The Role of Risk Management
for Occupational Health and Safety
Benefiting from effective risk assessment
by Andreas E. Fiedler
Introduction
Many workplaces have hazards. Hazards
put employees at risk of injury or harm to
health. Therefore health and safety need to
be managed in a systematic manner. This is
the job of occupational health and safety
management.
Occupational health and safety already is a
legal requirement in several countries.
Others have established such system but
the application is still optional.
Risk management is an integral part of
performing occupational health and safety.
It serves to identify and assess the risks
derived from the hazards. It finally leads to
appropriate action to reduce or even
eliminate such risks. Risk management is
the critical success factor in occupational
health and safety.
The Management System for
Occupational Health and Safety
The management system provides the
framework for the process of identifying
hazards, assessing associated risks, taking
action and reviewing the outcome. Like any
modern management system it conforms to
the kind of management system as it was
developed for quality management
(ISO9000). Hence, the occupational health
and safety management system just has to
be integrated into the existing management
systems.
The following are the elements of a
management system for Occupational
© 2004 Northwest Controlling Corporation Ltd. Page 1 of 4
Northwest Controlling Corporation Ltd.
Internet: http://www.noweco.com/welcome.htm
Email: info@noweco.com
Health and Safety (OHS) as suggested by
OSHAS 18001 which embraces BS8800,
AS/NZ 4801, NSAI SR 320 and a number of
other publications. It is based on the Plan -
Do - Check - Act cycle:
Defining the OHS Strategy
Planning
Implementation and Operation
Checking and Corrective Action
Management Review
Continual Improvement
Managing Risks
Overview
Risk management has become part of lots
of management systems. The information
security management system for example
uses risk management to assess the risks
associated with the audit findings of the
information security management system.
The same way the occupational health and
safety management system makes use of
risk management to assess the risk
associated with hazards.
This gives the frame for the process in
occupational health and safety:
Identifying hazards
Assessing associated risks
Taking action to mitigate risks
Monitoring the effectiveness
Identifying hazards
A hazard is anything that is a threat to
health and safety in an organisation.
Therefore it is linked to the people of the
organisation and it immediately becomes
clear that everybody has to contribute to
finding hazards at his or her workplace. It is
a legal requirement in some countries that
employers have to consult their employees.
A hazard is not just linked to a technical
equipment or a material used at a work-
place but has to include processes and
procedures that determine the work at the
workplace.
Sources for hazard identification can be:
Past incidents and accidents
Input by employees
Examining workplaces or work areas
Review of safety instruction for equip-
ment and materials
Any kind of creative thinking such as
brainstorming
Advice from legislation, standards,
checklists or external consultants.
Assessing associated risks
Prior to assessing risks these risks
associated to the identified hazards have to
be determined. Mind the gap and clearly
understand that hazards and risks resulting
from hazards are something different!
Risk assessment itself is very much the
same as with risk assessment in other
management systems. Typically, a risk is
assessed by its likelihood and its con-
sequence. Risk assessment will provide you
with an insight in your risks and allow to
prioritise risks for taking mitigating actions.
A risk matrix serves well to define and
classify likelihood and consequences of a
risk. A risk matrix makes use of descriptors
to define levels of both likelihood (from
almost certain to rare) and consequence
(from insignificant to catastrophic).
© 2004 Northwest Controlling Corporation Ltd. Page 2 of 4
Northwest Controlling Corporation Ltd.
Internet: http://www.noweco.com/welcome.htm
Email: info@noweco.com
The following aspects may be helpful to
determine the likelihood of a risk:
Other risks that add to the increase of
likelihood
Frequency of occurrence
Duration of risk occurrence
Number of people being exposed
Likely dose of exposure
Required exposure levels
Accordingly the consequences have to be
determined. With regard to property and
environmental damage these consequences
can be expressed in terms of money.
Whenever people are harmed the
consequences can be expressed in terms of
seriousness of the illness or injury. This has
further to be put in relation to who is
harmed, especially people at a particular
risk such as expectant mothers or young
people.
Risk assessment will be completed with
prioritisation of risks and assigned risk
factors to understand the scope of
mitigating actions required.
Taking actions to mitigate actions
Mitigating actions focus on reducing the
likelihood and/or consequence. There is a
hierarchy in different solutions whereby the
most effective usually is also the most
difficult and sometimes most expensive to
realise:
Actions that remove the hazard and
eliminate the risk.
Actions that replace the hazard by a less
dangerous one.
Actions that modify the product or
process design.
Actions that isolate the hazard from
people.
Actions that use engineering solutions
such as a new machinery or plant.
Actions that use administrative controls,
e.g. new procedures.
Actions that protect through personal
equipment from hazards.
Monitoring the effectiveness
The outcome of each risk mitigating action
has to be reviewed on two levels:
To ensure that the actions taken are
effective and continue to be effective.
To ensure that no new hazard/risk was
introduced by the actions taken.
Any control measures have to be
maintained in order to ensure that they are
kept in working order. As well procedures
have to be audited to ensure they are being
followed as intended.
After completing one entire cycle of risk
management the next has to be scheduled
to ensure that always the best actions are
taken and new hazards are included into
risk management.
Keeping Records
All analysis and assessments made as well
as all actions taken need to be recorded. A
Risk Register or Risk Log will serve to do
so. To allow record keeping being an
efficient task most organisations will look for
a software solution providing such risk
register.
© 2004 Northwest Controlling Corporation Ltd. Page 3 of 4
Northwest Controlling Corporation Ltd.
Internet: http://www.noweco.com/welcome.htm
Email: info@noweco.com
Why have a Risk Register
Support of risk management efforts
A risk register is able to support the risk
management efforts as it provides:
A tool for managing and reducing risk
before and during projects, or for ongoing
operational risks.
Documentation of the likelihood and
consequences of identified risks, and
easy monitoring of any high risks to
reduce likelihood and/or consequences.
Assistance in identifying mitigation
actions and the means by which those
actions may be evaluated by cost and
effectiveness, and the monitoring of
those actions until completed.
Evidence for interested parties such as
project owner, senior management,
steering committee, that a valid risk
management framework is in place to
reduce project or organisational ex-
posures.
A mechanism to easily communicate risk
management issues and seek in-
volvement and action by people who are
best able to reduce the likelihood and/or
consequences of risks.
A risk register usually supports four main
types of actions which are:
Preventative actions to reduce the
likelihood of occurrence or the con-
sequences should the event occur - if
cost-effective, these are done before the
event.
Contingency actions to reduce the con-
sequences should the event occur - if
cost-effective, these are done during or
after the occurrence of the event
Recovery actions to enable the project or
organisation to move forward after the
event – they do not reduce the likelihood
or consequences of the event itself, but
limit the spread of ‘knock-on’ events that
reduce business continuity
Transfer actions to transfer the loss to
someone else such as an insurance
company or sub-contractor – they do not
reduce the likelihood of the event but do
reduce the consequences and must be
enacted prior to the risk occurring
Conclusion
Risk management of occupational health
and safety will be a regular guest on the
agenda of management. However, apart
from just being a requirement management
may realise the benefits of occupational
health and safety, especially when
registered to the respective local standard:
Reduction of risk.
Competitive advantages.
Compliance with legal requirements.
Improvement of overall performance.
© 2004 Northwest Controlling Corporation Ltd. Page 4 of 4

