Prepared & Compiled by Haroon Tahir
haroon.aro.fd@gmail.com
FINANCE DEPARTMENT
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023)
DISTRICT SAHIWAL
Ch.No. Chapter
1 Carriage 3 to 23
2 Loading, Unloading & Stacking 24 to 26
3 Earthwork (Excavation & Embankment) 27 to 33
4 Dismantling (Demolition) 34 to 38
5 Mortar. 39 to 40
6 Concrete 41 to 51
7 Brickwork 52 to 57
8 Stone Masonry 58 to 60
9 Roofing 61 to 67
10 Flooring. 68 to 74
11 Surface Rendering 75 to 79
12 Wood Work 80 to 91
13 Painting & Varnishing. 92 to 98
14 Lining of Canals 99 to 100
15 Sheet Piling 101 to 102
16 Protection & Diversion Work 103 to 112
17 Outlets 113 to 114
18 Road & Road Structure 115 to 124
19 Plumbing, Sanitary Installation & Gas Fittings 125 to 133
20 Surface Drainage. 134 to 135
21 Sewerage 136 to 140
22 Sinking of Wells 141 to 143
23 Tubewell & Water Supply 144 to 166
24 Electric Installation 167 to 202
25 Iron Work 203 to 211
26 Miscellaneous 212 to 216
27 Heating Ventilation & Air Conditioning 217 to 223
TABLE OF CONTENTS
Page No.
Chap-1 (Carriage) Page 3
1. CARRIAGE
Note: 1 Theratesareapplicableto carriageof material on paccaroadsonly.
For kacharoadsan allowanceof 25% extrashall beallowed for 2nd and subsequent mileage(Km) rates. Rate
upto 1st mile(1st Km) ishowever common to both kachaand paccaroads.
Note: 2 For hilly areas80% abovetheratesin theplain areasshall beallowed for total mileage(Km) covered.
Note: 3 In caseof articleslonger than 15 ft. (4.6 m) carried in trucks, thefollowing ratesshall beallowed:-
i) Above15 ft. to 25 ft. (4.6 to 7.6 m) :- Total ratesto bepaid for 15 ft. to 25 ft. (4.6 to 7.6 m) length will be1.5 timesof the
rategiven in theCompositeScheduleof Rates.
ii) Above25 ft. (7.6 m) :- Thetotal rateto bepaid for above25 ft. (7.6 m) length will be2 timesof therategiven in the
CompositeScheduleof Rates.
Thelength measured shall not betheactual length, but thelength of theform of consignment asactually
received.
Note: 4 Theterm 'mile' (Km) whenever used isto mean statutemile(Km).
Note: 5 Theratesincludeloading and unloading of material from theconveyanceand stacking asdirected.
Note: 6 Theratesfor carriageby boat or steamer shall bethesameasby any other mechanical meanson land.
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
1 Carriageof 100 Cft. (2.83 cu.m) of all materialslikestone 16.1
aggregate, spawl, kankar lime(unslaked), surkhi, etc. or
150 Cft. (4.25 cu.m) of timber, by truck or by any other
meansowned by thecontractor.
1st chain (1st 30 m) Chain 288.95 30M 288.95
2nd chain (2nd 30 m) " 52.95 30M 52.95
3rd to 10th chain (60 to 300 m) " 33.05 30M 33.05
1000 to 3000 ft. (300 to 900 m) 1000 ft. 324.70 300 M 324.70
1st Km Km 305.40
2nd Km Km 145.65
3rd Km Km 114.10
4th Km Km 81.20
5th Km Km 75.85
6th Km Km 74.60
7th Km Km 69.60
8th Km Km 68.85
9th Km Km 64.75
10th Km Km 60.75
11th Kmsto 200Kms Km 52.20
201 Kmsto 250 Kms Km 3.25
251 Kms& susequent Kms Km 2.00
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
Add 20% extra for the item
"Recouping of ReserveStock of stone
for Flood Protection Work in
Irrigation Department".
Chap-1 (Carriage) Page 4
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
2 Carriageof 5 tonsof all material likecoal, stonelime 16.1 Cement carried in containersother
(unslaked), etc. B.G. Rail fastenings, pointsand crossing, than bagswill bepaid according to
BridgeGirders, pipes, sheets, Rail, M.S. bars, etc. etc. thisitem. Theword "pipes" covers
by truck or any other meansowned by thecontractor. G.I,C.I,R.C.C. and P.C.C.
