Building Condition Assessment
and Documentation
Part II – Overview and Direction
Randy Warbington, PE
Facilities Program Manager
Southern Region
USDA Forest Service
Mark McDonough, PE
Assistant Station Engineer
Southern Research Station
USDA Forest Service
3 Day Course Prepared for Presentation at ESRU, March 10-12, 2008
Edited for Presentation at National Facilities Meeting, April 30-May 2, 2008
Standard Terminology
Common Definitions
http://fsweb.wo.fs.fed.us/eng/documents/mtcconst.htm
Maintenance
Maintenance is “the act of keeping fixed
assets in acceptable condition.” It includes
Preventive maintenance, repairs, cyclical
maintenance (component replacement) and
addressing of statutory requirements needed
to assure that the asset achieves its expected
life. Maintenance excludes upgrade activities
aimed at expanding capacity or changing
function.
Annual Maintenance
 Work performed to maintain serviceability or repair
failures in the year in which they occur. Includes
preventive and cyclic maintenance performed in the
year which it is scheduled, as well as unscheduled or
catastrophic failures of components or assets.
 Typically this is the work funded by CP09, CMFC
and QMQM.
 OMB allows the agency to estimate this by
multiplying 3-5% * CRV.
Preventive Maintenance
 Scheduled servicing, repairs, inspections and
replacement of parts that result in fewer breakdowns
and fewer premature replacements to help achieve
the expected life of the fixed asset.
 Inspections are a critical part of preventive
maintenance as they provide the information for
scheduling maintenance and for evaluating its
effectiveness.
 A component of annual maintenance.
Deferred Maintenance
 Maintenance that was not performed when it should
have been or when it was scheduled and which,
therefore was put off or delayed for a future period.
 Made up of 4 parts – a) cyclic (component
replacement) b) minor repairs not done when they
should have been, c) work needed to meet laws,
regulations, etc as long as the original intent of the
asset has not been changed, and d) functional
obsolescence.
 There is no current OMB requirement to report
annual maintenance, only deferred maintenance.
Example of Functional Obsolescence
From the Facility Master Plan:
“This building provides office
space for 7 FTE’s. It was
originally a garage, but was
converted to an office in the early
1990’s. The building was
constructed in 1955 and is 440 ft2
in size. The building is in fair
condition. Water seepage into the
interior after heavy rains (>3”) has
been a recurring problem. It is
recommended that it be
decommissioned and replaced with
a modern facility.”
Does this building need to be
evaluated for historic significance
prior to demolition?
Operations & Maintenance (O&M)
 The activities and resources required to
operate and maintain facilities (recreation,
administrative, etc.) at a level of quality which
meets management objectives and customer
satisfaction.
 Costs associated with O&M are generally
recurrent, as opposed to capital investments,
which are generally one-time and non-
recurrent.
O&M (continued)
 O&M is like it sounds, part operations and
part maintenance
 O&M is funded by CP09, CMFC, NFRW,
QMQM, and a variety of other EBLIs
Condition Assessment
Objectives
Purposes of Condition Assessments
 Primary:
 Serve as physical inventory for the asset
 Show accomplishment (elimination of previously
identified maintenance work)
 Inform its valuation by determining the deferred
maintenance deduction to be applied to the “raw”
replacement value.
 These are primarily financial upward reporting functions
to allow the agency to adequately respond to requests for
information and oversight
Purposes of Condition Assessments
(cont.)
 Secondary
 Identify future work needs, serving as a sort of periodic
“reconnaissance” of the asset. In most cases the actual
correction of deficiencies will require additional
investigation, as there may be a number of alternatives as
to how to best to address them
 Serve as an additional opportunity to note critical health
and safety, environmental degradation or other similar
conditions which need to be addressed immediately.
 These two functions are more targeted to the actual day-
to-day work activities.
Purpose of a Condition Assessment
Subtracting the deferred maintenance on this building from the current
replacement value computed by I-Web based on GSF gives a truer picture of
its value. Often, deferred maintenance items discovered during condition
assessments may never actually be done. For example, this building may
not be really be worth repairing, and the building has been determined to be
of low priority.
Coordination with Other Required Surveys
See FSM 7309 44.1 Exhibit 01
 Condition Assessment – Every 5 years
 Physical Inventory – Every 5 Years
 Health and Safety – Annual, except ML 1
 Quarters – Annual, prior to each occupancy
 Facility Performance (Master Plan) – Every 10 years
 Accessibility - Every 3 Years
