SlideShare a Scribd company logo
1 of 3
dd9f2622-30ab-4a43-be52-ab7e23a85acc-150807120804-lva1-app6892
Carolann Seavers
90 Middlethorpe Grove.
Dringhouses.
York. YO24 1JY.
Home Tel. 01904 705578
Mobile Tel. 07986275107
Email:- carolannjb@googlemail.com
Signal Design Engineer
Profile Key Experience Profession
I am enthusiastic and focused with
excellent communication skills.
I am proficientin the use of
microstation versions J & 8 and has
a good command ofMicrosoftWord
& Excel.
 New Build Locations/Fringe design
and associated source documents
 Testing and Commissioning ofmost
major projects she has worked on
RailwaySignalling Design Engineer
Nationality
British
English – mother tongue
Qualifications
IRSE Design Licence
Module 3C & 5 Tester
SSI / RRI Location / REB Designer &
Checker
IRSE Assessor
Experience with Atkins (Aug 2009 – Present)
Signal Design Engineer: Major Projects worked on include:
Bowesfield /Clarborough /Derby S&C Renewals. Production ofcorrelation specification and correlation waiver. Also
responsible for organising staffto enable the correlation works to commence. Costing of2 days correlation on
Clarborough. Bonding on Bowesfield found to be non-compliant so design was produced to bring it in line with current
standards.
Thornton Fields De-commissioning. Carried outdetail design for locations,Bonding plans. Recovery of redundant
equipmentand alterations to modules Inputs and Outputs. Equipment/Interlocking : - SSI/RRI, Point machines,AC
immune DC Track Circuits,4 Aspect Colour lightsignals,Position ground lightsignals,AWS, TPWS TSS/OSS loops.
Angel Lane. Detailed design oflocations,cable schematics /cores,TFM Schematics,Control Tables. Removal ofpoints
and temporary false fed into SSI until new points installed and final data change.
Lea Valley on Network Works –Carried outdetailed design for Bonding Diagrams,Power Calculations,Location Design
and Route Lists (RRI,TI21 Track Circuits,3 Aspect Colour LightSignals,Position LightGround Signals,LOS Signals,
AWS, TPWS TSS/OSS Loops)
Leicester Junction S&C Renewals – Carried outcorrelation,produced Assetand Correlation Report(RRI,3 Crossovers,2
Turnouts & fixed Diamonds,Points renewed from Westinghouse type 63’s to HW2000 Point Machines)
Hackney Downs North & South S&C Renewals – Carried outdetailed design for locations (Recoveryof Redundant
Equipment,Detailed design ofNew Mk2 Clamp Locks – RCPL’s)
Drax Power Station – Carried outcorrelation updates which included redrawing oflocations,detailed design ofAspect
Sequence Charts,Sub-Routes/Sub-Overlap diagrams,Location’s/REB’s & Modifications.(DC Track Circuits,3/2 Aspect
LED Signals,HW2000 PointMachines,Position LightSignals,LOS Signals & AWS)
Redditch Branch Enhancements – Carried out, correlation updates,detailed design ofAspect Sequence Charts,Panel
dd9f2622-30ab-4a43-be52-ab7e23a85acc-150807120804-lva1-app6892
Design (Mentor Checking),Panel Wiring (Mentor Checking),Location Design & Mentor Checking of Location Design
which included recovery of redundantequipment,detailed design ofAxle Counters,LED Signals,AWS, TPWS OSS &
TSS, PSR OSS, SSI Data Link Diversity Change,Class IIDouble Insulated Power Supply.(Mk2 SSI Interlocking,LED
Signals,Train Detection for Redditch Branch – Thales AzLM Axle Counters,NX Panel)
Norwich/Yarmouth/LowestoftRe-Signalling – Carried outcosting ofcorrelation,Correlation Scope,Correlation Waiver,
Correlation Bundles,Booking in of source documents.
Yarmouth S & C Stageworks – Carried out FPS production,Design Methodology,Mentor checks of Yarmouth SDS New
Location “F” which housed new pointcircuitry.
Secondmentto Siemens – PointStageworks – Carried out A3 scheme plan extracts,9 pointstage which involved
conversion of existing pointmachines to HW2000 each being temporarilyoperated from the existing system.
Secondmentto Siemens – Great Coates No.1 SB Fringe – Carried out detailed design for correlation updates,Absent
switch controls,basic aspectcontrols between the interlockings in the Up & Down directions, Renewal ofGreat Coates
No1. Signal Box Diagram,Air sheets,New SB location to facilitate the fringe requirements which would notfit under the
Signal Box, Through Circuits,Alterations to Great Coates No.1 SB Circuits.Control Tables,Cabling Details.
Secondment to Siemens – Immingham Reception Sidings Fringe – Carried out detail design for, Basic
