Delhi Call Girls South Delhi 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Liffting supervisor
1. CURRICULAM VITAE
MUHAMMAD NAZIR TAJ MUHAMMADKHAN
Sponsorship (Iqama) Transferable Immediately available for Joining
Khobar, Saudi Arabia
Email:adnansaift@gmail.com
W. Phone. K.S.A +966595980668-+966547131268 +966557465437
H. Phone .Pakistan +923419118122-+923315624613+00923491452550
POSIT ION: LIFTING SUPERVISoR
Objective:
To be associated with your organization that provides me anopportunity to show my skills and Improve my knowledge with the
latest trendsand to be part ofteamthatworks dynamically towards the growth of the organization, with anobjective to accept
the challengesand utilize my Education and experience. Father’s.
Work Experience Summary:
Total 19years experience in Pakistan, United Arab Emirates and Saudi Arab onHeavy machineries,Crane, Forklift Operation
and Heavy & Light Driver work atOffshore & Onshore drilling & other Companies as Crane operator AND LIFTING
SUPERVISOR (5 yaers work as rigging Forman&lifting supervisor in Descon Engineering abudhabi united
arab emireates)
RIGGING PLAN
A rigging plan is developed every time a heavy load is being lifted. The basic idea behind a rigging plan is to have
control and establish safety precautions. It is an important planning process that will identify all hazardous
situations that might be encountered during lifting.
Types of Rigging Plans
The first step when conducting a rigging safety plan is to identify the type of lift. There are three major
classifications of lifting plans: Critical lifts, ordinary lifts, and pre-engineering lifts. Depending on the type of lift,
then the rigging plan will have different concepts under evaluation to determine the steps needed to complete a safe
rigging and lifting process.
Rigging and Lifting Plan Components
Once the evaluation process has determined the type of rigging and lifting plan needed, you will need to identify
and gather information on the following components:
The rigging equipment
Shackles, turnbuckles,and slings being used
The weight being lifted
Center of gravity of the load being lifted
Crane capacity and crane charts
2. Height, width, and length of the lift
Atmospheric and environmentalconditions when the process is being performed
Edges and corners of the load. It is important to evaluate all the geometry of the item being lifted
Sling angles
Load angle factor
Floor loading capacity
How to rig the load using good rigging practices
Identify and make sure that the attachment points and load can withstand the forces created by the
rigging gear attachment
Work zone safety
Evaluate hazards to determine consequences resulting from collision, upset, ordropping the load
Ordinary Lifts / Multiple Lift:
Ordinary lifts are the easiest ones to handle. They will normally require a verbal planning process and preliminary
lifting and rigging meetings. Only a minimal documentation and evaluation process is needed, but always being
sure that all safety precautions are been taken.
CriticalLifts
Critical lifts need a more detailed plan before execution. This process will normally require a written procedure and
approvalprocess.
Pre-Engineering Lifts
These are the most challenging ones to deal with. They will require specific rigging points, lifting procedure and
identification of components that will probably need to be managed separately, to avoid problems and minimize
potential issues.
Rigging Plan Execution
Once the plan has been established, you will need to follow it closely to reduce the probability of an accident. It is
important to
Verify all equipment, fixtures, and accessories before starting
Verify that all equipment has been properly inspected and that such inspections are valid.
Identify a load manager or a rigging leader. It can be your own safety professionalor ordinary lifts, assign
a designated leader; for critical lifts, assign a person-in-charge (PIC)
Conduct a pre-use inspection and verify that all components are in good condition.
Conduct a dummy rigging process following the pre-established rigging plan.
Be sure to identify and train all workers participating in the process.
Clear or prepare the area where the load is being placed or moved
Survey the lift site for hazardous orunsafe conditions
Clear lift path of obstructions
Identify the crane operator
Follow specific instructions/procedures for attachment of the rigging gear to the load. Use proper rigging
techniques.
Stop the job when any potentially unsafe condition is recognized
3. Tandem and Tilling Lift:
During rig move fowling superdent and Riggerone interaction
Safety meeting, mange Rigging Equipment and check the collier cod, safety, inspections the UsingTolls. Used the
same maximum capacity, Same modelof crane.
During Lift mad system tanks, madpumps, safra oil tank, Diesel tanks, Heavy Generators Dog house mass ,crown heavy hook
block, top draw, draw box,and Rig Maine camp Usedtwocranes any tandem and Tilling lift during rig move.
