SlideShare a Scribd company logo
1 of 24
Download to read offline
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
– 2010 
Preventing Pad Cratering During ICT Using Sherlock 
DfR Solutions Webinar 
November 21, 2013
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
Pad cratering is defined as cracking which initiates within the laminate during a dynamic mechanical event such as In Circuit Testing (ICT), board depanelization, connector insertion, and other shock and vibration inducing activities. 
Simulation can be used to prevent this serious but prevalent failure. Pad cratering was first recognized in BGA packages but newer leadless, bottom termination components are also vulnerable. 
Pad Cratering
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
oCracking initiating within the PCB laminate during a dynamic mechanical event 
oIn circuit testing (ICT), board depanelization, connector insertion, shock and vibration, etc. 
Pad Cratering: Strain & Flexure
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
Laminate Cracking Leads to Trace Fracture 
Bending Force 
Functional failure will occur 
Trace routed externally
© 2004 - 20019070 0 0 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 5 
Pad Cratering 
 Drivers 
 Finer pitch components 
 More brittle laminates 
 Stiffer solders (SAC vs. SnPb) 
 Presence of a large heat sink 
 Location 
 PCB thickness 
 Component size & rigidity 
 Temperatures & cooling rates 
 Difficult to detect using standard 
procedures 
 X-ray, dye-n-pry, ball shear, and 
ball pull 
Intel (2006)
© 2004 - 20019070 0 0 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
6 
Is Pad Cratering a Pb-Free Issue? No, but… 
Paste Solder Ball 
Average Fracture 
Load (N) 
Std Dev (N) 
SnPb SnPb 692 93 
SnPb 656 102 
Sn4.0Ag0.5Cu 935 190 
Sn4.0Ag0.5Cu 
35x35mm, 388 I/O BGA; 0.76 mm/min 
Roubaud, HPAPEX 2001
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
Weakest link in the system fails first 
BGA Mechanical Loading Failure Modes
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
oFailure Modes Defined 
IPC 9708
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
No pass / fail limits 
3 strain limit approaches 
Component supplier provided 
Customer specified 
Rate limited 
Maximum allowable strain versus rate and PCB thickness 
IPC 9704
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
oCalPoly study showing failure of electrical testing to capture all defects 
Detecting Pad Cratering 
Board Level Failure Analysis of Chip Scale Package Drop Test Assemblies, 2008 International Microelectronics And Packaging Society.
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
oMajority of failures occur at corners of packages: locations of stress & strain concentrations 
Electrical Failure Pareto from CalPoly Study 
Board Level Failure Analysis of Chip Scale Package Drop Test Assemblies, 2008 International Microelectronics And Packaging Society.
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
Difficult to detect using standard procedures 
Companies frequently unaware of pad cratering until failure happens 
Recalls have been common and painful! 
Potential warning signs: 
Excessive BGA repair rate 
High percentage of “defective” BGAs 
High rate of “retest to pass” at in circuit test (ICT) 
New X-ray potential with 3D m-CT inspection 
Precision cross-sections are required to confirm 
Pad Cratering Failure Analysis
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
Design 
Non-critical pads 
Solder mask defined vs. non-solder mask defined 
Pad Geometry 
Layout & PCB thickness 
Corner Glue 
More compliant solder 
SAC305 is relatively rigid, SAC105 and SNC are possible alternatives 
New laminate acceptance criteria and materials 
Best Mitigation! – Avoid the problem by not overstressing the interconnect 
Limitations on board flexure 
Simulation to predict the strains induced during ICT and highlight potential probles 
750 to 500 microstrain, component and layout dependent 
Process Control & Validation 
Potential Mitigations to Pad Cratering
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
oReview/perform ICT strain evaluation at fixture supplier and in process: 
o500 μs rule of thumb, critical for BTCs, CSP, and BGA packages 
oTo reduce the pressures exerted on the PCB: 
oFirst and simplest solution: reduce the probe forces when possible. 
oSecondly, optimize position of the fingers/stoppers to control probe forces. 
oOften difficult to achieve. Mechanically, the stoppers must be located exactly under the pressure fingers to avoid the creation of shear points 
ICT Strain: Fixture & Process Analysis
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
Eliminate potential bed of nails (ICT) damage by: 
Identifying components on the circuit card that could experience cracking or failure during bed of nails testing. 
Prior to the ICT, the designer can optimize the process: 
Change test points 
Change pogo pin pressure, or 
Add /move board supports 
Sherlock analysis is component-specific, allowing for more precise identification of at-risk areas 
Sherlock Software
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
Designers can identify potential bed of nails damage early in the layout process, before a bed of nails tester is ever designed 
Allows for tradeoff analyses, saving costly board damage and redesign. 
Sherlock – Automated Design Analysis Software
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
oTest points are automatically loaded if defined in pick and place or the odb++ archive 
oFixture locations can also be imported 
Setup Test Points and Fixtures
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
Test Point Modification
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
oGuide Pins (mount hole) constrained in-plane (x,y) but can move up and down 
oSupport pin just constrained in the Z direction 
ICT Fixtures
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
Finite Element Mesh
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
Displacement
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
Strain Results
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
Component Risk
© 2004 - 2007 
2010 
9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 
Pad Cratering is an increasingly common failure mode 
Catastrophic and non-reworkable 
Easy to avoid detection and difficult to diagnose 
Partial cracks riskiest since they escape and expand in the field 
Multiple paths for mitigation 
Few for true prevention 
Best mitigation is to reduce board level strains 
No hard, fast rules for avoidance 
Dependent on design, component, layout, process… 
Simulation can be used to quantify the strains associated with ICT 
Pad Cratering Conclusions