aspect controls transferred between the interlockings, Fringe boundary moved on the Up Immingham Line
one signal section into the Immingham Reception SB area, The limit of track section indications required to
be passed between the two signal boxes, Recovery of 650V power supply new 110V supply provided,
Control Tables, Cabling Details, Through Circuits, Location/Relay Rooms, Immingham Reception Sidings SB
Panel.
Experience with Volker Rail Signalling Ltd (Feb 2008 – Jun 2009)
Lead Designer: Duties included working closelywith the Design Manager to ensure the safe and effective delivery of the
VolkerRail Signalling design order book.Production and checking ofsignalling design to currentstandards and
procedures. Mentoring junior members ofstaff. Performing testing duties when required.
Major projects worked on included:
Hull Docks FreightLine Enhancement,Power enabling stages,RRILocation design.NRGreturns.
Lee Valley on Network Works, TFM schematic,fringe design (RRI – SSI).
Manchester Airport Third Platform, Independentcheck of location,signal with PL, TPWS TSS/OSS, RA/OFF Indicators,
INT R, TRTS, SSI signal modules.
Experience with Westinghouse Signals Ltd (Mar 1998 – Feb 2008)
Designer: Production and checking of signalling design to currentstandards and procedures. Mentoring junior members
of staff. Performing testing duties when required.
Major projects include:
RA/CD Indicators - Waterloo, Clapham & Twickenham,Location design & final records.
Euston/Willesden Area Re-signalling.Signalling plan design.Testing and Commissioning.
Dartford Re-signalling,SSILocation design.
CTRL (Dagenham Dock Re-signalling),Aspectsequence chartdesign.
Level Crossing Standards,Design.
West Anglia Route Modernisation (Stages 1 – 5), REB & location,TFM schematics,Cables schematics/cable core plans,
New location fringe design,Points,power,signal & data link stageworks.Testing and Commissioning
Glen Parva – Nuneaton Re-signalling,production and checking ofSSI AZLM Axle Counter Locations.
Knottingley – Ferrybridge Re-signalling,SSIfringe locations (Interfacing with RRI)
Lincoln – West Holmes Interlocking Renewal,Top nutting , new relay room.
Data logger(SA-380) design.Correlation ofWestinghouse circuitcontroller type “L” lever bands.Testing and
Commissioning ofall stage works and final Commissioning.NRGreturns.
Colton/Hambleton/TempleHirst,Robusttrain protection design.
Moorthorpe – Hickleton Interlocking Renewal GRP 1 – 4, Scheme plan updates,location plan,data link schematic,TFM
schematic,power supply,cable schematic design.
Alnmouth/Tweedmouth Panel Refurbishment’s,Like for like renewal of existing panel,PMUX renewal,SSI data change
(new PMUX allocations were less in each card). NRG returns.
Wakefield/Oakenshaw Re-signalling,York IECC & Horbury Jcn. S.B EmergencyAlarm design.
dd9f2622-30ab-4a43-be52-ab7e23a85acc-150807120804-lva1-app6892
Experience with SCUK Northern Group (Aug 1997 – Mar 1998)
Designer: Production of signalling design to currentstandards and procedures. Performing testing duties when required.
Major projects include Liverpool Street Non – Specific, Phase 3 NRG returns.
Experience with Interlogic Control Engineering (Mar 1994 – Sep 1995)
Designer: Production of signalling design to currentstandards and procedures. Performing testing duties when required.
Major projects include London Bridge TDM Renewal,TDM system design.
Experience with SCUK Northern Group (Apr 1991 – Jun 1993)
Designer: Production of signalling design to currentstandards and procedures. Performing testing duties when required.
Major projects include Newcastle Electrification,SSI Location Design,Scheme,Bonding and Location plan amendments.
Testing & Commissioning.
Experience with British Rail S&TE Dept (Oct 1989 – Apr 1991)
Design Assistant: - Production of signalling design to currentstandards and procedures. Performing testing duties when
required.
Major projects include Peterborough Re-signalling,Location Design,Scheme,Bonding and Location plan amendments.
Testing & Commissioning.
Littleport – Kings Lynn Re-signalling/Electrification,Testsection secondment.
Tracer (1983 – 1988): - Production of signalling design to currentstandards and procedures. Performing testing duties
when required. Updating drawings,re-drawing negatives.Trimming and folding prints.Signal box/Panel diagram design,
paint, varnish.