(1) Professional Experience Work as RIGGING Forman & LIFTING SUPERVISOR
With Descon Engineering & different company UNDER CONSTRCTION & LIFE OIL& GAS PLANT DESCONEngineering
Ltd. SGD project shahAbu Dhabi, UAE
HEAVYLIFTING TAME MUMBER WITH600 TON CRAWLER CRANE LIFTING IN SHAH GAS .WORK AS RIGGING forman UNDER
THE RIGGING SUPRIDENT { AL HOSN Client SAIPEM: Contractor Subcontractor}
DESCON Engineering Ltd. Integrated Gas Development Project Habshan-5 Abu Dhabi, UAE
RIGGING SUPERVISER : LOADING . OFF LOADING MATERIL SUFFTING
HEAVYLIFTING TAME MUMBER WITH 1200 TON MOBIL CRANE LIFTING IN . Integrated Gas Development Project Habshan-
5 Abu Dhabi, UAE. WORK AS RIGGING SUPERVISER UNDER THE TEAM WORK THE RIGGINGSUPRIDENT SHAFI –UL- ALLAH
{ AL HOSN Client SAIPEM: Contractor Subcontractor}
DESCON Engineering Ltd. AMW Workshop, RUWAIS,UAE. Shutdown Project 1900DESCON Engineering Ltd P#1314
Project, ADGAS,DAS ISLAND,UAE. RIGGING SUPERVISER
ADGAS Client TECHNP Contractor Subcontractor
DESCON Engineering Ltd P# 1527, shutdown Project TAKREER UMMALNARPROJECT
TAKREER Client Contractor
DESCON ENGINEERING PROJECT1320 :RIGGING SUPERVISER
FARTIL RUWAIS INDUSTRIAL AREA
FERTIL Client Contractor Subcontractor
DESCON ENGINEERING Habshan Gasco shad Down 1505 RIGGING SUPERVISER
4. DESCON Engineering Ltd. Integrated Gas Development Project ASAB SHAH -Abu Dhabi, UAE.
RIGGING SUPERVISER : LOADING .OFF LOADING MATERIL SUFFTING16/04/2009 TO11/03/2010
GASCO Client BECHTEL Contractor Subcontractor
MEZYAN SURVEY WORKS L.L.C.WORK AS RIGGING SUPERVISER: LOADING . OFF LOADING MATERIL
SUFFTING
Responsibility:Different Lifting
Drill floor lifting Jobs.
Off loading &back loading of supply boat.
Drill pipes, Drill Collar, casing pipes food and Chemical Container.
Lifting Gauge (Man loading Unloading from boat).
Lifting Various Items from Deck.
Fresh Water DrillWater Fuel Cementing &Barite.
Chopper Duties for HLO.
Responsible forsuccessfully operating and maintaining hydraulic, telescopic cranes at
construction sites forunloading and back loading equipments.
Identify and eliminate the risk factors that cause instability of lifting operations under guidance of
HSE team and Plant Manager.
Inspection and use of standard lifting gears and appliances.
Responsible formaintaining not to reach maximum capacity of crane, maintaining crane in stable
and firm condition.
Executed all lifting works as perlifting plan.
Recognize and perform lifting as per load chart and safe mechanicalcalculative techniques.
Plan the lift to prevent the damage of underground and overhead services.
Maintaining the lifting accessories in safe and usable condition.
Monitoring the crane maintenance and schedule underthe supervision of Plant Manager.
Guide work force and project team to execute all lifting tasks and functions very safely.
Able to participate very actively in pre-job meeting with the crane crew.
Successfully completed NDRC works by utilizing Safe & lifting techniques. Crane and rigging support for
the construction repair facility.
Support forthe installation of any facility pipe line and upgrading of the pier.
Support forany civil and mechanicaljob of the facility.
Assure that all the job must be in accordance within the safety standard procedure.Responsible for
inspecting and maintaining cranes against any defects and overloading.
Responsible forinspecting the worksite condition before setting up the crane. Looking all the safety and
security measures before operating the crane.
5. Roles and Responsibiutes off “Fire officer”
Identification of hazards and their preventive measures in plant.
Preparing and checking hot and height work permit in plant.
Can operate fire hydrant, fire pump, and breathing apparatus.
To participate in regular emergency mock drills.
To update and skill to maintain good standards of own performance.
Planning corrective action for non conformation related file.
Preparing first aid report.
Knowledge of fixed fire fighting instillation and various types of fire tender and fire
notice.
Knowledge of WGPM / FDCPE Extinguisher and monitor.
Daily hydrants system checking
Roles and Responsibilities’ off “safety
• Implementoffire control substation in plant.
• ImplementofEHz coating onfire extinguisheras a per based oniso standers.
• Controlling the fire alarm and fire monitor.
• Maintained fire extinguisher monthly inceptiondocument good condition or not,if
• any damaged are there assembled new one and replaced it.
• Conduct emergency mock drill is plantgiveninstructionhow to handle in case
• of any emergency.
• Maintain monthly inceptionoff illumination report (loxmeter) and sound level
• ( noise meter ) checking reportas a per based ofEhs document in plant/
• Implementationoffire and safety Singh boards for all critical working areasand
• monthly inductionboards.
• Maintained fire tender fire alarm systemand fire hydrant systemhose with weekly
• inceptionreport.
• Issuing permit to relegated task.
• Daily inspectionfor responsible area .
• Preparing Ra risk easements of each and every task.
• Conduct emergency mock drill in plant givenany emergency situationto manpower and technicianis
assembly point.