More Related Content

What's hot

QM-060-問題分析與解決能力提升
QM-060-問題分析與解決能力提升QM-060-問題分析與解決能力提升
QM-060-問題分析與解決能力提升handbook
 
NG BB 25 Measurement System Analysis - Attribute
NG BB 25 Measurement System Analysis - AttributeNG BB 25 Measurement System Analysis - Attribute
NG BB 25 Measurement System Analysis - AttributeLeanleaders.org
 
問題分析與解決方法介紹
問題分析與解決方法介紹問題分析與解決方法介紹
問題分析與解決方法介紹joe lo
 
IS/IS NOT Solving “Unsolvable” Problems
IS/IS NOT Solving “Unsolvable” ProblemsIS/IS NOT Solving “Unsolvable” Problems
IS/IS NOT Solving “Unsolvable” ProblemsNUS-ISS
 
【經理人講堂】目標設定:14項規劃工具
【經理人講堂】目標設定:14項規劃工具【經理人講堂】目標設定:14項規劃工具
【經理人講堂】目標設定:14項規劃工具周建良 Zhou Jian Liang
 
麦肯锡方法论:发现和分析问题的七个步骤
麦肯锡方法论:发现和分析问题的七个步骤麦肯锡方法论:发现和分析问题的七个步骤
麦肯锡方法论:发现和分析问题的七个步骤孔子 无敌
 
Fish Bone Analysis | Gaurav Singh Rajput
Fish Bone Analysis | Gaurav Singh RajputFish Bone Analysis | Gaurav Singh Rajput
Fish Bone Analysis | Gaurav Singh RajputGaurav Singh Rajput
 
5S輔導計畫
5S輔導計畫5S輔導計畫
5S輔導計畫基欽 劉
 
Factory Management-2 Policy Deployment & Control
Factory Management-2  Policy Deployment & ControlFactory Management-2  Policy Deployment & Control
Factory Management-2 Policy Deployment & ControlEduardo L. Garcia
 
Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance DEEPAK SAHOO
 
Javier Garcia - Verdugo Sanchez - The Poka - Yoke System
Javier Garcia - Verdugo Sanchez -  The Poka - Yoke SystemJavier Garcia - Verdugo Sanchez -  The Poka - Yoke System
Javier Garcia - Verdugo Sanchez - The Poka - Yoke SystemJ. García - Verdugo
 
作業現場稽核重點 Tip 8 for On-Site Audit
作業現場稽核重點 Tip 8 for On-Site Audit作業現場稽核重點 Tip 8 for On-Site Audit
作業現場稽核重點 Tip 8 for On-Site AuditFast SiC Semiconductor Inc.
 
