Senior Contracts Administrator with over 20 years experience in pre and post award commercial 
management for tier 1 contractors. Strong commercial management skills in all aspects of project start up, 
process and management plan development, subcontract procurement, award, administration and close out 
and risk management. Diverse experience working on multimillion dollar projects in Australia and overseas 
including major infrastructure, CSG, LNG and mining projects. 
Ongoing commitment to the implementation and improvement of commercial processes and procedures. 
PROFESSIONAL STRENGTHS 
 Project commercial start-up 
 Process development 
 Management plan preparation 
 Commercial leadership on 
contractual matters 
 Communication, negotiation 
and influencing skills 
 Subcontract pre and post award 
commercial management 
 Contract evaluation/negotiation 
 Knowledge of risk management 
Joan Willox  Em: joanw illox3@gmail.com ~  Mob: 0407 176940 
principles/process application 
 Contract close out 
 Teamwork and self 
management 
QUALIFICATIONS 
Royal Institute of Chartered Surveyors: Member since 1992 
Bachelor of Science with distinction – Quantity Surveying - Robert Gordons University, Scotland 
EXECUTIVE CAREER SUMMARY 
02/2012 – Current Senior Contracts Administrator – CLOUGH, Australia 
10/2006 – 01/2012 Senior Contracts Administrator – THIESS, Australia 
09/2002 – 08/2005 Senior Quantity Surveyor – AMEC JV, Hong Kong 
06/1998 – 09/2000 Senior Quantity Surveyor – BALFOUR BEATTY JV, Hong Kong 
06/1995 – 12/1997 Senior Quantity Surveyor – KVAERNER CONSTRUCTION, Malaysia/Egypt 
02/1992 – 05/1994 Quantity Surveyor – BALFOUR BEATTY, UK 
07/1990 – 12/1991 Graduate Quantity Surveyor – CEMENTATION CONSTRUCTION, UK 
PROFESSIONAL EXPERIENCE 
CLOUGH PROJECTS PTY LTD 02/2012 – Current 
Senior Contracts Administrator 
Seconded to Oil Search Erave to Samberigi Road Project (PNG) $50 million (10/2014 – Current) 
Project commercial set-up, sourcing strategy development and tendering activities. 
 Project specific process, procedural and documentation development in absence of a complete 
management system. 
 Sourcing strategy development and all tendering activities for early works packages. 
 Assisted with preparation and development of phase management plan and risk register.
Senior Contracts Administrator 
Arrow Energy Daandine Expansion Project $Confidential (09/2013 – 09/2014) 
Project commercial set-up on an Engineering, Procurement, Construction Management (EPCM) contract 
including project specific process and procedural development . Sourcing strategy development, tendering 
activities, pre and post award management of early works packages. 
 Commercial project specific procedural and process development and review. 
 Assist with development and preparation of sourcing strategies. 
 Subcontract and consultant prequalification, tendering and pre and post award activities. 
Senior Contracts Administrator 
QGC Compression Facilities 8+2 $Confidential (01/2013 – 08/2013) 
Assisting with project commercial set-up including project specific process and procedure development. 
Review and preparation of subcontract and major equipment contracts and client proposals. 
 Commercial project specific procedural and process development and review. 
 Assist procurement team to prepare tendering documentation. 
 Review and settlement of subcontract commercial deviations prior to award. 
 Overseeing post award administration of awarded subcontracts. 
 Responding to subcontract related head contract correspondence. 
 Preparation of novation documentation and assist with subcontract and project close out. 
Senior Contracts Administrator 
Wafi Golpu Project $10 million (02/2012 – 12/2012) 
Overseeing project commercial set-up including project specific process and procedural development and 
review, supply chain management, head contract review and implementation of procedures and processes 
to meet head contract obligations. 
 Project specific procedural and process development and review for supply chain management, 
subcontract management and risk and insurance. 
 Ensuring compliance with head contract requirements, preparation of head contract correspondence, 
identification and administration of head contract delays and variations. 
