SlideShare a Scribd company logo
1 of 3
Domhnaill O Doherty
BSc (Hons) QuantitySurveying
SeniorQuantitySurveyor
www.driver-group.com Page 1 of 3
Key Facts
 Over 8yrs industry experience working for Cost Consultants
in Ireland and Middle East.
 Over 2yrs Experience in commercial management in Civil &
Residential works in Ireland.
 Over 6yrs Experience in civil and infrastructure & Residential
works in Oman.
 FIDIC, Oman standard conditions of contract 3rd
& 4th
 Degree Qualified in Quantity Surveying.
 A specialist in Quantity Surveying services.
 Candidate Member of RICS.
Summary
Domhnaill has over 8 years’ experience working in the Construction Industry
in Ireland and the Middle East. Domhnaill has experience working in both pre
and post quantity surveying services in many different forms of Contract. He
has spent time working for Main Contractors and Consultancies as a result
he has gained a wealth of Commercial and Contract experience in both
building and Civil Engineering projects. Domhnaill has worked as a lead
Quantity Surveyor on projects with contract values in an excess of RO 104
million.
Domhnaill has attained a BSc in Quantity Surveying, BSc (Hons) in Quantity
Surveying (Edinburgh Napier University) and was awarded a Building
Software Services certificate. Domhnaill is currently a candidate member for
RICS in the Middle East and is committed to his professional development
and this is demonstrated in his accomplishments to date.
He has exceptional negotiation and communicating skills which builds strong
working relationships with Clients and colleagues.
Qualification
BSc Quantity Surveying
BSc (Hons) Quantity Surveying
Memberships and
Associations
Candidate member of the Royal
Institute of Chartered Surveyors
(RICS)
Sector Experience
Mixed Use Development
Residential
Civil and Infrastructure
Claims (Narrative)
Geographic Experience
Middle East.
Ireland
Core Skills and Services
QS Project management
Contractual evaluations
Post contract services
Procurement
Claims preparation and defence
Domhnaill O Doherty
BSc (Hons) QuantitySurveying
SeniorQuantitySurveyor
www.driver-group.com Page 2 of 3
Sector Experience
Buildings
His buildings experience briefly comprises:
 OMR 6 million Rials- Duqm, Oman, in which he was a Senior Quantity Surveyor on a Lump sum Contract
for a Park Inn Hotel. He was responsible for the evaluating and agreeing of Variations submitted by the
Contractor.
 OMR 9 million Omani Rials– Ireland, in which he was the Project Quantity Surveyor on a design and build
project of a mixed development and a Residential block. He was responsible for procurement and
appointment of all sub-contractors, produced elemental bill of quantities for each trade, submitted and
agreed monthly valuations, submitted and agreed variations.
Infrastructure
His infrastructure experience briefly comprises:
 OMR 28 million Omani Rials, Dualisation of Jabrin – Ibri Section 2, Oman in which he is the senior Quantity
Surveyor responsible for the retendering of the Works, cost checking, End Cost Predictions, Interim
Payment Preparation, Valuation Compilation, Project Management Reporting and provisional of Contractual
advise.
 OMR 36 million Omani Rials, Dualisation of Jabrin – Ibri Section 1, Oman in which he is the senior Quantity
Surveyor responsible for cost checking, end Cost Predictions, Interim Payment Preparation and
recommendation, Valuation Compilation, Project Management Reporting and provisional of Contractual
advise.
 OMR 40 million Omani Rials, Dualisation of Jabrin – Ibri Section 2, Oman in which he was the senior
Quantity Surveyor responsible for cost checking, Change Management, End Cost Predictions, Interim
Payment Preparation, Valuation Compilation, Project Management Reporting and provisional of Contractual
advise which included advising the Client on termination procedures for the Main Contractor responsible
for the project. Domhnaill was also involved in drafting, on behalf of the Engineer, responses to the
Contractor’s requests for a number Engineers decisions.
 OMR 19 million Omani Rials – Wadi Bani Kharus Asphalt Road, Oman in which he was the Quantity
Surveyor responsible for cost checking, Change Management, End Cost Predictions, Valuation Compilation,
Project Management Reporting, provisional of contractual advise and settlement of the final account.
 OMR 81 million Omani Rials – N6 between Kinnegad and Athlone , Ireland in which he was the Quantity
Surveyor responsible for cost checking, Change Management, End Cost Predictions, Valuation Compilation,
Project Management Reporting and provisional of Contractual advise.
Domhnaill O Doherty
BSc (Hons) QuantitySurveying
SeniorQuantitySurveyor
www.driver-group.com Page 3 of 3
Core Skills and Competencies
Commercial and Contracts
Extensive experience in a full range of quantity surveying services to both private and public sector Clients which
include:
• Preliminary / Budget Estimates
• Detailed Cost Plans
• Tendering Procedures
• Value Management
• Preparation of Bills of Quantities
• Contract Selection / Advice
• Change Control
• Interim Valuations
• Settlement of Final Accounts
• Procurement Strategies
• International Contracts
Dispute Resolution
An extension of time and application of cost claim representing the Contractor for the Oman Convention Centre in
which Domhnaill worked to develop the claim document. His section of works was large ly focused on the
chronology / narrative of delay events No.9 and No. 25.
Domhnaill has assisted in the preparation of an independent report on behalf of the Contractor for the
Construction of Paved Road in Wilayat Madha (Governorate of Musandam). Domhnaill evaluated the extra over
cost associated with the failure of being able to dispose surplus material off site, between May 2013 and January
2016.
Domhnaill had key involvement in the process of terminating the main Contractor on Jabrin – Ibri section 1 where
he was involved in liaising and coordinating with the Client in the termination process. Also, Domhnaill was
involved in drafting responses, on behalf of the Engineer, for a number of engineer decisions requested by the
Contractor.