Three Ways to Transition From “Fire Fighting” Mode to Boost Gains
Three Ways to Transition From “Fire Fighting” Mode to Boost GainsThree Ways to Transition From “Fire Fighting” Mode to Boost Gains
Three Ways to Transition From “Fire Fighting” Mode to Boost GainsSafetyChain Software
 

What's hot (20)

QM-060-問題分析與解決能力提升
QM-060-問題分析與解決能力提升QM-060-問題分析與解決能力提升
QM-060-問題分析與解決能力提升
 
動作經濟原則 motion efficiency
動作經濟原則 motion efficiency動作經濟原則 motion efficiency
動作經濟原則 motion efficiency
 
設備工具管理 Equipment management
設備工具管理 Equipment management設備工具管理 Equipment management
設備工具管理 Equipment management
 
NG BB 25 Measurement System Analysis - Attribute
NG BB 25 Measurement System Analysis - AttributeNG BB 25 Measurement System Analysis - Attribute
NG BB 25 Measurement System Analysis - Attribute
 
問題分析與解決方法介紹
問題分析與解決方法介紹問題分析與解決方法介紹
問題分析與解決方法介紹
 
Poke yoke
Poke yokePoke yoke
Poke yoke
 
IS/IS NOT Solving “Unsolvable” Problems
IS/IS NOT Solving “Unsolvable” ProblemsIS/IS NOT Solving “Unsolvable” Problems
IS/IS NOT Solving “Unsolvable” Problems
 
【經理人講堂】目標設定:14項規劃工具
【經理人講堂】目標設定:14項規劃工具【經理人講堂】目標設定:14項規劃工具
【經理人講堂】目標設定:14項規劃工具
 
麦肯锡方法论:发现和分析问题的七个步骤
麦肯锡方法论:发现和分析问题的七个步骤麦肯锡方法论:发现和分析问题的七个步骤
麦肯锡方法论:发现和分析问题的七个步骤
 
Fish Bone Analysis | Gaurav Singh Rajput
Fish Bone Analysis | Gaurav Singh RajputFish Bone Analysis | Gaurav Singh Rajput
Fish Bone Analysis | Gaurav Singh Rajput
 
5S輔導計畫
5S輔導計畫5S輔導計畫
5S輔導計畫
 
Factory Management-2 Policy Deployment & Control
Factory Management-2  Policy Deployment & ControlFactory Management-2  Policy Deployment & Control
Factory Management-2 Policy Deployment & Control
 
Qcc
QccQcc
Qcc
 
Advanced Pfmea
Advanced PfmeaAdvanced Pfmea
Advanced Pfmea
 
Bad Actor Analysis
Bad Actor AnalysisBad Actor Analysis
Bad Actor Analysis
 
Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance
 
Javier Garcia - Verdugo Sanchez - The Poka - Yoke System
Javier Garcia - Verdugo Sanchez -  The Poka - Yoke SystemJavier Garcia - Verdugo Sanchez -  The Poka - Yoke System
Javier Garcia - Verdugo Sanchez - The Poka - Yoke System
 
IE手法-愚巧法、防錯法 Fool-Proofing
IE手法-愚巧法、防錯法 Fool-ProofingIE手法-愚巧法、防錯法 Fool-Proofing
IE手法-愚巧法、防錯法 Fool-Proofing
 
作業現場稽核重點 Tip 8 for On-Site Audit
作業現場稽核重點 Tip 8 for On-Site Audit作業現場稽核重點 Tip 8 for On-Site Audit
作業現場稽核重點 Tip 8 for On-Site Audit
 
Three Ways to Transition From “Fire Fighting” Mode to Boost Gains
Three Ways to Transition From “Fire Fighting” Mode to Boost GainsThree Ways to Transition From “Fire Fighting” Mode to Boost Gains
Three Ways to Transition From “Fire Fighting” Mode to Boost Gains
 

Similar to Preventing Pad Cratering During ICT Using Sherlock

Using Physics of Failure to Predict System Level Reliability for Avionic Systems
Using Physics of Failure to Predict System Level Reliability for Avionic SystemsUsing Physics of Failure to Predict System Level Reliability for Avionic Systems
Using Physics of Failure to Predict System Level Reliability for Avionic SystemsGreg Caswell
 
Reliability of power modules using sherlock
Reliability of power modules using sherlockReliability of power modules using sherlock
Reliability of power modules using sherlockGreg Caswell
 
Intro to Sherlock_Linkedin
Intro to Sherlock_LinkedinIntro to Sherlock_Linkedin
Intro to Sherlock_LinkedinCraig Hillman
 
