GENERAL RISK ASSESSMENT REPORT CARRIED IN
TRANSMISSION COMPANY OF NIGERIA
CALABAR SUB-REGION.
AYANDA DEMILADE ISAAC
NSECRSSEPT130
SUBMITTED TO NOVELLE CENTER OF HEALTH, SAFETY & ENVIRONMENT,
CALABAR
INTRODUCTION
A Risk Assessment is an important tool for the Management of Transmission Company of
Nigeria to use in evaluating the security and safety of the Facilities that they manage, and in
determining the potential for loss or harm to organizational staffs, operations, mission, and
stakeholders. The risk assessment provides management with the capability to:
• Provide an adequate level of protection for staffs and the facility.
• Meet Federal requirements for Electricity Regulatory Bodies and Staff welfare.
• Satisfy oversight organizations.
• Establish an acceptable level of risk.
• Advice management at all levels
• Monitoring and Compliance
• Enforcement of the Legislations
This is to ensure levels of risk and uncertainty are identified and then properly managed in a
structured way, so any potential threat to the delivery of outputs (level of resourcing, time, cost
and quality) and the realization of outcomes/benefits by the Business Owner(s) is appropriately
managed to ensure the health and safety of the staffs.
This Risk Assessment Report (RAR) presents the results of the risk assessment on
Transmission Company of Nigeria. This report documents the vulnerabilities discovered during
risk assessment activities and provides an assessment of the risks associated with the possible
exploitation of those vulnerabilities. Furthermore, it evaluates existing countermeasures and
provides recommendations for cost-effective solutions that would eliminate or minimize the
effects of the identified risks for the company,
This report discusses the General risk analysis (GRA) process and results for
Transmission Company of Nigeria (TCN). A Risk Assessment was executed to study
infrastructural Facilities and Staff welfare that could have an impact on the organization
exposing its staffs to risk and facilities to potential danger, hazards and damages.
This Risk Assessment Report (RAR) describes the TCN operating environment, findings
regarding system weaknesses, and provides recommendations for mitigating staff welfare & risks
involved in both the working environment and facilities. The Risk Assessment provides a basis
on which the TCN Certification Authority (CA) and the Authorizing Official (AO) can make an
informed risk-based decision of whether TCN will be:
1. Certified and Accredited (approved to operate with acceptable residual risk)
2. Given Interim Authority to Operate (IATO) for a period not to exceed one year, during
which time recommended countermeasures can and will be implemented
3. Not approved for operation until identified risks have been mitigated
This Risk Assessment covers the entire organization of TCN, external (customer), staffs
departments, equipment and facilities, also working procedures & standard of operation.
The organizational structure of the station comprises of the following departments: Control
Room, Stores, Security Department, Admin/Human Resource, Accounts, Motor Vehicle
Department (MVD), Electrical & Maintenance Department (EMD), Protection Control &
Metering (PC&M), Lines and the Switch Yard.
AIM OF RISK ASSESSMENT
The aim of risk assessment and management approach is to identify, assess and mitigate
risks where possible and to continually monitor risks throughout the remainder of the report as
other risks or threats emerge or a risk’s impact or likelihood changes.
OBJECTIVE OF RISK ASSESSMENT
The objective of this risk assessment was to identify threats and vulnerabilities related to
Transmission Company of Nigeria, Calabar Sub-Region. The risk assessment will be utilized to
identify risk mitigation plans related to TCN facilities.
This was achieved by defining the following:
 The process that will be/has been adopted by the assessment to identify, analyze and
evaluate risks.
 How risk mitigation strategies will be developed and deployed to reduce the likelihood
and/or impact of risks;
 How often risks will be reviewed, the process for review and who will be involved;
 Roles and responsibilities for risk management;
 How reporting on risk status, and changes to risk status, will be undertaken within the
management and to the Steering Committee;
 A complete Risk Register containing all risks identified for the Project, their current
grading and the identified risk mitigation strategies to reduce the likelihood and
seriousness of each risk.
RESEARCH METHODOLOGY
This research work was carried out using the Qualitative data collection method with the aid of
General Risk Assessment Report form which described in details the specific situation using
research tools such as key personnel interview to validate information gotten, site visit,
vulnerability sources and observations at the site of the project.
INFORMATION GATHERING TECHNIQUES
In support of this Risk Assessment, the following task was conducted:
 Reviewed agency and facility documents
 Interviewed key personnel
 Existing controls were verified and validated for compliance
 Conducted vulnerability scans against the equipment.
 Performed on-site inspections and conducted interviews with key personnel
Threat Identification and Analysis
A key part of the threat analysis is determining the threat actions associated with each threat-
source. These factors govern the probability and impact of a given threat-source to exploit
vulnerabilities.
Vulnerability Identification and Analysis
Vulnerability is a weakness through which a threat may adversely impact a system or its
associated assets. Multiple threats may exploit a single vulnerability. Thus, mitigating a single
vulnerability can address more than one threat/vulnerability pair.
Control Analysis
The overall objective of the control analysis process is to assess the status of present
Management, Operational, and Technical system security controls, which may be either
preventive or detective in nature. This assessment is required to determine the likelihood that the