 Supply chain management from RFQ to award and procurement status report update. 
 Assist with strategy and risk review and documentation. 
 Internal and external reporting. 
THIESS PTY LTD 10/2006 – 01/2012 
Senior Contracts Administrator 
Critical Portfolio Works Program $200 million (08/2009 – 01/2012) 
Overseeing the initial procurement of major process equipment and civil packages leading onto the 
commercial and contractual management of the respective suppliers and subcontractors following contract 
award with one (1) staff member assisting. 
Joan Willox  Em: joanw illox3@gmail.com ~  Mob: 0407 176940
 Development and ownership of procurement register and assisting with the development of required 
procurement procedural documentation. 
 Review and preparation of subcontract and major equipment supplier enquiry documents, evaluations, 
client proposals and contracts. 
 Administration of subcontract and head contract variations and notices of change 
 Updating of Risk Register (CURA) 
 Internal and external month end reporting 
Senior Contracts Administrator 
Bundamba AWTP $388 million (10/2006 – 11/2008) 
Commercial and contractual management of over 200 subcontractors and major process equipment 
suppliers with four (4) staff assisting. 
 Review and preparation of subcontract and major equipment supplier enquiry documents, contracts, 
measurements, variation and claim assessments, payments and final accounts. 
 Review, preparation and presentation of internal reports including monthly accruals and forecasting. 
 Review and preparation of procurement register for major subcontractors/suppliers in conjunction with 
design/construction/planning teams. 
 Maternity Leave December 2008 to July 2009. 
Travel and Study in Europe 08/2005 –10/2006 
HK ACE (AMEC) JOINT VENTURE, HONG KONG 09/2002 –08/2005 
Senior Quantity Surveyor 
KCRC West Rail Tuen Mun Station, Hong Kong HK$1,352 Million 
Measurement and valuation of major client variations and client related Final Account negotiations and 
settlement. Administration of several major Subcontract accounts. 
Travel, Study and English language teaching in Hong Kong 10/2000 –08/2002 
BCJ (BALFOUR BEATTY) JOINT VENTURE, HONG KONG 06/1998 –09/2000 
Senior Quantity Surveyor 
New Hong Kong Airport, Hong Kong HK$10.5 Billion 
Reporting directly to Commercial Manager. Site Management Plan preparation and subsequently 
Basescope Subcontract management and Final Account agreement. Client related Final Account 
negotiations and settlement. 
KVAERNER CONSTRUCTION (Formerly Trafalgar House/Cementation) 06/1995 –05/1998 
Senior Quantity Surveyor 
Media Production City, Cairo, Egypt US$450 Million (09/1997 – 05/1998) 
Reporting directly to Commercial Manager and assisting with all Pre-Contract duties. 
Senior Quantity Surveyor 
KBBC JV, Pergau Hydroelectric Project, Malaysia GBP500 million (06/1995 – 08/1997) 
Joan Willox  Em: joanw illox3@gmail.com ~  Mob: 0407 176940
Commercial management of sole M&E installation Subcontract valued at £15 million with two staff assisting. 
One year sabbatical (ASIA Travel) 06/1994 – 05/1995 
BALFOUR BEATTY CONSTRUCTION LIMITED 02/1992 – 05/1994 
Quantity Surveyor 
Invercannie Water Treatment Works, SCOTLAND, £3.5 MILLION (04/1993 – 05/1994) 
Sole resident Quantity Surveyor on site. 
Quantity Surveyor 
St. Fergus Gas Plant Major Civils II, Scotland, £3.5 MILLION (02/1992 – 03/1993) 
Sole resident Quantity Surveyor on site. 
 Successfully passed TPC examination gaining “Associate member status of R.I.C.S”. 
CEMENTATION CONSTRUCTION LTD. 07/1988 –12/1991 
Graduate Quantity Surveyor 
Dartford North Approach Road, London, £8 MILLION (07/1990 – 12/1991) 
Graduate Quantity Surveyor, reporting to Senior Quantity Surveyor. 
Student Quantity Surveyor (Final Year at Robert Gordons University) (09/1989 – 06/1990) 
 Awarded “Bachelor of Science with Distinction in Quantity Surveying”. 
Student Quantity Surveyor (Sandwich Year) 
Faslane Submarine Base, Scotland, £500 MILLION (07/1988 – 09/1989) 
Student Quantity Surveyor reporting to Senior Quantity Surveyor. 
 Awarded “Student of the Year” 
SOFTWARE SKILLS 
JDE ~ Incite ~ Procon~Microsoft Excel/Word 
PROFESSIONAL REFEREES 
Full details of professional referees to support commercial management capabilities available on request. 
Joan Willox  Em: joanw illox3@gmail.com ~  Mob: 0407 176940