Quality and Reliability Challenges for Package‐on‐Package (PoP)
Quality and Reliability Challenges for Package‐on‐Package (PoP)Quality and Reliability Challenges for Package‐on‐Package (PoP)
Quality and Reliability Challenges for Package‐on‐Package (PoP)Cheryl Tulkoff
 
Accelerate Your DFMEA with Sherlock!
Accelerate Your DFMEA with Sherlock!Accelerate Your DFMEA with Sherlock!
Accelerate Your DFMEA with Sherlock!Cheryl Tulkoff
 
Coatings and-pottings-issues-challenges-and-the-reason-for-a-consortium
Coatings and-pottings-issues-challenges-and-the-reason-for-a-consortiumCoatings and-pottings-issues-challenges-and-the-reason-for-a-consortium
Coatings and-pottings-issues-challenges-and-the-reason-for-a-consortiumGreg Caswell
 
Alternative Methods for Qualifying EEE Parts for CubeSats
Alternative Methods for Qualifying EEE Parts for CubeSatsAlternative Methods for Qualifying EEE Parts for CubeSats
Alternative Methods for Qualifying EEE Parts for CubeSatsCraig Hillman
 
Reliability of-wearable-electronics
Reliability of-wearable-electronicsReliability of-wearable-electronics
Reliability of-wearable-electronicsGreg Caswell
 
Physics of Failure Simulation and Modeling Specification Webinar
Physics of Failure Simulation and Modeling Specification WebinarPhysics of Failure Simulation and Modeling Specification Webinar
Physics of Failure Simulation and Modeling Specification WebinarEd Dodd
 
Alternatives to MTBF
Alternatives to MTBF Alternatives to MTBF
Alternatives to MTBF Craig Hillman
 
Design for Manufacturing: Challenges & Opportunities
Design for Manufacturing: Challenges & OpportunitiesDesign for Manufacturing: Challenges & Opportunities
Design for Manufacturing: Challenges & OpportunitiesCheryl Tulkoff
 
Wearable Electronics and Reliability
Wearable Electronics and ReliabilityWearable Electronics and Reliability
Wearable Electronics and ReliabilityCraig Hillman
 
Simplified vs. Detailed
Simplified vs. DetailedSimplified vs. Detailed
Simplified vs. DetailedCraig Hillman
 
StuckPipePro | Stuck Pipe Analysis Software
StuckPipePro | Stuck Pipe Analysis SoftwareStuckPipePro | Stuck Pipe Analysis Software
StuckPipePro | Stuck Pipe Analysis Softwarepvisoftware
 
DFR Conference, March 2019
DFR  Conference, March 2019DFR  Conference, March 2019
DFR Conference, March 2019OptimalPlus
 
Root Cause Analysis of HALT Failures
 Root Cause Analysis of HALT Failures Root Cause Analysis of HALT Failures
Root Cause Analysis of HALT FailuresCheryl Tulkoff
 
TNC connector catalog
TNC connector catalogTNC connector catalog
TNC connector catalogEcho Dong
 
Roxtec BG Applications
Roxtec BG ApplicationsRoxtec BG Applications
Roxtec BG ApplicationsRoxtec Brasil
 
QuickSilver Controls QCI-DS021 QCI-D2-IGF
QuickSilver Controls QCI-DS021 QCI-D2-IGFQuickSilver Controls QCI-DS021 QCI-D2-IGF
QuickSilver Controls QCI-DS021 QCI-D2-IGFElectromate
 

Similar to Preventing Pad Cratering During ICT Using Sherlock (20)

Using Physics of Failure to Predict System Level Reliability for Avionic Systems
Using Physics of Failure to Predict System Level Reliability for Avionic SystemsUsing Physics of Failure to Predict System Level Reliability for Avionic Systems
Using Physics of Failure to Predict System Level Reliability for Avionic Systems
 
Reliability of power modules using sherlock
Reliability of power modules using sherlockReliability of power modules using sherlock
Reliability of power modules using sherlock
 
Intro to Sherlock_Linkedin
Intro to Sherlock_LinkedinIntro to Sherlock_Linkedin
Intro to Sherlock_Linkedin
 
Quality and Reliability Challenges for Package‐on‐Package (PoP)
Quality and Reliability Challenges for Package‐on‐Package (PoP)Quality and Reliability Challenges for Package‐on‐Package (PoP)
Quality and Reliability Challenges for Package‐on‐Package (PoP)
 
Accelerate Your DFMEA with Sherlock!
Accelerate Your DFMEA with Sherlock!Accelerate Your DFMEA with Sherlock!
Accelerate Your DFMEA with Sherlock!
 
