BUILDING
INFRASTRUCTURE
SUSTAINABLE
THE HEALTH
AND SAFETY OF
EVERYONE
WHO WORKS
ON OUR SITES
IS OUR FIRST
PRIORITY
TARGETED ACTIONS
OUR TEAMS WEAR PERSONAL
PROTECTIVE EQUIPMENT
AT ALL TIMES (HELMETS,
GLOVES, GLASSES, EARPLUGS…)
WE HOLD DAILY WARM-UP
SESSION
A ROBUST INTERNALACTION
PLAN: IN 2016, WE DEDICATED
40% OF TRAINING TIME
TO HEALTH AND SAFETY
A LEADER IN CIVIL WORKS
BOUYGUES TRAVAUX PUBLICS DELIVERS
TRANSPORT INFRASTRUCTURE AND MANAGES
CIVIL ENGINEERING PROJECTS IN THE ENERGY
AND ENVIRONMENT SECTOR
BOUYGUES TRAVAUX PUBLICS HAS RECOGNISED
EXPERTISE IN DEVELOPMENT AND MANAGEMENT
OF COMPLEX PROJECTS
BOUYGUES TRAVAUX PUBLICS’ SUCCESS IS
BUILT ON ITS TEAMS, THEIR EXPERTISE
AND MINDSET. IT IS ALSO BASED ON A CULTURE
OF INNOVATION AND A PROACTIVE R&D POLICY
VOLONTARISTE
PROJECT CULTURE
 RECOGNISED EXPERTISE IN
FINANCIALAND LEGAL ENGINEERING
 RESOURCES AND COMMITMENT
OF THE PROJECT MANAGEMENT
DEPARTMENT
 ABILITY TO DELIVER MAJOR WORKS
UNDER ALL TYPES OF CONTRACT
STRUCTURES
COMMITTED & RESPONSIBLE
FOR 10 YEARS NOW, BOUYGUES TRAVAUX PUBLICS
HAS BEEN PROVIDING ITS LOYAL SUPPORT FOR
CAUSES OF GENERAL INTEREST:
FOR DECADES, WE HAVE SUPPORTED THE
COMMUNITIES IN WHICH WE WORK. FROM SOUTH
AFRICA TO HONG KONG, WE HAVE DELIVERED
GLOBAL LEGACIES IN SKILLS, EMPLOYMENT,
SOCIAL INTEGRATION & HEALTH
FOCUS
292,000 HOURS
At the Nimes-Montpellier
high-speed rail scheme in
France, our consortium
dedicated 14% of working
time (292,000 hours) to
those in need of
occupational integration,
This was double the amount
requested by our client.
CIVIL ENGINEERING WITHIN THE GROUP
TELECOM TELEVISION CONSTRUCTION ACTIVITIES
CIVIL WORKS DIVISION
Construction Roads Property Development
Building Concessions Energy & Services
100 % 100 %96,6 %90,5 % 43,9 %
28,3 %
OUR ROOTS
The BOUYGUES
group enters the French
civil engineering market
RE ISLAND BRIDGE
FRANCE
Constructed in only 20 months.
This 2,9km bridge connects
Re Island to mainland France
PARC DES PRINCES
FRANCE
1st stadium constructed
by the group with a major
innovation: prefabrication and
assembly by post-tensioning of
load-bearing structures
THE CHANNEL TUNNEL
FRANCE / UNITED KINGDOM
At the time, the longest
underwater tunnel to be
excavated with TBMs
1965 1972 1988 1993 1997
CENTRAL RECLAMATION
HONG KONG
20 hectares land reclamation
for real estate development to
accommodate office buildings,
shopping malls, hotels and
subway public transport
OUR ROOTS
BEIRUT SEAFRONT
LEBANON
Construction of a dyke
using 80 2,000 tonne
wave-absorbing caissons,
constructed on land
and towed into position
OLKILUOTO 3 EPR
NUCLEAR POWER PLANT
FINLAND
Construction of the nuclear
island and back-up storage
buildings of the world’s first
third-generation European
Pressurized Reactor (EPR)
SYDNEY METRO
AUSTRALIA
At the time, the longest tunnel
to be excavated in Australia
and the first time a slurry
shield TBM was used
GAUTRAIN
SOUTH AFRICA
Construction of a 77km-long
commuter rail link comprising
15km of tunnels,10km
of viaducts and 10 stations
1998 2000 2011 2014
PORT MIAMI TUNNEL
UNITED STATES
Improvement of the access
to the Port of Miami with the
construction of a twin-tube
road tunnel in highly complex
ground conditions
FROM PROJECT DESIGN
TO OPERATION
AND MAINTENANCE,
BOUYGUES TRAVAUX
PUBLICS IS INVOLVED
IN THE ENTIRE
VALUE CHAIN
OF CONSTRUCTION
LIFECYCLE STRUCTURE
A MULTI-LOCAL PLAYER