 Vulnerability – Every 5 Years
 Friable Asbestos Materials – Annual
 Energy Conservation – As Needed
 Pre-Occupancy – Prior to Leasing
 ECAP Audits (Internal) – Annual
 EACP Audits (External) – Every 5 Years
 EMS – Annual/Every 3 Years
 EMS Second Party – Every 5 Years
Integrated Assessments
 Efforts are underway to try to integrate the some or all of the
following:
 Facility Condition Assessments – 5 Year Cycle
 ECAP Audits (Internal) – 1 Year Cycle
 Health and Safety Inspection – 1 Year Cycle
 It may make more sense to integrate preventive maintenance
(PM) and repair assessments with health and safety
inspections and ECAP audits, rather than facility condition
assessments, which primarily target cyclic replacement and
deferred maintenance
 Although there is no manual requirement for preventive
maintenance and repair assessments, they are still needed in
order to responsibly operate and maintain facilities to the
desired standard and provide customer satisfaction
Facility Condition Assessment
Scheduling
 Buildings, Water Systems, Wastewater
Systems, Developed Recreation Sites – All of
these require real property inventory and
condition Assessment on a 5 year cycle
 Efficiency then suggests that assets located
near each other geographically should be
scheduled for inspection concurrently in order
to save travel time and costs
Example of Spreadsheet that Can be
Used to Schedule and Balance Workload
ftp://sv1.r8.fs.fed.us/pub/Facility%20Condition%20Assessment%20Training/
I-Web vs. MMS
 It has been recognized that INFRA may not be the most useful
way to handle scheduling of the multitude of day to day
activities (Preventive maintenance, minor repairs,) that are
often needed on a facility.
 Instead a more specialized maintenance management
software (MMS) might in some cases be more appropriate.
 We will likely investigate the acquisition of such a system in
the near future.
 Regardless, however, most items which would be expected to
be collected during a condition assessment would not
normally cost less than $2,000 (individually), the minor
purchase limit for construction, but instead would consist of
major component repair and replacement, which really has the
most effect on asset value.
Minor vs. Major Items
 As an example, one unit found that approximately
85% of the maintenance work items which had been
recorded in I-Web during past assessments were
estimated to cost less than $2,000 each, but this only
added up to about 6% in value of the total
maintenance work recorded for that Forest.
 Therefore it is probably more productive to focus on
major items when doing condition assessments, and
keep up with the small stuff on a much more regular
basis.
There are Always Exceptions
 The major exception would be noting critical items
(health and safety, environmental degradation or
mission delivery) which absolutely must be
addressed immediately.
Example: Non-functioning smoke detector in a
sleeping quarters.
Minor Items Left Undone Lead to DM
 It should be recognized that usually it is relatively
minor items left unaddressed that lead to deferred
maintenance.
 Therefore as a matter of practice these items should
not be left to be discovered during a condition
assessment which occurs only on a 5-year interval.
Previously we discussed funds available to do
operations and maintenance work with.
 Correction of small recurring items such as replacing
a filter, a burned out light bulb or fixing a broken
lock should be addressed as ongoing “operations”
using these fund types.
Preventive Maintenance Tips
Replacing furnace
filters on a regular
basis will prevent
compressor freeze-
up, dirty ductwork,
fan failures, etc.
Putting off repairing
a roof leak or a
waterproofing
project may result in
mold infestations
that are extremely
expensive to restore
to useable condition.
Non-functional exit signs, emergency
lighting, smoke detectors need to be
replaced immediately to prevent loss
of life in case of a fire.
You sure don’t want to wait
long before you address this
maintenance item!
Foremost Objective
 Perhaps the most important objective for
facility condition assessments beyond those
stated above relate to the need to have
standardized inspections across the agency,
standardized “acceptable” care, and to
develop cost estimates that are consistent,
repeatable and defendable.
 This is probably even more important than
developing detailed construction cost
estimates.
Consistent Standard of Care
 Standard work items shown on the inspection
form are “representative” of a consistent
standard of repair and/or replacement quality
across the agency, and should be used
whenever possible, otherwise custom work
items and minor improvement needs are
available in the system.
Consistent Costing Method
 Costing is automated in the I-web module,
requiring only limited interaction by the user;
work item costs are based on R S Means, with
appropriate multipliers applied to capture