More Related Content

What's hot (19)

Ian C. Shannon
Ian C. ShannonIan C. Shannon
Ian C. Shannon
 
BULLETIN CONSTRUCTION SERVICE New 14
BULLETIN CONSTRUCTION SERVICE New 14BULLETIN CONSTRUCTION SERVICE New 14
BULLETIN CONSTRUCTION SERVICE New 14
 
Bulletin construction secvice business profile 24.06.2016 word
Bulletin construction secvice business profile 24.06.2016  wordBulletin construction secvice business profile 24.06.2016  word
Bulletin construction secvice business profile 24.06.2016 word
 
PSP.PERERA CV
PSP.PERERA CVPSP.PERERA CV
PSP.PERERA CV
 
Stelian Dragomir-CV
Stelian Dragomir-CVStelian Dragomir-CV
Stelian Dragomir-CV
 
Chris Lee CV doc.
Chris Lee CV  doc.Chris Lee CV  doc.
Chris Lee CV doc.
 
Personal 3 CV 2015
Personal 3  CV 2015Personal 3  CV 2015
Personal 3 CV 2015
 
Peter L. Cabbab.
Peter L. Cabbab.Peter L. Cabbab.
Peter L. Cabbab.
 
Troy Ens Resume
Troy Ens ResumeTroy Ens Resume
Troy Ens Resume
 
CV 2015 Christo Van Jaarsveld
CV 2015 Christo Van JaarsveldCV 2015 Christo Van Jaarsveld
CV 2015 Christo Van Jaarsveld
 
RESUME JLQM-RJ - COOR
RESUME JLQM-RJ - COORRESUME JLQM-RJ - COOR
RESUME JLQM-RJ - COOR
 
عبدالسلام_original
عبدالسلام_originalعبدالسلام_original
عبدالسلام_original
 
GC - CV June
GC - CV JuneGC - CV June
GC - CV June
 
YS CV Jan 2017
YS CV Jan 2017YS CV Jan 2017
YS CV Jan 2017
 
Stelian Dragomir CV
Stelian Dragomir CVStelian Dragomir CV
Stelian Dragomir CV
 
ALAQ ALEZDEHAR1
ALAQ ALEZDEHAR1ALAQ ALEZDEHAR1
ALAQ ALEZDEHAR1
 
CV-RN.PV
CV-RN.PVCV-RN.PV
CV-RN.PV
 
Cv abdullatif 2016
Cv abdullatif 2016Cv abdullatif 2016
Cv abdullatif 2016
 
Robert W Kapp Resume
Robert W Kapp Resume Robert W Kapp Resume
Robert W Kapp Resume
 

Similar to Experienced Contracts Administrator Relocating to Melbourne (20)

WALTER STEPHEN WALTER
WALTER STEPHEN WALTERWALTER STEPHEN WALTER
WALTER STEPHEN WALTER
 
alan_morrison_resume (15)
alan_morrison_resume (15)alan_morrison_resume (15)
alan_morrison_resume (15)
 
Moph 7 5-13 (sa path)
Moph   7 5-13 (sa path)Moph   7 5-13 (sa path)
Moph 7 5-13 (sa path)
 
Moph 7 5-13 (sa path)
Moph   7 5-13 (sa path)Moph   7 5-13 (sa path)
Moph 7 5-13 (sa path)
 
MG Resume 160727
MG Resume 160727MG Resume 160727
MG Resume 160727
 
151213CS2426993.2 (1)
151213CS2426993.2 (1)151213CS2426993.2 (1)
151213CS2426993.2 (1)
 
CV-MIB-CM (QS)
CV-MIB-CM (QS)CV-MIB-CM (QS)
CV-MIB-CM (QS)
 
CV-MIB-CM (QS)
CV-MIB-CM (QS)CV-MIB-CM (QS)
CV-MIB-CM (QS)
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
CV-MIB-CM (QS)
CV-MIB-CM (QS)CV-MIB-CM (QS)
CV-MIB-CM (QS)
 
Mills Robert CV 2015-2
Mills Robert CV 2015-2Mills Robert CV 2015-2
Mills Robert CV 2015-2
 
Richard D Brown CV Jan 16
Richard D Brown CV Jan 16Richard D Brown CV Jan 16
Richard D Brown CV Jan 16
 
Ehab A-Azeem C V
Ehab A-Azeem C VEhab A-Azeem C V
Ehab A-Azeem C V
 
Martin Lawton CV June 2014
Martin Lawton CV June 2014Martin Lawton CV June 2014
Martin Lawton CV June 2014
 
EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015
 
Sanjeewa_CV updated on 16.05.2014
Sanjeewa_CV  updated on 16.05.2014Sanjeewa_CV  updated on 16.05.2014
Sanjeewa_CV updated on 16.05.2014
 