A LONG-STANDING
PRESENCE
IN 6 COUNTRIES
A STRONG BASE
IN FRANCE,
WITH 3 DIVISIONS
A CAPACITY TO DELIVER
COMPLEX, HIGHLY TECHNICAL
PROJECTS AROUND
THE WORLD
UNITED KINGDOM SWITZERLAND
AUSTRALIA HONG KONG
EGYPT CROATIA
A STRONG BASE IN FRANCE
UN RÉSEAU
D’IMPLANTATIONS
RÉGIONALES
 Au contact et à l’écoute
des donneurs d’ordre
 L’éventail des métiers
de Bouygues Travaux
Publics
 Une spécialisation dans
les transports urbains
IMPROVING THE DAILY
LIVES OF THOSE LIVING
IN THE PARIS REGION
 Operating in urban
environments
 Multi-sector project
management
 Delivering within and
alongside ‘live’
infrastructure
NUCLEAR CORE
COMPETENCES
 Five fields of expertise
 Providing unprecedented
levels of nuclear-radiation
safety
 Robotics and dedicated
equipment
FRANCE
Extension of Line 14 Paris Metro (ongoing)
Flamanville EPR Nuclear power Plant (ongoing)
Brest Cable Car (2016)
Chatou River Dam (2013)
A41 Motorway (2008)
CÔTE D’IVOIRE
Tongon Goldmine (ongoing)
Henri-Konan-Bédié Bridge, Abidjan (2014)
USA
Port of Miami Tunnel (2014) QATAR
IDRIS - MTS01 (ongoing)
HONG KONG
Liantang Tunnel (ongoing)
SCL1128 Tunnel (ongoing)
Tsing Yi Viaduct (2008)
Tai Lam Tunnel (1998)
MTR 510 (1997)
AUSTRALIA
NorthConnex
Motorway Connection (ongoing)
Landsborough Highway
Reconstruction (2013)
Sydney Metro (2000)
REFERENCES
TUNNELS &
UNDERGROUND
STRUCTURES
RIVER &
MARINE
WORKS
BRIDGES
LINEAR
PROJECTS
INDUSTRIAL CIVIL
ENGINEERING
REHABILITATION EARTHWORKS MINING
EIGHT MAJOR FIELDS OF EXPERTISE
TUNNELS & UNDERGROUND STRUCTURES
BENCHMARK EXPERTISE
IN UNDERGROUND WORKS
 Tunnel boring machine (TBM) excavation:
slurry shield, earth-pressure balance,
double shield, variable density, multi-mode
 Traditional excavations: pre-support,
excavation, support
 Immersed-tube tunnels
17.63 METRES
At the time, the TBMs that
excavated the Groene Hart tunnel
in the Netherlands in 2000
(14.87m) and the 2009
Chongming tunnel in china
(15.43m) were the worlds largest.
So too, is our 17.63 leviathan at
the Tuen Mun-Chek Lap Kok
scheme in Hong Kong.
FOCUS
RIVER & MARINE WORKS
COMBINING BESPOKE
EQUIPMENT AND RECOGNISED
KNOW-HOW TO OVERCOME
UNIQUE ENVIRONMENTAL
CHALLENGES AND EXACTING
TECHNICAL REQUIREMENTS
 Ports
 Dams
 Wharves
 Dykes
 Locks
 Offshore structures
ZOURITE – To minimize impacts
on the marine ecology surrounding
the Reunion Island, a bespoke
jack-up barge of the size of a
soccer field was engineered and
constructed to place the massive
4,800 tons precast piles into
position.
FOCUS
8 PILLARS
BRIDGES
LONG-STANDING,
RECOGNISED EXPERTISE
IN THE DESIGN AND
DELIVERY OF HIGHLY
TECHNICAL PROJECTS
 Cable-stayed bridges
 Suspension bridges
 Bow-string bridges
 Arch bridges
 Mixed bridges
42 KM
Bouygues Travaux Publics
and its subsidiary Dragages Hong
Kong are currently completing the
9.4km Hong Kong section of the
world’s largest sea bridge
between Hong Kong, Macao and
Zhuhai. It will carry a 2 x 3-lane
motorway, suspended over the
sea for some 42km.
FOCUS
SOLID EXPERIENCE
OF DELIVERING MAJOR
ROAD AND RAIL
INFRASTRUCTURE
PROJECTS
 Roads
 Motorways
 Railways
 Metro lines
 Tramway lines
LINEAR PROJECTS
80 KM OF HIGH SPEED AND FREIGHT LINES
The Nimes-Montpellier Bypass will provide
the ‘missing link’ of the future European
rail network between Spain and Central
Europe, The 80km line represents the
first combined rail-and-freight route in
France and comprises 188 civil structures,
