tower
Energy Meters
Piping of circulation
pump
Details of scope to Define the activates for work
6/13/2019 25Project Managers Cliub of PUNE
Thanks
Questions
6/13/2019 26Project Managers Cliub of PUNE

More Related Content

What's hot

Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project ManagementRodolfo Siles
 
Primavera presentation
Primavera presentationPrimavera presentation
Primavera presentationNithin Dev
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementWaleed Elnaggar
 
project time management
 project time management project time management
project time managementHira Atiq
 
Construction Bid Proposal Template PowerPoint Presentation Slides
Construction Bid Proposal Template PowerPoint Presentation SlidesConstruction Bid Proposal Template PowerPoint Presentation Slides
Construction Bid Proposal Template PowerPoint Presentation SlidesSlideTeam
 
Lecture 1. general introduction to project management
Lecture 1. general introduction to project management Lecture 1. general introduction to project management
Lecture 1. general introduction to project management Dania Abdel-aziz
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management FundamentalsOxfordCambridge
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesMohamed Loey
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULEAjeesh Mk
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Managementcgautam
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation TafseerKishan Solankimbaccepmp
 

What's hot (20)

Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
project management (10).pptx
project management (10).pptxproject management (10).pptx
project management (10).pptx
 
Primavera presentation
Primavera presentationPrimavera presentation
Primavera presentation
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Project planning
Project planning Project planning
Project planning
 
tcc primavera
tcc primaveratcc primavera
tcc primavera
 
Project management
Project managementProject management
Project management
 
project time management
 project time management project time management
project time management
 
Project management
Project managementProject management
Project management
 
Construction Bid Proposal Template PowerPoint Presentation Slides
Construction Bid Proposal Template PowerPoint Presentation SlidesConstruction Bid Proposal Template PowerPoint Presentation Slides
Construction Bid Proposal Template PowerPoint Presentation Slides
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Lecture 1. general introduction to project management
Lecture 1. general introduction to project management Lecture 1. general introduction to project management
Lecture 1. general introduction to project management
 
Project management-Report
Project management-ReportProject management-Report
Project management-Report
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management Fundamentals
 
Project Management
Project ManagementProject Management
Project Management
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management Processes
 
project management
project managementproject management
project management
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation Tafseer
 

Similar to Role of project engineering in project management

Similar to Role of project engineering in project management (20)

Prashant Wani1
Prashant Wani1Prashant Wani1
Prashant Wani1
 
CV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerCV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project Engineer
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project Engineer
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical Engineer
 
Resume +Tahir 2016
Resume +Tahir 2016Resume +Tahir 2016
Resume +Tahir 2016
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
 
Resume-steer
Resume-steerResume-steer
Resume-steer
 
Bill resume
Bill resumeBill resume
Bill resume
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
CV
CVCV
CV
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
 
ARafer Resume
ARafer ResumeARafer Resume
ARafer Resume
 
Resume pritam
Resume  pritamResume  pritam
Resume pritam
 
Pradeep-CV
Pradeep-CVPradeep-CV
Pradeep-CV
 
REMIGIO D GLORIA CV
REMIGIO D GLORIA CVREMIGIO D GLORIA CV
REMIGIO D GLORIA CV
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli Resume
 
Updated Resume.DOC
Updated Resume.DOCUpdated Resume.DOC
Updated Resume.DOC
 
Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.
 
Ragab_Personel CV _Form_Jan_2015
Ragab_Personel CV _Form_Jan_2015Ragab_Personel CV _Form_Jan_2015
Ragab_Personel CV _Form_Jan_2015
 
Ramanuja Sharma_CV
Ramanuja Sharma_CVRamanuja Sharma_CV
Ramanuja Sharma_CV
 

Recently uploaded

Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixingviprabot1
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 

Recently uploaded (20)

POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixing
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 