CV_Charwin Caban
CV_Charwin CabanCV_Charwin Caban
CV_Charwin Caban
 
GregPhilpott__CV_ProcLeader
GregPhilpott__CV_ProcLeaderGregPhilpott__CV_ProcLeader
GregPhilpott__CV_ProcLeader
 
CV_KAD_PMP+BDM
CV_KAD_PMP+BDMCV_KAD_PMP+BDM
CV_KAD_PMP+BDM
 
CV Kamal (terkini) apply Pr1ma
CV Kamal (terkini) apply Pr1maCV Kamal (terkini) apply Pr1ma
CV Kamal (terkini) apply Pr1ma
 

Experienced Contracts Administrator Relocating to Melbourne

  • 1. RESUME Joan Willox (MRICS, BSc Quantity Surveying) Address: Relocating to Melbourne (Current address - 276 Wights Mountain Road, QLD 4520) Email: joanwillox3@gmail.com Tel: 0407 176940 Senior Contracts Administrator Senior Contracts Administrator with over 20 years experience in pre and post award commercial management for tier 1 contractors. Strong commercial management skills in all aspects of project start up, process and management plan development, subcontract procurement, award, administration and close out and risk management. Diverse experience working on multimillion dollar projects in Australia and overseas including major infrastructure, CSG, LNG and mining projects. Ongoing commitment to the implementation and improvement of commercial processes and procedures. PROFESSIONAL STRENGTHS  Project commercial start-up  Process development  Management plan preparation  Commercial leadership on contractual matters  Communication, negotiation and influencing skills  Subcontract pre and post award commercial management  Contract evaluation/negotiation  Knowledge of risk management Joan Willox  Em: joanw illox3@gmail.com ~  Mob: 0407 176940 principles/process application  Contract close out  Teamwork and self management QUALIFICATIONS Royal Institute of Chartered Surveyors: Member since 1992 Bachelor of Science with distinction – Quantity Surveying - Robert Gordons University, Scotland EXECUTIVE CAREER SUMMARY 02/2012 – Current Senior Contracts Administrator – CLOUGH, Australia 10/2006 – 01/2012 Senior Contracts Administrator – THIESS, Australia 09/2002 – 08/2005 Senior Quantity Surveyor – AMEC JV, Hong Kong 06/1998 – 09/2000 Senior Quantity Surveyor – BALFOUR BEATTY JV, Hong Kong 06/1995 – 12/1997 Senior Quantity Surveyor – KVAERNER CONSTRUCTION, Malaysia/Egypt 02/1992 – 05/1994 Quantity Surveyor – BALFOUR BEATTY, UK 07/1990 – 12/1991 Graduate Quantity Surveyor – CEMENTATION CONSTRUCTION, UK PROFESSIONAL EXPERIENCE CLOUGH PROJECTS PTY LTD 02/2012 – Current Senior Contracts Administrator Seconded to Oil Search Erave to Samberigi Road Project (PNG) $50 million (10/2014 – Current) Project commercial set-up, sourcing strategy development and tendering activities.  Project specific process, procedural and documentation development in absence of a complete management system.  Sourcing strategy development and all tendering activities for early works packages.  Assisted with preparation and development of phase management plan and risk register.
  • 2. Senior Contracts Administrator Arrow Energy Daandine Expansion Project $Confidential (09/2013 – 09/2014) Project commercial set-up on an Engineering, Procurement, Construction Management (EPCM) contract including project specific process and procedural development . Sourcing strategy development, tendering activities, pre and post award management of early works packages.  Commercial project specific procedural and process development and review.  Assist with development and preparation of sourcing strategies.  Subcontract and consultant prequalification, tendering and pre and post award activities. Senior Contracts Administrator QGC Compression Facilities 8+2 $Confidential (01/2013 – 08/2013) Assisting with project commercial set-up including project specific process and procedure development. Review and preparation of subcontract and major equipment contracts and client proposals.  Commercial project specific procedural and process development and review.  Assist procurement team to prepare tendering documentation.  Review and settlement of subcontract commercial deviations prior to award.  Overseeing post award administration of awarded subcontracts.  Responding to subcontract related head contract correspondence.  Preparation of novation documentation and assist with subcontract and project close out. Senior Contracts Administrator Wafi Golpu Project $10 million (02/2012 – 12/2012) Overseeing project commercial set-up including project specific process and procedural development and review, supply chain management, head contract review and implementation of procedures and processes to meet head contract obligations.  