More Related Content

What's hot

Presentation eci dr moustafa ismail 20 july 2020
Presentation eci dr moustafa ismail 20 july 2020Presentation eci dr moustafa ismail 20 july 2020
Presentation eci dr moustafa ismail 20 july 2020Moustafa Ismail Abu Dief
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts finalFitBlar Mit
 
ICI Project 2 - Building and process & sample document
ICI Project 2 - Building and process & sample documentICI Project 2 - Building and process & sample document
ICI Project 2 - Building and process & sample documentHaziq1511
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selectionanojan kanagarathnam
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Processarpantripathi2
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tenderingvvsasane
 
1.Paul Martin CV 13_04_16
1.Paul Martin CV 13_04_161.Paul Martin CV 13_04_16
1.Paul Martin CV 13_04_16Paul Martin
 
MEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATIONMEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATIONFarah Sham
 
Tendering Document for the Procurement of Works
Tendering Document for the Procurement of WorksTendering Document for the Procurement of Works
Tendering Document for the Procurement of WorksMohammad Alimuzzaman Bappy
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variationVj NiroSh
 
Tendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessTendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessPrateek Kashyap
 
Tenders in professional practice
Tenders in professional practiceTenders in professional practice
Tenders in professional practiceAditya Sanyal
 

What's hot (20)

Fidic Form of Contract.
Fidic Form of Contract.Fidic Form of Contract.
Fidic Form of Contract.
 
Tendering-professional practices-jamia millia islamia
Tendering-professional practices-jamia millia islamiaTendering-professional practices-jamia millia islamia
Tendering-professional practices-jamia millia islamia
 
Presentation eci dr moustafa ismail 20 july 2020
Presentation eci dr moustafa ismail 20 july 2020Presentation eci dr moustafa ismail 20 july 2020
Presentation eci dr moustafa ismail 20 july 2020
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts final
 
Ehab A-Azeem C V
Ehab A-Azeem C VEhab A-Azeem C V
Ehab A-Azeem C V
 
ICI Project 2 - Building and process & sample document
ICI Project 2 - Building and process & sample documentICI Project 2 - Building and process & sample document
ICI Project 2 - Building and process & sample document
 
Nit55
Nit55Nit55
Nit55
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Process
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tendering
 
Design liability
Design liabilityDesign liability
Design liability
 
Zuher Mirza CV
Zuher Mirza CVZuher Mirza CV
Zuher Mirza CV
 
1.Paul Martin CV 13_04_16
1.Paul Martin CV 13_04_161.Paul Martin CV 13_04_16
1.Paul Martin CV 13_04_16
 
MEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATIONMEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATION
 
Formation
FormationFormation
Formation
 
Tendering Document for the Procurement of Works
Tendering Document for the Procurement of WorksTendering Document for the Procurement of Works
Tendering Document for the Procurement of Works
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
 
Tendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessTendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award Process
 
Tenders in professional practice
Tenders in professional practiceTenders in professional practice
Tenders in professional practice
 
Questions in notes
Questions in notesQuestions in notes
Questions in notes
 

Viewers also liked

Keynote presentation OOFHEC2016: Anders flodström
Keynote presentation OOFHEC2016: Anders flodströmKeynote presentation OOFHEC2016: Anders flodström
Keynote presentation OOFHEC2016: Anders flodströmEADTU
 
Materi tik kls ix smt 1 ppt bab 1&2 x1
Materi tik kls ix smt 1 ppt bab 1&2 x1Materi tik kls ix smt 1 ppt bab 1&2 x1
Materi tik kls ix smt 1 ppt bab 1&2 x1RafiHatta
 
Collective Leadership Webinar for the Society for Nonprofits
Collective Leadership Webinar for the Society for NonprofitsCollective Leadership Webinar for the Society for Nonprofits
Collective Leadership Webinar for the Society for NonprofitsCassandra O'Neill
 
Governabilidade e economia ameaçadas no brasil
Governabilidade e economia ameaçadas no brasilGovernabilidade e economia ameaçadas no brasil
Governabilidade e economia ameaçadas no brasilFernando Alcoforado
 
Clase n°3 metodologia de proyectos
Clase n°3 metodologia de proyectosClase n°3 metodologia de proyectos
Clase n°3 metodologia de proyectoshistoriahaa
 
Cloud_Network_Whitepaper_1123_LowRes
Cloud_Network_Whitepaper_1123_LowResCloud_Network_Whitepaper_1123_LowRes
Cloud_Network_Whitepaper_1123_LowResDarren Szukalski
 
Proxy SIP en Entornos PBX
Proxy SIP en Entornos PBXProxy SIP en Entornos PBX
Proxy SIP en Entornos PBXJon Bonilla
 
Anorexia y bulimia
Anorexia y bulimiaAnorexia y bulimia
Anorexia y bulimiadanii1297
 
Las 7 maravillas del mundo
Las 7 maravillas del mundoLas 7 maravillas del mundo
Las 7 maravillas del mundoSarai Diaz
 
DesignOfAnExtensibleTelemetry&CommandArcitectureForSmallSatellites
DesignOfAnExtensibleTelemetry&CommandArcitectureForSmallSatellitesDesignOfAnExtensibleTelemetry&CommandArcitectureForSmallSatellites
DesignOfAnExtensibleTelemetry&CommandArcitectureForSmallSatellitesBrenden Hogan
 
Higiene para Ensino findamental I
Higiene para Ensino findamental IHigiene para Ensino findamental I
Higiene para Ensino findamental Iprofefflavio
 
Programación dace 2016 2017 portada
Programación dace 2016 2017 portadaProgramación dace 2016 2017 portada
Programación dace 2016 2017 portadaIes Salvador Sandoval
 
Discriminación por motivos de Género. Clase 1
Discriminación por motivos de Género. Clase 1Discriminación por motivos de Género. Clase 1
Discriminación por motivos de Género. Clase 1INADI
 

Viewers also liked (20)

Keynote presentation OOFHEC2016: Anders flodström
Keynote presentation OOFHEC2016: Anders flodströmKeynote presentation OOFHEC2016: Anders flodström
Keynote presentation OOFHEC2016: Anders flodström
 
Brazil Talent Report
Brazil Talent ReportBrazil Talent Report
Brazil Talent Report
 
Materi tik kls ix smt 1 ppt bab 1&2 x1
Materi tik kls ix smt 1 ppt bab 1&2 x1Materi tik kls ix smt 1 ppt bab 1&2 x1
Materi tik kls ix smt 1 ppt bab 1&2 x1
 
