SlideShare a Scribd company logo
1 of 5
Download to read offline
ACKNOWLEDGEMENT
I would like to acknowledge and extend my heartfelt gratitude to our camp Instructor and for
their vital encouragement for their guidance and motivation and support in the completion
of this project report. This survey camp meant a lot to me as it gave me lot of field experience.
I would also like to thank our store keeper Mr. Manoj Khadka for who co-operated with me
in the matter of guidance to providing instruments. Most of all I thank my group members,
who were operative in the completion of this report.
The purpose of this fieldwork was to make the each student independent to carry out the
work in real problem in the field. We think, the purpose is suitable for further work and which
make us to produce the report of the fieldwork in time. We are sincerely indebted to our
collage MAMTS, for providing opportunity to consolidate our theoretical and practical
knowledge in engineering surveying.
Our camp Instructor:
1. Er. Niraj Pudasaini (Vice Principle)
2. Er. Sanjaya Subedi (Instructor)
3. Er. Ashma Pokhrel (Instructor)
4. Er. Nita Khadka (Instructor)
5. Er. Sushanta Subedhi (Instructor)
6. Mr. Manoj Khadka (Store Keeper)
7. Mr. Anish Bomjom (Teaching Aid)
PREFACE
This report presents the surveying data of closed camp of Madan Ashrit Memorial Technical
School (Group B). This report will help readers to knowing about the general and detail
description of Surveying progress like as Linear Measurement, Angular Measurement,
Topographic Detailing, Contour Map, Road curve setting, determining the span of the bridge
distance in suitable zone etc.
I am thankful to Er.Niraj Pudasaini for giving some instructions and preliminary idea in
handling me to completing this report. I am also thankful to Mr. Suman Jyoti for his kind
information to preparing this report.
I hope that the report will be further useful in field work for all site visitor in civil construction
and surveying. Inthis SurveyCamp,Wearesupposed to surveya givenplot in all its aspect and work
on road alignment, topographic map and bridge alignment with proper X-section, L-Section
and its topography fulfilling all technical requirements. ThisReportincludestheentiredescriptionof
thepracticalcarriedoutduringtheSurveyCamp.Italsoincludestheprofileandcross-sectionsatdifferentpoints
oftheRoadAlignmentandBridgeSiteSurvey.
I will be verymuch thankful to the viewers who go through this report for bringing such errors in our notice.
Furthermore we would be very thankful for the examiners or viewers for their suggestions in improving
this report.
Our Surveying Team:
1. Suman Jyoti
2. Bishnu pd. Bhandari
3. Dipesh Jung Shai
4. Dubdorje Tamang
5. Dhurba Thapa
6. Dinesh Moktan
7. Sunita Khatiwada
ABSTRACT
Surveying is the science and art of determining the relative positions of above, on, or beneath
the surface of earth, and is the most important part of Civil Engineering. The results of surveys
are used to map the earth, prepare navigational charts, established property boundaries.
Develop data of land used and natural resource information etc. Further survey maintains
highways, railroads, buildings, bridges, tunnels, canals, dams and many more.
Thus, the objective of survey camp was to make us gain the experience in this field by
performing topographic survey in a large area, learning to propose road alignment and select
suitable site for bridge axis.
The report reflects the methodology, observations, and calculations made by thestudents in the
Camp with the corresponding drawings. The large portion of the course covered with elements
of topographic surveying, and then those of road alignment and bridge site survey f follow it.
The main objective of the Survey Camp organized for us is to take an opportunity to consolidate
and update our practical and theoretical knowledge in engineering surveying in the actual field
condition.
In this survey camp we have to prepare a topographic map of the given area, road and bridge
site survey fulfilling all technical requirements. In this regard, we are required to carry out the
necessary field works in our sub-group so that we will get opportunity to the decision on
planning and execution of field works for the preparation of topographic map, road alignment
and bridge site survey. This survey camp helps us to build in our confidence to conduct
engineering survey on required accuracy.
CONTENTS
S.N TITLE PAGE
1 Introduction
1.1 Background
1.1.1 Location……………………………………..…….1
1.1.2Site……………………………………………........1
1.1.3TopographyandGeology…………………………..2
1.1.4Rainfall,ClimateandVegetation……………………2
1.1.5DescriptionofWork………………………………..3
1.1.6WorksdetailsandSchedule………………………....3
1.2 Introduction
1.2.1Surveying…………………………………………4
1.2.2PrincipleofSurveying………………………...……4
1.2.3Definationofterms…………………………....……5
2 TopographicSurveying
2.1LinearMeasurement……………………………………7
2.2TheodoliteTraversing…………………………………...8
2.3Methodology……………………………………….…...9
2.3.1BalancingtheTraverse…………….…………...…10
2.3.2ClosingError………………………………….…11
2.4Detailing……………………………………………….11
2.5TachometryDetailing…………………………………..12
2.6Levelling………………………………………………14
2.7Contouring……………………………………………..15
2.8TotalStation……………………………………………16
3 BridgeSiteSurvey
3.1Overview………………………………………………49
3.2BriefdescriptionofArea………………………………...50
3.3TechnicalSpecification…………………………………50
3.4Methodology………………………………………...…50
3.4Calculation………………………………………...……53
4 RoadAlignmentSurvey
4.1Introduction………………………………….…………61
4.2Curves…………………………………………………61
4.3EquipmentRequired……………………………………62
4.4Norms…………………………………………………63
4.4Methodology…………………………………………...63
4.4Calculation…………………………………………..…66
 starting of Survey Camp report

