SAFETY RISK ASSESSMENTS for Airside Construction Doc Ref -
SE-CTJ-01CW-MST-00417
Project - ABC Works By - ABC Ltd Date โ€“ 01/01/01
Page 1 of 6
Nr. HAZARD EFFECT
RISK ANALYSIS /
NO CONTROLS CONTROL MEASURES
RISK ANALYSIS /
WITH CONTROLS
Residual
Risk
remarks
severity likelihood risk severity likelihood risk
General Airside Working
1 Lack of Airside
safety awareness
โ€ข Cause damage &
Injury
โ€ข Impact negatively on
airport operations
6 6 36 โ€ข Staff to receive airside safety training.
โ€ข Risk Assessments & Method of Work Plan to
be briefed to all affected workers.
โ€ข Airside induction
โ€ข Pre start-up and regular site meetings
should be held to ensure safety
requirements are met.
โ€ข Promotion of safety awareness through
training.
6 2 12 Adequately
Controlled
Risk
2 Construction that
impacts on the safe
operation of airport
โ€ข Cause damage and
injury
6 6 36 โ€ข Method of Work Plans to be submitted and
approved by stakeholders prior to any work
starting
โ€ข Notams to be issued where necessary.
โ€ข A close working relationship between the
contractor, airport operator and
stakeholders will enhance safety at the
airport
โ€ข Ensure clean and tidy storage and proper
disposal of materials and waste
6 2 12 Adequately
Controlled
Risk
SAFETY RISK ASSESSMENTS for Airside Construction Doc Ref -
SE-CTJ-01CW-MST-00417
Project - ABC Works By - ABC Ltd Date โ€“ 01/01/01
Page 2 of 6
Nr. HAZARD EFFECT
RISK ANALYSIS /
NO CONTROLS CONTROL MEASURES
RISK ANALYSIS /
WITH CONTROLS
Residual
Risk
remarks
severity likelihood risk severity likelihood risk
3 Unauthored
Persons
โ€ข Security breach 8 4 32 โ€ข All those entering airside to have a pass and
to be checked by security.
8 2 16 Adequately
Controlled
Risk
4 Collision with
aircraft in flight
โ€ข Severe damage
โ€ข Fatalities
โ€ข Public outcry
10 4 40 โ€ข Fan corridor height restrictions briefed to all
site teams
โ€ข Works in the fan corridor will be controlled by
Restricted Area Access Work Permits
โ€ข Height markers ( such as goal posts ) shall be
constructed as applicable to advise of height
limits
โ€ข All plant equipment shall be selected on basis
of maximum operating heights so as to not
interfere with airport operations
โ€ข Supervision at all times.
โ€ข Any plant operating at heights must not
infringe the protected surfaces, inside or
outside the airport property limits
โ€ข Crane operating heights should be checked
to ensure no protected surfaces are
infringed.
10 2 20 Adequately
Controlled
Risk
5 Lighting for night
working
โ€ข Distracts, dazzle and
blind pilots and ATC
8 4 32 โ€ข Lights shall be shielded so direct light does not
shine above the horizon.
8 2 16 Adequately
Controlled
Risk
6 FOD- Foreign
Object Debris
โ€ข Damage to aircraft
tyres, engines
โ€ข Injury
4 6 24 โ€ข Continuously remove waste or loose
materials
โ€ข Vehicles entering or exiting the worksite
may need to be cleaned to prevent mud or
debris being deposited in the airside area
4 2 8 Negligible
Risk
SAFETY RISK ASSESSMENTS for Airside Construction Doc Ref -
SE-CTJ-01CW-MST-00417
Project - ABC Works By - ABC Ltd Date โ€“ 01/01/01
Page 3 of 6
Nr. HAZARD EFFECT
RISK ANALYSIS /
NO CONTROLS CONTROL MEASURES
RISK ANALYSIS /
WITH CONTROLS
Residual
Risk
remarks
severity likelihood risk severity likelihood risk
โ€ข Ensuring the workforce are committed to
active FOD prevention
โ€ข Maintaining good housekeeping practice
โ€ขSuitable site fencing should be installed to
protect from jet blast and to ensure FOD is
contained within the site
โ€ขStaff should remove and dispose of any
FOD found
7 Bird Strikes โ€ข Damage to aircrafts
โ€ข injury
4 4 16 โ€ข Donโ€™t attract birds by feeding them.
โ€ข Dispose of waste food properly using bins
4 2 8 Negligible
Risk
8 Equipment or
material near
NAVAIDs
Navigational Aids
โ€ข Degrade or impair
radiated signals
โ€ข Injury
4 4 16 โ€ข Keep area in front of localiser and glide slope
free.