More Related Content

What's hot

Yan zhang resume
Yan zhang resumeYan zhang resume
Yan zhang resumeYanZhang314
 
Tresa_resume_01192016
Tresa_resume_01192016Tresa_resume_01192016
Tresa_resume_01192016Tresa Tieu
 
Resume_update 6.15.16
Resume_update 6.15.16Resume_update 6.15.16
Resume_update 6.15.16Wayne Huffer
 
Pmp rf engineer resume
Pmp rf engineer resumePmp rf engineer resume
Pmp rf engineer resumeAhmad Hedib
 
Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)Nabeel Aslam
 
Hancock,Bryan Bsee Revised Jh
Hancock,Bryan Bsee Revised JhHancock,Bryan Bsee Revised Jh
Hancock,Bryan Bsee Revised Jhguestd8e9fb1b
 
Amjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yAmjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yMasood Dar
 
Daisy_resume_2016_s
Daisy_resume_2016_sDaisy_resume_2016_s
Daisy_resume_2016_sDaisy Ingram
 
Stephen kramer resume updated 2
Stephen kramer resume updated 2Stephen kramer resume updated 2
Stephen kramer resume updated 2Stephen Kramer
 
Safety govt job bangalore walk in 12
Safety govt job bangalore walk in 12Safety govt job bangalore walk in 12
Safety govt job bangalore walk in 12Balaji Rajasekaran
 

What's hot (20)

GPSANDOR_2016
GPSANDOR_2016GPSANDOR_2016
GPSANDOR_2016
 
Yan zhang resume
Yan zhang resumeYan zhang resume
Yan zhang resume
 
Tresa_resume_01192016
Tresa_resume_01192016Tresa_resume_01192016
Tresa_resume_01192016
 
My Profile - SHI
My Profile - SHIMy Profile - SHI
My Profile - SHI
 
WORK EXPERIENCE
WORK EXPERIENCEWORK EXPERIENCE
WORK EXPERIENCE
 
Resume_update 6.15.16
Resume_update 6.15.16Resume_update 6.15.16
Resume_update 6.15.16
 
KW resume 2015
KW resume 2015KW resume 2015
KW resume 2015
 
Gerrard Michaels CV 2016
Gerrard Michaels CV 2016Gerrard Michaels CV 2016
Gerrard Michaels CV 2016
 
Pmp rf engineer resume
Pmp rf engineer resumePmp rf engineer resume
Pmp rf engineer resume
 
Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)
 
Mohammad Alsaleem cv rf
Mohammad Alsaleem cv rfMohammad Alsaleem cv rf
Mohammad Alsaleem cv rf
 
Usman khan Resume
Usman khan ResumeUsman khan Resume
Usman khan Resume
 
Hancock,Bryan Bsee Revised Jh
Hancock,Bryan Bsee Revised JhHancock,Bryan Bsee Revised Jh
Hancock,Bryan Bsee Revised Jh
 
Amjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yAmjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15y
 
Daisy_resume_2016_s
Daisy_resume_2016_sDaisy_resume_2016_s
Daisy_resume_2016_s
 
Stephen kramer resume updated 2
Stephen kramer resume updated 2Stephen kramer resume updated 2
Stephen kramer resume updated 2
 