More Related Content

What's hot

Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)Saksham Bhutani
 
flyover internship 2
flyover internship 2flyover internship 2
flyover internship 2Ravi Mehta
 
Survey report sample BCE
Survey report sample BCESurvey report sample BCE
Survey report sample BCESushrut Gautam
 
Roadway condition survey full report(BUET)
Roadway condition survey full report(BUET)Roadway condition survey full report(BUET)
Roadway condition survey full report(BUET)Ahmed Ferdous Ankon
 
4.engineering surveys
4.engineering surveys4.engineering surveys
4.engineering surveysMani Vel
 
Civic survey- Building And Town Planning-GTU-Civil Engineering
Civic survey- Building And Town Planning-GTU-Civil EngineeringCivic survey- Building And Town Planning-GTU-Civil Engineering
Civic survey- Building And Town Planning-GTU-Civil EngineeringRutvij Patel
 
Bridge site survey 01
Bridge site survey 01Bridge site survey 01
Bridge site survey 01Suman Jyoti
 
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNINGUnit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNINGRNRANGANATH
 
Traffic volume study report by pronob ghosh buet 1204011
Traffic volume study report by pronob ghosh buet 1204011 Traffic volume study report by pronob ghosh buet 1204011
Traffic volume study report by pronob ghosh buet 1204011 Pronob Ghosh
 
Points and crossing
Points and crossingPoints and crossing
Points and crossingAkash Patel
 
Survey camp report main (2nd) Part
Survey camp report main (2nd) PartSurvey camp report main (2nd) Part
Survey camp report main (2nd) PartBishnuBhandari12
 
IRC.SP.19-2001 - MANUAL FOR SURVEY, INVESTIGATION AND PREPARATION OF ROAD PRO...
IRC.SP.19-2001 - MANUAL FOR SURVEY, INVESTIGATION AND PREPARATION OF ROAD PRO...IRC.SP.19-2001 - MANUAL FOR SURVEY, INVESTIGATION AND PREPARATION OF ROAD PRO...
IRC.SP.19-2001 - MANUAL FOR SURVEY, INVESTIGATION AND PREPARATION OF ROAD PRO...BrahmaV1
 
Traffic study project for final year CIVIL engineering
Traffic study project for final year CIVIL engineeringTraffic study project for final year CIVIL engineering
Traffic study project for final year CIVIL engineeringMohammadOsamaJafry
 
Training project report NHAI by Amit Kumar
Training project report NHAI by Amit KumarTraining project report NHAI by Amit Kumar
Training project report NHAI by Amit KumarAmitKumar7069
 