More Related Content

What's hot

ISO 31000 risk management process
ISO 31000 risk management processISO 31000 risk management process
ISO 31000 risk management processMuizz Anibire
 
Risk Management
Risk ManagementRisk Management
Risk Managementysshah
 
Human factors in risk management
Human factors in risk managementHuman factors in risk management
Human factors in risk managementBasitali Nevarekar
 
Risk Assessment: Creating a Risk Matrix
Risk Assessment: Creating a Risk MatrixRisk Assessment: Creating a Risk Matrix
Risk Assessment: Creating a Risk MatrixEtQ, Inc.
 
The secret to professional investigations
The secret to professional investigationsThe secret to professional investigations
The secret to professional investigations3Sixty Systems Ltd
 
Risk Management Process in OH&S
Risk Management Process in OH&SRisk Management Process in OH&S
Risk Management Process in OH&SAhmed-Refat Refat
 
Contingency%20planning%20lecture%205
Contingency%20planning%20lecture%205Contingency%20planning%20lecture%205
Contingency%20planning%20lecture%205Magdalena Anna Fas
 
Risk Assessment Workshop
Risk Assessment WorkshopRisk Assessment Workshop
Risk Assessment WorkshopBozward0901
 
Risk assessment at workplace
Risk assessment at workplaceRisk assessment at workplace
Risk assessment at workplacesajid ali
 
Enterprise risk management-Yashvanth G Nayak
Enterprise risk management-Yashvanth G NayakEnterprise risk management-Yashvanth G Nayak
Enterprise risk management-Yashvanth G NayakYashavanth Nayak
 
