WORKS START JANUARY 2015
Important traffic information
The first phase of the transformation of Paradise at the
heart of the city will begin in January 2015.
This important step will see the commencement of demolition
of existing buildings to clear the site for the new development,
together with work on new road layouts to improve connectivity
and access across the city for both road users and pedestrians.
WHAT’S HAPPENING AND WHEN?
From 5th January 2015 – Bus Diversions
Bus routes 82, 83, 87 and 89 will be diverted via
Newhall Street and Newhall Hill.
* From 10th January 2015 – Summer Row
Temporary Closures
Temporary restrictions to ALL vehicles between Lionel Street
and Great Charles Street. Diversion route will be in
place and signed.
Parking restrictions:
ALL parking on Summer Row will be suspended.
* From 17th January 2015 – Parade/Sand Pits Diversions
for traffic travelling out of the city
Outbound traffic: Parade/Sand Pits closed to ALL vehicles.
Diversion in place via Cambridge Street for vehicles
travelling out of the city.
Traffic into city open to all vehicles with reduced lanes.
* From 17th January 2015 – Broad Street/
Bridge Street/Holliday Street
Temporary overnight closures with diversions.
Broad Street lane restrictions into city from Bridge Street.
* From 31st January 2015 – Broad Street Restrictions
and Diversions for traffic into the city
Access on Broad Street restricted from Bridge Street to buses
and Hackney Carriages only for traffic into city.
Diversion routes will be in place and signed.
Significant disruption/delays should
be expected during the first phase of
works which will last for approximately
18 months.
It is strongly recommended that alternative
forms of transport should be used during
the Paradise works.
Use public transport wherever possible. Birmingham City
Centre is well served by rail, bus and Metro services – for more
information and journey planning advice please visit:
networkwestmidlands.com
Plan your journey. If you have to travel by car and your journey
would normally take you through the Paradise Circus area please
consider alternative routes as your journey may be disrupted and
you may face delays.
Car sharing. If you have to use your car for commuting, consider
setting up a car-share arrangement with colleagues.
Staggered working times. Traffic is heaviest during the morning
and evening peak periods. Consider earlier or later working hours to
avoid these periods.
Travel by foot/cycle. If your journey is relatively short, consider
walking or cycling.
Paradise is part of the Birmingham
Connected vision. Over the next 20 years
Birmingham City Council will reinvent the
way in which people and goods move
across the city.
FURTHER INFORMATION
We apologise for any inconvenience these necessary
works may cause and thank you for your
co-operation. If you would like any further information
or to see the latest news on the works, please visit:
birmingham.gov.uk/connected
Ongoing updates will be posted on this website
throughout the duration of the project.
Alternatively you can contact Carillion
regarding the construction works:
paradiseconstruction@carillionplc.com
* Should these dates change due to unforeseen
circumstances, updates will be posted on the
birmingham.gov.uk/connected and
paradisebirmingham.co.uk websites.
G
REAT
C
HA
RLES
STREETSUFFO
LK
STREET
Q
UEENSW
AY
CAMBRIDGE
STREET
BRIDGESTREET
BRO
AD
STREET
SHEEPCO
TE
STREET
ST
VINC
ENT
STREET
HOLLIDAY STREET
BROAD STREET
LIBRARY OF
BIRMINGHAM TOWN HALL
SUMMER ROW
ALPHA TOWER
BIRMINGHAM
MUSEUM AND
ART GALLERY
BIRMINGHAM
REPERTORY
THEATRE
ICC
BRINDLEYPLACE
BIRMINGHAM BMW
MAILBOX
BARCLAYCARD ARENA
LIO
NEL
STREET
FLEET
STR
EET
BRO
AD
STREET
PARADE/SANDPITS
PARADE / SAND PITS
G
EO
RG
E
STREET
NEW
HALL
STREET
TRAFFIC INTO CITY
Access on Broad Street
restricted from Bridge
Street to buses and
Hackney Carriages only.
TRAFFIC OUT OF CITY
Broad Street is open
to all vehicles.
ROAD DIVERSIONS
Site works
Diversion via Sheepcote St
Diversion via Cambridge St
Diversion via Holliday St
Diversion via Fleet St
Access restricted to buses
and Hackney Carriages
only for into city traffic
Closed to ALL vehicles
Temporary closures
to Summer Row
Existing traffic flow
Two way traffic on Broad Street
If travelling by car, try to avoid
the area completely or use
public transport as delays and
disruption are expected.
Details of alternative forms of
transport are available at:
networkwestmidlands.com
Pedestrian & cycle routes
will be maintained
throughout.
More detailed information will be issued in January 2015 and will be available at: birmingham.gov.uk/connected
SUMMERHILLSTREET
KING
EDW
ARDS
RO
AD