Role of project engineering in project management

  • 1. Role of Project Engineering in Project Management Dr. P. M. Deshpande Ph.D.(Chem), M. Tech. Energy System (IIT), Chartered Engineer ,Fellow of IE India
  • 2. Engineering and Infrastructure Project • To develop the facility for product – Generation of Electricity – Transmission of Electricity – Water treatment plant – Waste water treatment plant – Automobile factory • To develop the facility for service – Air port – High ways – Ports 6/13/2019 2Project Managers Cliub of PUNE
  • 3. Definition • The word project comes from the Latin word projectum from the Latin verb proicere, "before an action" • In turn comes from pro-, which denotes precedence, something that comes before something else in time • paralleling the Greek πρό and iacere, "to do". The word "project" thus originally meant "before an action". 6/13/2019 3Project Managers Cliub of PUNE
  • 4. Principle of Project The principle is Concept To Completion 1st step DEFINE THE GOLE 2nd step DEVELP CONCEPT 3rd step DEVELP PRELIMINARY DESIGN 4TH step STUDY THE FESIBLITY –Techno - Economics 5TH step DETAIED OUT ENGGINEERING DESIGH PPF-PF-PD-PE-PH-PO 6/13/2019 4Project Managers Cliub of PUNE
  • 7. Deign Engineering Process • Develop the preliminary design (Basic Engineering) – for engineering feasibility – Based on standard engineering practice • System engineering ( Process Design- PFD/ SFD) – Defining System – Defining size Process Design Drawing • Detail Engineering – System engineering – Product, Process Equipment Detailing – Plant layout • Different engineering drawings – Bill of Material – Specifications 6/13/2019 7Project Managers Cliub of PUNE
  • 8. Project Engineering • Study of engineering specification • Bill of material BOM • Convert to BOQ based on wastage, process, – Example is bar bending • Study the plant layout • Define the erection/ contraction /method • Identify and define civil/mechanical/electrical/instrumentation scope • Define/redefine WBS for constructability • Identify the resources - unskilled/ skilled/semi-skilled/technical List out the requirements to convert design in to work for the development of facility 6/13/2019 8Project Managers Cliub of PUNE
  • 9. Scope of Project The project goal is achieved if the scope of project is detailed out in different phases of project • Project Feasibility • Project Development • Project Execution • Project Handing over • Project Operation Project scope is defined by project engineering in terms of engineering details , specification , resources The successes of project in terms of cost, time, and different factors depends on implementation of project management principles 6/13/2019 9Project Managers Cliub of PUNE
  • 10. Project Development Project development is based of Project Feasibility DPR – To develop project for capacity as per project goal – Detailed out design to achieve project goal – To define the scope and its specification – Define the required resources for project – Define the knowledge, technology, engineering, construction needs – Define WBS – Define mechanical, electrical, civil , instrumentation and allied work based on project – Develop Construction plan – All these activates are based on Project Engineering Inputs • ALL OUTPUTS OF THESE ACTIVITEIES LEADS TO SPECIFICATIO, QUANTITY, ACTIVITY FOR CONSTUCTION AS INPUT FOR PROJECT PLANNING AND SUBSEQUET REVISIONS 6/13/2019 10Project Managers Cliub of PUNE
  • 11. Stack holders Aspects Phase of Project Tender Bidding Finance Scope of project Project Feasibility Scope Definition Client legal Project Development Planning/sch eduling PMC /EPC Commercial Project Execution Contracting Technology Provider Finanancial Social Project Handover Execution Contractor Planning Project Operation Cost estimation Engineering Contractor Safety, Risk Project Handover Funding Overview of Project Management Environment 6/13/2019 11Project Managers Cliub of PUNE
  • 12. Corporate Project Stage Different contributes Client Preliminary stage Design Consultant Project Feasibility Scope Technology Provider Project Development Tender, Contract EPC/PMC Project Execution Cost estimation Contractor Project Handover Planning Scheduling Project OPERATI On Finanace,Execution Responsibilities of stack holder 6/13/2019 12Project Managers Cliub of PUNE
  • 13. Project Management –PMBOK approach • Project Stack holder • Project Organization • Project management process • Project integration • Project scope management • Project time management • Project cost management • Project quality management • Project human resource management • Project communication management • Project procure management • Project sack holder management 6/13/2019 13Project Managers Cliub of PUNE
  • 14. PROJECT ENGINEERING • Detailed Project Engineering is core activity • The scope and service by engineers are Integrated by engineering • It is a multi disciplinary engineering team activity • Ensure seamless integration project phases • Helps in understanding interface activities and scope • Plant design , plant O&M needs (productivity, design duties) and engineering requirements are integrated • Contribution of project engineers of stack holds ensure timely completion of project • Project Planning and project performance improve • Leads to higher proficiency of project management 6/13/2019 14Project Managers Cliub of PUNE
  • 15. Mechanical • Prepare final layout and flow sheet based on the main machinery selected, with proper code. • Review and approve data and drawings from suppliers. • Prepare general arrangement drawings for ducting and chutes. • Review & approve fabrication drawings (steel GAs) for all chutes, ducts. Belt conveyor galleries, trestles, short supports, foundations and transfer towers. • Prepare steel GA’s for any interface areas, where required. • Procurement Services - Mechanical Contractor. 6/13/2019 15Project Managers Cliub of PUNE