identified vulnerabilities can be exploited, and the impact such exploitation may have on the
facility.
BODY OF THE WORK
BACKGROUND OF COMPANY
As part of the evolution in the Power Industry in Nigeria, the Federal Government by
Decree No. 24 of 1972 created the National Electric Power Authority (NEPA). This was
consequent upon the merger of the Electricity Corporation of Nigeria (ECN) and Niger Dams
Authority (NDA). In September 1990, the partial commercialization came into being with the
appointment of a Managing Director/Chief Executive to superintend over the Corporation. Also,
the Authority was divided into four autonomous divisions namely: Generation and Transmission;
Distribution and Sales; Engineering; Finance and Administration. Each division was headed by
an Executive Director.
The Transmission Company of Nigeria (TCN) is one of the successors of the unbundled
PHCN and is currently an asset held under the custodianship of the Federal Ministry of Power. It
will initially remain publicly owned. TCN has the responsibility for the management of
operation, maintenance and expansion of the 132kV and 330kV transmission system. The
Bureau of Public Enterprise (BPE) recently appointed a Management Contractor, Manitoba
Hydro International (MHI) for TCN which took over the functions of Transmission Service
Provider, System Operator and Market Operator to undertake the overall management of TCN.
System Operations (SO) function was established as a sector within the defunct Power Holding
Company of Nigeria under the Transmission sector. The SO has now evolved into a semi-
autonomous sector under TCN and upon acquiring its license would operate as an independent
company in future. The main responsibility of the System Operator is to operate the transmission
system and the connected installed generation in a safe and reliable manner. SO is also
responsible for the overall security and reliability of the grid system, economic dispatch of
available generation resources and maintaining system stability.
IDENTIFY AND ASSESS RISK FACTORS
Identifying the risk factors via the Risk Assessment is considered a qualitative process. Risk factors
are events and conditions that may influence or drive uncertainty in project performance. They may
be inherent characteristics or conditions of the company or external influences, events, or conditions.
Risk factors may have either favorable or unfavorable impacts on the facility.
LIST OF IDENTIFIED HAZARDS AND CONTROL MEASURES
The following potential hazards and the mitigation measures are highlighted in the table below:
HAZARDS CONTROL MEASURES
Workstation Setup Good work Layout & management
Restricted Access Provision of safety signs and symbols
Bites and Stings Environmental Fumigation
Powered Equipment Maintenance & provision of PPE
Vehicles Proper & regular maintenance
Electrical Use of PPE & permit to work
Lifting & Carrying Use of mechanical aids
Working at height Egress, safety lines & Edge protection
Food Good personal hygiene
Mobile & Fixed Plant Periodic maintenance
Working in remote areas Provision of shelter & security
MAJOR FINDINGS/OBSERVATIONS
In the course of carrying out this risk assessment, the following risks were identified:
1. The workstation setup has a poor infrastructural design and layout. The switch yard is of
high risk to staffs of the organization due to a lack of perimeter fence, safety signs and
symbols. The risk level within/around the switch yard is high because the facility consists
of high voltage transformers, live power lines and radiation effects. Also, a particular spot
within the workstation is very bushy, with thick tall grasses that could breed dangerous
rodents, snakes, termites and bees, which can make the working environment unsafe.
There should be an immediate installation of a perimeter fence to prevent unauthorized
access and reduce the risk of workers or visitors accidentally walking through the switch
yard, neglecting and not aware of high voltage and the potential hazards within.
Images showing the Switch yard without a perimeter fence
2. Inadequate fire-fighting equipment, fire alarm system, musters point, emergency exit and
control measures if a fire outbreak occurs within the facility. There are no procedures to
ensure the ongoing operation of the system in event of a significant business interruption
or disaster. The organization does not perform sufficient integrity checks on the facility.
The immediate need for installation of fire alarm systems, fire extinguishers, heat &
smoke detectors, water sprinkler, emergency exit and muster point to checkmate and
reduce the likelihood of a fire disaster.
3. Lack of safety signs and symbols such as Regulatory, Warning and Information symbols
to enforce and regulate standard environmental, health & safety within the workplace.
There is no fire safety signs and symbols in place, mandatory signs & symbols for staffs
to ensure use of PPE before entering the switch yard. The transformers within the switch
yard generates over 132kv of electricity which is very dangerous if any worker within
accidentally comes in contact. The management of TCN should ensure immediate
installation of caution Signs, prohibition signs, danger signs, safe conditions and
mandatory signs to prevent accidents in areas that are of greater risk and hazards within
the switch yard and other critical areas.
Images showing Powered Equipment without safety signs & symbols
4. The staffs in the following departments; Electrical Maintenance Department (EMD),
Protection, Control & Metering (PC&M) and Lines do not have the recommended
Personal Protective Equipment (PPE) when carrying out their respective activities within
and outside the facility. Most importantly within the switch yard. Due to the nature of
their work, they are regularly exposed to danger in the cause of duty that could be
detrimental and harmful to them. Lack of documentation on operating processes and
provision of the PPE by the company. The management should ensure adequate and
sufficient provision of PPE for all staffs that carryout risky/hazardous works. There