Coatings and-pottings-issues-challenges-and-the-reason-for-a-consortium
Coatings and-pottings-issues-challenges-and-the-reason-for-a-consortiumCoatings and-pottings-issues-challenges-and-the-reason-for-a-consortium
Coatings and-pottings-issues-challenges-and-the-reason-for-a-consortium
 
Alternative Methods for Qualifying EEE Parts for CubeSats
Alternative Methods for Qualifying EEE Parts for CubeSatsAlternative Methods for Qualifying EEE Parts for CubeSats
Alternative Methods for Qualifying EEE Parts for CubeSats
 
Reliability of-wearable-electronics
Reliability of-wearable-electronicsReliability of-wearable-electronics
Reliability of-wearable-electronics
 
Physics of Failure Simulation and Modeling Specification Webinar
Physics of Failure Simulation and Modeling Specification WebinarPhysics of Failure Simulation and Modeling Specification Webinar
Physics of Failure Simulation and Modeling Specification Webinar
 
Alternatives to MTBF
Alternatives to MTBF Alternatives to MTBF
Alternatives to MTBF
 
Design for Manufacturing: Challenges & Opportunities
Design for Manufacturing: Challenges & OpportunitiesDesign for Manufacturing: Challenges & Opportunities
Design for Manufacturing: Challenges & Opportunities
 
Wearable Electronics and Reliability
Wearable Electronics and ReliabilityWearable Electronics and Reliability
Wearable Electronics and Reliability
 
Simplified vs. Detailed
Simplified vs. DetailedSimplified vs. Detailed
Simplified vs. Detailed
 
StuckPipePro | Stuck Pipe Analysis Software
StuckPipePro | Stuck Pipe Analysis SoftwareStuckPipePro | Stuck Pipe Analysis Software
StuckPipePro | Stuck Pipe Analysis Software
 
DFR Conference, March 2019
DFR  Conference, March 2019DFR  Conference, March 2019
DFR Conference, March 2019
 
Root Cause Analysis of HALT Failures
 Root Cause Analysis of HALT Failures Root Cause Analysis of HALT Failures
Root Cause Analysis of HALT Failures
 
TNC connector catalog
TNC connector catalogTNC connector catalog
TNC connector catalog
 
Roxtec BG Applications
Roxtec BG ApplicationsRoxtec BG Applications
Roxtec BG Applications
 
Catalogo sellos lab
Catalogo sellos labCatalogo sellos lab
Catalogo sellos lab
 
QuickSilver Controls QCI-DS021 QCI-D2-IGF
QuickSilver Controls QCI-DS021 QCI-D2-IGFQuickSilver Controls QCI-DS021 QCI-D2-IGF
QuickSilver Controls QCI-DS021 QCI-D2-IGF
 

Recently uploaded

Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsPrecisely
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsAndrey Dotsenko
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfngoud9212
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 

Recently uploaded (20)

Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power Systems
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdf
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 