Risk Assessment and Management
Risk Assessment and ManagementRisk Assessment and Management
Risk Assessment and ManagementIsuru Asiri
 
The importance of risk management in business
The importance of risk management in businessThe importance of risk management in business
The importance of risk management in businessr2financial
 
Ppt for IMPROVEMENT OF SAFETY THROUGH SAFETY MANAGAMENT PLAN – office p...
Ppt for IMPROVEMENT OF SAFETY   THROUGH    SAFETY MANAGAMENT PLAN –  office p...Ppt for IMPROVEMENT OF SAFETY   THROUGH    SAFETY MANAGAMENT PLAN –  office p...
Ppt for IMPROVEMENT OF SAFETY THROUGH SAFETY MANAGAMENT PLAN – office p...AMIT SAHU
 
Safety hazard-identification-on-construction-projects
Safety hazard-identification-on-construction-projectsSafety hazard-identification-on-construction-projects
Safety hazard-identification-on-construction-projectsAHMED NADIM JILANI
 

What's hot (20)

Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
ISO 31000 risk management process
ISO 31000 risk management processISO 31000 risk management process
ISO 31000 risk management process
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Human factors in risk management
Human factors in risk managementHuman factors in risk management
Human factors in risk management
 
Risk Assessment: Creating a Risk Matrix
Risk Assessment: Creating a Risk MatrixRisk Assessment: Creating a Risk Matrix
Risk Assessment: Creating a Risk Matrix
 
51_operational_risk
51_operational_risk51_operational_risk
51_operational_risk
 
The secret to professional investigations
The secret to professional investigationsThe secret to professional investigations
The secret to professional investigations
 
Risk Management Process in OH&S
Risk Management Process in OH&SRisk Management Process in OH&S
Risk Management Process in OH&S
 
Contingency%20planning%20lecture%205
Contingency%20planning%20lecture%205Contingency%20planning%20lecture%205
Contingency%20planning%20lecture%205
 
Risk Assessment Workshop
Risk Assessment WorkshopRisk Assessment Workshop
Risk Assessment Workshop
 
Risk assessment at workplace
Risk assessment at workplaceRisk assessment at workplace
Risk assessment at workplace
 
Unit 5 risk assessment and management
Unit 5 risk assessment and managementUnit 5 risk assessment and management
Unit 5 risk assessment and management
 
Enterprise risk management-Yashvanth G Nayak
Enterprise risk management-Yashvanth G NayakEnterprise risk management-Yashvanth G Nayak
Enterprise risk management-Yashvanth G Nayak
 
Risk Assessment and Management
Risk Assessment and ManagementRisk Assessment and Management
Risk Assessment and Management
 
Insurance
InsuranceInsurance
Insurance
 
The importance of risk management in business
The importance of risk management in businessThe importance of risk management in business
The importance of risk management in business
 
Ppt for IMPROVEMENT OF SAFETY THROUGH SAFETY MANAGAMENT PLAN – office p...
Ppt for IMPROVEMENT OF SAFETY   THROUGH    SAFETY MANAGAMENT PLAN –  office p...Ppt for IMPROVEMENT OF SAFETY   THROUGH    SAFETY MANAGAMENT PLAN –  office p...
Ppt for IMPROVEMENT OF SAFETY THROUGH SAFETY MANAGAMENT PLAN – office p...
 
Risk Management System
Risk Management SystemRisk Management System
Risk Management System
 
Safety hazard-identification-on-construction-projects
Safety hazard-identification-on-construction-projectsSafety hazard-identification-on-construction-projects
Safety hazard-identification-on-construction-projects
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 

Similar to Risk management osh

Identify and asses am
Identify and asses amIdentify and asses am
Identify and asses amSole Michael
 
RISK MANAGEMENT.pptx
RISK MANAGEMENT.pptxRISK MANAGEMENT.pptx
RISK MANAGEMENT.pptxssuser107f14
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentHavio
 
Multimedia Studio OH&S
Multimedia Studio OH&SMultimedia Studio OH&S
Multimedia Studio OH&SWebmaster
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptxprasannroy1
 
PRINCIPLES-OF-RISK-AND-MANAGEMENT.pptx
PRINCIPLES-OF-RISK-AND-MANAGEMENT.pptxPRINCIPLES-OF-RISK-AND-MANAGEMENT.pptx
PRINCIPLES-OF-RISK-AND-MANAGEMENT.pptxGraciaSuratos
 