110 of which are classed as hydraulic and
minimise our impact on natural habitats.
FOCUS
EXTENSIVE EXPERIENCE OF
CONSTRUCTING MAJOR ENERGY
AND INDUSTRIAL FACILITIES
INDUSTRIAL CIVIL ENGINEERING
 Nuclear power plants
 Waste treatment plants
 LNG tanks
 Water treatment plants
 Hydroelectric facilities
 Thermal power plants
 Maintenance and storage sites
36,000 TONNES OF STEEL
108 metres – or the equivalent of
a 30-storey tower, but also 36,000
tonnes and 160 metres long, such are
the dimensions of the metallic arch
which covers the Chernobyl
sarcophagus (Ukraine) built after the
catastrophe to enable the damaged
reactor to be dismantled.
FOCUS
INNOVATIVE SOLUTIONS
THAT EXTEND THE LIFETIME
OF A STRUCTURE
 Rehabilitation
 Maintenance
 Reinforcement
 Retrofit
REHABILITATION AND REINFORCEMENT OF STRUCTURES
To rehabilitate the Saint-Nazaire Bridge in
France, all in-house expertise in the field of
reinforcement was mobilised: additional
post-tensioning, modified hydraulic binder
to waterproof concrete, reinforced concrete
and a post-tensioning process using
carbon strips glued to the support.
FOCUS
4 IN 1
EARTH MOVEMENT
EXPERTISE IN COMPLEX
INFRASTRUCTURE WORK
 Managing and storing cut and fill
 Optimising route alignments
 Treating & decontaminating soil
 Drainage works
 Riprap works
EARTHWORKS
UBYSOL
To monitor the excavation of material
from worksites and ensure transparency
from material extraction to final
desposal, the company has developed
an innovative traceability solution
based on the technology of integrated
connected objects, for road transport
mode (Standard Ubysol) and river or
multimodal transport (Multi Ubysol).
FOCUS
SURFACE MINING
A PARTNER OF
CHOICE FOR MINING
INFRASTRUCTURE
WITH HIGHLY SPECIFIC
REQUIREMENTS
 Engineering
 Drill and blast
 Load and haul
 Maintenance
In the Kibali Goldmine
(Democratic Republic of
the Congo), as in all mines
where DTP Mining operates,
all maintenance of the
equipment fleet is carried out
on site by our teams. As a
result: our dumpers are
operational for over 6,100
hours a year.
FOCUS
6,100 HOURS / YEAR
ENGINEERING AT THE CORE OF OUR PERFORMANCE
A TECHNICAL DEPARTMENT MADE UP OF 400 STAFF
THROUGHOUT THE WORLD
PROJECT MANAGEMENT FROM DESIGN TO
CONSTRUCTION FOR:
 Securing planning
 Maintaining the highest possible quality standards
 Optimising costs
A TASK-FORCE ATTENTIVE TO PROJECT NEEDS
AND SPECIFIC REQUIREMENTS
 Designing key elements in-house
 Designing and constructing the required plant and
equipment after validating their specifications
INNOVATION IS AT THE CORE OF OUR
CULTURE AND PERFORMANCE.
TO BE USEFUL TO ALL,
INNOVATION HAS TO BE SHARED.
A TEAM IS DEDICATED TO INNOVATION
AND CREATIVITY TASKED WITH DEVELOPING
THE IDEAS, PRODUCTS AND TECHNOLOGIES
OF TOMORROW.
25 YEARS OF INNOVATION
TELEMACH
an unique robotic arm that we use to replace
worn cutter disks on our TBM cutter heads
MOBYDIC
a cutter-and-guidance system that enables
our TBM pilots to adapt to the prevailing
geology
PYXIS
uses state-of-the-art technology to calculate
TBM steering parameters and position
precast rings
THALIA
the world’s first TBM simulator
ROBY 850
an automated robot that drills holes in the
walls of our tunnels so that we can install
vital equipment
TO DISCOVER ON
www.bouygues-construction.com
THE LATEST NEWS FROM
… AND TO SHARE
ON SOCIAL NETWORKS
THANK YOUMERCI