Personal Achievement:
With the availableresources within the companyorOrganization with .I work, there I can Promote the goals and
plans in to an achievement by involving myself as well as all levels Of organization ,also by owningthe entire responsibility
forthat appreciate & Award from Ourcompany sep2010 Das Island AbuDhabiunitedArab Emirates :APRIL 14/2016 TO
Also still working in Grey WolfdrillingSaudi Arabia
Father’s Name
TAJ MUHAMMAD KHAN
DATEOF
BIRTH
02.01.1977 Marital Status Married Religion Islam
Pakistan-
Documement
PASS PORT Pak.
Passport BY9820402 Issu e Date 19-03-2014 Expiry Date 20-03-2019
Driving license Pak- NO#100000088740
6. detail Issu ed place kpk Issu e Date 02-09-2015 Expiry Date 02-09-2020
National ID Card (NICOB) Pak. NO#135042-320040-3
Issu ed place Abbott Abad
kpk.
Issu e date 7.7.2015 Expiry Date 7.7.2025
Qualification Details Certificate NO#016954
High School
Certificate
DATE 1984 1995 B.I.S.E Abbott Abad
kpk.
(2) United Arab
Emirates Detail
Driving license UAE.-No# 359334
Issu ed place SHARJAH Issu e date 28.02.2006 Expiry Date 28.02.2016
Emirates ID Derail. (Resident Identitycard)-NO#784-1977-2417530-4
Issu ed place Abu Dhabi Issu e date 25.32015 Expiry Date 25.3.2017
(3)SAUDI ARABIA
DETAIL
Iqima Detail KSAID NO#2391565070
Issu ed place AL-KHOBAR Issu e date 6.7.2015 Expiry Date 6.7.2020
Crane Driving license KSA-No 2391567050
Issu ed place AL-Hasha
Hafoof
Issu e date 10.11.2015 Expiry Date 10.11.2020
Heavy Driving license KSA-No 2391567050
Issu ed place Al -Qateef Issu e date 10.10.2015 Expiry Date 10.10.2020
Heavy Forklift Driving license KSA -No2391567050
Issu ed place AL-Hasha
Hafoof
Issu e date 10.11.2015 Expiry Date 10.11.2020
Saudi Aaramco ID .NO# 8149100
Issued place Shadgam Issue date 30.07.2015 Expiry Date 30.03.2016
Grey Wolf Oilfield Serves Saudi Arab-GlobalID
Employ no PA-037 GLOBAL ID NO G10070785 GW Rig-88
Language
Language
English Arabic, W/N Urdu, Punjabi Expert
7. P R O F E S S IO N A L QU A LIF IC A T IO N S
TECHNICAL QUALIFICATION: Basic course rigging
Crane & Forklift Operator & Heavy Equipment OperationCertifications Details.
TIB, Technical Inspection Bureau.
TUV, TUV NORD, middles.
EAST.W.L.L. ESTD, EmiratesTechnical & Safety Development Centre.
.AJC, Heavy lift Division Al Jabber Enrage.
MFC, Medical FitnessCertificate.
Basic Rigging slinging& Bansman15 day Course. TUV.Rehinland
S.S.E 10th Class Certificate.
AIB Arabian Inspection Bureau.IGD HABSHAN,
H.S.E CERTIFICATE.
TUV SUD Middle East L.L.C.
OFFSHORE CRANEOPERATOR& RiggingSupervisor CTF
TRADE TRAININGS:
Onshore &Offshore Crane operator license-By (TIB) Technical Inspection Bureau Abu Dhabi U.A.E.
Rigger License in Abu Dhabi
Work at Height HarnessCourse in United Arab Emirates
Elevator WorkPlatform in Descon EngineeringAbu Dhabi
Forklift-Truckin Descon Engineering Abu Dhabi
Rail Safety Induction certificates in Descon EngineeringAbu Dhabi
Midi-pass MFC, Medical FitnessCertificate. Zirco EMW middle Est.
Crane Operator Certificate in Descon EngineeringAbu Dhabi
Crane Operator license in Al MarshatransportSHARJAH UNITED ARAB EMIRATES.
FORKLIFT Operator Certificate in Descon EngineeringAbu Dhabi
FORKLIFT Operator license in Al Marshatransport SHARJAHUNITED ARAB EMIRATES
FORKLIFT Operator license in ITM.CO.LTD SAUDI ARABIA
Crane Operator license in ITM.CO.LTD SAUDI ARABIA
ARAMCOSPSPCrane Operator license in GREY WOLFSAUDI ARABIA
ARAMCOSPSP FORKLIFT Operator license in GREY WOLFSAUDI ARABIA
DifferentTypesof Crane’s operated
Track Mounted, Harbors, and Duck Crane Rough terrain, hydraulic truck, all terrain, boomtruck, crawler Tele Crawlers, tower,
conventional truck, carry Deck, forklift &Reach forks
NOTE: I have a visionof an energetic youth and lookforward to a bright future. I strongly believe in discipline, hard work and
8. good humor. I am self-motivated and enthusiastic and professional competence to work with no super vision. Good
communicationand inter professional skills. Natural flair for extensive delivering ofall results in time through proper planning
and speedy execution.
I hereby declare thatthe above mentioned statementis correct& true to the bestofmy knowledge&
belief
.
Declaration :