should be an enforcement and strict compliance with the aid of company policies and
working procedures. Training should be conducted for the staffs on health, safety and
environment to empower them.
5. The Motor Vehicle Department (MVD) have been neglected, a close inspection of these
work vehicles indicates they are in a poor state. Inadequate maintenance, bad tyres with
worn out threading, damaged pointer and brake lights, no reflectors stickers, fire
extinguisher, warning stickers and a bad pair of wiper. As a result of these lapses, there is
a high likelihood that if there is heavy rainfall, visibility when driving will be poor, the
damaged tail lights could cause a fatal accident as a result of unworthiness of the vehicle
and danger to other road users. A periodic maintenance of all work vehicles, replacement
and fixing of worn out & damaged parts such as the wiper, brake lights, tyres etc. is
recommended to the management.
6. Bites/Stings and inadequate waste disposal facilities such as waste bin, the environment
is bushy which could therefore breed dangerous animals and insect that can endanger the
workers within the facility. The management should provide adequate waste disposal
system and regular fumigation of bushy areas to keep the workplace safe at all times.
Images showing the Bushy Area.
7. Food; the company lacks a standard canteen to enable the staffs eat a proper meal and
maintain good hygiene practices, it was noted that the staffs purchase food from a lady
that brings food and sell to them in the open space, this could result to food disease or
poisoning due to poor environmental factors.
8. Lifting & Carrying of heavy loads & equipment by staffs which involves manual
handling/labor that could lead to injury and other hazards. Mechanical aid should be sort
after to reduce the risk to workers health and welfare.
9. Working in remote area by the lines department regularly who go on fault tracing within
the major power lines often end up in remote areas and have to work overtime at odd
hours, no security or shelter which exposes them to threats and attacks from inhabitants
of the land. Security and shelter should be made available for these workers to ensure
their safety and comfort when in a remote area.
MITIGATION RECOMMENDATIONS
Once the risks have been identified and risk level determined, a series of recommended
countermeasures are provided to mitigate or eliminate the risks to the system. The goal is to
reduce the risks to an acceptable level. Factors that are considered for recommended
countermeasures include:
 Effectiveness of recommended options (e.g., system compatibility)
 Legislation and regulation
 Organizational policy
 Operational impact
 Safety and reliability
In order to achieve a safe working environment all High and Medium risk findings must be
remediated immediately. Based on the identified risks, it is recommended that efforts to properly
implement the recommended countermeasures for the facility and company be in accordance
with the standard safety ethics. The remediation process requires a coordinated effort between
various groups within the company. Some controls must be implemented at the work level while
others are controlled by infrastructure support groups. Additionally, TCN upper management
approval and support is required in order to effectively communicate organizational policies and
procedures pertaining to safety and welfare of both staffs and equipment.
The most significant area of concern for the TCN is the lack of implementation of controls in the
area of Switch yard. It is important a perimeter fence is provided to guard against illegal entry
and access to the facility. Also there should be strict policy and measures such as the safety signs
and symbols, adequate provision and enforcement of PPE to all staffs working within the
premises, particularly those that perform high risk activities.
CONCLUSION AND SUMMARY
This report has provided the management with a framework to ensure that levels of risk
and uncertainty are properly managed to ensure smooth operation and welfare of the staffs. As
risk management is an ongoing process over the life of a project, the Risk Assessment must be
considered a ‘snap shot’ of relevant risks at one point in time.
This report was achieved by defining the following:
 The process that will be/has been adopted by the report to identify, analyse and evaluate
risks in the work environment.
 How risk mitigation strategies will be developed and deployed to reduce the likelihood
and/or impact of risks;
 How often risks will be reviewed, the process for review and who will be involved;
 Roles and responsibilities for risk management;
 How reporting on risk status, and changes to risk status, will be undertaken.
 A complete Risk Register containing all risks identified for the Report, their current
rating and the identified risk mitigation strategies to reduce the likelihood and seriousness
of each risk.
In conclusion, the Risk Assessment at TCN calabar sub-region identifies risks of
operation (those areas which do not meet minimum requirements and for which adequate
countermeasures have not been implemented). The RA also determines the likelihood of
occurrence and suggests countermeasures to mitigate identified risks in an effort to provide
an appropriate level-of-protection and to meet all minimum requirements imposed on the
organization. The countermeasures recommended in this report specify the additional safety
controls needed to meet policies and to effectively manage the management risk and its operating
environment.
REFERENCES
Transmission Company of Nigeria Safety Handbook & Act.
Factory Act 1990
Institute of Safety Professionals of Nigeria.
ILO Convention C155 and recommendation R164 as pertain to health, safety and workers
HASAWA (Health And Safety At Work Act) of 1974
MOHSR (Management of Health and Safety Regulation) 1999
Environmental Regulations for Workplaces, 1987
General Administrative Regulations, 2003
Electrical Installation Regulations, 2009
Major Hazard Installation Regulations, 1993
Regulations concerning the Certificate of Competency, 1990.