โ€ข Know the ILS sensitive areas
โ€ข Providing warning signs, markings or
lights at the edge of the sensitive area to
prevent accidental intrusion into the
sensitive areas
4 2 8 Negligible
Risk
9 Failure to control
dust.
โ€ขObscures or
diminishes the
visibility of areas
โ€ขInjury
6 4 24 โ€ข Use dust suppression by wetting surface.
โ€ข Use sheeting on trucks transporting fine
materials
โ€ข Sweep up dust
6 2 12 Adequately
Controlled
Risk
10 Inappropriate or
poorly maintained
fencing
โ€ขinadequate to
separate
construction areas
โ€ขInjury
4 4 16 โ€ข Ensure fencing is adequate
โ€ข Maintain fencing
4 2 12 Adequately
Controlled
Risk
SAFETY RISK ASSESSMENTS for Airside Construction Doc Ref -
SE-CTJ-01CW-MST-00417
Project - ABC Works By - ABC Ltd Date โ€“ 01/01/01
Page 4 of 6
Nr. HAZARD EFFECT
RISK ANALYSIS /
NO CONTROLS CONTROL MEASURES
RISK ANALYSIS /
WITH CONTROLS
Residual
Risk
remarks
severity likelihood risk severity likelihood risk
11 Jet Blast โ€ขInjury 6 6 36 โ€ข Protect construction workers from jet blast
โ€ข Ground crews are to ensure areas behind
the aircraft are clear, and that the aircraft is
positioned in such a way as to avoid
concentrating break-away blast at
buildings, parked or taxiing aircraft or
persons on the apron
6 2 12 Adequately
Controlled
Risk
12 Driving Airside โ€ข Accidents
โ€ข Injury
6 6 36 โ€ข All contractor drivers must be escorted by
a qualified vehicle operator or undergo
airside driver training and testing Access
routes should be agreed to and clearly
identified to minimize interference with the
operation on the airport
6 2 12 Negligible
Risk
13 Fire โ€ข Damage
โ€ข Injury
โ€ข Smoking restrictions should be described,
monitored and enforced
โ€ข Hot works restrictions (possibly involving
a separate hot works permit) should be
described, monitored and enforced
โ€ข Mobile phones should be switched off
when refueling plant so as not to ignite
fumes.
โ€ข No smoking.
โ€ข Fire extinguishers to be provided
14 Spillage of fuel,
oil, substances
โ€ข Injury by trips and
falls
โ€ขProvide spill kits
โ€ขDeal with spills straight away
โ€ขSpills should be thoroughly cleaned and
dried.
SAFETY RISK ASSESSMENTS for Airside Construction Doc Ref -
SE-CTJ-01CW-MST-00417
Project - ABC Works By - ABC Ltd Date โ€“ 01/01/01
Page 5 of 6
Note - The Control Measures are used to reduce the Likelihood and thereby the Residual Risk
A Hazard is the potential to cause harm. A Risk is the likelihood of harm taking place.
Table
Value Severity Value Likelihood Residual Risk - Ratings & Actions
10 Multiple Fatalities 10 Certain
Risk valve is obtained by multiplying the likelihood
value by the severity value. The severity value
remained the same, without or with controls, it is
the likelihood valve that the controls will reduce
8 Single Fatality or Permanent Disability 8 Very Likely 60 - 100 Intolerable Risk
6 Major Injury loss of time >3 days 6 Likely 32 - 48 Moderately Controlled Risk
4 Minor or Serious Injury 4 May Happen 12 - 24 Adequately Controlled Risk
2 Slight injury 2 Unlikely 0 - 8 Negligible Risk
Aim of Risk Assessment - To find solutions that would eliminate, mitigate, or manage the risks to an acceptable level.
Risk Assessment Matrix
Severity Likelihood
Certain
Value =10
Very Likely
Value = 8
Likely
Value = 6
May Happen
Value = 4
Unlikely
Value = 2
Multiple Fatalities Value = 10 100 80 60 40 20
Single Fatality or Permanent
Disability
Value = 8 80 64 42 32 16
Major Injury loss of time >3 days Value = 6 60 49 36 24 12
Minor or Serious Injury Value = 4 40 32 24 16 8
Slight injury Value = 2 20 16 12 8 4
Green
Amber
Red
No further action required
The current residual risk requires a review of available options and action
The current residual risk requires further action to reduce it.
SAFETY RISK ASSESSMENTS for Airside Construction Doc Ref -
SE-CTJ-01CW-MST-00417
Project - ABC Works By - ABC Ltd Date โ€“ 01/01/01
Page 6 of 6
Images