conditions of the Forest Service business
environment in a consistent fashion.
Note about costs
 All costs are assumed to be based on
contracting, with overhead and profit as
described in R S Means
 Costs may not be indicative of what would be
encountered using force account, local jacks-
of-all-trades, brother-in-laws, etc.
Consistent Replacement Schedule
 Replacement will be based upon condition as
well as age and “typical expected life”.
 Sources of Building Component Data:
 R S Means
 Agency Experience
Available Sources for Component Life
Expectancy
 Tempering of Means data with corporate
experience as captured in the Standard Work
Items shown on the standard forms
 ASHRAE (Association of Heating,
Refrigeration and Air Conditioning Engineers
 National Association of Home Builders
 Building Cost Information Service (British)
Typical Life Expectancy of Building
Components – Appliances (NAHB)
Typical Life Expectancy of Building
Components – Bathrooms Footings
Typical Life Expectancy of Building
Components – HVAC Paint
Typical Life Expectancy of Building
Components – Plumbing Windows
Progressive Levels of Inspection
 All inspections must look at each of the standard
work items as an agency minimum, as applicable
(comparable to the concept of using “standard” specs
in construction)
 Additional work items shown in Means but not in
the standard list may be also be considered – these
are one type of “custom work items” (comparable to
“approved supplemental specs” in construction)
 Custom work items not included in Means may be
needed for specialized assets – (comparable to
“special project specs” in construction).
Tailoring the level of Assessment Detail to the
Building’s Expected Use
 Buildings such as a barn might only need the
“standard” work items collected on them.
 Buildings that are used on an everyday basis
might need more detailed work items to be
collected.
 Specialized buildings might require “custom”
work items to be collected; these items may
not be found in the MEANS database.
Example of an asset for which “custom” work
items that may be found in “Means” might apply
Example of a specialized asset requiring
“custom” work items not found in “Means”
Replacement of “chinking” for a log building. This work
would not typically be covered by RS Means Cost Data.
Performing Building
Condition Assessments
Overview of Tasks
 Obtain a Basic or Complex Condition Assessment Form from
I-Web for each building, as applicable
 Verify header info and/or fill out blanks for each building
 User input will be required for inspector name, inspection date
and remote travel time
 Consider each standard work item for each building and
determine if it applies, based upon typical life and existing
condition. See the Work Items Data Dictionary
 Obtain applicable quantities for each item
 Consider whether non-standard or custom items should be
included as well
 Note any other significant or critical maintenance or operation
items in the blanks provided on the form
Header Information to be Verified
 Unit, Site Name, Bldg ID, Bldg Name, Size, Bldg
Category, Sub-Category, Maintenance Level,
Historic Status and Real Property tie, as well as date
of last Assessment will all come out of the I-Web
database
 Confirm whether the form is appropriate for the
actual building – basic or complex, and if not make a
note; if required schedule for alternate inspection
 Verify the accuracy and make changes on the form
where needed; recall that CRV cannot be changed, it
is computed by INFRA, and is based upon GSF,
category and sub-category
Additional Tasks
 Print out I-Web Report BLDWK03L:Building
Work Item Details for the building to be
inspected
 Note work items that have been accomplished
since last condition assessment
 Recording date and cost for accomplishment
will no longer be mandatory
Header Information to be Input
 Inspector Name – Initials are not OK, need full name
 Inspection Date
 Remote Travel Time – Record to the nearest hour
based on the average number of hours it normally
takes to travel to the site from a populated area, such
as a small community, where materials for repair or
restoration may be obtained
 Base travel time on the most likely method that will
be used to transport labor and materials to the jobsite
(one-way trip time)
 Travel Time will be used by INFRA to compute the
“remoteness” factor, which affects work item cost
Travel Modes
Work Item Input (for all items)
 Input the quantity needed for the appropriate
standard or custom work item
 Input the year the work is needed (planned year), or
the fact that it has been deferred
 As input requires mm-dd-yyyy use last day of FY
 Realize the work will be recorded in I-web as annual
or deferred maintenance not depending upon the
nature of the item, but instead based on the year the
work is needed, with DM as the default
 Input reason and priority – H&S, mission or
resource, critical and non-critical – with mission
non-critical as default
Lunch – 12:00 to 1:00