Collective Leadership Webinar for the Society for Nonprofits
Collective Leadership Webinar for the Society for NonprofitsCollective Leadership Webinar for the Society for Nonprofits
Collective Leadership Webinar for the Society for Nonprofits
 
CERTIFICATES
CERTIFICATESCERTIFICATES
CERTIFICATES
 
Governabilidade e economia ameaçadas no brasil
Governabilidade e economia ameaçadas no brasilGovernabilidade e economia ameaçadas no brasil
Governabilidade e economia ameaçadas no brasil
 
Clase n°3 metodologia de proyectos
Clase n°3 metodologia de proyectosClase n°3 metodologia de proyectos
Clase n°3 metodologia de proyectos
 
Caroline Millar CV 2016
Caroline Millar CV 2016Caroline Millar CV 2016
Caroline Millar CV 2016
 
Cloud_Network_Whitepaper_1123_LowRes
Cloud_Network_Whitepaper_1123_LowResCloud_Network_Whitepaper_1123_LowRes
Cloud_Network_Whitepaper_1123_LowRes
 
Proxy SIP en Entornos PBX
Proxy SIP en Entornos PBXProxy SIP en Entornos PBX
Proxy SIP en Entornos PBX
 
Como usar o painel do site da Luve
Como usar o painel do site da LuveComo usar o painel do site da Luve
Como usar o painel do site da Luve
 
Anorexia y bulimia
Anorexia y bulimiaAnorexia y bulimia
Anorexia y bulimia
 
Las 7 maravillas del mundo
Las 7 maravillas del mundoLas 7 maravillas del mundo
Las 7 maravillas del mundo
 
Redes informaticas
Redes informaticasRedes informaticas
Redes informaticas
 
DesignOfAnExtensibleTelemetry&CommandArcitectureForSmallSatellites
DesignOfAnExtensibleTelemetry&CommandArcitectureForSmallSatellitesDesignOfAnExtensibleTelemetry&CommandArcitectureForSmallSatellites
DesignOfAnExtensibleTelemetry&CommandArcitectureForSmallSatellites
 
Kabbalah presentación
Kabbalah presentaciónKabbalah presentación
Kabbalah presentación
 
Higiene para Ensino findamental I
Higiene para Ensino findamental IHigiene para Ensino findamental I
Higiene para Ensino findamental I
 
Programación dace 2016 2017 portada
Programación dace 2016 2017 portadaProgramación dace 2016 2017 portada
Programación dace 2016 2017 portada
 
Discriminación por motivos de Género. Clase 1
Discriminación por motivos de Género. Clase 1Discriminación por motivos de Género. Clase 1
Discriminación por motivos de Género. Clase 1
 
INTERNET
INTERNETINTERNET
INTERNET
 

Similar to DomhnaillODoherty2016

DavidBarryCVSeptember2016
DavidBarryCVSeptember2016DavidBarryCVSeptember2016
DavidBarryCVSeptember2016David Barry
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox
 
Richard D Brown CV Jan 16
Richard D Brown CV Jan 16Richard D Brown CV Jan 16
Richard D Brown CV Jan 16Richard Brown
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al Kurdi
 
Cooney_Conor_FM CV_2 pg_Sept 2016
Cooney_Conor_FM CV_2 pg_Sept 2016Cooney_Conor_FM CV_2 pg_Sept 2016
Cooney_Conor_FM CV_2 pg_Sept 2016Conor Cooney
 
CV Senior Quantity Surveyor(CIVIL)
CV Senior Quantity Surveyor(CIVIL)CV Senior Quantity Surveyor(CIVIL)
CV Senior Quantity Surveyor(CIVIL)Naeem Altaf Chughtai
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox
 
CURRICULUM VITAE 12.03.16
CURRICULUM VITAE  12.03.16CURRICULUM VITAE  12.03.16
CURRICULUM VITAE 12.03.16Stephen Baird
 
Ehab Sarhan-Snr Cost Engineer-QS 032016
Ehab Sarhan-Snr Cost Engineer-QS 032016Ehab Sarhan-Snr Cost Engineer-QS 032016
Ehab Sarhan-Snr Cost Engineer-QS 032016Ehab Sarhan
 
