19-1
Lecture 8
Strategies in Logistics
•Transportation Strategy
•Procurement and Manufacturing Strategies
19-2
Transportation Strategy (Chapter 15)
Logistics
•The art and science of obtaining, producing,
and distributing material and product in the
proper place and in the proper quantities.
International logistics
•All functions concerned with the movement of
materials and finished goods on a global scale.
19-3
•The problem of deciding how best to transport
goods from plants to customers is a complex
one that affects the cost of a product.
•Major trade-offs related to the cost of
transporting the product, speed of delivery, and
flexibility to react to changes are involved.
19-4
•Few companies use a single mode of transportation.
•Multimodal solutions are the norm, and finding the correct
multimode strategies can be a significant problem.
•The problem of coordination and scheduling the carriers
requires comprehensive information systems capable of
tracking goods through the system.
•Standardized containers often are used so that a product
can be transferred efficiently from a truck to an airplane or
ship.
19-5
Centroid method
•A technique for locating single facilities that considers the
existing facilities, the distances between them, and the
volumes of goods to be shipped.
•The technique is often used to locate intermediate or
distribution warehouses.
•This method assumes that inbound and outbound
transportation costs are equal and it does not include
special shipping costs for less than full loads.
19-6
Summary:
•Logistics companies now have complex
computer tracking technology that reduces the
risk in transportation and allows the logistics
company to add more value to the firm than it
could if the function were performed in-house.
19-7
Procurement and Manufacturing
Strategies
Institutionalize the sourcing strategy in procurement:
•The procurement process begins once the vendor is
selected and contracts finalised.
•Here, the sourcing and procurement department needs to
define a set of metrics against which the supplier will be
measured for the contract’s duration.
19-8
Procurement and Manufacturing
Strategies
Institutionalize the sourcing strategy in procurement:
•These metrics should be based on performance, delivery,
compliance with pricing guidelines, and similar factors.
•It is vital that metrics that relate to the company’s
sustainability goals are considered as well.
•Periodic audits may also need to be incorporated in the
process to directly observe practices that relate to these
metrics to ensure honest reporting of data.
19-9
Procurement and Manufacturing
Strategies
Total cost of ownership Estimate of the cost of an item that includes all the costs related
to the procurement and use of the item, including disposing of the item after its useful
life.
•Total cost of ownership (TCO) is an estimate of the cost
of an item that includes all the costs related to its
procurement and use, including any related costs in
disposing of the item after it is no longer useful.
•The concept can be applied to a company’s internal costs
or it can be viewed more broadly to consider costs
throughout the supply chain.
19-10
Procurement and Manufacturing
Strategies
•To fully appreciate the cost of purchasing an item from a
particular vendor, an approach that captures the costs of
the activities associated with purchasing and actually
using the item should be considered.
•Depending on the complexity of the purchasing process,
activities such as pre-bid conferences, visits by potential
suppliers, and even visits to potential suppliers can
significantly impact the total cost of the item.
19-11
Procurement and Manufacturing
Strategies
Manufacturing:
•Firms that serve customers from finished goods inventory
are known as make-to-stock firms.
•Those that combine a number of preassembled modules
to meet a customer’s specifications are called assemble-
to-order firms.
19-12
Procurement and Manufacturing
Strategies
Manufacturing:
•Those that make the customer’s product from raw
materials, parts, and components are make-to-order firms.
•An engineer-to-order firm will work with the customer to
design the product, and then make it from purchased
materials, parts, and components.
19-13
Procurement and Manufacturing
Strategies
Manufacturing that focus on location
•Generally, production takes place, and then the goods
are distributed to the customer in manufacturing.
•However, as for the capacity to deliver, the service must
first be distributed to the customer either physically or
through some communications medium, such as the
telephone
19-14
Procurement and Manufacturing
Strategies
Manufacturing that focus on location
•Then the service can be produced.
Example:
•A hotel room or rental car that is available in another city
is not much use to the customer
•It must be where the customer is when that customer
needs it.
McGraw-Hill/Irwin Copyright Š 2011 The McGraw-Hill Companies, All Rights Reserved
Scheduling
Chapter 19
19-16
Learning Objectives
1. Know what a Manufacturing Execution
System production activity control is.
2. Understand typical priority scheduling
rules and the impact they have on
scheduling performance measures.
3. Recognize a simple job allocation
procedure.
4. Explain the issues considered in
employee scheduling.
19-17