More Related Content

What's hot

Industrial safety
Industrial safetyIndustrial safety
Industrial safety
priyaprabbu
 
Incident Investigation Training by Zenith
Incident Investigation Training by ZenithIncident Investigation Training by Zenith
Incident Investigation Training by Zenith
Atlantic Training, LLC.
 
Construction safety lecture-2
Construction safety  lecture-2Construction safety  lecture-2
Construction safety lecture-2
Saleem Malik
 
Hsse safety iceberg theory gp
Hsse safety iceberg theory gpHsse safety iceberg theory gp
Hsse safety iceberg theory gp
Noor Ezlina
 

What's hot (20)

B Part 4 Risk Assessment & Study Example By J Mc Cann
B  Part 4 Risk Assessment &  Study Example By J Mc CannB  Part 4 Risk Assessment &  Study Example By J Mc Cann
B Part 4 Risk Assessment & Study Example By J Mc Cann
 
EHS Leading Indicators
EHS Leading IndicatorsEHS Leading Indicators
EHS Leading Indicators
 
Job Hazard Analysis
Job Hazard AnalysisJob Hazard Analysis
Job Hazard Analysis
 
Hse Action Plan
Hse Action PlanHse Action Plan
Hse Action Plan
 
Industrial safety
Industrial safetyIndustrial safety
Industrial safety
 
A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety Induction
 
HIRA
HIRAHIRA
HIRA
 
Emergency Evacuation Planning by NCDC
Emergency Evacuation Planning by NCDCEmergency Evacuation Planning by NCDC
Emergency Evacuation Planning by NCDC
 
Identification of hazard industry and risk assessment
Identification of hazard industry and risk assessment Identification of hazard industry and risk assessment
Identification of hazard industry and risk assessment
 
Confined Space Ppt
Confined Space PptConfined Space Ppt
Confined Space Ppt
 
Workplace risk management
Workplace risk managementWorkplace risk management
Workplace risk management
 
Basic safety orientation training
Basic safety orientation trainingBasic safety orientation training
Basic safety orientation training
 
Ppt for IMPROVEMENT OF SAFETY THROUGH SAFETY MANAGAMENT PLAN – office p...
Ppt for IMPROVEMENT OF SAFETY   THROUGH    SAFETY MANAGAMENT PLAN –  office p...Ppt for IMPROVEMENT OF SAFETY   THROUGH    SAFETY MANAGAMENT PLAN –  office p...
Ppt for IMPROVEMENT OF SAFETY THROUGH SAFETY MANAGAMENT PLAN – office p...
 
Incident Investigation Training by Zenith
Incident Investigation Training by ZenithIncident Investigation Training by Zenith
Incident Investigation Training by Zenith
 
QHSE
QHSEQHSE
QHSE
 
Construction safety lecture-2
Construction safety  lecture-2Construction safety  lecture-2
Construction safety lecture-2
 
Material Handling Training by OSHA
Material Handling Training by OSHAMaterial Handling Training by OSHA
Material Handling Training by OSHA
 
Emergency Response Plan
Emergency Response PlanEmergency Response Plan
Emergency Response Plan
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
Hsse safety iceberg theory gp
Hsse safety iceberg theory gpHsse safety iceberg theory gp
Hsse safety iceberg theory gp
 

Viewers also liked

Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
dysos
 
Sun burn brewery slideshare
Sun burn brewery slideshareSun burn brewery slideshare
Sun burn brewery slideshare
Soccertrees
 
Industrial health and safety seminar
Industrial health and safety seminarIndustrial health and safety seminar
Industrial health and safety seminar
Fahad Shaikh
 
Health and safety plan generic
Health and safety plan genericHealth and safety plan generic
Health and safety plan generic
firstpick
 
Hazardous Materials Control & Management Training by NOAA
Hazardous Materials Control & Management Training by NOAAHazardous Materials Control & Management Training by NOAA
Hazardous Materials Control & Management Training by NOAA
Atlantic Training, LLC.
 
Employee welfare
Employee welfare Employee welfare
Employee welfare
Chandan Raj
 

Viewers also liked (20)

Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk Assessment at Swansea ITeC
Risk Assessment at Swansea ITeCRisk Assessment at Swansea ITeC
Risk Assessment at Swansea ITeC
 
12 reasons you should invest in safety training
12 reasons you should invest in safety training12 reasons you should invest in safety training
12 reasons you should invest in safety training
 
Addiction overview
Addiction overviewAddiction overview
Addiction overview
 
Sun burn brewery slideshare
Sun burn brewery slideshareSun burn brewery slideshare
Sun burn brewery slideshare
 
Water Fire Extinguishers Powerpoint
Water Fire Extinguishers PowerpointWater Fire Extinguishers Powerpoint
Water Fire Extinguishers Powerpoint
 
Leading with Tech Safety: An Unexpected Pathway to Excellence
Leading with Tech Safety: An Unexpected Pathway to ExcellenceLeading with Tech Safety: An Unexpected Pathway to Excellence
Leading with Tech Safety: An Unexpected Pathway to Excellence
 