More Related Content

What's hot

Causes of deterioration of concrete structures
Causes of deterioration of concrete structuresCauses of deterioration of concrete structures
Causes of deterioration of concrete structuresKarthi Kavya
 
Facility Condition Assessment And Asset Management With GIS
Facility Condition Assessment And Asset Management With GISFacility Condition Assessment And Asset Management With GIS
Facility Condition Assessment And Asset Management With GISJohn Przybyla
 
Chemical attack
Chemical attackChemical attack
Chemical attackJ C
 
Health & safety management system in indian construction
Health & safety management system in indian constructionHealth & safety management system in indian construction
Health & safety management system in indian constructionsai0513
 
Session no 1 basic contemporary safety concepts
Session no 1 basic contemporary safety conceptsSession no 1 basic contemporary safety concepts
Session no 1 basic contemporary safety conceptssameh shalash
 
Smart Maintenance engineering
Smart Maintenance engineering Smart Maintenance engineering
Smart Maintenance engineering Michel Mafumba
 
Construction defects
Construction defectsConstruction defects
Construction defectsshivam tomar
 
Case study on non destructive testing on concrete structures
Case study on non destructive testing on concrete structuresCase study on non destructive testing on concrete structures
Case study on non destructive testing on concrete structuresLahmeyer International, UAE
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFShankar Ramasamy
 
Good construction practices - Part 2 - ACC
Good construction practices - Part 2 - ACCGood construction practices - Part 2 - ACC
Good construction practices - Part 2 - ACCKeto Diet Active
 
Construction Safety Management
Construction Safety ManagementConstruction Safety Management
Construction Safety ManagementGAURAV. H .TANDON
 
demolition techniques
demolition techniquesdemolition techniques
demolition techniquesbholu sharma
 
Quality : Concept & Overview for Construction Projects.
Quality : Concept & Overview for Construction Projects.Quality : Concept & Overview for Construction Projects.
Quality : Concept & Overview for Construction Projects.Sanjay Mishra
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality controlSOURAV4798
 

What's hot (20)

Causes of deterioration of concrete structures
Causes of deterioration of concrete structuresCauses of deterioration of concrete structures
Causes of deterioration of concrete structures
 
Facility Condition Assessment And Asset Management With GIS
Facility Condition Assessment And Asset Management With GISFacility Condition Assessment And Asset Management With GIS
Facility Condition Assessment And Asset Management With GIS
 
Chemical attack
Chemical attackChemical attack
Chemical attack
 
Health & safety management system in indian construction
Health & safety management system in indian constructionHealth & safety management system in indian construction
Health & safety management system in indian construction
 
Properties of concrete
Properties of concrete Properties of concrete
Properties of concrete
 
Session no 1 basic contemporary safety concepts
Session no 1 basic contemporary safety conceptsSession no 1 basic contemporary safety concepts
Session no 1 basic contemporary safety concepts
 
What is BIM?
What is BIM?What is BIM?
What is BIM?
 
Smart Maintenance engineering
Smart Maintenance engineering Smart Maintenance engineering
Smart Maintenance engineering
 
Construction defects
Construction defectsConstruction defects
Construction defects
 
Demolition of buildings
Demolition of buildingsDemolition of buildings
Demolition of buildings
 
Case study on non destructive testing on concrete structures
Case study on non destructive testing on concrete structuresCase study on non destructive testing on concrete structures
Case study on non destructive testing on concrete structures
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
 
107 quality control
107 quality control107 quality control
107 quality control
 
Good construction practices - Part 2 - ACC
Good construction practices - Part 2 - ACCGood construction practices - Part 2 - ACC
Good construction practices - Part 2 - ACC
 
072 Method Statement
072 Method Statement072 Method Statement
072 Method Statement
 
Construction Safety Management
Construction Safety ManagementConstruction Safety Management
Construction Safety Management
 
demolition techniques
demolition techniquesdemolition techniques
demolition techniques
 
Quality : Concept & Overview for Construction Projects.
Quality : Concept & Overview for Construction Projects.Quality : Concept & Overview for Construction Projects.
Quality : Concept & Overview for Construction Projects.
 