Ahmet_Ondortoglu Resume
Ahmet_Ondortoglu ResumeAhmet_Ondortoglu Resume
Ahmet_Ondortoglu Resume
 
Reden_CV
Reden_CVReden_CV
Reden_CV
 
LinkedinResume033015
LinkedinResume033015LinkedinResume033015
LinkedinResume033015
 
Safety govt job bangalore walk in 12
Safety govt job bangalore walk in 12Safety govt job bangalore walk in 12
Safety govt job bangalore walk in 12
 

Viewers also liked

Project 1 integration march 2015
Project 1 integration march 2015Project 1 integration march 2015
Project 1 integration march 2015apongmalik
 
Elg assignment 2
Elg assignment 2Elg assignment 2
Elg assignment 2apongmalik
 
Project 2 design process research & analysis mac 2015
Project 2 design process research & analysis mac 2015Project 2 design process research & analysis mac 2015
Project 2 design process research & analysis mac 2015apongmalik
 
Personaliti warna2
Personaliti warna2Personaliti warna2
Personaliti warna2chewan03
 
Project 1 brief cts mac 2015
Project 1 brief cts mac 2015Project 1 brief cts mac 2015
Project 1 brief cts mac 2015apongmalik
 
Final project enbe
Final project enbeFinal project enbe
Final project enbeapongmalik
 
Treasury_ManagementGWSCPAV1
Treasury_ManagementGWSCPAV1Treasury_ManagementGWSCPAV1
Treasury_ManagementGWSCPAV1Leonard Williams
 
2015 InsideNGO Presentation on FX management
2015 InsideNGO Presentation on FX management2015 InsideNGO Presentation on FX management
2015 InsideNGO Presentation on FX managementLeonard Williams
 
An introduction to Blockchain (for nontechnical people)
An introduction to Blockchain (for nontechnical people)An introduction to Blockchain (for nontechnical people)
An introduction to Blockchain (for nontechnical people)Miguel Neumann
 
Reward points: Loyalty or Captivity?
Reward points: Loyalty or Captivity?Reward points: Loyalty or Captivity?
Reward points: Loyalty or Captivity?Miguel Neumann
 
Optical_Fiber_Technology
Optical_Fiber_TechnologyOptical_Fiber_Technology
Optical_Fiber_Technologyrajen maji
 

Viewers also liked (17)

Project 2 itd
Project 2 itdProject 2 itd
Project 2 itd
 
Mrinmoy Banerjee - CV(2)
Mrinmoy Banerjee - CV(2)Mrinmoy Banerjee - CV(2)
Mrinmoy Banerjee - CV(2)
 
MSM_CapstoneFINAL
MSM_CapstoneFINALMSM_CapstoneFINAL
MSM_CapstoneFINAL
 
Project 1 integration march 2015
Project 1 integration march 2015Project 1 integration march 2015
Project 1 integration march 2015
 
Mrinmoy Banerjee - CV(2)
Mrinmoy Banerjee - CV(2)Mrinmoy Banerjee - CV(2)
Mrinmoy Banerjee - CV(2)
 
Bus1
Bus1Bus1
Bus1
 
Elg assignment 2
Elg assignment 2Elg assignment 2
Elg assignment 2
 
Project 2 design process research & analysis mac 2015
Project 2 design process research & analysis mac 2015Project 2 design process research & analysis mac 2015
Project 2 design process research & analysis mac 2015
 
Personaliti warna2
Personaliti warna2Personaliti warna2
Personaliti warna2
 
Project 1 brief cts mac 2015
Project 1 brief cts mac 2015Project 1 brief cts mac 2015
Project 1 brief cts mac 2015
 
Final project enbe
Final project enbeFinal project enbe
Final project enbe
 
Mongo indexes
Mongo indexesMongo indexes
Mongo indexes
 
Treasury_ManagementGWSCPAV1
Treasury_ManagementGWSCPAV1Treasury_ManagementGWSCPAV1
Treasury_ManagementGWSCPAV1
 
2015 InsideNGO Presentation on FX management
2015 InsideNGO Presentation on FX management2015 InsideNGO Presentation on FX management
2015 InsideNGO Presentation on FX management
 
An introduction to Blockchain (for nontechnical people)
An introduction to Blockchain (for nontechnical people)An introduction to Blockchain (for nontechnical people)
An introduction to Blockchain (for nontechnical people)
 
Reward points: Loyalty or Captivity?
Reward points: Loyalty or Captivity?Reward points: Loyalty or Captivity?
Reward points: Loyalty or Captivity?
 