HSE Management System
HSE Management SystemHSE Management System
HSE Management System
 
HSE Presentation Health & Safety Passport Scheme 2011
HSE Presentation Health & Safety Passport Scheme 2011HSE Presentation Health & Safety Passport Scheme 2011
HSE Presentation Health & Safety Passport Scheme 2011
 
EMERGENCY PLANNING
EMERGENCY PLANNINGEMERGENCY PLANNING
EMERGENCY PLANNING
 
OHSAS 18001 + ISO 14001 – Implementation Methods
OHSAS 18001 + ISO 14001 – Implementation MethodsOHSAS 18001 + ISO 14001 – Implementation Methods
OHSAS 18001 + ISO 14001 – Implementation Methods
 
Industrial health and safety seminar
Industrial health and safety seminarIndustrial health and safety seminar
Industrial health and safety seminar
 
Hse inspection presentation
Hse inspection presentationHse inspection presentation
Hse inspection presentation
 
Implementation of OHSAS 18001
Implementation of  OHSAS 18001Implementation of  OHSAS 18001
Implementation of OHSAS 18001
 
Health and safety plan generic
Health and safety plan genericHealth and safety plan generic
Health and safety plan generic
 
Emergency Action Plan by NOAO
Emergency Action Plan by NOAOEmergency Action Plan by NOAO
Emergency Action Plan by NOAO
 
Emergency Action Plans Training by NMED
Emergency Action Plans Training by NMEDEmergency Action Plans Training by NMED
Emergency Action Plans Training by NMED
 
Hazardous Materials Control & Management Training by NOAA
Hazardous Materials Control & Management Training by NOAAHazardous Materials Control & Management Training by NOAA
Hazardous Materials Control & Management Training by NOAA
 
Emergency Preparedness and Response Training by BCMSA
Emergency Preparedness and Response Training by BCMSAEmergency Preparedness and Response Training by BCMSA
Emergency Preparedness and Response Training by BCMSA
 
Employee welfare
Employee welfare Employee welfare
Employee welfare
 

Similar to HSE RISK ASSESSMENT

Management of Change 22.4.15
Management of Change 22.4.15Management of Change 22.4.15
Management of Change 22.4.15
SANJIV SONI
 
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Yuvraj Shrivastava
 

Similar to HSE RISK ASSESSMENT (20)

HAZARD IDENTIFICATION AND RISK ASSESSMENT IN AUTO COMPONENTS MANUFACTURING IN...
HAZARD IDENTIFICATION AND RISK ASSESSMENT IN AUTO COMPONENTS MANUFACTURING IN...HAZARD IDENTIFICATION AND RISK ASSESSMENT IN AUTO COMPONENTS MANUFACTURING IN...
HAZARD IDENTIFICATION AND RISK ASSESSMENT IN AUTO COMPONENTS MANUFACTURING IN...
 
WASHEQ PPT Afternoon session 2011
WASHEQ PPT Afternoon session 2011WASHEQ PPT Afternoon session 2011
WASHEQ PPT Afternoon session 2011
 
IRJET- Assessing the Workplace Risk in Food Industry
IRJET-  	  Assessing the Workplace Risk in Food IndustryIRJET-  	  Assessing the Workplace Risk in Food Industry
IRJET- Assessing the Workplace Risk in Food Industry
 
Management of Change 22.4.15
Management of Change 22.4.15Management of Change 22.4.15
Management of Change 22.4.15
 
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
 
HIRA Manual
HIRA ManualHIRA Manual
HIRA Manual
 
Study to Identify and Rectify Potential Risks in General Engineering Services...
Study to Identify and Rectify Potential Risks in General Engineering Services...Study to Identify and Rectify Potential Risks in General Engineering Services...
Study to Identify and Rectify Potential Risks in General Engineering Services...
 
Cv HASSAN RIAZ
Cv HASSAN RIAZCv HASSAN RIAZ
Cv HASSAN RIAZ
 
Risk management osh
Risk management oshRisk management osh
Risk management osh
 
Insurance
InsuranceInsurance
Insurance
 
Careers Australia Question 1 ca whs activity
Careers Australia Question 1 ca whs activityCareers Australia Question 1 ca whs activity
Careers Australia Question 1 ca whs activity
 
Occupational safety and health n union
Occupational safety and health n unionOccupational safety and health n union
Occupational safety and health n union
 
topic5.ppt
topic5.ppttopic5.ppt
topic5.ppt
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
topic5 (1).ppt
topic5 (1).ppttopic5 (1).ppt
topic5 (1).ppt
 
Risk Assessment and Management.ppt
Risk Assessment and Management.pptRisk Assessment and Management.ppt
Risk Assessment and Management.ppt
 
Risk assessment and management
Risk assessment and managementRisk assessment and management
Risk assessment and management
 
Topic5
Topic5Topic5
Topic5
 
Understanding Risk Management & Cyber security Principles in Medical Devices
Understanding Risk Management & Cyber security Principles in Medical DevicesUnderstanding Risk Management & Cyber security Principles in Medical Devices
Understanding Risk Management & Cyber security Principles in Medical Devices
 