L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3 L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3 Sachin PatiL
 
Trumpet interchange
Trumpet interchange Trumpet interchange
Trumpet interchange Spice Shuvo
 
DELHI-AGRA ROAD PROJECT
DELHI-AGRA ROAD PROJECTDELHI-AGRA ROAD PROJECT
DELHI-AGRA ROAD PROJECTGLA University
 

What's hot (20)

PROJECTS ON SURVEYING
PROJECTS ON SURVEYINGPROJECTS ON SURVEYING
PROJECTS ON SURVEYING
 
Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)
 
flyover internship 2
flyover internship 2flyover internship 2
flyover internship 2
 
Types of curve in hill road
Types of curve in hill roadTypes of curve in hill road
Types of curve in hill road
 
Survey report sample BCE
Survey report sample BCESurvey report sample BCE
Survey report sample BCE
 
Roadway condition survey full report(BUET)
Roadway condition survey full report(BUET)Roadway condition survey full report(BUET)
Roadway condition survey full report(BUET)
 
4.engineering surveys
4.engineering surveys4.engineering surveys
4.engineering surveys
 
Civic survey- Building And Town Planning-GTU-Civil Engineering
Civic survey- Building And Town Planning-GTU-Civil EngineeringCivic survey- Building And Town Planning-GTU-Civil Engineering
Civic survey- Building And Town Planning-GTU-Civil Engineering
 
Bridge site survey 01
Bridge site survey 01Bridge site survey 01
Bridge site survey 01
 
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNINGUnit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
 
Traffic volume study report by pronob ghosh buet 1204011
Traffic volume study report by pronob ghosh buet 1204011 Traffic volume study report by pronob ghosh buet 1204011
Traffic volume study report by pronob ghosh buet 1204011
 
Points and crossing
Points and crossingPoints and crossing
Points and crossing
 
Survey camp report main (2nd) Part
Survey camp report main (2nd) PartSurvey camp report main (2nd) Part
Survey camp report main (2nd) Part
 
IRC.SP.19-2001 - MANUAL FOR SURVEY, INVESTIGATION AND PREPARATION OF ROAD PRO...
IRC.SP.19-2001 - MANUAL FOR SURVEY, INVESTIGATION AND PREPARATION OF ROAD PRO...IRC.SP.19-2001 - MANUAL FOR SURVEY, INVESTIGATION AND PREPARATION OF ROAD PRO...
IRC.SP.19-2001 - MANUAL FOR SURVEY, INVESTIGATION AND PREPARATION OF ROAD PRO...
 
Traffic study project for final year CIVIL engineering
Traffic study project for final year CIVIL engineeringTraffic study project for final year CIVIL engineering
Traffic study project for final year CIVIL engineering
 
Training project report NHAI by Amit Kumar
Training project report NHAI by Amit KumarTraining project report NHAI by Amit Kumar
Training project report NHAI by Amit Kumar
 
L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3 L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3
 
Trumpet interchange
Trumpet interchange Trumpet interchange
Trumpet interchange
 
DELHI-AGRA ROAD PROJECT
DELHI-AGRA ROAD PROJECTDELHI-AGRA ROAD PROJECT
DELHI-AGRA ROAD PROJECT
 
Tunnels surevey
Tunnels sureveyTunnels surevey
Tunnels surevey
 

Similar to starting of Survey Camp report

Survey Camp Report (Mars Nepal Engineering Survey Camp)
Survey Camp Report (Mars Nepal Engineering Survey Camp)Survey Camp Report (Mars Nepal Engineering Survey Camp)
Survey Camp Report (Mars Nepal Engineering Survey Camp)Sudip khadka
 
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...Natasha Grant
 
Abijit sharma 201818510 survey report
Abijit sharma 201818510 survey reportAbijit sharma 201818510 survey report
Abijit sharma 201818510 survey reportSingayWangchuk2
 
Abijit sharma 201818510 survey report converted by_abcdpdf
Abijit sharma 201818510 survey report converted by_abcdpdfAbijit sharma 201818510 survey report converted by_abcdpdf
Abijit sharma 201818510 survey report converted by_abcdpdfSingayWangchuk2
 