Safety and the supervisor
Safety and the supervisor Safety and the supervisor
Safety and the supervisor
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
 

Similar to Condition Asessment.ppt

1 page facility renewal snapshot
1 page facility renewal snapshot1 page facility renewal snapshot
1 page facility renewal snapshotBarry Lynch
 
JR Dickens - IWCS 2007
JR Dickens - IWCS 2007JR Dickens - IWCS 2007
JR Dickens - IWCS 2007jrd9234
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenancePallavi Yadav
 
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET Journal
 
Beyond the bca
Beyond the bcaBeyond the bca
Beyond the bcaRobb Dods
 
Building Service Chapter 3
Building Service Chapter 3Building Service Chapter 3
Building Service Chapter 3Izam Lukman
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Managementshrinivas kulkarni
 
Chap 5 Elements of Maint Techenologyf.ppt
Chap 5 Elements of Maint Techenologyf.pptChap 5 Elements of Maint Techenologyf.ppt
Chap 5 Elements of Maint Techenologyf.pptAbeyuAssefa
 
OR&A - Bridging the gap
OR&A - Bridging the gapOR&A - Bridging the gap
OR&A - Bridging the gapuak10
 
Refinery Overhauling Introduction
Refinery Overhauling IntroductionRefinery Overhauling Introduction
Refinery Overhauling IntroductionAshar Ahmed
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance managementStudy Stuff
 
Photovoltaic Training Course - Module 4.1 - Importance of maintenance
Photovoltaic Training Course - Module 4.1 - Importance of maintenancePhotovoltaic Training Course - Module 4.1 - Importance of maintenance
Photovoltaic Training Course - Module 4.1 - Importance of maintenanceLeonardo ENERGY
 
Tips on Cost optimization For Process Plants.
Tips on Cost optimization For Process Plants.Tips on Cost optimization For Process Plants.
Tips on Cost optimization For Process Plants.fxudegbu
 
Introduction to maintenance
Introduction to maintenanceIntroduction to maintenance
Introduction to maintenanceHashim V tkmce
 

Similar to Condition Asessment.ppt (20)

1 page facility renewal snapshot
1 page facility renewal snapshot1 page facility renewal snapshot
1 page facility renewal snapshot
 
JR Dickens - IWCS 2007
JR Dickens - IWCS 2007JR Dickens - IWCS 2007
JR Dickens - IWCS 2007
 
Maintenance
MaintenanceMaintenance
Maintenance
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenance
 
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
 
Energy Audit 22.9.2022.pptx
Energy Audit 22.9.2022.pptxEnergy Audit 22.9.2022.pptx
Energy Audit 22.9.2022.pptx
 
Beyond the bca
Beyond the bcaBeyond the bca
Beyond the bca
 
Building Service Chapter 3
Building Service Chapter 3Building Service Chapter 3
Building Service Chapter 3
 
Maintenance
MaintenanceMaintenance
Maintenance
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Management
 
Chap 5 Elements of Maint Techenologyf.ppt
Chap 5 Elements of Maint Techenologyf.pptChap 5 Elements of Maint Techenologyf.ppt
Chap 5 Elements of Maint Techenologyf.ppt
 
OR&A - Bridging the gap
OR&A - Bridging the gapOR&A - Bridging the gap
OR&A - Bridging the gap
 
Om 5
Om 5Om 5
Om 5
 
Refinery Overhauling Introduction
Refinery Overhauling IntroductionRefinery Overhauling Introduction
Refinery Overhauling Introduction
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance management
 
Photovoltaic Training Course - Module 4.1 - Importance of maintenance
Photovoltaic Training Course - Module 4.1 - Importance of maintenancePhotovoltaic Training Course - Module 4.1 - Importance of maintenance
Photovoltaic Training Course - Module 4.1 - Importance of maintenance
 
Maintenance
MaintenanceMaintenance
Maintenance
 
Energy audit
Energy auditEnergy audit
Energy audit
 
Tips on Cost optimization For Process Plants.
Tips on Cost optimization For Process Plants.Tips on Cost optimization For Process Plants.
Tips on Cost optimization For Process Plants.
 