Manufacturing Execution Systems
• Manufacturing execution system (MES): an
information system that schedules,
dispatches, tracks, monitors, and controls
production
– Real-time linkage to:
• MRP
• Product and process planning
• Systems that extend beyond the factory
• Service execution system (SES): an
information system that links schedules,
dispatches, tracks, monitors, and controls the
customer’s encounters with the service
organization
LO 1
19-18
The Nature and Importance of
Work Centers
• Work center: an area in which
production resources are organized
and work is completed
– May be a single machine, a group of
machines, or an area where work is done
– Can be organized according to function,
product in a flow, or group technology
• Jobs need to be routed between
functionally organized work centers to
complete the work
LO 1
19-19
Loading
• Infinite loading: work is assigned to a
work center based on what is needed
– No consideration to capacity
• Finite loading: schedules each
resource using the setup and run time
required for each order
– Determines exactly what will be done by
each resource at every moment during the
day
LO 1
19-20
Scheduling
• Forward scheduling: the system takes
an order and schedules each operation
that must be completed forward in time
– Can tell the earliest date an order can be
completed
• Backward scheduling: starts with due
date and schedules the required
operations in reverse sequence
– Can tell when an order must be started in
order to be done by a specific date
LO 2
19-21
Limitations
• Machine-limited process: equipment
is the critical resource that is scheduled
• Labor-limited process: people are the
key resource that is scheduled
• Most actual processes are either labor
limited or machine limited but not both
LO 2
19-22
Typical Scheduling and Control
Functions
1. Allocating orders, equipment, and
personnel
2. Determining the sequence of order
performance
3. Initiating performance of the
scheduled work
4. Shop-floor control
LO 2
19-23
Objectives of Work-Center
Scheduling
1. Meet due dates
2. Minimize lead time
3. Minimize setup time or cost
4. Minimize work-in-process inventory
5. Maximize machine utilization
LO 2
19-24
Job Sequencing
• Sequencing: the process of
determining the job order on machines
or work centers
– Also known as priority sequencing
• Priority rules: the rules used in
obtaining a job sequence
– Can be simple or complex
– Can use one or more pieces of information
– Common rules shown on next slide
LO 2
19-25
Standard Measures of Schedule
Performance
1. Meeting due dates
2. Minimizing the flow time
3. Minimizing work-in-process inventory
4. Minimizing idle time
LO 2
19-26
Scheduling and Jobs on Two
Machines
• Two or more jobs must be processed
on two machines in a common
sequence
• Wish to minimize the flow time from the
beginning of the first job to the finish of
the last job
• Use Johnson’s rule
LO 2
19-27
Steps to Johnson’s Rule
1. List the operation time for each job
2. Select the shortest operation time
3. If the shortest time is on the first
machine, do first
– If the shortest time is on the second
machine, do the job last
– For ties, do first
4. Repeat 2-3 for each remaining job
LO 2
19-28
Scheduling a Set Number of Jobs
on the Same Number of Machines
• Some work centers have enough machines
to start all the jobs
• Here the issue is the particular assignment
of individual jobs to individual machines
• Assignment method: a special case of the
transportation method of linear programming
1. There are n things to be distributed to n
destinations
2. Each thing assigned to one and only one
destination
3. Only one criterion can be used
LO 2
19-29
Shop-Floor Control: Major
Functions
1. Assigning priority of each shop order
2. Maintaining WIP quantity information
3. Conveying shop-order status
information to the office
4. Providing actual output data for
capacity control purposes
5. Providing quantity by location by shop
order for WIP inventory and
accounting
6. Providing measurement of efficiency,
utilization, and productivity
LO 2
19-30
Gantt Chart
LO 2
19-31
Tools of Shop-Floor Control
1. The daily dispatch list
2. Various status and exception reports
a. Anticipated delay report
b. Scrap report
c. Rework report
d. Performance summary reports
e. Shortage list
3. An input/output control report
LO 3
19-32
Principles of Work Center
Scheduling
1. There is a direct equivalence between work
flow and cash flow
2. The effectiveness of any job shop should be
measured by speed of flow through the shop
3. Schedule jobs as a string, with process steps
back-to-back
4. A job once started should not be interrupted
5. Speed of flow is most efficiently achieved by
focusing on bottleneck work centers and jobs
LO 3
19-33
Principles of Job Shop Scheduling
Continued
6. Reschedule every day
7. Obtain feedback each day on jobs that are
not completed at each work center
8. Match work center input information to what
the worker can actually do
9. When improving output, look for
incompatibility between engineering design
and process execution
10.Certainty of standards, routings, and so forth
is not possible, but always work towards
achieving it
LO 3
19-34
Personnel Scheduling in Services
• Scheduling consecutive days off
• Scheduling daily work times
• Scheduling hourly work times
LO 4