More Related Content

What's hot

Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training Presentation
FAIZ FAREED
ย 
Aviation security -_chpt1
Aviation security -_chpt1Aviation security -_chpt1
Aviation security -_chpt1
carlinclarke
ย 

What's hot (20)

Safety evaluation Best practices-04.11.10
Safety evaluation   Best practices-04.11.10Safety evaluation   Best practices-04.11.10
Safety evaluation Best practices-04.11.10
ย 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
ย 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templates
ย 
Risk Assessments 96 pages
Risk Assessments 96 pagesRisk Assessments 96 pages
Risk Assessments 96 pages
ย 
Hse plan
Hse planHse plan
Hse plan
ย 
Man and machine interface
Man and machine interfaceMan and machine interface
Man and machine interface
ย 
Confined Space Ppt
Confined Space PptConfined Space Ppt
Confined Space Ppt
ย 
18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates
ย 
11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates
ย 
14 use of plant graders and road rollers risk assessment templates
14 use of plant  graders and road rollers risk assessment templates14 use of plant  graders and road rollers risk assessment templates
14 use of plant graders and road rollers risk assessment templates
ย 
Portable tools risk assessment
Portable tools risk assessment Portable tools risk assessment
Portable tools risk assessment
ย 
BANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptBANKSMAN TRAINING.ppt
BANKSMAN TRAINING.ppt
ย 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
ย 
Work At Height
Work At HeightWork At Height
Work At Height
ย 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training Presentation
ย 
EHS Presentation
EHS PresentationEHS Presentation
EHS Presentation
ย 
A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety Induction
ย 
Legal register
Legal registerLegal register
Legal register
ย 
31 ndrc operations within excavations (temporary works) risk assessment templ...
31 ndrc operations within excavations (temporary works) risk assessment templ...31 ndrc operations within excavations (temporary works) risk assessment templ...
31 ndrc operations within excavations (temporary works) risk assessment templ...
ย 
Aviation security -_chpt1
Aviation security -_chpt1Aviation security -_chpt1
Aviation security -_chpt1
ย 

Similar to Risk Assessments for Airside Construction

18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
Dwarika Bhushan Sharma
ย 
25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx
Dwarika Bhushan Sharma
ย 
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
MohammedAliQazi
ย 
15 Formwork (Temporary Works) Risk Assessment Templates.docx
15 Formwork (Temporary Works) Risk Assessment Templates.docx15 Formwork (Temporary Works) Risk Assessment Templates.docx
15 Formwork (Temporary Works) Risk Assessment Templates.docx
Dwarika Bhushan Sharma
ย 
11 Piling Operations with Rebar Cage installation Risk Assessment Templates.docx
11 Piling Operations with Rebar Cage installation Risk Assessment Templates.docx11 Piling Operations with Rebar Cage installation Risk Assessment Templates.docx
11 Piling Operations with Rebar Cage installation Risk Assessment Templates.docx
Dwarika Bhushan Sharma
ย 
12 Sheet Piling Operations (Temporary Works) Risk Assessment Templates.docx
12 Sheet Piling Operations (Temporary Works) Risk Assessment Templates.docx12 Sheet Piling Operations (Temporary Works) Risk Assessment Templates.docx
12 Sheet Piling Operations (Temporary Works) Risk Assessment Templates.docx
Dwarika Bhushan Sharma
ย 
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Andrew Louis
ย 
14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx
14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx
14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx
Dwarika Bhushan Sharma
ย 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptx
AamirAbbas75
ย 
7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx
Dwarika Bhushan Sharma
ย 

Similar to Risk Assessments for Airside Construction (20)