Safety Inspections and Sample Safety Inspection.Health and safety training D...
Safety Inspections and Sample Safety Inspection.Health  and safety training D...Safety Inspections and Sample Safety Inspection.Health  and safety training D...
Safety Inspections and Sample Safety Inspection.Health and safety training D...Salman Jailani
 
u10a1-Risk Assessment Report-Beji Jacob
u10a1-Risk Assessment Report-Beji Jacobu10a1-Risk Assessment Report-Beji Jacob
u10a1-Risk Assessment Report-Beji JacobBeji Jacob
 
Chapter 5 Environmental Safety, Security and Compliances(FASS)
Chapter 5  Environmental Safety, Security and Compliances(FASS)Chapter 5  Environmental Safety, Security and Compliances(FASS)
Chapter 5 Environmental Safety, Security and Compliances(FASS)Md Shaifullar Rabbi
 
HIRA - A GUIDE TO HAZARD IDENTIFICATION AND RISK ASSESSMENT FOR WORKPLACE SAF...
HIRA - A GUIDE TO HAZARD IDENTIFICATION AND RISK ASSESSMENT FOR WORKPLACE SAF...HIRA - A GUIDE TO HAZARD IDENTIFICATION AND RISK ASSESSMENT FOR WORKPLACE SAF...
HIRA - A GUIDE TO HAZARD IDENTIFICATION AND RISK ASSESSMENT FOR WORKPLACE SAF...4C Consulting Private Limited
 
Health and safety Inspections
Health and safety Inspections Health and safety Inspections
Health and safety Inspections MireGreyling
 
12917_Hazard_Identification,_Risk_Assessment_and_control_Procedure.pdf
12917_Hazard_Identification,_Risk_Assessment_and_control_Procedure.pdf12917_Hazard_Identification,_Risk_Assessment_and_control_Procedure.pdf
12917_Hazard_Identification,_Risk_Assessment_and_control_Procedure.pdfMuhammad Sulaiman
 
PROJECT REPORT ACHIEVEMENTS HITESH
PROJECT REPORT ACHIEVEMENTS HITESHPROJECT REPORT ACHIEVEMENTS HITESH
PROJECT REPORT ACHIEVEMENTS HITESHHITESH RATHOD
 
Risk Management (1) (1).ppt
Risk Management (1) (1).pptRisk Management (1) (1).ppt
Risk Management (1) (1).pptAjjuSingh2
 
AbstractKey FeaturesAssessmentIntroductionMeasur.docx
AbstractKey FeaturesAssessmentIntroductionMeasur.docxAbstractKey FeaturesAssessmentIntroductionMeasur.docx
AbstractKey FeaturesAssessmentIntroductionMeasur.docxransayo
 

Similar to Risk management osh (20)

Identify and asses am
Identify and asses amIdentify and asses am
Identify and asses am
 
RISK MANAGEMENT.pptx
RISK MANAGEMENT.pptxRISK MANAGEMENT.pptx
RISK MANAGEMENT.pptx
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Multimedia Studio OH&S
Multimedia Studio OH&SMultimedia Studio OH&S
Multimedia Studio OH&S
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
PRINCIPLES-OF-RISK-AND-MANAGEMENT.pptx
PRINCIPLES-OF-RISK-AND-MANAGEMENT.pptxPRINCIPLES-OF-RISK-AND-MANAGEMENT.pptx
PRINCIPLES-OF-RISK-AND-MANAGEMENT.pptx
 
Safety Inspections and Sample Safety Inspection.Health and safety training D...
Safety Inspections and Sample Safety Inspection.Health  and safety training D...Safety Inspections and Sample Safety Inspection.Health  and safety training D...
Safety Inspections and Sample Safety Inspection.Health and safety training D...
 
u10a1-Risk Assessment Report-Beji Jacob
u10a1-Risk Assessment Report-Beji Jacobu10a1-Risk Assessment Report-Beji Jacob
u10a1-Risk Assessment Report-Beji Jacob
 
Chapter 5 Environmental Safety, Security and Compliances(FASS)
Chapter 5  Environmental Safety, Security and Compliances(FASS)Chapter 5  Environmental Safety, Security and Compliances(FASS)
Chapter 5 Environmental Safety, Security and Compliances(FASS)
 
Hazards and risk management
Hazards and risk managementHazards and risk management
Hazards and risk management
 
OHS
OHSOHS
OHS
 
HIRA - A GUIDE TO HAZARD IDENTIFICATION AND RISK ASSESSMENT FOR WORKPLACE SAF...
HIRA - A GUIDE TO HAZARD IDENTIFICATION AND RISK ASSESSMENT FOR WORKPLACE SAF...HIRA - A GUIDE TO HAZARD IDENTIFICATION AND RISK ASSESSMENT FOR WORKPLACE SAF...
HIRA - A GUIDE TO HAZARD IDENTIFICATION AND RISK ASSESSMENT FOR WORKPLACE SAF...
 
