Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Unit 1 task 3
1. Unit 1 Film Noir Task 3
Contract
I shall be completing to the best of my ability, all of the following roles and responsibilities listed
below. I shall also be completing all of the thirty five tasks in my action plan by myself no later
than 10:00 on Monday 4th July 2016.
1. Director
2. Producer
3. Scriptwriter
4. Storyboard artist
5. Assistant Director
6. Casting Director
7. Location Manager
8. Sound Engineer
9. Production Designer
10.Art Director
11.Costume Designer
12.Choreographer
Signed: Chelsie
Action Plan
No. TASK ROLE DESCRIPTION DATE
COMPLETED
1. 2 Create and write a narrative for
film noir
Wrote my story about
Detective Slater
Saturday 20th
February
2. 2 Mind Map Completed my ideas on a
mind map
Friday 10th
June
3. 2 Pre-production file Contents page, page
numbers – will complete
remainder after each task
Friday 10th
June
4. 3 Contract Completing 12 job roles in
this project on my own
Friday 10th
June
5. 3 Action plan 35 tasks to complete for
this unit
Friday 10th
June
6. Individual Pictures for individual brief 5-8 pictures for different
shots (CU face, CU
hand/feet, LS, MS,
Unusual)
Friday 10th
June
7. Individual Voice-over for individual brief 200 word voice-over for
Detective Slater
Friday 10th
June
8. 2 Research film noir Split the research into
groups of topic, audience,
conventions and legal and
ethical considerations.
Monday 13th
June
9. 2 Bibliography Complete as I go along, as
soon as I have researched
something update
immediately
Monday 13th
June
10.2 Research film noir Primary and secondary
research and Audience
Tuesday 14th
June
2. research
11.1 PowerPoint presentation Complete PowerPoint
presentation on all my roles
and responsibilities
Tuesday 14th
June
12.2 Idea Complete my idea in my
pre-presentation file.
Thursday 16th
June
13.2 Research film noir Audience research survey,
professional budget costs,
my budget costs and legal
and ethical considerations
Thursday 16th
June
14.2 Location reconnaissance Went to each location for
best angles and to visualise
each area. Added pictures
to my pre-production file
Tuesday 21st
June
15.2 Audience survey Went to local town and
asked twenty people seven
questions for my audience
survey
Tuesday 21st
June
16.2 Research film noir Completed my results from
the audience survey
Wednesday
22nd June
17.2 Shooting Script Detailed shot list Wednesday
22nd June
18.2 Shooting schedule Outline of places to shoot Wednesday
22nd June
19.2 Storyboard To show a visual flow of all
the scenes
Thursday 23rd
June
20.2 Production role All by me except cameo
role by victim
Thursday 23rd
June
21.2 Prop/costumes List all props/costumes
required and obtain before
filming starts
Thursday 23rd
June
22.2 Production schedule Detailed shot list, props,
scenes and when filming
Thursday 23rd
June
23.2 Call sheet Breakdown of each area
and what scenes I shall be
filming
Thursday 23rd
June
24.2 Bibliography Websites, book, survey Thursday 23rd
June
25.2 Health & Safety/Risk Assessment Assessment for police
station, car park and inside
the car
Sunday 26th
June
26.2 Film for short film noir Completed the police
station, car, inside the car
and getting out of the car
scenes
Sunday 26th
June
27.2 Health & Safety/Risk Assessment Assessment for walking
towards the crime scene,
murder scene and crime
scene
Saturday 2nd
July
28.2 Film for short film noir Completed walking towards
the crime scene, murder
scene and crime scene
Saturday 2nd
July
29.4 Photos for evaluation Took photos to show
setting up my camera
Saturday 2nd
July
3. 30.2 Confirmation of finance Confirmation of finance Sunday 3rd
July
31.2 Edit film noir Edit footage Sunday 3rd
July
32.2 Edit film noir Record voice-over Sunday 3rd
July
33.2 Edit film noir Add music Sunday 3rd
July
34.4 Evaluation 300 – 500 words
summarising tasks. Did 529
but allowed 10% leeway
Sunday 3rd
July
35.4 Diary Completed diary over
eleven days
Sunday 3rd
July