Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Zak Valiff - Causeway Road and Semaphore Road Shared Use Paths

20 views

Published on

Presented at AITPM SA Back to Basics event, October 2018

Published in: Education
  • Be the first to comment

  • Be the first to like this

Zak Valiff - Causeway Road and Semaphore Road Shared Use Paths

  1. 1. www.cityofpae.sa.gov.auFollow us on @CityofPAE Causeway Rd and Semaphore Rd Shared Use Paths Presented by Zak Valiff City of Port Adelaide Enfield 19 October 2018 Closing the Missing Link – The Port Hike and Bike Loop Path
  2. 2. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link – The Port Hike and Bike Loop Path AGENDA • Council’s Strategic Bicycle Plan 2015-2020 • The Port CBD Cycling Network • The Port Hike and Bike Loop Path • ‘The Missing Link’ • Cedar Woods Development • Semaphore Rd Shared Path – Concept Design • Causeway Rd Shared Path – Concept Design • Video
  3. 3. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link – The Port Hike and Bike Loop Path Strategic Bike Plan 2015-2020 • In 2013 we applied for State Bike Funding from DPTI • Developed the Bike Plan in 2014/15 • InfraPlan • Port BUG • City of PAE
  4. 4. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link – The Port Hike and Bike Loop Path Port CBD Cycling Network • Short-Medium term actions • ‘The Missing Link’ • Causeway Rd Shared Use Path • Semaphore Rd Shared Use Path • Identified as a Medium-High Priority • Port Hike & Bike Loop Path – Inner Harbour
  5. 5. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link – The Port Hike and Bike Loop Path Cedar Woods Development • $160 million development • 500 new homes • City of PAE want a minimum 17.5m ‘vista’ to be able to see Hart’s Mill from Semaphore Rd • At State Commission Assessment Panel (SCAP) • Early construction works to begin before the end of the year
  6. 6. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link – The Port Hike and Bike Loop Path Cedar Woods Development
  7. 7. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link – The Port Hike and Bike Loop Path Semaphore Road • Install a 3m wide concrete path • Relocation of bus stop 110m west • Widen and realign refuge in Semaphore Rd median • Widen refuges in islands Fletcher Rd • Provide ‘cut-through’ to Heath St
  8. 8. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link – The Port Hike and Bike Loop Path Causeway Road • Construct a 2.5m - 3m wide path to match existing path on Semaphore Rd • DDA compliant ramps and DPTI standard handrails to match path widths • Relocate road train route sign behind post and rail fence Heavy Vehicle Route Sign
  9. 9. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link – The Port Hike and Bike Loop Path Causeway Road • Construct a new refuge at Hart St – Ban right turn movements into Hart St from Causeway Rd • Install new light pole for the proposed refuge • Maintain minimum lane widths of 5m at refuge location Hart St & Causeway Rd
  10. 10. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link – The Port Hike and Bike Loop Path Causeway Road • Renewal of the existing non-standard shared path • Install 3m-3.5m wide bitumen and paved paths • Extend carpark into old bus turnaround. Old Bus Turnaround at Ethelton Station
  11. 11. www.cityofpae.sa.gov.auFollow us on @CityofPAE Closing the Missing Link – The Port Hike and Bike Loop Path Video:

×