1st chain (1st 30 m) Chain 288.95 30M 288.95
2nd chain (2nd 30 m) " 52.95 30M 52.95
3rd to 10th chain (60 to 300 m) " 33.05 30M 33.05
1000 to 3000 ft. (300 to 900 m) 1000 Ft. 324.70 300M 324.70
1st Km Km 305.40
2nd Km Km 145.65
3rd Km Km 114.10
4th Km Km 81.20
1st mile Mile 491.45
5th Km Km 75.85
2nd mile " 129.40
6th Km Km 74.60
3rd mile Mile 118.65
7th Km Km 69.60
4th mile " 109.20
8th Km Km 68.85
5th mile 101.55
9th Km Km 64.75
6th mile 95.55
10th Km Km 60.75
1 " 67.15
11th Kmsto 200Kms Km 52.20
201 Kmsto 250 Kms Km 3.25
251 Kms& susequent Kms Km 2.00
3 Carriageof 100 maundsof fuel wood by truck 16.1
or any other meansowned by thecontractor:
1st chain (1st 30 m) Chain 288.95 30 M 288.95
2nd chain (2nd 30 m) " 52.95 30 M 52.95
3rd to 10th chain (60 to 300 m) " 33.05 30 M 33.05
1000 to 3000 ft. (300 to 900 m) 1000 ft 324.70 300 M 324.70
1st Km Km 305.40
2nd Km Km 145.65
3rd Km Km 114.10
4th Km Km 81.20
1st mile Mile 491.45
5th Km Km 75.85
2nd mile " 129.40
6th Km Km 74.60
3rd mile " 118.65
7th Km Km 69.60
4th mile " 109.20
8th Km Km 68.85
5th mile " 101.55
9th Km Km 64.75
6th mile " 95.55
Chap-1 (Carriage) Page 5
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
10th Km Km 60.75
7th mileand subsequent miles " 67.15
11th & subsequent Kms Km 52.20
4 Carriageof 1000 Nos. bricks10"x5"x3" (250x125x75 mm) ditto Reducetherateby 33% in caseof
or 1000 Nos. tiles12"x6"x2" (300x150x50 mm) by truck or carriageof 1000 Nos. tilessize
any other meansowned by thecontractor :- 12"x6"x1¼" (300 x 150 x 30 mm).
1st chain (1st 30 m) Chain 288.95 30 M 288.95
2nd chain (2nd 30 m) " 52.95 30 M 52.95
3rd to 10th chain (60 to 300 m) " 33.05 30 M 33.05
1000 to 3000 ft. (300 to 900 m) 1000 Ft 324.70 300 M 324.70
1st Km Km 305.40
2nd Km Km 145.65
3rd Km Km 114.10
4th Km Km 81.20
1st mile Mile 491.45
5th Km Km 75.85
2nd mile " 129.40
6th Km Km 74.60
3rd mile " 118.65
7th Km Km 69.60
4th mile " 109.20
8th Km Km 68.85
5th mile " 101.55
9th Km Km 64.75
6th mile " 95.55
10th Km Km 60.75
7th mileand subsequent miles " 67.15
11th & subsequent Kms Km 52.20
5 Carriageof 100 cft. (2.83 cu.m) of all material likestone, 16.1 Material trolly to besupplied by the
aggregate, spawl, kankar lime(unslaked), surkhi, etc. or Government and maintained and run
150 cft. (4.25 cu.m) of timber, by meansof material trolly. by thecontractor.
1st chain (1st 30 m) Chain 288.95 30 M 288.95
2nd chain to 10th chain (2nd 30 m to 300 m) " 52.95 30 M 52.95
1000 to 3000 ft. (300 to 900 m) 1000 Ft. 324.70 300 M 324.70
1st Km Km 250.45
2nd Km Km 193.75
3rd Km Km 106.95
4th Km Km 85.15
1st mile Mile 403.05
5th Km Km 75.45
2nd mile 155.30
6th Km Km 72.55
3rd mile 134.00
7th Km Km 61.60
8th Km Km 60.95
9th Km Km 57.25
6th mile 95.55
10th Km Km 53.70
7th mile and subsequent miles 67.15
11th Kmsto 200Kms Km 47.95
201 Kmsto 250 Kms Km 3.25
251 Kms& susequent Kms Km 2.00
Chap-1 (Carriage) Page 6
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
6 Carriageof 5 tonsof all material likecoal, stonelime 16.1 Material trolly to besupplied by the
(unslaked), etc. B.G. Rail fastening, pointsand crossing, Government and maintained and run
Bridgegirders, pipes, sheets, Rail, M.S. bars, etc. etc. by by thecontractor.
meansof material trolly.