Introduction to maintenance
Introduction to maintenanceIntroduction to maintenance
Introduction to maintenance
 

Recently uploaded

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 

Recently uploaded (20)

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 

Condition Asessment.ppt

  • 1. Building Condition Assessment and Documentation Part II – Overview and Direction Randy Warbington, PE Facilities Program Manager Southern Region USDA Forest Service Mark McDonough, PE Assistant Station Engineer Southern Research Station USDA Forest Service 3 Day Course Prepared for Presentation at ESRU, March 10-12, 2008 Edited for Presentation at National Facilities Meeting, April 30-May 2, 2008
  • 4. Maintenance Maintenance is “the act of keeping fixed assets in acceptable condition.” It includes Preventive maintenance, repairs, cyclical maintenance (component replacement) and addressing of statutory requirements needed to assure that the asset achieves its expected life. Maintenance excludes upgrade activities aimed at expanding capacity or changing function.
  • 5. Annual Maintenance  Work performed to maintain serviceability or repair failures in the year in which they occur. Includes preventive and cyclic maintenance performed in the year which it is scheduled, as well as unscheduled or catastrophic failures of components or assets.  Typically this is the work funded by CP09, CMFC and QMQM.  OMB allows the agency to estimate this by multiplying 3-5% * CRV.
  • 6. Preventive Maintenance  Scheduled servicing, repairs, inspections and replacement of parts that result in fewer breakdowns and fewer premature replacements to help achieve the expected life of the fixed asset.  Inspections are a critical part of preventive maintenance as they provide the information for scheduling maintenance and for evaluating its effectiveness.  A component of annual maintenance.
  • 7. Deferred Maintenance  Maintenance that was not performed when it should have been or when it was scheduled and which, therefore was put off or delayed for a future period.  Made up of 4 parts – a) cyclic (component replacement) b) minor repairs not done when they should have been, c) work needed to meet laws, regulations, etc as long as the original intent of the asset has not been changed, and d) functional obsolescence.  There is no current OMB requirement to report annual maintenance, only deferred maintenance.
  • 8. Example of Functional Obsolescence From the Facility Master Plan: “This building provides office space for 7 FTE’s. It was originally a garage, but was converted to an office in the early 1990’s. The building was constructed in 1955 and is 440 ft2 in size. The building is in fair condition. Water seepage into the interior after heavy rains (>3”) has been a recurring problem. It is recommended that it be decommissioned and replaced with a modern facility.” Does this building need to be evaluated for historic significance prior to demolition?
  • 9. Operations & Maintenance (O&M)  The activities and resources required to operate and maintain facilities (recreation, administrative, etc.) at a level of quality which meets management objectives and customer satisfaction.  Costs associated with O&M are generally recurrent, as opposed to capital investments, which are generally one-time and non- recurrent.
  • 10. O&M (continued)  O&M is like it sounds, part operations and part maintenance  O&M is funded by CP09, CMFC, NFRW, QMQM, and a variety of other EBLIs
  • 12. Purposes of Condition Assessments  Primary:  Serve as physical inventory for the asset  Show accomplishment (elimination of previously identified maintenance work)  Inform its valuation by determining the deferred maintenance deduction to be applied to the “raw” replacement value.  These are primarily financial upward reporting functions to allow the agency to adequately respond to requests for information and oversight
  • 13. Purposes of Condition Assessments (cont.)  Secondary  Identify future work needs, serving as a sort of periodic “reconnaissance” of the asset. In most cases the actual correction of deficiencies will require additional investigation, as there may be a number of alternatives as to how to best to address them  Serve as an additional opportunity to note critical health and safety, environmental degradation or other similar conditions which need to be addressed immediately.  These two functions are more targeted to the actual day- to-day work activities.
  • 14. Purpose of a Condition Assessment Subtracting the deferred maintenance on this building from the current replacement value computed by I-Web based on GSF gives a truer picture of its value. Often, deferred maintenance items discovered during condition assessments may never actually be done. For example, this building may not be really be worth repairing, and the building has been determined to be of low priority.