More Related Content

Similar to Bouygues Travaux Publics_Corporate Presentation

HSR Spain Inc Group
HSR Spain Inc GroupHSR Spain Inc Group
HSR Spain Inc Group
Inc Group
 
Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis
 

Similar to Bouygues Travaux Publics_Corporate Presentation (20)

Atkins' tunnelling projects
Atkins' tunnelling projectsAtkins' tunnelling projects
Atkins' tunnelling projects
 
Sky Way - Future Innovative Transport
Sky Way - Future Innovative TransportSky Way - Future Innovative Transport
Sky Way - Future Innovative Transport
 
CAF Presentation
CAF PresentationCAF Presentation
CAF Presentation
 
Nr idea workshop oxford april 2016 version1
Nr idea workshop oxford april 2016 version1Nr idea workshop oxford april 2016 version1
Nr idea workshop oxford april 2016 version1
 
Runway construction project execution plan
Runway construction project execution plan Runway construction project execution plan
Runway construction project execution plan
 
On the road
On the roadOn the road
On the road
 
HSR Spain Inc Group
HSR Spain Inc GroupHSR Spain Inc Group
HSR Spain Inc Group
 
Anese brochure
Anese brochure Anese brochure
Anese brochure
 
Snr. civil eng. ibrahim hamdan
Snr. civil eng. ibrahim hamdan  Snr. civil eng. ibrahim hamdan
Snr. civil eng. ibrahim hamdan
 
The Millau Viaduct Project - An Engineering Marvel
The Millau Viaduct Project - An Engineering MarvelThe Millau Viaduct Project - An Engineering Marvel
The Millau Viaduct Project - An Engineering Marvel
 
Visite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore windVisite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore wind
 
Infrastructure (English)
Infrastructure (English)Infrastructure (English)
Infrastructure (English)
 
Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1
 
Presentation on Millau viaduct
Presentation on Millau viaductPresentation on Millau viaduct
Presentation on Millau viaduct
 
FWP 2017 l Sylvain MONTELS, Piriou
FWP 2017 l Sylvain MONTELS, PiriouFWP 2017 l Sylvain MONTELS, Piriou
FWP 2017 l Sylvain MONTELS, Piriou
 
Moving London Forward - Crossrail
Moving London Forward - Crossrail Moving London Forward - Crossrail
Moving London Forward - Crossrail
 
2017 AEC Excellence Awards Finalists
2017 AEC Excellence Awards Finalists2017 AEC Excellence Awards Finalists
2017 AEC Excellence Awards Finalists
 
Seven Wonders Of Concrete
Seven  Wonders Of  ConcreteSeven  Wonders Of  Concrete
Seven Wonders Of Concrete
 
Seven Wonders of Concrete: Vote for your favourite project
Seven Wonders of Concrete: Vote for your favourite projectSeven Wonders of Concrete: Vote for your favourite project
Seven Wonders of Concrete: Vote for your favourite project
 
2015 Excellence in Infrastructure Submissions
2015 Excellence in Infrastructure Submissions2015 Excellence in Infrastructure Submissions
2015 Excellence in Infrastructure Submissions
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Recently uploaded (20)

Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 

Bouygues Travaux Publics_Corporate Presentation

  • 2. THE HEALTH AND SAFETY OF EVERYONE WHO WORKS ON OUR SITES IS OUR FIRST PRIORITY
  • 3. TARGETED ACTIONS OUR TEAMS WEAR PERSONAL PROTECTIVE EQUIPMENT AT ALL TIMES (HELMETS, GLOVES, GLASSES, EARPLUGS…) WE HOLD DAILY WARM-UP SESSION A ROBUST INTERNALACTION PLAN: IN 2016, WE DEDICATED 40% OF TRAINING TIME TO HEALTH AND SAFETY
  • 4. A LEADER IN CIVIL WORKS BOUYGUES TRAVAUX PUBLICS DELIVERS TRANSPORT INFRASTRUCTURE AND MANAGES CIVIL ENGINEERING PROJECTS IN THE ENERGY AND ENVIRONMENT SECTOR BOUYGUES TRAVAUX PUBLICS HAS RECOGNISED EXPERTISE IN DEVELOPMENT AND MANAGEMENT OF COMPLEX PROJECTS BOUYGUES TRAVAUX PUBLICS’ SUCCESS IS BUILT ON ITS TEAMS, THEIR EXPERTISE AND MINDSET. IT IS ALSO BASED ON A CULTURE OF INNOVATION AND A PROACTIVE R&D POLICY VOLONTARISTE
  • 5. PROJECT CULTURE  RECOGNISED EXPERTISE IN FINANCIALAND LEGAL ENGINEERING  RESOURCES AND COMMITMENT OF THE PROJECT MANAGEMENT DEPARTMENT  ABILITY TO DELIVER MAJOR WORKS UNDER ALL TYPES OF CONTRACT STRUCTURES
  • 6. COMMITTED & RESPONSIBLE FOR 10 YEARS NOW, BOUYGUES TRAVAUX PUBLICS HAS BEEN PROVIDING ITS LOYAL SUPPORT FOR CAUSES OF GENERAL INTEREST: FOR DECADES, WE HAVE SUPPORTED THE COMMUNITIES IN WHICH WE WORK. FROM SOUTH AFRICA TO HONG KONG, WE HAVE DELIVERED GLOBAL LEGACIES IN SKILLS, EMPLOYMENT, SOCIAL INTEGRATION & HEALTH
  • 7. FOCUS 292,000 HOURS At the Nimes-Montpellier high-speed rail scheme in France, our consortium dedicated 14% of working time (292,000 hours) to those in need of occupational integration, This was double the amount requested by our client.
  • 8. CIVIL ENGINEERING WITHIN THE GROUP TELECOM TELEVISION CONSTRUCTION ACTIVITIES CIVIL WORKS DIVISION Construction Roads Property Development Building Concessions Energy & Services 100 % 100 %96,6 %90,5 % 43,9 % 28,3 %
  • 9. OUR ROOTS The BOUYGUES group enters the French civil engineering market RE ISLAND BRIDGE FRANCE Constructed in only 20 months. This 2,9km bridge connects Re Island to mainland France PARC DES PRINCES FRANCE 1st stadium constructed by the group with a major innovation: prefabrication and assembly by post-tensioning of load-bearing structures THE CHANNEL TUNNEL FRANCE / UNITED KINGDOM At the time, the longest underwater tunnel to be excavated with TBMs 1965 1972 1988 1993 1997 CENTRAL RECLAMATION HONG KONG 20 hectares land reclamation for real estate development to accommodate office buildings, shopping malls, hotels and subway public transport
  • 10. OUR ROOTS BEIRUT SEAFRONT LEBANON Construction of a dyke using 80 2,000 tonne wave-absorbing caissons, constructed on land and towed into position OLKILUOTO 3 EPR NUCLEAR POWER PLANT FINLAND Construction of the nuclear island and back-up storage buildings of the world’s first third-generation European Pressurized Reactor (EPR) SYDNEY METRO AUSTRALIA At the time, the longest tunnel to be excavated in Australia and the first time a slurry shield TBM was used GAUTRAIN SOUTH AFRICA Construction of a 77km-long commuter rail link comprising 15km of tunnels,10km of viaducts and 10 stations 1998 2000 2011 2014 PORT MIAMI TUNNEL UNITED STATES Improvement of the access to the Port of Miami with the construction of a twin-tube road tunnel in highly complex ground conditions
  • 11. FROM PROJECT DESIGN TO OPERATION AND MAINTENANCE, BOUYGUES TRAVAUX PUBLICS IS INVOLVED IN THE ENTIRE VALUE CHAIN OF CONSTRUCTION LIFECYCLE STRUCTURE