1st chain (1st 30 m) Chain 288.95 30 M 288.95
2nd chain (2nd 30 m) " 52.95 30 M 52.95
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 324.70 300 M 324.70
1st Km Km 250.45
2nd Km Km 193.75
3rd Km Km 106.95
4th Km Km 85.15
5th Km Km 75.45
6th Km Km 72.55
3rd mileand subsequent miles 134
7th Km Km 61.60
4th mile 109.20
8th Km Km 60.95
9th Km Km 57.25
10th Km Km 53.70
q
11th Kmsto 200Kms Km 47.95
201 Kmsto 250 Kms Km 3.25
251 Kms& susequent Kms Km 2.00
7 Carriageof 100 maundsof fuel wood, by meansof ditto Material trolly to besupplied
material trolly. by theGovernment and
1st chain (1st 30 m) Chain 288.95 30 M 288.95 maintained and run by the
2nd chain (2nd 30 m) " 52.95 30 M 52.95 contractor.
1000 to 3000 ft. (300 to 900 m) 1000 Ft 324.70 300 M 324.70
1st Km Km 250.45
2nd Km Km 193.75
3rd Km Km 106.95
4th Km Km 85.15
1st mile Mile 403.05
5th Km Km 75.45
2nd mile " 155.30
6th Km Km 72.55
3rd milesubsequent miles " 134.00
7th Km Km 61.60
4th mile 109.20
8th Km Km 60.95
5th mile 101.55
9th Km Km 57.25
6th mile 95.55
10th Km Km 53.70
7th mile and subsequent miles 67.15
11th & subsequent Kms Km 47.95
8 Carriageof 1000 Nos. tiles12"x6"x2" (300x150x50 mm), ditto Material trolly to besupplied by the
by meansof material trolly. Government and maintained and run
1st chain (1st 30 m) Chain 288.95 30 M 288.95 by thecontractor.
2nd chain (2nd 30 m) " 52.95 30 M 52.95
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 324.70 300 M 324.70
1st Km Km 250.45
Chap-1 (Carriage) Page 7
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
2nd Km Km 193.75 16.1
3rd Km Km 106.95
4th Km Km 85.15
1st mile Mile 403.05
5th Km Km 75.45
2nd mile " 155.30
6th Km Km 72.55
3rd milesubsequent miles " 134.00
7th Km Km 61.60
4th mile 109.20
8th. Km 60.95
5th mile 101.55
9th Km Km 57.25
6th mile 95.55
10th Km Km 53.70
7th mile and subsequent miles 67.15
11th & subsequent Kms Km 47.95
9 Carriageof 1000 No. bricks, 9"x4½"x3" ditto
(225x113x75 mm) or 8"x4"x4" (200x100x100
mm) (nominal)
1st chain (1st 30 m) Chain 236.75 30 M 236.75
2nd chain (2nd 30 m) " 51.50 30 M 51.50
3rd to 10th chain (60 to 300 m) " 27.13 30 M 27.13
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 265.84 300 M 265.84
1st Km Km 250.35
2nd Km Km 119.15
3rd Km Km 93.45
4th Km Km 67.00
1st mile Mile 402.85
5th Km Km 64.05
2nd mile " 106.05
6th Km Km 62.60
3rd mile " 100.40
7th Km Km 57.05
4th mile " 89.50
8th Km Km 56.40
5th mile " 83.20
9th Km Km 53.00
6th mile " 78.25
10th Km Km 49.70
7th mileand subsequent miles " 55.10
11th & subsequent Kms Km 42.65
10 Carriageof 1000 No. tiles9"x4½"x1½" 16.1
(225x113x38 mm).