Preventing Pad Cratering During ICT Using Sherlock

  • 1. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com – 2010 Preventing Pad Cratering During ICT Using Sherlock DfR Solutions Webinar November 21, 2013
  • 2. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com Pad cratering is defined as cracking which initiates within the laminate during a dynamic mechanical event such as In Circuit Testing (ICT), board depanelization, connector insertion, and other shock and vibration inducing activities. Simulation can be used to prevent this serious but prevalent failure. Pad cratering was first recognized in BGA packages but newer leadless, bottom termination components are also vulnerable. Pad Cratering
  • 3. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com oCracking initiating within the PCB laminate during a dynamic mechanical event oIn circuit testing (ICT), board depanelization, connector insertion, shock and vibration, etc. Pad Cratering: Strain & Flexure
  • 4. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com Laminate Cracking Leads to Trace Fracture Bending Force Functional failure will occur Trace routed externally
  • 5. © 2004 - 20019070 0 0 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 5 Pad Cratering  Drivers  Finer pitch components  More brittle laminates  Stiffer solders (SAC vs. SnPb)  Presence of a large heat sink  Location  PCB thickness  Component size & rigidity  Temperatures & cooling rates  Difficult to detect using standard procedures  X-ray, dye-n-pry, ball shear, and ball pull Intel (2006)
  • 6. © 2004 - 20019070 0 0 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com 6 Is Pad Cratering a Pb-Free Issue? No, but… Paste Solder Ball Average Fracture Load (N) Std Dev (N) SnPb SnPb 692 93 SnPb 656 102 Sn4.0Ag0.5Cu 935 190 Sn4.0Ag0.5Cu 35x35mm, 388 I/O BGA; 0.76 mm/min Roubaud, HPAPEX 2001
  • 7. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com Weakest link in the system fails first BGA Mechanical Loading Failure Modes
  • 8. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com oFailure Modes Defined IPC 9708
  • 9. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com No pass / fail limits 3 strain limit approaches Component supplier provided Customer specified Rate limited Maximum allowable strain versus rate and PCB thickness IPC 9704
  • 10. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com oCalPoly study showing failure of electrical testing to capture all defects Detecting Pad Cratering Board Level Failure Analysis of Chip Scale Package Drop Test Assemblies, 2008 International Microelectronics And Packaging Society.
  • 11. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com oMajority of failures occur at corners of packages: locations of stress & strain concentrations Electrical Failure Pareto from CalPoly Study Board Level Failure Analysis of Chip Scale Package Drop Test Assemblies, 2008 International Microelectronics And Packaging Society.
  • 12. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com Difficult to detect using standard procedures Companies frequently unaware of pad cratering until failure happens Recalls have been common and painful! Potential warning signs: Excessive BGA repair rate High percentage of “defective” BGAs High rate of “retest to pass” at in circuit test (ICT) New X-ray potential with 3D m-CT inspection Precision cross-sections are required to confirm Pad Cratering Failure Analysis
  • 13. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com Design Non-critical pads Solder mask defined vs. non-solder mask defined Pad Geometry Layout & PCB thickness Corner Glue More compliant solder SAC305 is relatively rigid, SAC105 and SNC are possible alternatives New laminate acceptance criteria and materials Best Mitigation! – Avoid the problem by not overstressing the interconnect Limitations on board flexure Simulation to predict the strains induced during ICT and highlight potential probles 750 to 500 microstrain, component and layout dependent Process Control & Validation Potential Mitigations to Pad Cratering
  • 14. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com oReview/perform ICT strain evaluation at fixture supplier and in process: o500 μs rule of thumb, critical for BTCs, CSP, and BGA packages oTo reduce the pressures exerted on the PCB: oFirst and simplest solution: reduce the probe forces when possible. oSecondly, optimize position of the fingers/stoppers to control probe forces. oOften difficult to achieve. Mechanically, the stoppers must be located exactly under the pressure fingers to avoid the creation of shear points ICT Strain: Fixture & Process Analysis
  • 15. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com Eliminate potential bed of nails (ICT) damage by: Identifying components on the circuit card that could experience cracking or failure during bed of nails testing. Prior to the ICT, the designer can optimize the process: Change test points Change pogo pin pressure, or Add /move board supports Sherlock analysis is component-specific, allowing for more precise identification of at-risk areas Sherlock Software
  • 16. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com Designers can identify potential bed of nails damage early in the layout process, before a bed of nails tester is ever designed Allows for tradeoff analyses, saving costly board damage and redesign. Sherlock – Automated Design Analysis Software
  • 17. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com oTest points are automatically loaded if defined in pick and place or the odb++ archive oFixture locations can also be imported Setup Test Points and Fixtures
  • 18. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com Test Point Modification
  • 19. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com oGuide Pins (mount hole) constrained in-plane (x,y) but can move up and down oSupport pin just constrained in the Z direction ICT Fixtures
  • 20. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com Finite Element Mesh
  • 21. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com Displacement
  • 22. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com Strain Results
  • 23. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com Component Risk
  • 24. © 2004 - 2007 2010 9000 Virginia Manor Rd Ste 290, Beltsville MD 20705 | 301-474-0607 | www.dfrsolutions.com Pad Cratering is an increasingly common failure mode Catastrophic and non-reworkable Easy to avoid detection and difficult to diagnose Partial cracks riskiest since they escape and expand in the field Multiple paths for mitigation Few for true prevention Best mitigation is to reduce board level strains No hard, fast rules for avoidance Dependent on design, component, layout, process… Simulation can be used to quantify the strains associated with ICT Pad Cratering Conclusions