More Related Content

What's hot

MHD-Buses magazine March_16
MHD-Buses magazine March_16MHD-Buses magazine March_16
MHD-Buses magazine March_16
Roland Scull
 
Case Study - Tower Hamlets, external refubsihment to Bromley Road
Case Study - Tower Hamlets, external refubsihment to Bromley RoadCase Study - Tower Hamlets, external refubsihment to Bromley Road
Case Study - Tower Hamlets, external refubsihment to Bromley Road
Steve Mandry
 

What's hot (20)

Ham United Group presentation
Ham United Group presentationHam United Group presentation
Ham United Group presentation
 
Proposed additional car parking facility - south of Timber Bridge
Proposed additional car parking facility  - south of Timber BridgeProposed additional car parking facility  - south of Timber Bridge
Proposed additional car parking facility - south of Timber Bridge
 
Abp150416
Abp150416Abp150416
Abp150416
 
Hon. Guy Joseph's 2020/2021 Budget Presentation
Hon. Guy Joseph's 2020/2021 Budget PresentationHon. Guy Joseph's 2020/2021 Budget Presentation
Hon. Guy Joseph's 2020/2021 Budget Presentation
 
Documentation
DocumentationDocumentation
Documentation
 
Hon. Edmund Estephane's 2020/2021 Budget Presentation
Hon. Edmund Estephane's 2020/2021 Budget PresentationHon. Edmund Estephane's 2020/2021 Budget Presentation
Hon. Edmund Estephane's 2020/2021 Budget Presentation
 
MHD-Buses magazine March_16
MHD-Buses magazine March_16MHD-Buses magazine March_16
MHD-Buses magazine March_16
 
Case Study - Tower Hamlets, external refubsihment to Bromley Road
Case Study - Tower Hamlets, external refubsihment to Bromley RoadCase Study - Tower Hamlets, external refubsihment to Bromley Road
Case Study - Tower Hamlets, external refubsihment to Bromley Road
 
Models for Funding & Management, Functional Landscapes Seminar, Peter Neal
Models for Funding & Management, Functional Landscapes Seminar, Peter NealModels for Funding & Management, Functional Landscapes Seminar, Peter Neal
Models for Funding & Management, Functional Landscapes Seminar, Peter Neal
 
JAN 2010 Community Improvement Update
JAN 2010 Community Improvement UpdateJAN 2010 Community Improvement Update
JAN 2010 Community Improvement Update
 
Alexlapointemasccc2014
Alexlapointemasccc2014Alexlapointemasccc2014
Alexlapointemasccc2014
 
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
 
Oakwood Avenue Bump-outs (panels)
Oakwood Avenue Bump-outs (panels)Oakwood Avenue Bump-outs (panels)
Oakwood Avenue Bump-outs (panels)
 
Re presenting place-booklet
Re presenting place-bookletRe presenting place-booklet
Re presenting place-booklet
 
Cts tradeshow remarks
Cts tradeshow remarksCts tradeshow remarks
Cts tradeshow remarks
 
Turkey Creek Road and F&B Road Status
Turkey Creek Road and F&B Road StatusTurkey Creek Road and F&B Road Status
Turkey Creek Road and F&B Road Status
 
Banyan Boulevard Presentation
Banyan Boulevard PresentationBanyan Boulevard Presentation
Banyan Boulevard Presentation
 