18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
ย 
25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx
ย 
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
ย 
15 Formwork (Temporary Works) Risk Assessment Templates.docx
15 Formwork (Temporary Works) Risk Assessment Templates.docx15 Formwork (Temporary Works) Risk Assessment Templates.docx
15 Formwork (Temporary Works) Risk Assessment Templates.docx
ย 
11 Piling Operations with Rebar Cage installation Risk Assessment Templates.docx
11 Piling Operations with Rebar Cage installation Risk Assessment Templates.docx11 Piling Operations with Rebar Cage installation Risk Assessment Templates.docx
11 Piling Operations with Rebar Cage installation Risk Assessment Templates.docx
ย 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh Rajput
ย 
HIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdfHIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdf
ย 
12 Sheet Piling Operations (Temporary Works) Risk Assessment Templates.docx
12 Sheet Piling Operations (Temporary Works) Risk Assessment Templates.docx12 Sheet Piling Operations (Temporary Works) Risk Assessment Templates.docx
12 Sheet Piling Operations (Temporary Works) Risk Assessment Templates.docx
ย 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates
ย 
Safety plan
Safety planSafety plan
Safety plan
ย 
Safety_induction
Safety_inductionSafety_induction
Safety_induction
ย 
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
ย 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates
ย 
14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx
14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx
14 Use of Plant- Graders and road rollers Risk Assessment Templates.docx
ย 
IR_Safety orientation.pdf TRAINING PRESENTATION
IR_Safety orientation.pdf TRAINING PRESENTATIONIR_Safety orientation.pdf TRAINING PRESENTATION
IR_Safety orientation.pdf TRAINING PRESENTATION
ย 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptx
ย 
ADO-A Chapter 06
ADO-A Chapter 06ADO-A Chapter 06
ADO-A Chapter 06
ย 
Chapter 06
Chapter 06Chapter 06
Chapter 06
ย 
12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates
ย 
7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx
ย 

More from David H Moloney

More from David H Moloney (20)

Farm Life & Creameries from 1900
Farm Life & Creameries from 1900 Farm Life & Creameries from 1900
Farm Life & Creameries from 1900
ย 
Book of Derbys Irish Estate 1824
Book of Derbys Irish Estate 1824Book of Derbys Irish Estate 1824
Book of Derbys Irish Estate 1824
ย 
Photo Album of Cork Runway Reconstruction
Photo Album of Cork Runway ReconstructionPhoto Album of Cork Runway Reconstruction
Photo Album of Cork Runway Reconstruction
ย 
Runway construction project execution plan
Runway construction project execution plan Runway construction project execution plan
Runway construction project execution plan
ย 
Project Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanProject Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, Oman
ย 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures Construction
ย 
Muscat Airport Construction
Muscat Airport ConstructionMuscat Airport Construction
Muscat Airport Construction
ย 
Construction Environmental Awareness and Training POSTER
Construction Environmental Awareness and Training  POSTERConstruction Environmental Awareness and Training  POSTER
Construction Environmental Awareness and Training POSTER
ย 
Construction Presentations 2019
Construction Presentations 2019Construction Presentations 2019
Construction Presentations 2019
ย 
Project Planning Organising Tracking Construction
Project Planning Organising Tracking  ConstructionProject Planning Organising Tracking  Construction
Project Planning Organising Tracking Construction
ย 
Motorway Construction, Project Execution Plan
Motorway Construction, Project Execution PlanMotorway Construction, Project Execution Plan
Motorway Construction, Project Execution Plan
ย 
Heathrow 3rd Runway Construction
Heathrow 3rd Runway ConstructionHeathrow 3rd Runway Construction
Heathrow 3rd Runway Construction
ย 
Sea Port Construction, Project Execution Plan
Sea Port Construction, Project Execution PlanSea Port Construction, Project Execution Plan
Sea Port Construction, Project Execution Plan
ย 
Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution Plan
ย 
Runway Construction Project Execution Plan
Runway Construction Project Execution PlanRunway Construction Project Execution Plan
Runway Construction Project Execution Plan
ย 
Project Execution Plan for High Rise Building
Project Execution Plan for High Rise BuildingProject Execution Plan for High Rise Building
Project Execution Plan for High Rise Building
ย 
Project Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionProject Execution Plan for Bridge Construction
Project Execution Plan for Bridge Construction
ย 
Oil pipeline 42 inch by 455 km
Oil pipeline 42 inch by  455 kmOil pipeline 42 inch by  455 km
Oil pipeline 42 inch by 455 km
ย 
Airport Construction
Airport ConstructionAirport Construction
Airport Construction
ย 
Construction Methods & Sequence
Construction  Methods & SequenceConstruction  Methods & Sequence
Construction Methods & Sequence
ย 

Recently uploaded

Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night StandCall Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
amitlee9823
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
ย 

Recently uploaded (20)

Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night StandCall Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
ย 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
ย 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ย 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
ย 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
ย 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
ย 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
ย 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
ย 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
ย 
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
ย 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
ย 