Project specific procedural and process development and review for supply chain management, subcontract management and risk and insurance.  Ensuring compliance with head contract requirements, preparation of head contract correspondence, identification and administration of head contract delays and variations.  Supply chain management from RFQ to award and procurement status report update.  Assist with strategy and risk review and documentation.  Internal and external reporting. THIESS PTY LTD 10/2006 – 01/2012 Senior Contracts Administrator Critical Portfolio Works Program $200 million (08/2009 – 01/2012) Overseeing the initial procurement of major process equipment and civil packages leading onto the commercial and contractual management of the respective suppliers and subcontractors following contract award with one (1) staff member assisting. Joan Willox  Em: joanw illox3@gmail.com ~  Mob: 0407 176940
  • 3.  Development and ownership of procurement register and assisting with the development of required procurement procedural documentation.  Review and preparation of subcontract and major equipment supplier enquiry documents, evaluations, client proposals and contracts.  Administration of subcontract and head contract variations and notices of change  Updating of Risk Register (CURA)  Internal and external month end reporting Senior Contracts Administrator Bundamba AWTP $388 million (10/2006 – 11/2008) Commercial and contractual management of over 200 subcontractors and major process equipment suppliers with four (4) staff assisting.  Review and preparation of subcontract and major equipment supplier enquiry documents, contracts, measurements, variation and claim assessments, payments and final accounts.  Review, preparation and presentation of internal reports including monthly accruals and forecasting.  Review and preparation of procurement register for major subcontractors/suppliers in conjunction with design/construction/planning teams.  Maternity Leave December 2008 to July 2009. Travel and Study in Europe 08/2005 –10/2006 HK ACE (AMEC) JOINT VENTURE, HONG KONG 09/2002 –08/2005 Senior Quantity Surveyor KCRC West Rail Tuen Mun Station, Hong Kong HK$1,352 Million Measurement and valuation of major client variations and client related Final Account negotiations and settlement. Administration of several major Subcontract accounts. Travel, Study and English language teaching in Hong Kong 10/2000 –08/2002 BCJ (BALFOUR BEATTY) JOINT VENTURE, HONG KONG 06/1998 –09/2000 Senior Quantity Surveyor New Hong Kong Airport, Hong Kong HK$10.5 Billion Reporting directly to Commercial Manager. Site Management Plan preparation and subsequently Basescope Subcontract management and Final Account agreement. Client related Final Account negotiations and settlement. KVAERNER CONSTRUCTION (Formerly Trafalgar House/Cementation) 06/1995 –05/1998 Senior Quantity Surveyor Media Production City, Cairo, Egypt US$450 Million (09/1997 – 05/1998) Reporting directly to Commercial Manager and assisting with all Pre-Contract duties. Senior Quantity Surveyor KBBC JV, Pergau Hydroelectric Project, Malaysia GBP500 million (06/1995 – 08/1997) Joan Willox  Em: joanw illox3@gmail.com ~  Mob: 0407 176940
  • 4. Commercial management of sole M&E installation Subcontract valued at £15 million with two staff assisting. One year sabbatical (ASIA Travel) 06/1994 – 05/1995 BALFOUR BEATTY CONSTRUCTION LIMITED 02/1992 – 05/1994 Quantity Surveyor Invercannie Water Treatment Works, SCOTLAND, £3.5 MILLION (04/1993 – 05/1994) Sole resident Quantity Surveyor on site. Quantity Surveyor St. Fergus Gas Plant Major Civils II, Scotland, £3.5 MILLION (02/1992 – 03/1993) Sole resident Quantity Surveyor on site.  Successfully passed TPC examination gaining “Associate member status of R.I.C.S”. CEMENTATION CONSTRUCTION LTD. 07/1988 –12/1991 Graduate Quantity Surveyor Dartford North Approach Road, London, £8 MILLION (07/1990 – 12/1991) Graduate Quantity Surveyor, reporting to Senior Quantity Surveyor. Student Quantity Surveyor (Final Year at Robert Gordons University) (09/1989 – 06/1990)  Awarded “Bachelor of Science with Distinction in Quantity Surveying”. Student Quantity Surveyor (Sandwich Year) Faslane Submarine Base, Scotland, £500 MILLION (07/1988 – 09/1989) Student Quantity Surveyor reporting to Senior Quantity Surveyor.  Awarded “Student of the Year” SOFTWARE SKILLS JDE ~ Incite ~ Procon~Microsoft Excel/Word PROFESSIONAL REFEREES Full details of professional referees to support commercial management capabilities available on request. Joan Willox  Em: joanw illox3@gmail.com ~  Mob: 0407 176940