Royal Pier Cruise Terminal (Southampton) - Terminal Outline Design report
Royal Pier Cruise Terminal (Southampton) - Terminal Outline Design reportRoyal Pier Cruise Terminal (Southampton) - Terminal Outline Design report
Royal Pier Cruise Terminal (Southampton) - Terminal Outline Design report
 
Visuals From RHVisuals
Visuals From RHVisualsVisuals From RHVisuals
Visuals From RHVisuals
 
The Valletta Waterfront Experience: Back to the Future
The Valletta Waterfront Experience: Back to the FutureThe Valletta Waterfront Experience: Back to the Future
The Valletta Waterfront Experience: Back to the Future
 

Viewers also liked (6)

AS PE Deviance
AS PE DevianceAS PE Deviance
AS PE Deviance
 
Introduction to Blogging - A Training Session for University Staff
Introduction to Blogging - A Training Session for University StaffIntroduction to Blogging - A Training Session for University Staff
Introduction to Blogging - A Training Session for University Staff
 
Introduction to Inbound Marketing
Introduction to Inbound MarketingIntroduction to Inbound Marketing
Introduction to Inbound Marketing
 
Introduction to blogging
Introduction to bloggingIntroduction to blogging
Introduction to blogging
 
An introduction to blogging
An introduction to bloggingAn introduction to blogging
An introduction to blogging
 
Blogging ppt
Blogging pptBlogging ppt
Blogging ppt
 

Similar to Important traffic information around Paradise Forum, Birmingham

1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
Candice Spiroski
 
Mini holland, impact on green lanes April 2014 - how Enfield Council's propos...
Mini holland, impact on green lanes April 2014 - how Enfield Council's propos...Mini holland, impact on green lanes April 2014 - how Enfield Council's propos...
Mini holland, impact on green lanes April 2014 - how Enfield Council's propos...
helenos
 
Traffic Solutions
Traffic SolutionsTraffic Solutions
Traffic Solutions
SHS Geog
 
Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019
Crosstown TO
 
Dufferin second-public-notice-june-27
Dufferin second-public-notice-june-27Dufferin second-public-notice-june-27
Dufferin second-public-notice-june-27
loyalj
 

Similar to Important traffic information around Paradise Forum, Birmingham (20)

1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
 
Mini holland, impact on green lanes April 2014 - how Enfield Council's propos...
Mini holland, impact on green lanes April 2014 - how Enfield Council's propos...Mini holland, impact on green lanes April 2014 - how Enfield Council's propos...
Mini holland, impact on green lanes April 2014 - how Enfield Council's propos...
 
Reclaiming the ring road, intro contexts, Graham Paul Smith
Reclaiming the ring road, intro contexts, Graham Paul SmithReclaiming the ring road, intro contexts, Graham Paul Smith
Reclaiming the ring road, intro contexts, Graham Paul Smith
 
Traffic Solutions
Traffic SolutionsTraffic Solutions
Traffic Solutions
 
Emergency Transport Plan, Moseley ward forum
Emergency Transport Plan, Moseley ward forumEmergency Transport Plan, Moseley ward forum
Emergency Transport Plan, Moseley ward forum
 
Beaches to Bay
Beaches to Bay Beaches to Bay
Beaches to Bay
 
Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019
 
GW-Codman-all
GW-Codman-allGW-Codman-all
GW-Codman-all
 
Dufferin second-public-notice-june-27
Dufferin second-public-notice-june-27Dufferin second-public-notice-june-27
Dufferin second-public-notice-june-27
 
Рикардо Марини - Какой город хотите вы
Рикардо Марини - Какой город хотите выРикардо Марини - Какой город хотите вы
Рикардо Марини - Какой город хотите вы
 
Heart Streatham Issue 40
Heart Streatham Issue 40Heart Streatham Issue 40
Heart Streatham Issue 40
 