Transportation field report
Transportation field reportTransportation field report
Transportation field reportSushrut Gautam
 
Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...Suman Jyoti
 
Report 2013 - 2014
Report 2013 - 2014Report 2013 - 2014
Report 2013 - 2014Bavik Sing
 
Internship Report
Internship ReportInternship Report
Internship Reportprathagarg
 
Design of rigit pavement
Design of rigit pavementDesign of rigit pavement
Design of rigit pavementTAHIR HUSEN
 
Bio Data Sukdeb Samanta
Bio Data Sukdeb SamantaBio Data Sukdeb Samanta
Bio Data Sukdeb Samantasukdeb samanta
 
Metodología para-el-diseño-semi-automático-y-optimizado-de-rampas-en-múltiple...
Metodología para-el-diseño-semi-automático-y-optimizado-de-rampas-en-múltiple...Metodología para-el-diseño-semi-automático-y-optimizado-de-rampas-en-múltiple...
Metodología para-el-diseño-semi-automático-y-optimizado-de-rampas-en-múltiple...FLORTATIANAVARGASCUE
 
CONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGECONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGEAnkit Gautam
 
Study is to perform roadway condition survey of link road between panthapath ...
Study is to perform roadway condition survey of link road between panthapath ...Study is to perform roadway condition survey of link road between panthapath ...
Study is to perform roadway condition survey of link road between panthapath ...Khaza Ahmed Palash
 
اطروة أستاذ أحمد_القزاز مقوم_علمي
اطروة أستاذ أحمد_القزاز مقوم_علمياطروة أستاذ أحمد_القزاز مقوم_علمي
اطروة أستاذ أحمد_القزاز مقوم_علميZainab Sattar
 
Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Speed report from panthpoath to russel square by pronob ghosh buet 1204011Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Speed report from panthpoath to russel square by pronob ghosh buet 1204011Pronob Ghosh
 
Can you explained to me the importance of survey camp.Solution.pdf
Can you explained to me the importance of survey camp.Solution.pdfCan you explained to me the importance of survey camp.Solution.pdf
Can you explained to me the importance of survey camp.Solution.pdfAmansupan
 
roadway condition survey
roadway condition surveyroadway condition survey
roadway condition surveymruemran
 
" Design of Flexible Pavement "
" Design of Flexible Pavement "" Design of Flexible Pavement "
" Design of Flexible Pavement "Nishant Pandey
 
M TECH GEOMATICS COURSE BROCHURE
M TECH GEOMATICS COURSE BROCHUREM TECH GEOMATICS COURSE BROCHURE
M TECH GEOMATICS COURSE BROCHURESiddharth Chaudhary
 

Similar to starting of Survey Camp report (20)

Survey Camp Report (Mars Nepal Engineering Survey Camp)
Survey Camp Report (Mars Nepal Engineering Survey Camp)Survey Camp Report (Mars Nepal Engineering Survey Camp)
Survey Camp Report (Mars Nepal Engineering Survey Camp)
 
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
 
Abijit sharma 201818510 survey report
Abijit sharma 201818510 survey reportAbijit sharma 201818510 survey report
Abijit sharma 201818510 survey report
 
Abijit sharma 201818510 survey report converted by_abcdpdf
Abijit sharma 201818510 survey report converted by_abcdpdfAbijit sharma 201818510 survey report converted by_abcdpdf
Abijit sharma 201818510 survey report converted by_abcdpdf
 
Transportation field report
Transportation field reportTransportation field report
Transportation field report
 
Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...
 
Report 2013 - 2014
Report 2013 - 2014Report 2013 - 2014
Report 2013 - 2014
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Design of rigit pavement
Design of rigit pavementDesign of rigit pavement
Design of rigit pavement
 
Bio Data Sukdeb Samanta
Bio Data Sukdeb SamantaBio Data Sukdeb Samanta
Bio Data Sukdeb Samanta
 
Metodología para-el-diseño-semi-automático-y-optimizado-de-rampas-en-múltiple...
Metodología para-el-diseño-semi-automático-y-optimizado-de-rampas-en-múltiple...Metodología para-el-diseño-semi-automático-y-optimizado-de-rampas-en-múltiple...
Metodología para-el-diseño-semi-automático-y-optimizado-de-rampas-en-múltiple...
 
CONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGECONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGE
 
Study is to perform roadway condition survey of link road between panthapath ...
Study is to perform roadway condition survey of link road between panthapath ...Study is to perform roadway condition survey of link road between panthapath ...
Study is to perform roadway condition survey of link road between panthapath ...
 
اطروة أستاذ أحمد_القزاز مقوم_علمي
اطروة أستاذ أحمد_القزاز مقوم_علمياطروة أستاذ أحمد_القزاز مقوم_علمي
اطروة أستاذ أحمد_القزاز مقوم_علمي
 
Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Speed report from panthpoath to russel square by pronob ghosh buet 1204011Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Speed report from panthpoath to russel square by pronob ghosh buet 1204011
 
Can you explained to me the importance of survey camp.Solution.pdf
Can you explained to me the importance of survey camp.Solution.pdfCan you explained to me the importance of survey camp.Solution.pdf
Can you explained to me the importance of survey camp.Solution.pdf
 
roadway condition survey
roadway condition surveyroadway condition survey
roadway condition survey
 
" Design of Flexible Pavement "
" Design of Flexible Pavement "" Design of Flexible Pavement "
" Design of Flexible Pavement "
 
final-file
final-filefinal-file
final-file
 
M TECH GEOMATICS COURSE BROCHURE
M TECH GEOMATICS COURSE BROCHUREM TECH GEOMATICS COURSE BROCHURE
M TECH GEOMATICS COURSE BROCHURE
 

More from BishnuBhandari12

CE-2003 Numerical Methods .pdf
CE-2003 Numerical Methods .pdfCE-2003 Numerical Methods .pdf
CE-2003 Numerical Methods .pdfBishnuBhandari12
 
MATH-2103 Engineering mathematics-III (ODE).pdf
MATH-2103 Engineering mathematics-III (ODE).pdfMATH-2103 Engineering mathematics-III (ODE).pdf
MATH-2103 Engineering mathematics-III (ODE).pdfBishnuBhandari12
 
MATH-2103 Engineering mathematics-III (PDE).pdf
MATH-2103 Engineering mathematics-III (PDE).pdfMATH-2103 Engineering mathematics-III (PDE).pdf
MATH-2103 Engineering mathematics-III (PDE).pdfBishnuBhandari12
 
CE-2201 Fluid Mechanics (B).pdf
CE-2201 Fluid Mechanics (B).pdfCE-2201 Fluid Mechanics (B).pdf
CE-2201 Fluid Mechanics (B).pdfBishnuBhandari12
 
CE-2201 Fluid Mechanics (A).pdf
CE-2201 Fluid Mechanics (A).pdfCE-2201 Fluid Mechanics (A).pdf
CE-2201 Fluid Mechanics (A).pdfBishnuBhandari12
 
CE-2103 Solid Mechanics (B).pdf
CE-2103 Solid Mechanics (B).pdfCE-2103 Solid Mechanics (B).pdf
CE-2103 Solid Mechanics (B).pdfBishnuBhandari12
 
CE-2103 Solid Mechanics A.pdf
CE-2103 Solid Mechanics A.pdfCE-2103 Solid Mechanics A.pdf
CE-2103 Solid Mechanics A.pdfBishnuBhandari12
 
CE-2105, Design of concrete structures-1(1st part).pdf
CE-2105, Design of concrete structures-1(1st part).pdfCE-2105, Design of concrete structures-1(1st part).pdf
CE-2105, Design of concrete structures-1(1st part).pdfBishnuBhandari12
 
CE-2105, Design of Concrete Structure - I(2nd part).pdf
CE-2105, Design of Concrete Structure - I(2nd part).pdfCE-2105, Design of Concrete Structure - I(2nd part).pdf
CE-2105, Design of Concrete Structure - I(2nd part).pdfBishnuBhandari12
 