More Related Content

Similar to L8.ppt

Production and planning control
Production and planning controlProduction and planning control
Production and planning controlArpitha Aarushi
 
Mba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control aMba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control aRai University
 
Production planning and control - Basic concepts
Production planning and control - Basic conceptsProduction planning and control - Basic concepts
Production planning and control - Basic conceptsgokulfea
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & ControlKunalJagtap5
 
Ch11 introto business
Ch11 introto businessCh11 introto business
Ch11 introto businessAjit Kumar
 
PPC and functions of PPC.pptx
PPC and functions of PPC.pptxPPC and functions of PPC.pptx
PPC and functions of PPC.pptxIbrahimFakkad
 
Process Planning & Cost Estimation - Cellular Manufacturing
Process Planning & Cost Estimation - Cellular ManufacturingProcess Planning & Cost Estimation - Cellular Manufacturing
Process Planning & Cost Estimation - Cellular ManufacturingDrGopiKrishnanPonnus
 
schedulingandsequencing-140424065526-phpapp02__1_.ppt
schedulingandsequencing-140424065526-phpapp02__1_.pptschedulingandsequencing-140424065526-phpapp02__1_.ppt
schedulingandsequencing-140424065526-phpapp02__1_.pptVELMURUGANM19
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and controlLaxmikant Deshmukh
 
Nitish Sharma.pptx
Nitish Sharma.pptxNitish Sharma.pptx
Nitish Sharma.pptxDeepakTomar79
 
Lecture_1_J_Tanyanyiwa.pptx
Lecture_1_J_Tanyanyiwa.pptxLecture_1_J_Tanyanyiwa.pptx
Lecture_1_J_Tanyanyiwa.pptxBekithemba2
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLDisha Pawar
 
OM II_Group 9_MRF.pptx
OM II_Group 9_MRF.pptxOM II_Group 9_MRF.pptx
OM II_Group 9_MRF.pptxArpitaMandal22
 
Production Planning & Control Book
Production Planning & Control BookProduction Planning & Control Book
Production Planning & Control BookLearn With GeekAlign
 
Production and Operation Management.pptx
Production and Operation Management.pptxProduction and Operation Management.pptx
Production and Operation Management.pptxSairaali51
 
OPERATIONS MANAGEMENT- Full Slides.pptx
OPERATIONS MANAGEMENT- Full Slides.pptxOPERATIONS MANAGEMENT- Full Slides.pptx
OPERATIONS MANAGEMENT- Full Slides.pptxThusharaVinay
 
Production And Planning control.ppt
Production And Planning control.pptProduction And Planning control.ppt
Production And Planning control.pptSrinuKN
 

Similar to L8.ppt (20)

Production and planning control
Production and planning controlProduction and planning control
Production and planning control
 
Mba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control aMba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control a
 
Pm1
Pm1Pm1
Pm1
 
Production planning and control - Basic concepts
Production planning and control - Basic conceptsProduction planning and control - Basic concepts
Production planning and control - Basic concepts
 
Ppc
PpcPpc
Ppc
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Ch11 introto business
Ch11 introto businessCh11 introto business
Ch11 introto business
 
PPC and functions of PPC.pptx
PPC and functions of PPC.pptxPPC and functions of PPC.pptx
PPC and functions of PPC.pptx
 
Process Planning & Cost Estimation - Cellular Manufacturing
Process Planning & Cost Estimation - Cellular ManufacturingProcess Planning & Cost Estimation - Cellular Manufacturing
Process Planning & Cost Estimation - Cellular Manufacturing
 
schedulingandsequencing-140424065526-phpapp02__1_.ppt
schedulingandsequencing-140424065526-phpapp02__1_.pptschedulingandsequencing-140424065526-phpapp02__1_.ppt
schedulingandsequencing-140424065526-phpapp02__1_.ppt
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Nitish Sharma.pptx
Nitish Sharma.pptxNitish Sharma.pptx
Nitish Sharma.pptx
 
Manufacturing systems
Manufacturing systems Manufacturing systems
Manufacturing systems
 