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande
 
asif resume July 2016.
asif resume July 2016.asif resume July 2016.
asif resume July 2016.Asif Shariff
 

Similar to DomhnaillODoherty2016 (20)

DavidBarryCVSeptember2016
DavidBarryCVSeptember2016DavidBarryCVSeptember2016
DavidBarryCVSeptember2016
 
S.Shrikanth - CV
S.Shrikanth - CVS.Shrikanth - CV
S.Shrikanth - CV
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - Resume
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - Resume
 
Richard D Brown CV Jan 16
Richard D Brown CV Jan 16Richard D Brown CV Jan 16
Richard D Brown CV Jan 16
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016
 
Cooney_Conor_FM CV_2 pg_Sept 2016
Cooney_Conor_FM CV_2 pg_Sept 2016Cooney_Conor_FM CV_2 pg_Sept 2016
Cooney_Conor_FM CV_2 pg_Sept 2016
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
CV_Charwin Caban
CV_Charwin CabanCV_Charwin Caban
CV_Charwin Caban
 
CV Senior Quantity Surveyor(CIVIL)
CV Senior Quantity Surveyor(CIVIL)CV Senior Quantity Surveyor(CIVIL)
CV Senior Quantity Surveyor(CIVIL)
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - Resume
 
Updated aded cv 4-12-2017
Updated aded cv 4-12-2017Updated aded cv 4-12-2017
Updated aded cv 4-12-2017
 
CURRICULUM VITAE 12.03.16
CURRICULUM VITAE  12.03.16CURRICULUM VITAE  12.03.16
CURRICULUM VITAE 12.03.16
 
Moph 7 5-13 (sa path)
Moph   7 5-13 (sa path)Moph   7 5-13 (sa path)
Moph 7 5-13 (sa path)
 
Moph 7 5-13 (sa path)
Moph   7 5-13 (sa path)Moph   7 5-13 (sa path)
Moph 7 5-13 (sa path)
 
Arunkumar_Proc & Contr_25.12.2014
Arunkumar_Proc & Contr_25.12.2014Arunkumar_Proc & Contr_25.12.2014
Arunkumar_Proc & Contr_25.12.2014
 
Ehab Sarhan-Snr Cost Engineer-QS 032016
Ehab Sarhan-Snr Cost Engineer-QS 032016Ehab Sarhan-Snr Cost Engineer-QS 032016
Ehab Sarhan-Snr Cost Engineer-QS 032016
 
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts Administrator
 
WALTER STEPHEN WALTER
WALTER STEPHEN WALTERWALTER STEPHEN WALTER
WALTER STEPHEN WALTER
 
asif resume July 2016.
asif resume July 2016.asif resume July 2016.
asif resume July 2016.
 