ATS-16: Connecting the Dots: Trails and Transportation, Buff Brown
ATS-16: Connecting the Dots: Trails and Transportation, Buff BrownATS-16: Connecting the Dots: Trails and Transportation, Buff Brown
ATS-16: Connecting the Dots: Trails and Transportation, Buff Brown
 
Oxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm Strategy
 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
 
VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
Gt create presentation
Gt create presentationGt create presentation
Gt create presentation
 
Capital Works Project Bulletin: Windsor Siding
Capital Works Project Bulletin: Windsor SidingCapital Works Project Bulletin: Windsor Siding
Capital Works Project Bulletin: Windsor Siding
 
Denver union station
Denver union stationDenver union station
Denver union station
 
April 9 VTA Mountain View Open House project display boards
April 9 VTA Mountain View Open House project display boardsApril 9 VTA Mountain View Open House project display boards
April 9 VTA Mountain View Open House project display boards
 

Recently uploaded

sample sample sample sample sample sample
sample sample sample sample sample samplesample sample sample sample sample sample
sample sample sample sample sample sample
Casey Keith
 
sample sample sample sample sample sample
sample sample sample sample sample samplesample sample sample sample sample sample
sample sample sample sample sample sample
Casey Keith
 
Visa Consultant in Lahore || 📞03094429236
Visa Consultant in Lahore || 📞03094429236Visa Consultant in Lahore || 📞03094429236
Visa Consultant in Lahore || 📞03094429236
Sherazi Tours
 
CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...
CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...
CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...
Abortion pills in Riyadh +966572737505 get cytotec
 

Recently uploaded (20)

Hire 💕 8617697112 Champawat Call Girls Service Call Girls Agency
Hire 💕 8617697112 Champawat Call Girls Service Call Girls AgencyHire 💕 8617697112 Champawat Call Girls Service Call Girls Agency
Hire 💕 8617697112 Champawat Call Girls Service Call Girls Agency
 
Genuine 9332606886 Hot and Beautiful 💕 Pune Escorts call Girls
Genuine 9332606886 Hot and Beautiful 💕 Pune Escorts call GirlsGenuine 9332606886 Hot and Beautiful 💕 Pune Escorts call Girls
Genuine 9332606886 Hot and Beautiful 💕 Pune Escorts call Girls
 
2k Shots ≽ 9205541914 ≼ Call Girls In Tagore Garden (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Tagore Garden (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Tagore Garden (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Tagore Garden (Delhi)
 
sample sample sample sample sample sample
sample sample sample sample sample samplesample sample sample sample sample sample
sample sample sample sample sample sample
 
Night 7k to 12k Lahaul and Spiti Call Girls 👉👉 8617697112⭐⭐ 100% Genuine Esco...
Night 7k to 12k Lahaul and Spiti Call Girls 👉👉 8617697112⭐⭐ 100% Genuine Esco...Night 7k to 12k Lahaul and Spiti Call Girls 👉👉 8617697112⭐⭐ 100% Genuine Esco...
Night 7k to 12k Lahaul and Spiti Call Girls 👉👉 8617697112⭐⭐ 100% Genuine Esco...
 
Papi kondalu Call Girls 8250077686 Service Offer VIP Hot Model
Papi kondalu Call Girls 8250077686 Service Offer VIP Hot ModelPapi kondalu Call Girls 8250077686 Service Offer VIP Hot Model
Papi kondalu Call Girls 8250077686 Service Offer VIP Hot Model
 
Genuine 8250077686 Hot and Beautiful 💕 Bhavnagar Escorts call Girls
Genuine 8250077686 Hot and Beautiful 💕 Bhavnagar Escorts call GirlsGenuine 8250077686 Hot and Beautiful 💕 Bhavnagar Escorts call Girls
Genuine 8250077686 Hot and Beautiful 💕 Bhavnagar Escorts call Girls
 
WhatsApp Chat: 📞 8617697112 Independent Call Girls in Darjeeling
WhatsApp Chat: 📞 8617697112 Independent Call Girls in DarjeelingWhatsApp Chat: 📞 8617697112 Independent Call Girls in Darjeeling
WhatsApp Chat: 📞 8617697112 Independent Call Girls in Darjeeling
 