Lecture_1_J_Tanyanyiwa.pptx
Lecture_1_J_Tanyanyiwa.pptxLecture_1_J_Tanyanyiwa.pptx
Lecture_1_J_Tanyanyiwa.pptx
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
OM II_Group 9_MRF.pptx
OM II_Group 9_MRF.pptxOM II_Group 9_MRF.pptx
OM II_Group 9_MRF.pptx
 
Production Planning & Control Book
Production Planning & Control BookProduction Planning & Control Book
Production Planning & Control Book
 
Production and Operation Management.pptx
Production and Operation Management.pptxProduction and Operation Management.pptx
Production and Operation Management.pptx
 
OPERATIONS MANAGEMENT- Full Slides.pptx
OPERATIONS MANAGEMENT- Full Slides.pptxOPERATIONS MANAGEMENT- Full Slides.pptx
OPERATIONS MANAGEMENT- Full Slides.pptx
 
Production And Planning control.ppt
Production And Planning control.pptProduction And Planning control.ppt
Production And Planning control.ppt
 

More from BryanTeoh6

More from BryanTeoh6 (7)

L10.ppt
L10.pptL10.ppt
L10.ppt
 
L7.ppt
L7.pptL7.ppt
L7.ppt
 
L6.ppt
L6.pptL6.ppt
L6.ppt
 
L4.ppt
L4.pptL4.ppt
L4.ppt
 
L3.ppt
L3.pptL3.ppt
L3.ppt
 
L2.ppt
L2.pptL2.ppt
L2.ppt
 
logistics strategy
logistics strategylogistics strategy
logistics strategy
 

Recently uploaded

Diuretic, Hypoglycemic and Limit test of Heavy metals and Arsenic.-1.pdf
Diuretic, Hypoglycemic and Limit test of Heavy metals and Arsenic.-1.pdfDiuretic, Hypoglycemic and Limit test of Heavy metals and Arsenic.-1.pdf
Diuretic, Hypoglycemic and Limit test of Heavy metals and Arsenic.-1.pdfKartik Tiwari
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jisc
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptNishitharanjan Rout
 
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...Gary Wood
 
PANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptxPANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptxakanksha16arora
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSAnaAcapella
 
Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17Celine George
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
Simple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfSimple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfstareducators107
 
Michaelis Menten Equation and Estimation Of Vmax and Tmax.pptx
Michaelis Menten Equation and Estimation Of Vmax and Tmax.pptxMichaelis Menten Equation and Estimation Of Vmax and Tmax.pptx
Michaelis Menten Equation and Estimation Of Vmax and Tmax.pptxRugvedSathawane
 
diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....Ritu480198
 
How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17Celine George
 
Orientation Canvas Course Presentation.pdf
Orientation Canvas Course Presentation.pdfOrientation Canvas Course Presentation.pdf
Orientation Canvas Course Presentation.pdfElizabeth Walsh
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsSandeep D Chaudhary
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
What is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptxWhat is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptxCeline George
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonhttgc7rh9c
 

Recently uploaded (20)

Diuretic, Hypoglycemic and Limit test of Heavy metals and Arsenic.-1.pdf
Diuretic, Hypoglycemic and Limit test of Heavy metals and Arsenic.-1.pdfDiuretic, Hypoglycemic and Limit test of Heavy metals and Arsenic.-1.pdf
Diuretic, Hypoglycemic and Limit test of Heavy metals and Arsenic.-1.pdf
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.ppt
 
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
 
PANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptxPANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptx
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
 
Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Simple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfSimple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdf
 
Michaelis Menten Equation and Estimation Of Vmax and Tmax.pptx
Michaelis Menten Equation and Estimation Of Vmax and Tmax.pptxMichaelis Menten Equation and Estimation Of Vmax and Tmax.pptx
Michaelis Menten Equation and Estimation Of Vmax and Tmax.pptx
 
diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....
 