Hsse policy group 5 final
Hsse policy group 5 finalHsse policy group 5 final
Hsse policy group 5 final
 

HSE RISK ASSESSMENT

  • 1. GENERAL RISK ASSESSMENT REPORT CARRIED IN TRANSMISSION COMPANY OF NIGERIA CALABAR SUB-REGION. AYANDA DEMILADE ISAAC NSECRSSEPT130 SUBMITTED TO NOVELLE CENTER OF HEALTH, SAFETY & ENVIRONMENT, CALABAR
  • 2. INTRODUCTION A Risk Assessment is an important tool for the Management of Transmission Company of Nigeria to use in evaluating the security and safety of the Facilities that they manage, and in determining the potential for loss or harm to organizational staffs, operations, mission, and stakeholders. The risk assessment provides management with the capability to: • Provide an adequate level of protection for staffs and the facility. • Meet Federal requirements for Electricity Regulatory Bodies and Staff welfare. • Satisfy oversight organizations. • Establish an acceptable level of risk. • Advice management at all levels • Monitoring and Compliance • Enforcement of the Legislations This is to ensure levels of risk and uncertainty are identified and then properly managed in a structured way, so any potential threat to the delivery of outputs (level of resourcing, time, cost and quality) and the realization of outcomes/benefits by the Business Owner(s) is appropriately managed to ensure the health and safety of the staffs. This Risk Assessment Report (RAR) presents the results of the risk assessment on Transmission Company of Nigeria. This report documents the vulnerabilities discovered during risk assessment activities and provides an assessment of the risks associated with the possible exploitation of those vulnerabilities. Furthermore, it evaluates existing countermeasures and provides recommendations for cost-effective solutions that would eliminate or minimize the effects of the identified risks for the company, This report discusses the General risk analysis (GRA) process and results for Transmission Company of Nigeria (TCN). A Risk Assessment was executed to study infrastructural Facilities and Staff welfare that could have an impact on the organization exposing its staffs to risk and facilities to potential danger, hazards and damages. This Risk Assessment Report (RAR) describes the TCN operating environment, findings regarding system weaknesses, and provides recommendations for mitigating staff welfare & risks involved in both the working environment and facilities. The Risk Assessment provides a basis on which the TCN Certification Authority (CA) and the Authorizing Official (AO) can make an informed risk-based decision of whether TCN will be:
  • 3. 1. Certified and Accredited (approved to operate with acceptable residual risk) 2. Given Interim Authority to Operate (IATO) for a period not to exceed one year, during which time recommended countermeasures can and will be implemented 3. Not approved for operation until identified risks have been mitigated This Risk Assessment covers the entire organization of TCN, external (customer), staffs departments, equipment and facilities, also working procedures & standard of operation. The organizational structure of the station comprises of the following departments: Control Room, Stores, Security Department, Admin/Human Resource, Accounts, Motor Vehicle Department (MVD), Electrical & Maintenance Department (EMD), Protection Control & Metering (PC&M), Lines and the Switch Yard. AIM OF RISK ASSESSMENT The aim of risk assessment and management approach is to identify, assess and mitigate risks where possible and to continually monitor risks throughout the remainder of the report as other risks or threats emerge or a risk’s impact or likelihood changes. OBJECTIVE OF RISK ASSESSMENT The objective of this risk assessment was to identify threats and vulnerabilities related to Transmission Company of Nigeria, Calabar Sub-Region. The risk assessment will be utilized to identify risk mitigation plans related to TCN facilities. This was achieved by defining the following:  The process that will be/has been adopted by the assessment to identify, analyze and evaluate risks.  How risk mitigation strategies will be developed and deployed to reduce the likelihood and/or impact of risks;  How often risks will be reviewed, the process for review and who will be involved;  Roles and responsibilities for risk management;  How reporting on risk status, and changes to risk status, will be undertaken within the management and to the Steering Committee;
  • 4.  A complete Risk Register containing all risks identified for the Project, their current grading and the identified risk mitigation strategies to reduce the likelihood and seriousness of each risk. RESEARCH METHODOLOGY This research work was carried out using the Qualitative data collection method with the aid of General Risk Assessment Report form which described in details the specific situation using research tools such as key personnel interview to validate information gotten, site visit, vulnerability sources and observations at the site of the project. INFORMATION GATHERING TECHNIQUES In support of this Risk Assessment, the following task was conducted:  Reviewed agency and facility documents  Interviewed key personnel  Existing controls were verified and validated for compliance  Conducted vulnerability scans against the equipment.  Performed on-site inspections and conducted interviews with key personnel Threat Identification and Analysis A key part of the threat analysis is determining the threat actions associated with each threat- source. These factors govern the probability and impact of a given threat-source to exploit vulnerabilities. Vulnerability Identification and Analysis Vulnerability is a weakness through which a threat may adversely impact a system or its associated assets. Multiple threats may exploit a single vulnerability. Thus, mitigating a single vulnerability can address more than one threat/vulnerability pair. Control Analysis The overall objective of the control analysis process is to assess the status of present Management, Operational, and Technical system security controls, which may be either preventive or detective in nature. This assessment is required to determine the likelihood that the identified vulnerabilities can be exploited, and the impact such exploitation may have on the facility.