Assignment of engineering economics by Bishnu Bhandari
Assignment of engineering economics by Bishnu BhandariAssignment of engineering economics by Bishnu Bhandari
Assignment of engineering economics by Bishnu BhandariBishnuBhandari12
 

More from BishnuBhandari12 (11)

CE-2003 Numerical Methods .pdf
CE-2003 Numerical Methods .pdfCE-2003 Numerical Methods .pdf
CE-2003 Numerical Methods .pdf
 
MATH-2103 Engineering mathematics-III (ODE).pdf
MATH-2103 Engineering mathematics-III (ODE).pdfMATH-2103 Engineering mathematics-III (ODE).pdf
MATH-2103 Engineering mathematics-III (ODE).pdf
 
MATH-2103 Engineering mathematics-III (PDE).pdf
MATH-2103 Engineering mathematics-III (PDE).pdfMATH-2103 Engineering mathematics-III (PDE).pdf
MATH-2103 Engineering mathematics-III (PDE).pdf
 
CE-2201 Fluid Mechanics (B).pdf
CE-2201 Fluid Mechanics (B).pdfCE-2201 Fluid Mechanics (B).pdf
CE-2201 Fluid Mechanics (B).pdf
 
CE-2201 Fluid Mechanics (A).pdf
CE-2201 Fluid Mechanics (A).pdfCE-2201 Fluid Mechanics (A).pdf
CE-2201 Fluid Mechanics (A).pdf
 
CE-2103 Solid Mechanics (B).pdf
CE-2103 Solid Mechanics (B).pdfCE-2103 Solid Mechanics (B).pdf
CE-2103 Solid Mechanics (B).pdf
 
CE-2103 Solid Mechanics A.pdf
CE-2103 Solid Mechanics A.pdfCE-2103 Solid Mechanics A.pdf
CE-2103 Solid Mechanics A.pdf
 
CE-2105, Design of concrete structures-1(1st part).pdf
CE-2105, Design of concrete structures-1(1st part).pdfCE-2105, Design of concrete structures-1(1st part).pdf
CE-2105, Design of concrete structures-1(1st part).pdf
 
CE-2105, Design of Concrete Structure - I(2nd part).pdf
CE-2105, Design of Concrete Structure - I(2nd part).pdfCE-2105, Design of Concrete Structure - I(2nd part).pdf
CE-2105, Design of Concrete Structure - I(2nd part).pdf
 
1. cover page
1. cover page1. cover page
1. cover page
 
Assignment of engineering economics by Bishnu Bhandari
Assignment of engineering economics by Bishnu BhandariAssignment of engineering economics by Bishnu Bhandari
Assignment of engineering economics by Bishnu Bhandari
 

Recently uploaded

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 

Recently uploaded (20)