  • 12. A MULTI-LOCAL PLAYER A LONG-STANDING PRESENCE IN 6 COUNTRIES A STRONG BASE IN FRANCE, WITH 3 DIVISIONS A CAPACITY TO DELIVER COMPLEX, HIGHLY TECHNICAL PROJECTS AROUND THE WORLD UNITED KINGDOM SWITZERLAND AUSTRALIA HONG KONG EGYPT CROATIA
  • 13. A STRONG BASE IN FRANCE UN RÉSEAU D’IMPLANTATIONS RÉGIONALES  Au contact et à l’écoute des donneurs d’ordre  L’éventail des métiers de Bouygues Travaux Publics  Une spécialisation dans les transports urbains IMPROVING THE DAILY LIVES OF THOSE LIVING IN THE PARIS REGION  Operating in urban environments  Multi-sector project management  Delivering within and alongside ‘live’ infrastructure NUCLEAR CORE COMPETENCES  Five fields of expertise  Providing unprecedented levels of nuclear-radiation safety  Robotics and dedicated equipment
  • 14. FRANCE Extension of Line 14 Paris Metro (ongoing) Flamanville EPR Nuclear power Plant (ongoing) Brest Cable Car (2016) Chatou River Dam (2013) A41 Motorway (2008) CÔTE D’IVOIRE Tongon Goldmine (ongoing) Henri-Konan-Bédié Bridge, Abidjan (2014) USA Port of Miami Tunnel (2014) QATAR IDRIS - MTS01 (ongoing) HONG KONG Liantang Tunnel (ongoing) SCL1128 Tunnel (ongoing) Tsing Yi Viaduct (2008) Tai Lam Tunnel (1998) MTR 510 (1997) AUSTRALIA NorthConnex Motorway Connection (ongoing) Landsborough Highway Reconstruction (2013) Sydney Metro (2000) REFERENCES
  • 15. TUNNELS & UNDERGROUND STRUCTURES RIVER & MARINE WORKS BRIDGES LINEAR PROJECTS INDUSTRIAL CIVIL ENGINEERING REHABILITATION EARTHWORKS MINING EIGHT MAJOR FIELDS OF EXPERTISE
  • 16. TUNNELS & UNDERGROUND STRUCTURES BENCHMARK EXPERTISE IN UNDERGROUND WORKS  Tunnel boring machine (TBM) excavation: slurry shield, earth-pressure balance, double shield, variable density, multi-mode  Traditional excavations: pre-support, excavation, support  Immersed-tube tunnels
  • 17. 17.63 METRES At the time, the TBMs that excavated the Groene Hart tunnel in the Netherlands in 2000 (14.87m) and the 2009 Chongming tunnel in china (15.43m) were the worlds largest. So too, is our 17.63 leviathan at the Tuen Mun-Chek Lap Kok scheme in Hong Kong. FOCUS
  • 18. RIVER & MARINE WORKS COMBINING BESPOKE EQUIPMENT AND RECOGNISED KNOW-HOW TO OVERCOME UNIQUE ENVIRONMENTAL CHALLENGES AND EXACTING TECHNICAL REQUIREMENTS  Ports  Dams  Wharves  Dykes  Locks  Offshore structures
  • 19. ZOURITE – To minimize impacts on the marine ecology surrounding the Reunion Island, a bespoke jack-up barge of the size of a soccer field was engineered and constructed to place the massive 4,800 tons precast piles into position. FOCUS 8 PILLARS
  • 20. BRIDGES LONG-STANDING, RECOGNISED EXPERTISE IN THE DESIGN AND DELIVERY OF HIGHLY TECHNICAL PROJECTS  Cable-stayed bridges  Suspension bridges  Bow-string bridges  Arch bridges  Mixed bridges
  • 21. 42 KM Bouygues Travaux Publics and its subsidiary Dragages Hong Kong are currently completing the 9.4km Hong Kong section of the world’s largest sea bridge between Hong Kong, Macao and Zhuhai. It will carry a 2 x 3-lane motorway, suspended over the sea for some 42km. FOCUS
  • 22. SOLID EXPERIENCE OF DELIVERING MAJOR ROAD AND RAIL INFRASTRUCTURE PROJECTS  Roads  Motorways  Railways  Metro lines  Tramway lines LINEAR PROJECTS
  • 23. 80 KM OF HIGH SPEED AND FREIGHT LINES The Nimes-Montpellier Bypass will provide the ‘missing link’ of the future European rail network between Spain and Central Europe, The 80km line represents the first combined rail-and-freight route in France and comprises 188 civil structures, 110 of which are classed as hydraulic and minimise our impact on natural habitats. FOCUS