Optical_Fiber_Technology
Optical_Fiber_TechnologyOptical_Fiber_Technology
Optical_Fiber_Technology
 

Similar to Seavers Carolann July 2015(2)

Similar to Seavers Carolann July 2015(2) (20)

joshi-CV_design (2)
joshi-CV_design (2)joshi-CV_design (2)
joshi-CV_design (2)
 
suresh resume
suresh resumesuresh resume
suresh resume
 
noorCV
noorCVnoorCV
noorCV
 
Chandan Kumar_3+_Years _EXP
Chandan Kumar_3+_Years _EXPChandan Kumar_3+_Years _EXP
Chandan Kumar_3+_Years _EXP
 
BSmithResume2016
BSmithResume2016BSmithResume2016
BSmithResume2016
 
rz_9_15
rz_9_15rz_9_15
rz_9_15
 
VikramShete_New-1
VikramShete_New-1VikramShete_New-1
VikramShete_New-1
 
Ramesh resume
Ramesh resumeRamesh resume
Ramesh resume
 
Atchiraju Batchu_CV (1)
Atchiraju Batchu_CV (1)Atchiraju Batchu_CV (1)
Atchiraju Batchu_CV (1)
 
Ivan_Maric_Resume_Dec-2014
Ivan_Maric_Resume_Dec-2014Ivan_Maric_Resume_Dec-2014
Ivan_Maric_Resume_Dec-2014
 
New updated eet klf
New updated eet klfNew updated eet klf
New updated eet klf
 
Sandeep Sharma_CV
Sandeep Sharma_CVSandeep Sharma_CV
Sandeep Sharma_CV
 
CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27
 
Network protocol testing_5+ Yrs. Exp._CCNP Certified
Network protocol testing_5+ Yrs. Exp._CCNP CertifiedNetwork protocol testing_5+ Yrs. Exp._CCNP Certified
Network protocol testing_5+ Yrs. Exp._CCNP Certified
 
CCNP_Network protocol Testing_5+ Yrs. Exp._Santhosh
CCNP_Network protocol Testing_5+ Yrs. Exp._SanthoshCCNP_Network protocol Testing_5+ Yrs. Exp._Santhosh
CCNP_Network protocol Testing_5+ Yrs. Exp._Santhosh
 
RAS Resume_20160610
RAS Resume_20160610RAS Resume_20160610
RAS Resume_20160610
 
AKHILESH Resume
AKHILESH ResumeAKHILESH Resume
AKHILESH Resume
 
GeneCernilliResume
GeneCernilliResumeGeneCernilliResume
GeneCernilliResume
 
Wojciech Stanislawski Resume v2016
Wojciech Stanislawski Resume v2016Wojciech Stanislawski Resume v2016
Wojciech Stanislawski Resume v2016
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 

Seavers Carolann July 2015(2)