  • 15. Coordination with Other Required Surveys See FSM 7309 44.1 Exhibit 01  Condition Assessment – Every 5 years  Physical Inventory – Every 5 Years  Health and Safety – Annual, except ML 1  Quarters – Annual, prior to each occupancy  Facility Performance (Master Plan) – Every 10 years  Accessibility - Every 3 Years  Vulnerability – Every 5 Years  Friable Asbestos Materials – Annual  Energy Conservation – As Needed  Pre-Occupancy – Prior to Leasing  ECAP Audits (Internal) – Annual  EACP Audits (External) – Every 5 Years  EMS – Annual/Every 3 Years  EMS Second Party – Every 5 Years
  • 16. Integrated Assessments  Efforts are underway to try to integrate the some or all of the following:  Facility Condition Assessments – 5 Year Cycle  ECAP Audits (Internal) – 1 Year Cycle  Health and Safety Inspection – 1 Year Cycle  It may make more sense to integrate preventive maintenance (PM) and repair assessments with health and safety inspections and ECAP audits, rather than facility condition assessments, which primarily target cyclic replacement and deferred maintenance  Although there is no manual requirement for preventive maintenance and repair assessments, they are still needed in order to responsibly operate and maintain facilities to the desired standard and provide customer satisfaction
  • 17. Facility Condition Assessment Scheduling  Buildings, Water Systems, Wastewater Systems, Developed Recreation Sites – All of these require real property inventory and condition Assessment on a 5 year cycle  Efficiency then suggests that assets located near each other geographically should be scheduled for inspection concurrently in order to save travel time and costs
  • 18. Example of Spreadsheet that Can be Used to Schedule and Balance Workload ftp://sv1.r8.fs.fed.us/pub/Facility%20Condition%20Assessment%20Training/
  • 19. I-Web vs. MMS  It has been recognized that INFRA may not be the most useful way to handle scheduling of the multitude of day to day activities (Preventive maintenance, minor repairs,) that are often needed on a facility.  Instead a more specialized maintenance management software (MMS) might in some cases be more appropriate.  We will likely investigate the acquisition of such a system in the near future.  Regardless, however, most items which would be expected to be collected during a condition assessment would not normally cost less than $2,000 (individually), the minor purchase limit for construction, but instead would consist of major component repair and replacement, which really has the most effect on asset value.
  • 20. Minor vs. Major Items  As an example, one unit found that approximately 85% of the maintenance work items which had been recorded in I-Web during past assessments were estimated to cost less than $2,000 each, but this only added up to about 6% in value of the total maintenance work recorded for that Forest.  Therefore it is probably more productive to focus on major items when doing condition assessments, and keep up with the small stuff on a much more regular basis.
  • 21. There are Always Exceptions  The major exception would be noting critical items (health and safety, environmental degradation or mission delivery) which absolutely must be addressed immediately. Example: Non-functioning smoke detector in a sleeping quarters.
  • 22. Minor Items Left Undone Lead to DM  It should be recognized that usually it is relatively minor items left unaddressed that lead to deferred maintenance.  Therefore as a matter of practice these items should not be left to be discovered during a condition assessment which occurs only on a 5-year interval. Previously we discussed funds available to do operations and maintenance work with.  Correction of small recurring items such as replacing a filter, a burned out light bulb or fixing a broken lock should be addressed as ongoing “operations” using these fund types.
  • 23. Preventive Maintenance Tips Replacing furnace filters on a regular basis will prevent compressor freeze- up, dirty ductwork, fan failures, etc. Putting off repairing a roof leak or a waterproofing project may result in mold infestations that are extremely expensive to restore to useable condition. Non-functional exit signs, emergency lighting, smoke detectors need to be replaced immediately to prevent loss of life in case of a fire. You sure don’t want to wait long before you address this maintenance item!
  • 24. Foremost Objective  Perhaps the most important objective for facility condition assessments beyond those stated above relate to the need to have standardized inspections across the agency, standardized “acceptable” care, and to develop cost estimates that are consistent, repeatable and defendable.  This is probably even more important than developing detailed construction cost estimates.
  • 25. Consistent Standard of Care  Standard work items shown on the inspection form are “representative” of a consistent standard of repair and/or replacement quality across the agency, and should be used whenever possible, otherwise custom work items and minor improvement needs are available in the system.
  • 26. Consistent Costing Method  Costing is automated in the I-web module, requiring only limited interaction by the user; work item costs are based on R S Means, with appropriate multipliers applied to capture conditions of the Forest Service business environment in a consistent fashion.