How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17
 
Orientation Canvas Course Presentation.pdf
Orientation Canvas Course Presentation.pdfOrientation Canvas Course Presentation.pdf
Orientation Canvas Course Presentation.pdf
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
What is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptxWhat is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptx
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
 

L8.ppt

  • 1. 19-1 Lecture 8 Strategies in Logistics •Transportation Strategy •Procurement and Manufacturing Strategies
  • 2. 19-2 Transportation Strategy (Chapter 15) Logistics •The art and science of obtaining, producing, and distributing material and product in the proper place and in the proper quantities. International logistics •All functions concerned with the movement of materials and finished goods on a global scale.
  • 3. 19-3 •The problem of deciding how best to transport goods from plants to customers is a complex one that affects the cost of a product. •Major trade-offs related to the cost of transporting the product, speed of delivery, and flexibility to react to changes are involved.
  • 4. 19-4 •Few companies use a single mode of transportation. •Multimodal solutions are the norm, and finding the correct multimode strategies can be a significant problem. •The problem of coordination and scheduling the carriers requires comprehensive information systems capable of tracking goods through the system. •Standardized containers often are used so that a product can be transferred efficiently from a truck to an airplane or ship.
  • 5. 19-5 Centroid method •A technique for locating single facilities that considers the existing facilities, the distances between them, and the volumes of goods to be shipped. •The technique is often used to locate intermediate or distribution warehouses. •This method assumes that inbound and outbound transportation costs are equal and it does not include special shipping costs for less than full loads.
  • 6. 19-6 Summary: •Logistics companies now have complex computer tracking technology that reduces the risk in transportation and allows the logistics company to add more value to the firm than it could if the function were performed in-house.
  • 7. 19-7 Procurement and Manufacturing Strategies Institutionalize the sourcing strategy in procurement: •The procurement process begins once the vendor is selected and contracts finalised. •Here, the sourcing and procurement department needs to define a set of metrics against which the supplier will be measured for the contract’s duration.
  • 8. 19-8 Procurement and Manufacturing Strategies Institutionalize the sourcing strategy in procurement: •These metrics should be based on performance, delivery, compliance with pricing guidelines, and similar factors. •It is vital that metrics that relate to the company’s sustainability goals are considered as well. •Periodic audits may also need to be incorporated in the process to directly observe practices that relate to these metrics to ensure honest reporting of data.
  • 9. 19-9 Procurement and Manufacturing Strategies Total cost of ownership Estimate of the cost of an item that includes all the costs related to the procurement and use of the item, including disposing of the item after its useful life. •Total cost of ownership (TCO) is an estimate of the cost of an item that includes all the costs related to its procurement and use, including any related costs in disposing of the item after it is no longer useful. •The concept can be applied to a company’s internal costs or it can be viewed more broadly to consider costs throughout the supply chain.
  • 10. 19-10 Procurement and Manufacturing Strategies •To fully appreciate the cost of purchasing an item from a particular vendor, an approach that captures the costs of the activities associated with purchasing and actually using the item should be considered. •Depending on the complexity of the purchasing process, activities such as pre-bid conferences, visits by potential suppliers, and even visits to potential suppliers can significantly impact the total cost of the item.
  • 11. 19-11 Procurement and Manufacturing Strategies Manufacturing: •Firms that serve customers from finished goods inventory are known as make-to-stock firms. •Those that combine a number of preassembled modules to meet a customer’s specifications are called assemble- to-order firms.
  • 12. 19-12 Procurement and Manufacturing Strategies Manufacturing: •Those that make the customer’s product from raw materials, parts, and components are make-to-order firms. •An engineer-to-order firm will work with the customer to design the product, and then make it from purchased materials, parts, and components.
  • 13. 19-13 Procurement and Manufacturing Strategies Manufacturing that focus on location •Generally, production takes place, and then the goods are distributed to the customer in manufacturing. •However, as for the capacity to deliver, the service must first be distributed to the customer either physically or through some communications medium, such as the telephone
  • 14. 19-14 Procurement and Manufacturing Strategies Manufacturing that focus on location •Then the service can be produced. Example: •A hotel room or rental car that is available in another city is not much use to the customer •It must be where the customer is when that customer needs it.
  • 15. McGraw-Hill/Irwin Copyright Š 2011 The McGraw-Hill Companies, All Rights Reserved Scheduling Chapter 19