1st chain (1st 30 m) Chain 142.88 30 M 142.88
2nd chain (2nd 30 m) " 26.15 30 M 26.15 16.1
3rd to 10th chain (60 to 300 m) " 16.21 30 M 16.21
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 160.59 300 M 160.59
1st Km Km 151.10
Chap-1 (Carriage) Page 8
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
2nd Km Km 72.10
3rd Km Km 56.50
4th Km Km 40.15
1st mile Mile 243.15
5th Km Km 37.25
2nd mile " 64.05
6th Km Km 36.70
3rd mile " 58.25
7th Km Km 34.45
4th mile " 54.05
8th Km Km 34.10
5th mile " 50.20
9th Km Km 32.00
6th mile " 47.30
10th Km Km 30.10
7th mileand subsequent miles " 33.15
11th & subsequent Kms Km 25.80
11 Carriageof 1 Cwt. (50 Kg) cement in bags. ditto
1st chain (1st 30 m) Chain 5.45 30 M 5.45
2nd chain (2nd 30 m) " 0.65 30 M 0.65
3rd to 10th chain (60 to 300 m) " 0.31 30 M 0.31
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 3.20 300 M 3.20
1st Km Km 3.75
1st mile Mile 6.05
2nd Km Km 2.60
2nd mile " 2.00
3rd Km Km 1.15
3rd milesubsequent miles " 1.05
4th Km and subsequent kilometers. Km 0.70
12 Carriageof 100 Nos. empty cement bagsincluding 16.1
bundling.
1st 1000 (300 m) ft. 0/00 Ft. 79.66 300 M 79.66
1000 to 3000 (300 to 900 m) ft. " 9.92 300 M 9.92
1st Km Km 9.20
1st mile Mile 14.80
2nd Km Km 10.60
2nd mileto 6th mile Mile 1.95
3rd Km Km 4.35
7th mileand subsequent miles " 8.20
4th Km & subsequent Kms Km 4.20
13 Carriageof 100 (2.83 cu.m) cft. of Sarkandaor pilchi, frash ditto Previouslead of collection not
or brushwood, by boat or road :- to bededucted from thenext
lead of carriage.
1st chain (1st 30 m) Chain 118.21 30 M 118.21
Chap-1 (Carriage) Page 9
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
2nd chain (2nd 30 m) " 52.95 30 M 52.95
3rd to 10th chain (60 to 300 m) " 16.21 30 M 16.21
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 133.40 300 M 133.40
1st Km Km 145.10
1st mile Mile 216.25
2nd Km Km 72.10
2nd mile " 180.90
3rd Km Km 56.50
3rd mile " 154.15
4th Km Km 40.15
4th mile " 114.75
5th Km Km 37.25
5th mile " 96.40
6th Km Km 36.70
6th mile 78.25
7th Km Km 34.45
7th mileand subsequent miles 55.10
8th Km Km 34.10
9th Km Km 32.00
10th Km Km 30.10
11th Km & subsequent Km 25.80
14 Carriageof light machinery weighing upto 3 tonne Ton Tonne ditto
upto 1000 ft. (300 metre) 0/00 ft. 965.14 300 M 965.14
Exceeding 1000 to 5000 ft (300 to 1500metre) 1000 ft. 233.85 " 233.85
1st Km Km 300.45
1st mile Mile 483.50
2nd Km Km 142.00
2nd mile " 102.25
3rd Km Km 98.80
3rd mile " 98.50
4th Km Km 65.55
4th mile " 80.40
5th Km Km 62.90
5th mile " 82.60
6th Km Km 60.50
6th mile " 64.90
7th Km Km 52.30
7th mileand subsequent miles " 52.50
8th Km Km 52.05
9th Km Km 51.50
10th Km Km 41.20
11th Km & susequent Km 37.40
Chap-1 (Carriage) Page 10
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
15 Carriageof small consignmentsweighing upto 5 maunds 16.1 For consignment weighing 5 to 10
(job rates) : maunds, ratebeincreased by 25%;
and for consignmentsweighing 10
Consig- to 20 maunds, ratebeincreased by
Upto 1000 ft. (300 metre) ment/ 78.38 Consign- 78.38 100%.