  • 27. Note about costs  All costs are assumed to be based on contracting, with overhead and profit as described in R S Means  Costs may not be indicative of what would be encountered using force account, local jacks- of-all-trades, brother-in-laws, etc.
  • 28. Consistent Replacement Schedule  Replacement will be based upon condition as well as age and “typical expected life”.  Sources of Building Component Data:  R S Means  Agency Experience
  • 29. Available Sources for Component Life Expectancy  Tempering of Means data with corporate experience as captured in the Standard Work Items shown on the standard forms  ASHRAE (Association of Heating, Refrigeration and Air Conditioning Engineers  National Association of Home Builders  Building Cost Information Service (British)
  • 30. Typical Life Expectancy of Building Components – Appliances (NAHB)
  • 31. Typical Life Expectancy of Building Components – Bathrooms Footings
  • 32. Typical Life Expectancy of Building Components – HVAC Paint
  • 33. Typical Life Expectancy of Building Components – Plumbing Windows
  • 34. Progressive Levels of Inspection  All inspections must look at each of the standard work items as an agency minimum, as applicable (comparable to the concept of using “standard” specs in construction)  Additional work items shown in Means but not in the standard list may be also be considered – these are one type of “custom work items” (comparable to “approved supplemental specs” in construction)  Custom work items not included in Means may be needed for specialized assets – (comparable to “special project specs” in construction).
  • 35. Tailoring the level of Assessment Detail to the Building’s Expected Use  Buildings such as a barn might only need the “standard” work items collected on them.  Buildings that are used on an everyday basis might need more detailed work items to be collected.  Specialized buildings might require “custom” work items to be collected; these items may not be found in the MEANS database.
  • 36. Example of an asset for which “custom” work items that may be found in “Means” might apply
  • 37. Example of a specialized asset requiring “custom” work items not found in “Means” Replacement of “chinking” for a log building. This work would not typically be covered by RS Means Cost Data.
  • 39. Overview of Tasks  Obtain a Basic or Complex Condition Assessment Form from I-Web for each building, as applicable  Verify header info and/or fill out blanks for each building  User input will be required for inspector name, inspection date and remote travel time  Consider each standard work item for each building and determine if it applies, based upon typical life and existing condition. See the Work Items Data Dictionary  Obtain applicable quantities for each item  Consider whether non-standard or custom items should be included as well  Note any other significant or critical maintenance or operation items in the blanks provided on the form
  • 40. Header Information to be Verified  Unit, Site Name, Bldg ID, Bldg Name, Size, Bldg Category, Sub-Category, Maintenance Level, Historic Status and Real Property tie, as well as date of last Assessment will all come out of the I-Web database  Confirm whether the form is appropriate for the actual building – basic or complex, and if not make a note; if required schedule for alternate inspection  Verify the accuracy and make changes on the form where needed; recall that CRV cannot be changed, it is computed by INFRA, and is based upon GSF, category and sub-category
  • 41. Additional Tasks  Print out I-Web Report BLDWK03L:Building Work Item Details for the building to be inspected  Note work items that have been accomplished since last condition assessment  Recording date and cost for accomplishment will no longer be mandatory
  • 42. Header Information to be Input  Inspector Name – Initials are not OK, need full name  Inspection Date  Remote Travel Time – Record to the nearest hour based on the average number of hours it normally takes to travel to the site from a populated area, such as a small community, where materials for repair or restoration may be obtained  Base travel time on the most likely method that will be used to transport labor and materials to the jobsite (one-way trip time)  Travel Time will be used by INFRA to compute the “remoteness” factor, which affects work item cost
  • 44. Work Item Input (for all items)  Input the quantity needed for the appropriate standard or custom work item  Input the year the work is needed (planned year), or the fact that it has been deferred  As input requires mm-dd-yyyy use last day of FY  Realize the work will be recorded in I-web as annual or deferred maintenance not depending upon the nature of the item, but instead based on the year the work is needed, with DM as the default  Input reason and priority – H&S, mission or resource, critical and non-critical – with mission non-critical as default
  • 45. Lunch – 12:00 to 1:00