  • 5. BODY OF THE WORK BACKGROUND OF COMPANY As part of the evolution in the Power Industry in Nigeria, the Federal Government by Decree No. 24 of 1972 created the National Electric Power Authority (NEPA). This was consequent upon the merger of the Electricity Corporation of Nigeria (ECN) and Niger Dams Authority (NDA). In September 1990, the partial commercialization came into being with the appointment of a Managing Director/Chief Executive to superintend over the Corporation. Also, the Authority was divided into four autonomous divisions namely: Generation and Transmission; Distribution and Sales; Engineering; Finance and Administration. Each division was headed by an Executive Director. The Transmission Company of Nigeria (TCN) is one of the successors of the unbundled PHCN and is currently an asset held under the custodianship of the Federal Ministry of Power. It will initially remain publicly owned. TCN has the responsibility for the management of operation, maintenance and expansion of the 132kV and 330kV transmission system. The Bureau of Public Enterprise (BPE) recently appointed a Management Contractor, Manitoba Hydro International (MHI) for TCN which took over the functions of Transmission Service Provider, System Operator and Market Operator to undertake the overall management of TCN. System Operations (SO) function was established as a sector within the defunct Power Holding Company of Nigeria under the Transmission sector. The SO has now evolved into a semi- autonomous sector under TCN and upon acquiring its license would operate as an independent company in future. The main responsibility of the System Operator is to operate the transmission system and the connected installed generation in a safe and reliable manner. SO is also responsible for the overall security and reliability of the grid system, economic dispatch of available generation resources and maintaining system stability. IDENTIFY AND ASSESS RISK FACTORS Identifying the risk factors via the Risk Assessment is considered a qualitative process. Risk factors are events and conditions that may influence or drive uncertainty in project performance. They may be inherent characteristics or conditions of the company or external influences, events, or conditions. Risk factors may have either favorable or unfavorable impacts on the facility.
  • 6. LIST OF IDENTIFIED HAZARDS AND CONTROL MEASURES The following potential hazards and the mitigation measures are highlighted in the table below: HAZARDS CONTROL MEASURES Workstation Setup Good work Layout & management Restricted Access Provision of safety signs and symbols Bites and Stings Environmental Fumigation Powered Equipment Maintenance & provision of PPE Vehicles Proper & regular maintenance Electrical Use of PPE & permit to work Lifting & Carrying Use of mechanical aids Working at height Egress, safety lines & Edge protection Food Good personal hygiene Mobile & Fixed Plant Periodic maintenance Working in remote areas Provision of shelter & security MAJOR FINDINGS/OBSERVATIONS In the course of carrying out this risk assessment, the following risks were identified: 1. The workstation setup has a poor infrastructural design and layout. The switch yard is of high risk to staffs of the organization due to a lack of perimeter fence, safety signs and symbols. The risk level within/around the switch yard is high because the facility consists of high voltage transformers, live power lines and radiation effects. Also, a particular spot within the workstation is very bushy, with thick tall grasses that could breed dangerous rodents, snakes, termites and bees, which can make the working environment unsafe. There should be an immediate installation of a perimeter fence to prevent unauthorized access and reduce the risk of workers or visitors accidentally walking through the switch yard, neglecting and not aware of high voltage and the potential hazards within.
  • 7. Images showing the Switch yard without a perimeter fence
  • 8. 2. Inadequate fire-fighting equipment, fire alarm system, musters point, emergency exit and control measures if a fire outbreak occurs within the facility. There are no procedures to ensure the ongoing operation of the system in event of a significant business interruption or disaster. The organization does not perform sufficient integrity checks on the facility. The immediate need for installation of fire alarm systems, fire extinguishers, heat & smoke detectors, water sprinkler, emergency exit and muster point to checkmate and reduce the likelihood of a fire disaster. 3. Lack of safety signs and symbols such as Regulatory, Warning and Information symbols to enforce and regulate standard environmental, health & safety within the workplace. There is no fire safety signs and symbols in place, mandatory signs & symbols for staffs to ensure use of PPE before entering the switch yard. The transformers within the switch yard generates over 132kv of electricity which is very dangerous if any worker within accidentally comes in contact. The management of TCN should ensure immediate installation of caution Signs, prohibition signs, danger signs, safe conditions and mandatory signs to prevent accidents in areas that are of greater risk and hazards within the switch yard and other critical areas. Images showing Powered Equipment without safety signs & symbols