DomhnaillODoherty2016

  • 1. Domhnaill O Doherty BSc (Hons) QuantitySurveying SeniorQuantitySurveyor www.driver-group.com Page 1 of 3 Key Facts  Over 8yrs industry experience working for Cost Consultants in Ireland and Middle East.  Over 2yrs Experience in commercial management in Civil & Residential works in Ireland.  Over 6yrs Experience in civil and infrastructure & Residential works in Oman.  FIDIC, Oman standard conditions of contract 3rd & 4th  Degree Qualified in Quantity Surveying.  A specialist in Quantity Surveying services.  Candidate Member of RICS. Summary Domhnaill has over 8 years’ experience working in the Construction Industry in Ireland and the Middle East. Domhnaill has experience working in both pre and post quantity surveying services in many different forms of Contract. He has spent time working for Main Contractors and Consultancies as a result he has gained a wealth of Commercial and Contract experience in both building and Civil Engineering projects. Domhnaill has worked as a lead Quantity Surveyor on projects with contract values in an excess of RO 104 million. Domhnaill has attained a BSc in Quantity Surveying, BSc (Hons) in Quantity Surveying (Edinburgh Napier University) and was awarded a Building Software Services certificate. Domhnaill is currently a candidate member for RICS in the Middle East and is committed to his professional development and this is demonstrated in his accomplishments to date. He has exceptional negotiation and communicating skills which builds strong working relationships with Clients and colleagues. Qualification BSc Quantity Surveying BSc (Hons) Quantity Surveying Memberships and Associations Candidate member of the Royal Institute of Chartered Surveyors (RICS) Sector Experience Mixed Use Development Residential Civil and Infrastructure Claims (Narrative) Geographic Experience Middle East. Ireland Core Skills and Services QS Project management Contractual evaluations Post contract services Procurement Claims preparation and defence
  • 2. Domhnaill O Doherty BSc (Hons) QuantitySurveying SeniorQuantitySurveyor www.driver-group.com Page 2 of 3 Sector Experience Buildings His buildings experience briefly comprises:  OMR 6 million Rials- Duqm, Oman, in which he was a Senior Quantity Surveyor on a Lump sum Contract for a Park Inn Hotel. He was responsible for the evaluating and agreeing of Variations submitted by the Contractor.  OMR 9 million Omani Rials– Ireland, in which he was the Project Quantity Surveyor on a design and build project of a mixed development and a Residential block. He was responsible for procurement and appointment of all sub-contractors, produced elemental bill of quantities for each trade, submitted and agreed monthly valuations, submitted and agreed variations. Infrastructure His infrastructure experience briefly comprises:  OMR 28 million Omani Rials, Dualisation of Jabrin – Ibri Section 2, Oman in which he is the senior Quantity Surveyor responsible for the retendering of the Works, cost checking, End Cost Predictions, Interim Payment Preparation, Valuation Compilation, Project Management Reporting and provisional of Contractual advise.  OMR 36 million Omani Rials, Dualisation of Jabrin – Ibri Section 1, Oman in which he is the senior Quantity Surveyor responsible for cost checking, end Cost Predictions, Interim Payment Preparation and recommendation, Valuation Compilation, Project Management Reporting and provisional of Contractual advise.  OMR 40 million Omani Rials, Dualisation of Jabrin – Ibri Section 2, Oman in which he was the senior Quantity Surveyor responsible for cost checking, Change Management, End Cost Predictions, Interim Payment Preparation, Valuation Compilation, Project Management Reporting and provisional of Contractual advise which included advising the Client on termination procedures for the Main Contractor responsible for the project. Domhnaill was also involved in drafting, on behalf of the Engineer, responses to the Contractor’s requests for a number Engineers decisions.  OMR 19 million Omani Rials – Wadi Bani Kharus Asphalt Road, Oman in which he was the Quantity Surveyor responsible for cost checking, Change Management, End Cost Predictions, Valuation Compilation, Project Management Reporting, provisional of contractual advise and settlement of the final account.  OMR 81 million Omani Rials – N6 between Kinnegad and Athlone , Ireland in which he was the Quantity Surveyor responsible for cost checking, Change Management, End Cost Predictions, Valuation Compilation, Project Management Reporting and provisional of Contractual advise.
  • 3. Domhnaill O Doherty BSc (Hons) QuantitySurveying SeniorQuantitySurveyor www.driver-group.com Page 3 of 3 Core Skills and Competencies Commercial and Contracts Extensive experience in a full range of quantity surveying services to both private and public sector Clients which include: • Preliminary / Budget Estimates • Detailed Cost Plans • Tendering Procedures • Value Management • Preparation of Bills of Quantities • Contract Selection / Advice • Change Control • Interim Valuations • Settlement of Final Accounts • Procurement Strategies • International Contracts Dispute Resolution An extension of time and application of cost claim representing the Contractor for the Oman Convention Centre in which Domhnaill worked to develop the claim document. His section of works was large ly focused on the chronology / narrative of delay events No.9 and No. 25. Domhnaill has assisted in the preparation of an independent report on behalf of the Contractor for the Construction of Paved Road in Wilayat Madha (Governorate of Musandam). Domhnaill evaluated the extra over cost associated with the failure of being able to dispose surplus material off site, between May 2013 and January 2016. Domhnaill had key involvement in the process of terminating the main Contractor on Jabrin – Ibri section 1 where he was involved in liaising and coordinating with the Client in the termination process. Also, Domhnaill was involved in drafting responses, on behalf of the Engineer, for a number of engineer decisions requested by the Contractor.