  • 24. EXTENSIVE EXPERIENCE OF CONSTRUCTING MAJOR ENERGY AND INDUSTRIAL FACILITIES INDUSTRIAL CIVIL ENGINEERING  Nuclear power plants  Waste treatment plants  LNG tanks  Water treatment plants  Hydroelectric facilities  Thermal power plants  Maintenance and storage sites
  • 25. 36,000 TONNES OF STEEL 108 metres – or the equivalent of a 30-storey tower, but also 36,000 tonnes and 160 metres long, such are the dimensions of the metallic arch which covers the Chernobyl sarcophagus (Ukraine) built after the catastrophe to enable the damaged reactor to be dismantled. FOCUS
  • 26. INNOVATIVE SOLUTIONS THAT EXTEND THE LIFETIME OF A STRUCTURE  Rehabilitation  Maintenance  Reinforcement  Retrofit REHABILITATION AND REINFORCEMENT OF STRUCTURES
  • 27. To rehabilitate the Saint-Nazaire Bridge in France, all in-house expertise in the field of reinforcement was mobilised: additional post-tensioning, modified hydraulic binder to waterproof concrete, reinforced concrete and a post-tensioning process using carbon strips glued to the support. FOCUS 4 IN 1
  • 28. EARTH MOVEMENT EXPERTISE IN COMPLEX INFRASTRUCTURE WORK  Managing and storing cut and fill  Optimising route alignments  Treating & decontaminating soil  Drainage works  Riprap works EARTHWORKS
  • 29. UBYSOL To monitor the excavation of material from worksites and ensure transparency from material extraction to final desposal, the company has developed an innovative traceability solution based on the technology of integrated connected objects, for road transport mode (Standard Ubysol) and river or multimodal transport (Multi Ubysol). FOCUS
  • 30. SURFACE MINING A PARTNER OF CHOICE FOR MINING INFRASTRUCTURE WITH HIGHLY SPECIFIC REQUIREMENTS  Engineering  Drill and blast  Load and haul  Maintenance
  • 31. In the Kibali Goldmine (Democratic Republic of the Congo), as in all mines where DTP Mining operates, all maintenance of the equipment fleet is carried out on site by our teams. As a result: our dumpers are operational for over 6,100 hours a year. FOCUS 6,100 HOURS / YEAR
  • 32. ENGINEERING AT THE CORE OF OUR PERFORMANCE A TECHNICAL DEPARTMENT MADE UP OF 400 STAFF THROUGHOUT THE WORLD PROJECT MANAGEMENT FROM DESIGN TO CONSTRUCTION FOR:  Securing planning  Maintaining the highest possible quality standards  Optimising costs A TASK-FORCE ATTENTIVE TO PROJECT NEEDS AND SPECIFIC REQUIREMENTS  Designing key elements in-house  Designing and constructing the required plant and equipment after validating their specifications
  • 33. INNOVATION IS AT THE CORE OF OUR CULTURE AND PERFORMANCE. TO BE USEFUL TO ALL, INNOVATION HAS TO BE SHARED. A TEAM IS DEDICATED TO INNOVATION AND CREATIVITY TASKED WITH DEVELOPING THE IDEAS, PRODUCTS AND TECHNOLOGIES OF TOMORROW.
  • 34. 25 YEARS OF INNOVATION TELEMACH an unique robotic arm that we use to replace worn cutter disks on our TBM cutter heads MOBYDIC a cutter-and-guidance system that enables our TBM pilots to adapt to the prevailing geology PYXIS uses state-of-the-art technology to calculate TBM steering parameters and position precast rings THALIA the world’s first TBM simulator ROBY 850 an automated robot that drills holes in the walls of our tunnels so that we can install vital equipment
  • 35. TO DISCOVER ON www.bouygues-construction.com THE LATEST NEWS FROM … AND TO SHARE ON SOCIAL NETWORKS