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 

starting of Survey Camp report

  • 1. ACKNOWLEDGEMENT I would like to acknowledge and extend my heartfelt gratitude to our camp Instructor and for their vital encouragement for their guidance and motivation and support in the completion of this project report. This survey camp meant a lot to me as it gave me lot of field experience. I would also like to thank our store keeper Mr. Manoj Khadka for who co-operated with me in the matter of guidance to providing instruments. Most of all I thank my group members, who were operative in the completion of this report. The purpose of this fieldwork was to make the each student independent to carry out the work in real problem in the field. We think, the purpose is suitable for further work and which make us to produce the report of the fieldwork in time. We are sincerely indebted to our collage MAMTS, for providing opportunity to consolidate our theoretical and practical knowledge in engineering surveying. Our camp Instructor: 1. Er. Niraj Pudasaini (Vice Principle) 2. Er. Sanjaya Subedi (Instructor) 3. Er. Ashma Pokhrel (Instructor) 4. Er. Nita Khadka (Instructor) 5. Er. Sushanta Subedhi (Instructor) 6. Mr. Manoj Khadka (Store Keeper) 7. Mr. Anish Bomjom (Teaching Aid)
  • 2. PREFACE This report presents the surveying data of closed camp of Madan Ashrit Memorial Technical School (Group B). This report will help readers to knowing about the general and detail description of Surveying progress like as Linear Measurement, Angular Measurement, Topographic Detailing, Contour Map, Road curve setting, determining the span of the bridge distance in suitable zone etc. I am thankful to Er.Niraj Pudasaini for giving some instructions and preliminary idea in handling me to completing this report. I am also thankful to Mr. Suman Jyoti for his kind information to preparing this report. I hope that the report will be further useful in field work for all site visitor in civil construction and surveying. Inthis SurveyCamp,Wearesupposed to surveya givenplot in all its aspect and work on road alignment, topographic map and bridge alignment with proper X-section, L-Section and its topography fulfilling all technical requirements. ThisReportincludestheentiredescriptionof thepracticalcarriedoutduringtheSurveyCamp.Italsoincludestheprofileandcross-sectionsatdifferentpoints oftheRoadAlignmentandBridgeSiteSurvey. I will be verymuch thankful to the viewers who go through this report for bringing such errors in our notice. Furthermore we would be very thankful for the examiners or viewers for their suggestions in improving this report. Our Surveying Team: 1. Suman Jyoti 2. Bishnu pd. Bhandari 3. Dipesh Jung Shai 4. Dubdorje Tamang 5. Dhurba Thapa 6. Dinesh Moktan 7. Sunita Khatiwada
  • 3. ABSTRACT Surveying is the science and art of determining the relative positions of above, on, or beneath the surface of earth, and is the most important part of Civil Engineering. The results of surveys are used to map the earth, prepare navigational charts, established property boundaries. Develop data of land used and natural resource information etc. Further survey maintains highways, railroads, buildings, bridges, tunnels, canals, dams and many more. Thus, the objective of survey camp was to make us gain the experience in this field by performing topographic survey in a large area, learning to propose road alignment and select suitable site for bridge axis. The report reflects the methodology, observations, and calculations made by thestudents in the Camp with the corresponding drawings. The large portion of the course covered with elements of topographic surveying, and then those of road alignment and bridge site survey f follow it. The main objective of the Survey Camp organized for us is to take an opportunity to consolidate and update our practical and theoretical knowledge in engineering surveying in the actual field condition. In this survey camp we have to prepare a topographic map of the given area, road and bridge site survey fulfilling all technical requirements. In this regard, we are required to carry out the necessary field works in our sub-group so that we will get opportunity to the decision on planning and execution of field works for the preparation of topographic map, road alignment and bridge site survey. This survey camp helps us to build in our confidence to conduct engineering survey on required accuracy.
  • 4. CONTENTS S.N TITLE PAGE 1 Introduction 1.1 Background 1.1.1 Location……………………………………..…….1 1.1.2Site……………………………………………........1 1.1.3TopographyandGeology…………………………..2 1.1.4Rainfall,ClimateandVegetation……………………2 1.1.5DescriptionofWork………………………………..3 1.1.6WorksdetailsandSchedule………………………....3 1.2 Introduction 1.2.1Surveying…………………………………………4 1.2.2PrincipleofSurveying………………………...……4 1.2.3Definationofterms…………………………....……5 2 TopographicSurveying 2.1LinearMeasurement……………………………………7 2.2TheodoliteTraversing…………………………………...8 2.3Methodology……………………………………….…...9 2.3.1BalancingtheTraverse…………….…………...…10 2.3.2ClosingError………………………………….…11 2.4Detailing……………………………………………….11 2.5TachometryDetailing…………………………………..12 2.6Levelling………………………………………………14 2.7Contouring……………………………………………..15 2.8TotalStation……………………………………………16 3 BridgeSiteSurvey 3.1Overview………………………………………………49 3.2BriefdescriptionofArea………………………………...50 3.3TechnicalSpecification…………………………………50 3.4Methodology………………………………………...…50 3.4Calculation………………………………………...……53 4 RoadAlignmentSurvey 4.1Introduction………………………………….…………61 4.2Curves…………………………………………………61 4.3EquipmentRequired……………………………………62 4.4Norms…………………………………………………63 4.4Methodology…………………………………………...63 4.4Calculation…………………………………………..…66