  • 9. 4. The staffs in the following departments; Electrical Maintenance Department (EMD), Protection, Control & Metering (PC&M) and Lines do not have the recommended Personal Protective Equipment (PPE) when carrying out their respective activities within and outside the facility. Most importantly within the switch yard. Due to the nature of their work, they are regularly exposed to danger in the cause of duty that could be detrimental and harmful to them. Lack of documentation on operating processes and provision of the PPE by the company. The management should ensure adequate and sufficient provision of PPE for all staffs that carryout risky/hazardous works. There should be an enforcement and strict compliance with the aid of company policies and working procedures. Training should be conducted for the staffs on health, safety and environment to empower them. 5. The Motor Vehicle Department (MVD) have been neglected, a close inspection of these work vehicles indicates they are in a poor state. Inadequate maintenance, bad tyres with worn out threading, damaged pointer and brake lights, no reflectors stickers, fire extinguisher, warning stickers and a bad pair of wiper. As a result of these lapses, there is a high likelihood that if there is heavy rainfall, visibility when driving will be poor, the damaged tail lights could cause a fatal accident as a result of unworthiness of the vehicle and danger to other road users. A periodic maintenance of all work vehicles, replacement and fixing of worn out & damaged parts such as the wiper, brake lights, tyres etc. is recommended to the management.
  • 10. 6. Bites/Stings and inadequate waste disposal facilities such as waste bin, the environment is bushy which could therefore breed dangerous animals and insect that can endanger the workers within the facility. The management should provide adequate waste disposal system and regular fumigation of bushy areas to keep the workplace safe at all times. Images showing the Bushy Area. 7. Food; the company lacks a standard canteen to enable the staffs eat a proper meal and maintain good hygiene practices, it was noted that the staffs purchase food from a lady that brings food and sell to them in the open space, this could result to food disease or poisoning due to poor environmental factors. 8. Lifting & Carrying of heavy loads & equipment by staffs which involves manual handling/labor that could lead to injury and other hazards. Mechanical aid should be sort after to reduce the risk to workers health and welfare.
  • 11. 9. Working in remote area by the lines department regularly who go on fault tracing within the major power lines often end up in remote areas and have to work overtime at odd hours, no security or shelter which exposes them to threats and attacks from inhabitants of the land. Security and shelter should be made available for these workers to ensure their safety and comfort when in a remote area. MITIGATION RECOMMENDATIONS Once the risks have been identified and risk level determined, a series of recommended countermeasures are provided to mitigate or eliminate the risks to the system. The goal is to reduce the risks to an acceptable level. Factors that are considered for recommended countermeasures include:  Effectiveness of recommended options (e.g., system compatibility)  Legislation and regulation  Organizational policy  Operational impact  Safety and reliability In order to achieve a safe working environment all High and Medium risk findings must be remediated immediately. Based on the identified risks, it is recommended that efforts to properly implement the recommended countermeasures for the facility and company be in accordance with the standard safety ethics. The remediation process requires a coordinated effort between various groups within the company. Some controls must be implemented at the work level while others are controlled by infrastructure support groups. Additionally, TCN upper management approval and support is required in order to effectively communicate organizational policies and procedures pertaining to safety and welfare of both staffs and equipment. The most significant area of concern for the TCN is the lack of implementation of controls in the area of Switch yard. It is important a perimeter fence is provided to guard against illegal entry and access to the facility. Also there should be strict policy and measures such as the safety signs and symbols, adequate provision and enforcement of PPE to all staffs working within the premises, particularly those that perform high risk activities.
  • 12. CONCLUSION AND SUMMARY This report has provided the management with a framework to ensure that levels of risk and uncertainty are properly managed to ensure smooth operation and welfare of the staffs. As risk management is an ongoing process over the life of a project, the Risk Assessment must be considered a ‘snap shot’ of relevant risks at one point in time. This report was achieved by defining the following:  The process that will be/has been adopted by the report to identify, analyse and evaluate risks in the work environment.  How risk mitigation strategies will be developed and deployed to reduce the likelihood and/or impact of risks;  How often risks will be reviewed, the process for review and who will be involved;  Roles and responsibilities for risk management;  How reporting on risk status, and changes to risk status, will be undertaken.  A complete Risk Register containing all risks identified for the Report, their current rating and the identified risk mitigation strategies to reduce the likelihood and seriousness of each risk. In conclusion, the Risk Assessment at TCN calabar sub-region identifies risks of operation (those areas which do not meet minimum requirements and for which adequate countermeasures have not been implemented). The RA also determines the likelihood of occurrence and suggests countermeasures to mitigate identified risks in an effort to provide an appropriate level-of-protection and to meet all minimum requirements imposed on the organization. The countermeasures recommended in this report specify the additional safety controls needed to meet policies and to effectively manage the management risk and its operating environment.
  • 13. REFERENCES Transmission Company of Nigeria Safety Handbook & Act. Factory Act 1990 Institute of Safety Professionals of Nigeria. ILO Convention C155 and recommendation R164 as pertain to health, safety and workers HASAWA (Health And Safety At Work Act) of 1974 MOHSR (Management of Health and Safety Regulation) 1999 Environmental Regulations for Workplaces, 1987 General Administrative Regulations, 2003 Electrical Installation Regulations, 2009 Major Hazard Installation Regulations, 1993 Regulations concerning the Certificate of Competency, 1990.