1000 ft. ment/
Exceeding 1000 to 3000 ft. (300 to 900 1000 ft. 53.75 300 M 53.75
metre)
1st Km Consign- 47.05
1st mile Consign- 75.70 ment/ Km
2nd Km ment/Mile 29.85
2nd mileand subsequent miles " 15.85 "
3rd Km & subsequent " 10.45
16 Carriageof consignmentsjob.
i) Cooly load for distance:-
Each Each
a) Upto 5 Km Consignment 98.40 Consignment 98.40
b) Above5 to 13 Km " 251.85 " 251.85
ii) Carriageof consignmentsodd jobs. Each Each
a) Donkey load for distanceupto 500 feet. Consignment 10.85 Consignment 10.85
b) Upto 1000 feet. " 16.45 " 16.45
c) Upto ½ Mile/ 0.8 Km " 20.80 " 20.80
d) Upto oneMile/ 1.6 Km " 26.00 " 26.00
e) Upto threeMiles/ 4.8 Km " 45.95 " 45.95
f) Exceeding 3 Miles/ 16 km " 82.25 " 82.25
Each Each
iii) Cart load for adistance:- Consign- Consig-
ment nment
a) upto 4 Miles/ 6.4 Km " 89.85 " 89.85
b) Exceeding 4 Miles(6.4 Km) to10 Miles(16 Km) " 163.55 " 163.55
iv) Camel load for adistance:-
a) upto 4 Miles/ 6.4 Km.) " 66.45 " 66.45
b) exceeding 4 to 12 mills(6.4 Km to 19.2 Km) " 100.75 " 100.75
17 Hirechargesof:- 1. Thisitem will beallowed with
prior concurrenceof Superintending
i) truck (10 Ton Capacity) Per 4000.00 Per 4,000.00 Engineer.
day day 2. Therateincludespay of driver
ii) tractor with trolly " 10736.00 " 1,000.00 and cleaner only. Therepairsshall
betheresponsibility of theowner
iii) tractor without trolly " 10736.00 " 800.00 and thecost of lubrication, fuel,
Chap-1 (Carriage) Page 11
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
loading and unloading shall bepaid
by theborrower.
18 Carriageof bitumen, tar or other lubricants, in drums: 16.1
0 Kilometer to 100 Kilometers P.Ton 1,275.10
0 Kilometer to 200 Kilometers P.Ton 1,665.60
0 Kilometer to 250 Kilometers Per 80.60 P.Ton 1,935.60
251 to susequent Kilometers Ton P.Ton 14.95
2nd mile " 15.10
"
3rd mile 24.65
19 Carriageof Asbestoscement pipesBSSClass'B" with
comet joint and rubber ring, including loading, unloading
and stacking (rateper 100 Rft. (30 m pipes):-
i) 3" (75 mm) i/d pipes:-
1st chain (1st 30 m) Chain 11.40 30 M 11.40
2nd chain (2nd 30 m) " 2.10 30 M 2.10
3rd to 10th chain (60 to 300 m) " 1.30 30 M 1.30
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 12.80 300 M 12.80
1st Km Km 12.05
2nd Km Km 5.70
3rd Km Km 4.45
1st mile Mile 19.40
4th Km Km 3.20
2nd mile " 5.10
5th Km Km 3.00
3rd mile " 4.70
6th Km Km 2.90
4th mile " 4.30
7th Km Km 2.70
5th mile " 4.00
8th Km Km 2.65
6th mile " 3.75
9th Km Km 2.50
7th mileand subsequent miles " 2.65
10th Km Km 2.35
11th Km & Susequent Km 2.30
ii) 4" (100 mm) i/d pipes:-
1st chain (1st 30 m) Chain 14.95 30 M 14.95
2nd chain (2nd 30 m) " 2.75 30 M 2.75
3rd to 10th chain (60 to 300 m) " 1.70 30 M 1.70
1000 to 9000 ft. (300 to 900 m) 0/00 Ft. 16.80 300 M 16.80
Chap-1 (Carriage) Page 12
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
1st Km Km 15.80
1st mile Mile 25.40
2nd Km Km 7.50
2nd mile " 6.70
3rd Km Km 5.85
3rd mile " 6.15
4th Km Km 4.15
4th mile " 5.65
5th Km Km 3.90
5th mile " 5.25
6th Km Km 3.80
6th mile " 4.95
7th Km Km 3.55