Risk Assessments for Airside Construction

  • 1. SAFETY RISK ASSESSMENTS for Airside Construction Doc Ref - SE-CTJ-01CW-MST-00417 Project - ABC Works By - ABC Ltd Date โ€“ 01/01/01 Page 1 of 6 Nr. HAZARD EFFECT RISK ANALYSIS / NO CONTROLS CONTROL MEASURES RISK ANALYSIS / WITH CONTROLS Residual Risk remarks severity likelihood risk severity likelihood risk General Airside Working 1 Lack of Airside safety awareness โ€ข Cause damage & Injury โ€ข Impact negatively on airport operations 6 6 36 โ€ข Staff to receive airside safety training. โ€ข Risk Assessments & Method of Work Plan to be briefed to all affected workers. โ€ข Airside induction โ€ข Pre start-up and regular site meetings should be held to ensure safety requirements are met. โ€ข Promotion of safety awareness through training. 6 2 12 Adequately Controlled Risk 2 Construction that impacts on the safe operation of airport โ€ข Cause damage and injury 6 6 36 โ€ข Method of Work Plans to be submitted and approved by stakeholders prior to any work starting โ€ข Notams to be issued where necessary. โ€ข A close working relationship between the contractor, airport operator and stakeholders will enhance safety at the airport โ€ข Ensure clean and tidy storage and proper disposal of materials and waste 6 2 12 Adequately Controlled Risk
  • 2. SAFETY RISK ASSESSMENTS for Airside Construction Doc Ref - SE-CTJ-01CW-MST-00417 Project - ABC Works By - ABC Ltd Date โ€“ 01/01/01 Page 2 of 6 Nr. HAZARD EFFECT RISK ANALYSIS / NO CONTROLS CONTROL MEASURES RISK ANALYSIS / WITH CONTROLS Residual Risk remarks severity likelihood risk severity likelihood risk 3 Unauthored Persons โ€ข Security breach 8 4 32 โ€ข All those entering airside to have a pass and to be checked by security. 8 2 16 Adequately Controlled Risk 4 Collision with aircraft in flight โ€ข Severe damage โ€ข Fatalities โ€ข Public outcry 10 4 40 โ€ข Fan corridor height restrictions briefed to all site teams โ€ข Works in the fan corridor will be controlled by Restricted Area Access Work Permits โ€ข Height markers ( such as goal posts ) shall be constructed as applicable to advise of height limits โ€ข All plant equipment shall be selected on basis of maximum operating heights so as to not interfere with airport operations โ€ข Supervision at all times. โ€ข Any plant operating at heights must not infringe the protected surfaces, inside or outside the airport property limits โ€ข Crane operating heights should be checked to ensure no protected surfaces are infringed. 10 2 20 Adequately Controlled Risk 5 Lighting for night working โ€ข Distracts, dazzle and blind pilots and ATC 8 4 32 โ€ข Lights shall be shielded so direct light does not shine above the horizon. 8 2 16 Adequately Controlled Risk 6 FOD- Foreign Object Debris โ€ข Damage to aircraft tyres, engines โ€ข Injury 4 6 24 โ€ข Continuously remove waste or loose materials โ€ข Vehicles entering or exiting the worksite may need to be cleaned to prevent mud or debris being deposited in the airside area 4 2 8 Negligible Risk
  • 3. SAFETY RISK ASSESSMENTS for Airside Construction Doc Ref - SE-CTJ-01CW-MST-00417 Project - ABC Works By - ABC Ltd Date โ€“ 01/01/01 Page 3 of 6 Nr. HAZARD EFFECT RISK ANALYSIS / NO CONTROLS CONTROL MEASURES RISK ANALYSIS / WITH CONTROLS Residual Risk remarks severity likelihood risk severity likelihood risk โ€ข Ensuring the workforce are committed to active FOD prevention โ€ข Maintaining good housekeeping practice โ€ขSuitable site fencing should be installed to protect from jet blast and to ensure FOD is contained within the site โ€ขStaff should remove and dispose of any FOD found 7 Bird Strikes โ€ข Damage to aircrafts โ€ข injury 4 4 16 โ€ข Donโ€™t attract birds by feeding them. โ€ข Dispose of waste food properly using bins 4 2 8 Negligible Risk 8 Equipment or material near NAVAIDs Navigational Aids โ€ข Degrade or impair radiated signals โ€ข Injury 4 4 16 โ€ข Keep area in front of localiser and