  • 16. 19-16 Learning Objectives 1. Know what a Manufacturing Execution System production activity control is. 2. Understand typical priority scheduling rules and the impact they have on scheduling performance measures. 3. Recognize a simple job allocation procedure. 4. Explain the issues considered in employee scheduling.
  • 17. 19-17 Manufacturing Execution Systems • Manufacturing execution system (MES): an information system that schedules, dispatches, tracks, monitors, and controls production – Real-time linkage to: • MRP • Product and process planning • Systems that extend beyond the factory • Service execution system (SES): an information system that links schedules, dispatches, tracks, monitors, and controls the customer’s encounters with the service organization LO 1
  • 18. 19-18 The Nature and Importance of Work Centers • Work center: an area in which production resources are organized and work is completed – May be a single machine, a group of machines, or an area where work is done – Can be organized according to function, product in a flow, or group technology • Jobs need to be routed between functionally organized work centers to complete the work LO 1
  • 19. 19-19 Loading • Infinite loading: work is assigned to a work center based on what is needed – No consideration to capacity • Finite loading: schedules each resource using the setup and run time required for each order – Determines exactly what will be done by each resource at every moment during the day LO 1
  • 20. 19-20 Scheduling • Forward scheduling: the system takes an order and schedules each operation that must be completed forward in time – Can tell the earliest date an order can be completed • Backward scheduling: starts with due date and schedules the required operations in reverse sequence – Can tell when an order must be started in order to be done by a specific date LO 2
  • 21. 19-21 Limitations • Machine-limited process: equipment is the critical resource that is scheduled • Labor-limited process: people are the key resource that is scheduled • Most actual processes are either labor limited or machine limited but not both LO 2
  • 22. 19-22 Typical Scheduling and Control Functions 1. Allocating orders, equipment, and personnel 2. Determining the sequence of order performance 3. Initiating performance of the scheduled work 4. Shop-floor control LO 2
  • 23. 19-23 Objectives of Work-Center Scheduling 1. Meet due dates 2. Minimize lead time 3. Minimize setup time or cost 4. Minimize work-in-process inventory 5. Maximize machine utilization LO 2
  • 24. 19-24 Job Sequencing • Sequencing: the process of determining the job order on machines or work centers – Also known as priority sequencing • Priority rules: the rules used in obtaining a job sequence – Can be simple or complex – Can use one or more pieces of information – Common rules shown on next slide LO 2
  • 25. 19-25 Standard Measures of Schedule Performance 1. Meeting due dates 2. Minimizing the flow time 3. Minimizing work-in-process inventory 4. Minimizing idle time LO 2
  • 26. 19-26 Scheduling and Jobs on Two Machines • Two or more jobs must be processed on two machines in a common sequence • Wish to minimize the flow time from the beginning of the first job to the finish of the last job • Use Johnson’s rule LO 2
  • 27. 19-27 Steps to Johnson’s Rule 1. List the operation time for each job 2. Select the shortest operation time 3. If the shortest time is on the first machine, do first – If the shortest time is on the second machine, do the job last – For ties, do first 4. Repeat 2-3 for each remaining job LO 2
  • 28. 19-28 Scheduling a Set Number of Jobs on the Same Number of Machines • Some work centers have enough machines to start all the jobs • Here the issue is the particular assignment of individual jobs to individual machines • Assignment method: a special case of the transportation method of linear programming 1. There are n things to be distributed to n destinations 2. Each thing assigned to one and only one destination 3. Only one criterion can be used LO 2
  • 29. 19-29 Shop-Floor Control: Major Functions 1. Assigning priority of each shop order 2. Maintaining WIP quantity information 3. Conveying shop-order status information to the office 4. Providing actual output data for capacity control purposes 5. Providing quantity by location by shop order for WIP inventory and accounting 6. Providing measurement of efficiency, utilization, and productivity LO 2
  • 31. 19-31 Tools of Shop-Floor Control 1. The daily dispatch list 2. Various status and exception reports a. Anticipated delay report b. Scrap report c. Rework report d. Performance summary reports e. Shortage list 3. An input/output control report LO 3
  • 32. 19-32 Principles of Work Center Scheduling 1. There is a direct equivalence between work flow and cash flow 2. The effectiveness of any job shop should be measured by speed of flow through the shop 3. Schedule jobs as a string, with process steps back-to-back 4. A job once started should not be interrupted 5. Speed of flow is most efficiently achieved by focusing on bottleneck work centers and jobs LO 3
  • 33. 19-33 Principles of Job Shop Scheduling Continued 6. Reschedule every day 7. Obtain feedback each day on jobs that are not completed at each work center 8. Match work center input information to what the worker can actually do 9. When improving output, look for incompatibility between engineering design and process execution 10.Certainty of standards, routings, and so forth is not possible, but always work towards achieving it LO 3
  • 34. 19-34 Personnel Scheduling in Services • Scheduling consecutive days off • Scheduling daily work times • Scheduling hourly work times LO 4