Kolkata Call Girls - 📞 8617697112 🔝 Top Class Call Girls Service Available
Kolkata Call Girls - 📞 8617697112 🔝 Top Class Call Girls Service AvailableKolkata Call Girls - 📞 8617697112 🔝 Top Class Call Girls Service Available
Kolkata Call Girls - 📞 8617697112 🔝 Top Class Call Girls Service Available
 
Genesis 1:6 || Meditate the Scripture daily verse by verse
Genesis 1:6  ||  Meditate the Scripture daily verse by verseGenesis 1:6  ||  Meditate the Scripture daily verse by verse
Genesis 1:6 || Meditate the Scripture daily verse by verse
 
Genuine 9332606886 Hot and Beautiful 💕 Bilaspur Escorts call Girls
Genuine 9332606886 Hot and Beautiful 💕 Bilaspur Escorts call GirlsGenuine 9332606886 Hot and Beautiful 💕 Bilaspur Escorts call Girls
Genuine 9332606886 Hot and Beautiful 💕 Bilaspur Escorts call Girls
 
sample sample sample sample sample sample
sample sample sample sample sample samplesample sample sample sample sample sample
sample sample sample sample sample sample
 
Kanpur Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Kanpur Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceKanpur Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Kanpur Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Hire 💕 8617697112 Chamba Call Girls Service Call Girls Agency
Hire 💕 8617697112 Chamba Call Girls Service Call Girls AgencyHire 💕 8617697112 Chamba Call Girls Service Call Girls Agency
Hire 💕 8617697112 Chamba Call Girls Service Call Girls Agency
 
Ooty Call Girls 8250077686 Service Offer VIP Hot Model
Ooty Call Girls 8250077686 Service Offer VIP Hot ModelOoty Call Girls 8250077686 Service Offer VIP Hot Model
Ooty Call Girls 8250077686 Service Offer VIP Hot Model
 
Jhargram call girls 📞 8617697112 At Low Cost Cash Payment Booking
Jhargram call girls 📞 8617697112 At Low Cost Cash Payment BookingJhargram call girls 📞 8617697112 At Low Cost Cash Payment Booking
Jhargram call girls 📞 8617697112 At Low Cost Cash Payment Booking
 
Visa Consultant in Lahore || 📞03094429236
Visa Consultant in Lahore || 📞03094429236Visa Consultant in Lahore || 📞03094429236
Visa Consultant in Lahore || 📞03094429236
 
WhatsApp Chat: 📞 8617697112 Hire Call Girls Cooch Behar For a Sensual Sex Exp...
WhatsApp Chat: 📞 8617697112 Hire Call Girls Cooch Behar For a Sensual Sex Exp...WhatsApp Chat: 📞 8617697112 Hire Call Girls Cooch Behar For a Sensual Sex Exp...
WhatsApp Chat: 📞 8617697112 Hire Call Girls Cooch Behar For a Sensual Sex Exp...
 
CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...
CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...
CYTOTEC DUBAI ☎️ +966572737505 } Abortion pills in Abu dhabi,get misoprostal ...
 
Night 7k to 12k Daman Call Girls 👉👉 8617697112⭐⭐ 100% Genuine Escort Service ...
Night 7k to 12k Daman Call Girls 👉👉 8617697112⭐⭐ 100% Genuine Escort Service ...Night 7k to 12k Daman Call Girls 👉👉 8617697112⭐⭐ 100% Genuine Escort Service ...
Night 7k to 12k Daman Call Girls 👉👉 8617697112⭐⭐ 100% Genuine Escort Service ...
 