  • 1. dd9f2622-30ab-4a43-be52-ab7e23a85acc-150807120804-lva1-app6892 Carolann Seavers 90 Middlethorpe Grove. Dringhouses. York. YO24 1JY. Home Tel. 01904 705578 Mobile Tel. 07986275107 Email:- carolannjb@googlemail.com Signal Design Engineer Profile Key Experience Profession I am enthusiastic and focused with excellent communication skills. I am proficientin the use of microstation versions J & 8 and has a good command ofMicrosoftWord & Excel.  New Build Locations/Fringe design and associated source documents  Testing and Commissioning ofmost major projects she has worked on RailwaySignalling Design Engineer Nationality British English – mother tongue Qualifications IRSE Design Licence Module 3C & 5 Tester SSI / RRI Location / REB Designer & Checker IRSE Assessor Experience with Atkins (Aug 2009 – Present) Signal Design Engineer: Major Projects worked on include: Bowesfield /Clarborough /Derby S&C Renewals. Production ofcorrelation specification and correlation waiver. Also responsible for organising staffto enable the correlation works to commence. Costing of2 days correlation on Clarborough. Bonding on Bowesfield found to be non-compliant so design was produced to bring it in line with current standards. Thornton Fields De-commissioning. Carried outdetail design for locations,Bonding plans. Recovery of redundant equipmentand alterations to modules Inputs and Outputs. Equipment/Interlocking : - SSI/RRI, Point machines,AC immune DC Track Circuits,4 Aspect Colour lightsignals,Position ground lightsignals,AWS, TPWS TSS/OSS loops. Angel Lane. Detailed design oflocations,cable schematics /cores,TFM Schematics,Control Tables. Removal ofpoints and temporary false fed into SSI until new points installed and final data change. Lea Valley on Network Works –Carried outdetailed design for Bonding Diagrams,Power Calculations,Location Design and Route Lists (RRI,TI21 Track Circuits,3 Aspect Colour LightSignals,Position LightGround Signals,LOS Signals, AWS, TPWS TSS/OSS Loops) Leicester Junction S&C Renewals – Carried outcorrelation,produced Assetand Correlation Report(RRI,3 Crossovers,2 Turnouts & fixed Diamonds,Points renewed from Westinghouse type 63’s to HW2000 Point Machines) Hackney Downs North & South S&C Renewals – Carried outdetailed design for locations (Recoveryof Redundant Equipment,Detailed design ofNew Mk2 Clamp Locks – RCPL’s) Drax Power Station – Carried outcorrelation updates which included redrawing oflocations,detailed design ofAspect Sequence Charts,Sub-Routes/Sub-Overlap diagrams,Location’s/REB’s & Modifications.(DC Track Circuits,3/2 Aspect LED Signals,HW2000 PointMachines,Position LightSignals,LOS Signals & AWS) Redditch Branch Enhancements – Carried out, correlation updates,detailed design ofAspect Sequence Charts,Panel
  • 2. dd9f2622-30ab-4a43-be52-ab7e23a85acc-150807120804-lva1-app6892 Design (Mentor Checking),Panel Wiring (Mentor Checking),Location Design & Mentor Checking of Location Design which included recovery of redundantequipment,detailed design ofAxle Counters,LED Signals,AWS, TPWS OSS & TSS, PSR OSS, SSI Data Link Diversity Change,Class IIDouble Insulated Power Supply.(Mk2 SSI Interlocking,LED Signals,Train Detection for Redditch Branch – Thales AzLM Axle Counters,NX Panel) Norwich/Yarmouth/LowestoftRe-Signalling – Carried outcosting ofcorrelation,Correlation Scope,Correlation Waiver, Correlation Bundles,Booking in of source documents. Yarmouth S & C Stageworks – Carried out FPS production,Design Methodology,Mentor checks of Yarmouth SDS New Location “F” which housed new pointcircuitry. Secondmentto Siemens – PointStageworks – Carried out A3 scheme plan extracts,9 pointstage which involved conversion of existing pointmachines to HW2000 each being temporarilyoperated from the existing system. Secondmentto Siemens – Great Coates No.1 SB Fringe – Carried out detailed design for correlation updates,Absent switch controls,basic aspectcontrols between the interlockings in the Up & Down directions, Renewal ofGreat Coates No1. Signal Box Diagram,Air sheets,New SB location to facilitate the fringe requirements which would notfit under the Signal Box, Through Circuits,Alterations to Great Coates No.1 SB Circuits.Control Tables,Cabling Details. Secondment to Siemens – Immingham Reception Sidings Fringe – Carried out detail design for, Basic aspect