glide slope free. โ€ข Know the ILS sensitive areas โ€ข Providing warning signs, markings or lights at the edge of the sensitive area to prevent accidental intrusion into the sensitive areas 4 2 8 Negligible Risk 9 Failure to control dust. โ€ขObscures or diminishes the visibility of areas โ€ขInjury 6 4 24 โ€ข Use dust suppression by wetting surface. โ€ข Use sheeting on trucks transporting fine materials โ€ข Sweep up dust 6 2 12 Adequately Controlled Risk 10 Inappropriate or poorly maintained fencing โ€ขinadequate to separate construction areas โ€ขInjury 4 4 16 โ€ข Ensure fencing is adequate โ€ข Maintain fencing 4 2 12 Adequately Controlled Risk
  • 4. SAFETY RISK ASSESSMENTS for Airside Construction Doc Ref - SE-CTJ-01CW-MST-00417 Project - ABC Works By - ABC Ltd Date โ€“ 01/01/01 Page 4 of 6 Nr. HAZARD EFFECT RISK ANALYSIS / NO CONTROLS CONTROL MEASURES RISK ANALYSIS / WITH CONTROLS Residual Risk remarks severity likelihood risk severity likelihood risk 11 Jet Blast โ€ขInjury 6 6 36 โ€ข Protect construction workers from jet blast โ€ข Ground crews are to ensure areas behind the aircraft are clear, and that the aircraft is positioned in such a way as to avoid concentrating break-away blast at buildings, parked or taxiing aircraft or persons on the apron 6 2 12 Adequately Controlled Risk 12 Driving Airside โ€ข Accidents โ€ข Injury 6 6 36 โ€ข All contractor drivers must be escorted by a qualified vehicle operator or undergo airside driver training and testing Access routes should be agreed to and clearly identified to minimize interference with the operation on the airport 6 2 12 Negligible Risk 13 Fire โ€ข Damage โ€ข Injury โ€ข Smoking restrictions should be described, monitored and enforced โ€ข Hot works restrictions (possibly involving a separate hot works permit) should be described, monitored and enforced โ€ข Mobile phones should be switched off when refueling plant so as not to ignite fumes. โ€ข No smoking. โ€ข Fire extinguishers to be provided 14 Spillage of fuel, oil, substances โ€ข Injury by trips and falls โ€ขProvide spill kits โ€ขDeal with spills straight away โ€ขSpills should be thoroughly cleaned and dried.
  • 5. SAFETY RISK ASSESSMENTS for Airside Construction Doc Ref - SE-CTJ-01CW-MST-00417 Project - ABC Works By - ABC Ltd Date โ€“ 01/01/01 Page 5 of 6 Note - The Control Measures are used to reduce the Likelihood and thereby the Residual Risk A Hazard is the potential to cause harm. A Risk is the likelihood of harm taking place. Table Value Severity Value Likelihood Residual Risk - Ratings & Actions 10 Multiple Fatalities 10 Certain Risk valve is obtained by multiplying the likelihood value by the severity value. The severity value remained the same, without or with controls, it is the likelihood valve that the controls will reduce 8 Single Fatality or Permanent Disability 8 Very Likely 60 - 100 Intolerable Risk 6 Major Injury loss of time >3 days 6 Likely 32 - 48 Moderately Controlled Risk 4 Minor or Serious Injury 4 May Happen 12 - 24 Adequately Controlled Risk 2 Slight injury 2 Unlikely 0 - 8 Negligible Risk Aim of Risk Assessment - To find solutions that would eliminate, mitigate, or manage the risks to an acceptable level. Risk Assessment Matrix Severity Likelihood Certain Value =10 Very Likely Value = 8 Likely Value = 6 May Happen Value = 4 Unlikely Value = 2 Multiple Fatalities Value = 10 100 80 60 40 20 Single Fatality or Permanent Disability Value = 8 80 64 42 32 16 Major Injury loss of time >3 days Value = 6 60 49 36 24 12 Minor or Serious Injury Value = 4 40 32 24 16 8 Slight injury Value = 2 20 16 12 8 4 Green Amber Red No further action required The current residual risk requires a review of available options and action The current residual risk requires further action to reduce it.
  • 6. SAFETY RISK ASSESSMENTS for Airside Construction Doc Ref - SE-CTJ-01CW-MST-00417 Project - ABC Works By - ABC Ltd Date โ€“ 01/01/01 Page 6 of 6 Images