Important traffic information around Paradise Forum, Birmingham

  • 1. WORKS START JANUARY 2015 Important traffic information The first phase of the transformation of Paradise at the heart of the city will begin in January 2015. This important step will see the commencement of demolition of existing buildings to clear the site for the new development, together with work on new road layouts to improve connectivity and access across the city for both road users and pedestrians. WHAT’S HAPPENING AND WHEN? From 5th January 2015 – Bus Diversions Bus routes 82, 83, 87 and 89 will be diverted via Newhall Street and Newhall Hill. * From 10th January 2015 – Summer Row Temporary Closures Temporary restrictions to ALL vehicles between Lionel Street and Great Charles Street. Diversion route will be in place and signed. Parking restrictions: ALL parking on Summer Row will be suspended. * From 17th January 2015 – Parade/Sand Pits Diversions for traffic travelling out of the city Outbound traffic: Parade/Sand Pits closed to ALL vehicles. Diversion in place via Cambridge Street for vehicles travelling out of the city. Traffic into city open to all vehicles with reduced lanes. * From 17th January 2015 – Broad Street/ Bridge Street/Holliday Street Temporary overnight closures with diversions. Broad Street lane restrictions into city from Bridge Street. * From 31st January 2015 – Broad Street Restrictions and Diversions for traffic into the city Access on Broad Street restricted from Bridge Street to buses and Hackney Carriages only for traffic into city. Diversion routes will be in place and signed. Significant disruption/delays should be expected during the first phase of works which will last for approximately 18 months. It is strongly recommended that alternative forms of transport should be used during the Paradise works. Use public transport wherever possible. Birmingham City Centre is well served by rail, bus and Metro services – for more information and journey planning advice please visit: networkwestmidlands.com Plan your journey. If you have to travel by car and your journey would normally take you through the Paradise Circus area please consider alternative routes as your journey may be disrupted and you may face delays. Car sharing. If you have to use your car for commuting, consider setting up a car-share arrangement with colleagues. Staggered working times. Traffic is heaviest during the morning and evening peak periods. Consider earlier or later working hours to avoid these periods. Travel by foot/cycle. If your journey is relatively short, consider walking or cycling. Paradise is part of the Birmingham Connected vision. Over the next 20 years Birmingham City Council will reinvent the way in which people and goods move across the city. FURTHER INFORMATION We apologise for any inconvenience these necessary works may cause and thank you for your co-operation. If you would like any further information or to see the latest news on the works, please visit: birmingham.gov.uk/connected Ongoing updates will be posted on this website throughout the duration of the project. Alternatively you can contact Carillion regarding the construction works: paradiseconstruction@carillionplc.com * Should these dates change due to unforeseen circumstances, updates will be posted on the birmingham.gov.uk/connected and paradisebirmingham.co.uk websites.
  • 2. G REAT C HA RLES STREETSUFFO LK STREET Q UEENSW AY CAMBRIDGE STREET BRIDGESTREET BRO AD STREET SHEEPCO TE STREET ST VINC ENT STREET HOLLIDAY STREET BROAD STREET LIBRARY OF BIRMINGHAM TOWN HALL SUMMER ROW ALPHA TOWER BIRMINGHAM MUSEUM AND ART GALLERY BIRMINGHAM REPERTORY THEATRE ICC BRINDLEYPLACE BIRMINGHAM BMW MAILBOX BARCLAYCARD ARENA LIO NEL STREET FLEET STR EET BRO AD STREET PARADE/SANDPITS PARADE / SAND PITS G EO RG E STREET NEW HALL STREET TRAFFIC INTO CITY Access on Broad Street restricted from Bridge Street to buses and Hackney Carriages only. TRAFFIC OUT OF CITY Broad Street is open to all vehicles. ROAD DIVERSIONS Site works Diversion via Sheepcote St Diversion via Cambridge St Diversion via Holliday St Diversion via Fleet St Access restricted to buses and Hackney Carriages only for into city traffic Closed to ALL vehicles Temporary closures to Summer Row Existing traffic flow Two way traffic on Broad Street If travelling by car, try to avoid the area completely or use public transport as delays and disruption are expected. Details of alternative forms of transport are available at: networkwestmidlands.com Pedestrian & cycle routes will be maintained throughout. More detailed information will be issued in January 2015 and will be available at: birmingham.gov.uk/connected SUMMERHILLSTREET KING EDW ARDS RO AD