Healthcare Risk Management
Healthcare Risk Management  Healthcare Risk Management
Healthcare Risk Management
 
Health and safety Inspections
Health and safety Inspections Health and safety Inspections
Health and safety Inspections
 
12917_Hazard_Identification,_Risk_Assessment_and_control_Procedure.pdf
12917_Hazard_Identification,_Risk_Assessment_and_control_Procedure.pdf12917_Hazard_Identification,_Risk_Assessment_and_control_Procedure.pdf
12917_Hazard_Identification,_Risk_Assessment_and_control_Procedure.pdf
 
PROJECT REPORT ACHIEVEMENTS HITESH
PROJECT REPORT ACHIEVEMENTS HITESHPROJECT REPORT ACHIEVEMENTS HITESH
PROJECT REPORT ACHIEVEMENTS HITESH
 
HIRA Manual
HIRA ManualHIRA Manual
HIRA Manual
 
Risk Management (1) (1).ppt
Risk Management (1) (1).pptRisk Management (1) (1).ppt
Risk Management (1) (1).ppt
 
AbstractKey FeaturesAssessmentIntroductionMeasur.docx
AbstractKey FeaturesAssessmentIntroductionMeasur.docxAbstractKey FeaturesAssessmentIntroductionMeasur.docx
AbstractKey FeaturesAssessmentIntroductionMeasur.docx
 
Project/Program Risk management
Project/Program Risk managementProject/Program Risk management
Project/Program Risk management
 

Recently uploaded

Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 

Recently uploaded (20)

Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 

Risk management osh

  • 1. Northwest Controlling Corporation Ltd. Internet: http://www.noweco.com/welcome.htm Email: info@noweco.com The Role of Risk Management for Occupational Health and Safety Benefiting from effective risk assessment by Andreas E. Fiedler Introduction Many workplaces have hazards. Hazards put employees at risk of injury or harm to health. Therefore health and safety need to be managed in a systematic manner. This is the job of occupational health and safety management. Occupational health and safety already is a legal requirement in several countries. Others have established such system but the application is still optional. Risk management is an integral part of performing occupational health and safety. It serves to identify and assess the risks derived from the hazards. It finally leads to appropriate action to reduce or even eliminate such risks. Risk management is the critical success factor in occupational health and safety. The Management System for Occupational Health and Safety The management system provides the framework for the process of identifying hazards, assessing associated risks, taking action and reviewing the outcome. Like any modern management system it conforms to the kind of management system as it was developed for quality management (ISO9000). Hence, the occupational health and safety management system just has to be integrated into the existing management systems. The following are the elements of a management system for Occupational © 2004 Northwest Controlling Corporation Ltd. Page 1 of 4
  • 2. Northwest Controlling Corporation Ltd. Internet: http://www.noweco.com/welcome.htm Email: info@noweco.com Health and Safety (OHS) as suggested by OSHAS 18001 which embraces BS8800, AS/NZ 4801, NSAI SR 320 and a number of other publications. It is based on the Plan - Do - Check - Act cycle: Defining the OHS Strategy Planning Implementation and Operation Checking and Corrective Action Management Review Continual Improvement Managing Risks Overview Risk management has become part of lots of management systems. The information security management system for example uses risk management to assess the risks associated with the audit findings of the information security management system. The same way the occupational health and safety management system makes use of risk management to assess the risk associated with hazards. This gives the frame for the process in occupational health and safety: Identifying hazards Assessing associated risks Taking action to mitigate risks Monitoring the effectiveness Identifying hazards A hazard is anything that is a threat to health and safety in an organisation. Therefore it is linked to the people of the organisation and it immediately becomes clear that everybody has to contribute to finding hazards at his or her workplace. It is a legal requirement in some countries that employers have to consult their employees. A hazard is not just linked to a technical equipment or a material used at a work- place but has to include processes and procedures that determine the work at the workplace. Sources for hazard identification can be: Past incidents and accidents Input by employees Examining workplaces or work areas Review of safety instruction for equip- ment and materials Any kind of creative thinking such as brainstorming Advice from legislation, standards, checklists or external consultants. Assessing associated risks Prior to assessing risks these risks associated to the identified hazards have to be determined. Mind the gap and clearly understand that hazards and risks resulting from hazards are something different! Risk assessment itself is very much the same as with risk assessment in other management systems. Typically, a risk is assessed by its likelihood and its con- sequence. Risk assessment will provide you with an insight in your risks and allow to prioritise risks for taking mitigating actions. A risk matrix serves well to define and classify likelihood and consequences of a risk. A risk matrix makes use of descriptors to define levels of both likelihood (from almost certain to rare) and consequence (from insignificant to catastrophic). © 2004 Northwest Controlling Corporation Ltd. Page 2 of 4
  • 3. Northwest Controlling Corporation Ltd. Internet: http://www.noweco.com/welcome.htm Email: info@noweco.com The following aspects may be helpful to determine the likelihood of a risk: Other risks that add to the increase of likelihood Frequency of occurrence Duration of risk occurrence Number of people being exposed Likely dose of exposure Required exposure levels Accordingly the consequences have to be determined. With regard to property and environmental damage these consequences can be expressed in terms of money. Whenever people are harmed the consequences can be expressed in terms of seriousness of the illness or injury. This has further to be put in relation to who is harmed, especially people at a particular risk such as expectant mothers or young people. Risk assessment will be completed with prioritisation of risks and assigned risk factors to understand the scope of mitigating actions required. Taking actions to mitigate actions Mitigating actions focus on reducing the likelihood and/or consequence. There is a hierarchy in different solutions whereby the most effective usually is also the most difficult and sometimes most expensive to realise: Actions that remove the hazard and eliminate the risk. Actions that replace the hazard by a less dangerous one. Actions that modify the product or process design. Actions that isolate the hazard from people. Actions that use engineering solutions such as a new machinery or plant. Actions that use administrative controls, e.g. new procedures. Actions that protect through personal equipment from hazards. Monitoring the effectiveness The outcome of each risk mitigating action has to be reviewed on two levels: To ensure that the actions taken are effective and continue to be effective. To ensure that no new hazard/risk was introduced by the actions taken. Any control measures have to be maintained in order to ensure that they are kept in working order. As well procedures have to be audited to ensure they are being followed as intended. After completing one entire cycle of risk management the next has to be scheduled to ensure that always the best actions are taken and new hazards are included into risk management. Keeping Records All analysis and assessments made as well as all actions taken need to be recorded. A Risk Register or Risk Log will serve to do so. To allow record keeping being an efficient task most organisations will look for a software solution providing such risk register. © 2004 Northwest Controlling Corporation Ltd. Page 3 of 4
  • 4. Northwest Controlling Corporation Ltd. Internet: http://www.noweco.com/welcome.htm Email: info@noweco.com Why have a Risk Register Support of risk management efforts A risk register is able to support the risk management efforts as it provides: A tool for managing and reducing risk before and during projects, or for ongoing operational risks. Documentation of the likelihood and consequences of identified risks, and easy monitoring of any high risks to reduce likelihood and/or consequences. Assistance in identifying mitigation actions and the means by which those actions may be evaluated by cost and effectiveness, and the monitoring of those actions until completed. Evidence for interested parties such as project owner, senior management, steering committee, that a valid risk management framework is in place to reduce project or organisational ex- posures. A mechanism to easily communicate risk management issues and seek in- volvement and action by people who are best able to reduce the likelihood and/or consequences of risks. A risk register usually supports four main types of actions which are: Preventative actions to reduce the likelihood of occurrence or the con- sequences should the event occur - if cost-effective, these are done before the event. Contingency actions to reduce the con- sequences should the event occur - if cost-effective, these are done during or after the occurrence of the event Recovery actions to enable the project or organisation to move forward after the event – they do not reduce the likelihood or consequences of the event itself, but limit the spread of ‘knock-on’ events that reduce business continuity Transfer actions to transfer the loss to someone else such as an insurance company or sub-contractor – they do not reduce the likelihood of the event but do reduce the consequences and must be enacted prior to the risk occurring Conclusion Risk management of occupational health and safety will be a regular guest on the agenda of management. However, apart from just being a requirement management may realise the benefits of occupational health and safety, especially when registered to the respective local standard: Reduction of risk. Competitive advantages. Compliance with legal requirements. Improvement of overall performance. © 2004 Northwest Controlling Corporation Ltd. Page 4 of 4