  • 16. Electrical • System design for power system, Earthing system and lightning protection system for the plant, based on the machinery selected, approved layout/ flow-sheet and to keep the capital and operating costs at the optimum level. • Procurement Services – Electrical Equipment. • Scrutinize the GA drawings, power and control schematics and design details for the equipment submitted by the suppliers. • Prepare layout drawings and general arrangement with fixing detail for various electrical systems in the plant. • Procurement Services - Electrical Contractor. 6/13/2019 16Project Managers Cliub of PUNE
  • 17. Instrumentation and safety • Prepare control concept of the plant, identify number of control rooms, type of microprocessor controls, control loops for optimised operation of the plant, system architecture for central control based on latest programmable controllers available. • Procurement Services - total C&I system as a single turnkey package. • Scrutinize the GA drawings, control schematics, interface/inter-connection diagrams, I/O addresses etc submitted by the supplier. • Prepare detailed design and schemes for various components of the C&I system for the entire plant. 6/13/2019 17Project Managers Cliub of PUNE
  • 18. Civil and Structural • Prepare specifications for releasing to tenders for carrying out soil investigation and topographic survey work to the extent required. Supervise and evaluate soil investigation results and topographic survey carried out by independent external specialist agencies. • Design foundations, buildings and structural's in conformity with the project engineering and general arrangement drawings for the process departments and material handling sections. Foundations will be designed on the load data provided by different suppliers of the machinery. • The design of all duct supports, conveyor belt supports / foundations, bins and hoppers, stacks, stairs, platforms, railing etc shall form part of civil design scope. • Prepare RCC working drawings to enable the civil contractor(s) to prepare bar bending schedule and execute the work at site. • Prepare structural steel drawings (Steel GA’s only) “Good for fabrication” giving details of structural system, shape and size of members, splices details for the members to enable the fabricator to prepare shop floor details. • Prepare schematic drawings for the plant services within the plant area such as Roads, drainage, Sanitary system etc. • Procurement Services - Civil and structural Contractor. 6/13/2019 18Project Managers Cliub of PUNE
  • 19. Provide requisite technical support for obtaining clearances from relevant statutory agencies /authorities. Coverage Greenfield Brownfield Moderniza tion Rehabilitat ion Process Engineering √ √ √ √ Mechanical Engineering √ √ √ √ Electrical Engineering √ √ √ √ Instrument & Control Engineering √ √ √ √ Civil & Structural Engineering √ √ √ √ 6/13/2019 19Project Managers Cliub of PUNE
  • 20. Methodology: • Mechanical, Electrical, Instrumentation & control and Civil & Structural engineering follows clearly established guidelines and practices align with applicable statutory norms/ standards. • Identify scope • Indentify interface – Engineering – Scope – Alignment 6/13/2019 20Project Managers Cliub of PUNE
  • 21. Benefits: • Access to Holtec’s vast database for advance engineering and early lead of civil works construction drawings. • Cross benefit from knowledge of different engineering standards & practices of global cement manufacturing players. • Availability of integrated multi disciplinary engineering team under one roof. • Streamlined co-ordination with one lead manager. • Arresting omissions/ commissions at design stage. • Cross benefits due to incorporation of solutions implemented in other projects with resultant benefit both for CAPEX as well as O&M. 6/13/2019 21Project Managers Cliub of PUNE
  • 22. Case study –Power plant cooling tower project Process Principle -Basic Engineering In this process cooling water is circulated across the cooling tower to remove the heat generated in process plant equipments. The cooling water from cooling tower is supplied to process equipments of plant; and returned to cooling tower from process as closed loop water system. This system maintains the temperature of process. The cooling water picks up the heat from process equipments; this results in rise in temperature of cooling water. This heat is rejecting to environment in cooling tower. The cooling water temperature is reduced by3-7 oC depending on ambient conditions of project site. This drop in temperature depends on geographical local conditions such as ambient temperature, humidity and its variation during the day and different seasons. 6/13/2019 22Project Managers Cliub of PUNE
  • 23. Case-Project Engineering • Process steps - basic engineering • Process detailing - Sizing of equipment – Cooling tower – Pump – Heat exchanger – Piping – Instrumentation • Detail engineering – Detailing of Components of cooling tower – Different sizes pipe rooting – Electrical system detailing – Plant layout • Specifications of plant – Civil, Mechanical ,electrical instrumentation 6/13/2019 23Project Managers Cliub of PUNE
  • 24. Cooling Tower system 1. Civil Engineering Scope 2. Mechanical Engineering scope 3. Electrical Engineering Scope 4. Instrumentation Engineering Scope 5. Interface engineering activities 6. Resources for work and interface Onion Model for Engineering Projects 6/13/2019 24Project Managers Cliub of PUNE
  • 25. Civil work Mechanical Work Electrical work Instrumentation work Design conditions check with site conditions Design ,fabrication and installation of fame for fan Pump and motor assembly Control Logic design, installation and commissioning Civil work of cooling water room Installation of fan Fan and motor assembly Installation of instruments on piping system Civil work for Chimney Alignment of fan and motor Local control panel Positioning of instrument and its erection commissioning Foundation work for CWC pump Water distribution system in cooling tower Energy Meters Piping of circulation pump Details of scope to Define the activates for work 6/13/2019 25Project Managers Cliub of PUNE