controls transferred between the interlockings, Fringe boundary moved on the Up Immingham Line one signal section into the Immingham Reception SB area, The limit of track section indications required to be passed between the two signal boxes, Recovery of 650V power supply new 110V supply provided, Control Tables, Cabling Details, Through Circuits, Location/Relay Rooms, Immingham Reception Sidings SB Panel. Experience with Volker Rail Signalling Ltd (Feb 2008 – Jun 2009) Lead Designer: Duties included working closelywith the Design Manager to ensure the safe and effective delivery of the VolkerRail Signalling design order book.Production and checking ofsignalling design to currentstandards and procedures. Mentoring junior members ofstaff. Performing testing duties when required. Major projects worked on included: Hull Docks FreightLine Enhancement,Power enabling stages,RRILocation design.NRGreturns. Lee Valley on Network Works, TFM schematic,fringe design (RRI – SSI). Manchester Airport Third Platform, Independentcheck of location,signal with PL, TPWS TSS/OSS, RA/OFF Indicators, INT R, TRTS, SSI signal modules. Experience with Westinghouse Signals Ltd (Mar 1998 – Feb 2008) Designer: Production and checking of signalling design to currentstandards and procedures. Mentoring junior members of staff. Performing testing duties when required. Major projects include: RA/CD Indicators - Waterloo, Clapham & Twickenham,Location design & final records. Euston/Willesden Area Re-signalling.Signalling plan design.Testing and Commissioning. Dartford Re-signalling,SSILocation design. CTRL (Dagenham Dock Re-signalling),Aspectsequence chartdesign. Level Crossing Standards,Design. West Anglia Route Modernisation (Stages 1 – 5), REB & location,TFM schematics,Cables schematics/cable core plans, New location fringe design,Points,power,signal & data link stageworks.Testing and Commissioning Glen Parva – Nuneaton Re-signalling,production and checking ofSSI AZLM Axle Counter Locations. Knottingley – Ferrybridge Re-signalling,SSIfringe locations (Interfacing with RRI) Lincoln – West Holmes Interlocking Renewal,Top nutting , new relay room. Data logger(SA-380) design.Correlation ofWestinghouse circuitcontroller type “L” lever bands.Testing and Commissioning ofall stage works and final Commissioning.NRGreturns. Colton/Hambleton/TempleHirst,Robusttrain protection design. Moorthorpe – Hickleton Interlocking Renewal GRP 1 – 4, Scheme plan updates,location plan,data link schematic,TFM schematic,power supply,cable schematic design. Alnmouth/Tweedmouth Panel Refurbishment’s,Like for like renewal of existing panel,PMUX renewal,SSI data change (new PMUX allocations were less in each card). NRG returns. Wakefield/Oakenshaw Re-signalling,York IECC & Horbury Jcn. S.B EmergencyAlarm design.
  • 3. dd9f2622-30ab-4a43-be52-ab7e23a85acc-150807120804-lva1-app6892 Experience with SCUK Northern Group (Aug 1997 – Mar 1998) Designer: Production of signalling design to currentstandards and procedures. Performing testing duties when required. Major projects include Liverpool Street Non – Specific, Phase 3 NRG returns. Experience with Interlogic Control Engineering (Mar 1994 – Sep 1995) Designer: Production of signalling design to currentstandards and procedures. Performing testing duties when required. Major projects include London Bridge TDM Renewal,TDM system design. Experience with SCUK Northern Group (Apr 1991 – Jun 1993) Designer: Production of signalling design to currentstandards and procedures. Performing testing duties when required. Major projects include Newcastle Electrification,SSI Location Design,Scheme,Bonding and Location plan amendments. Testing & Commissioning. Experience with British Rail S&TE Dept (Oct 1989 – Apr 1991) Design Assistant: - Production of signalling design to currentstandards and procedures. Performing testing duties when required. Major projects include Peterborough Re-signalling,Location Design,Scheme,Bonding and Location plan amendments. Testing & Commissioning. Littleport – Kings Lynn Re-signalling/Electrification,Testsection secondment. Tracer (1983 – 1988): - Production of signalling design to currentstandards and procedures. Performing testing duties when required. Updating drawings,re-drawing negatives.Trimming and folding prints.Signal box/Panel diagram design, paint, varnish.