3. SALIENT FEATURE OF PROPOSED
AHMEDABAD–MUMBAI HIGH SPEED
CORRIDOR
Owners : Indian
railway
Line length : 508 km
(308miles)
Opening speed :320
km p/hour(200miles
p/hour)
Total travel time : 1 hr
& 52 minutes
4. COST STRUCTURE
The project is estimated to cost
Rs.97636 Cr (us $15 billion)
Japan has agreed to finance 81% of
total project cost Rs.79165 Cr (us $
12 billion) through a 50 years loan at
an int. rate 0.1% and a moratorium
on repayment upto 15 years.
5. OPERATORS
In feb 2016, the National High Speed
Rail Corporation (NHSRC) was
registered under the companies Act-
1956
The NHSRC is a special purpose
vehicle responsible for the
implementation of the Mumbai-
Ahmedabad high speed rail project .
6. INFRASTRUCTURE & OPERATION
Trains are proposed to have
length of between 10 and 16
coaches .
Each train will have a passenger
capacity of 1300 to 1600
passengers.
9. STATIONS
The line will have 11 stations
proposed station are :
1. MUMBAI
2. THANE
3. VIRAR
4. BOISAR
5. VALSAD
6. VAPI
7. SURAT
8. BHARUCH
9. VADODARA
10. ANAND
11. AHMEDABAD