This document provides a summary of a presentation on the construction of Muscat Airport. It outlines various construction methods and sequences used including setting up temporary site facilities, installing sheet pile shafts for deep excavations, dewatering methods, constructing reinforced concrete structures, and post-tensioning of bridge decks. The presentation aims to engage stakeholders and share knowledge on the airport construction process.