7th mileand subsequent miles " 3.45
8th Km Km 3.50
9th Km Km 3.30
10th Km Km 3.10
11th Km & subsequent Km Km 3.00
iii) 6" (150 mm) i/d pipes:-
1st chain (1st 30 m) Chain 22.40 30 M 22.40
2nd chain (2nd 30 m) " 4.10 30 M 4.10
3rd to 10th chain (60 to 300 m) " 2.55 30 M 2.55
1000 to 9000 ft. (300 to 900 m) 0/00 Ft. 25.20 300 M 25.20
1st Km Km 23.70
2nd Km Km 11.30
3rd Km Km 8.85
1st mile Mile 38.15
4th Km Km 6.30
2nd mile " 10.05
5th Km Km 5.85
3rd mile " 9.20
6th Km Km 5.75
4th mile " 8.45
7th Km Km 5.35
5th mile " 7.90
8th Km Km 5.25
6th mile " 7.40
9th Km Km 5.00
7th mileand subsequent miles " 5.20
10th Km Km 4.65
11th Km & subsequent Km Km 4.25
iv) 8" (200 mm) i/d pipes:
1st chain (1st 30 m) Chain 37.90 30 M 37.90
2nd chain (2nd 30 m) " 6.95 30 M 6.95
3rd to 10th chain (60 to 300 m) " 4.35 30 M 4.35
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 42.60 300 M 42.60
1st Km Km 40.10
Chap-1 (Carriage) Page 13
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
2nd Km Km 20.05
3rd Km Km 15.25
1st mile Mile 64.50
4th Km Km 10.85
2nd mile " 17.00
5th Km Km 10.10
3rd mile " 15.55
6th Km Km 9.95
4th mile " 14.35
7th Km Km 9.30
5th mile " 13.35
8th Km Km 9.10
6th mile " 12.55
9th Km Km 7.90
7th mileand subsequent miles " 8.80
10th Km Km 2.60
11th Km & subsequent Km Km 2.25
v) 10" (250 mm) i/d pipes:-
1st chain (1st 30 m) Chain 50.95 30 M 50.95
2nd chain (2nd 30 m) " 9.35 30 M 9.35
3rd to 10th chain (60 to 300 m) " 5.85 30 M 5.85
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 57.25 300 M 57.25
1st Km Km 53.90
2nd Km Km 25.60
3rd Km Km 20.05
1st mile Mile 86.70
4th Km Km 14.20
2nd mile " 22.85
5th Km Km 13.25
3rd mile " 20.95
6th Km Km 13.05
4th mile Mile 19.25
7th Km Km 12.40
5th mile " 17.90
8th Km Km 12.25
6th mile " 16.85
9th Km Km 11.55
7th mileand subsequent miles " 11.85
10th Km Km 10.85
11th Km & subsequent Kms Km 9.25
vi) 12" (300 mm) i/d pipes:
1st chain (1st 30 m) Chain 66.30 30 M 66.30
2nd chain (2nd 30 m) " 12.15 30 M 12.15
3rd to 10th chain (60 to 300 m) " 7.60 30 M 7.60
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 74.45 300 M 74.45
1st Km Km 70.05
2nd Km Km 34.25
3rd Km Km 26.45
Chap-1 (Carriage) Page 14
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
4th Km Km 18.50
1st mile Mile 112.70
5th Km Km 17.25
2nd mile " 29.70
6th Km Km 16.95
3rd mile " 27.20
7th Km Km 15.80
4th mile " 25.05
8th Km Km 15.65
5th mile " 23.30
9th Km Km 14.70
6th mile " 21.90
10th Km Km 13.75
7th mileand subsequent miles " 15.40
11th Km & subsequent Kms Km 11.95
vii) 16" (400 mm) i/d pipes:-
1st chain (1st 30 m) Chain 108.65 30 M 108.65
2nd chain (2nd 30 m) " 19.90 30 M 19.90
3rd to 10th chain (60 to 300 m) " 12.45 30 M 12.45
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 122.05 300 M 122.05
1st Km Km 114.80
2nd Km Km 55.00
3rd Km Km 42.85
1st mile Mile 184.75
4th Km Km 30.50
2nd mile " 48.65
5th Km Km 28.50
3rd mile " 44.60
6th Km Km 28.00
4th mile " 41.05
7th Km Km 26.15
5th mile " 38.20
8th Km Km 25.85
6th mile " 35.90
9th Km Km 24.30
7th mileand subsequent miles " 25.25
10th Km Km 22.80
11th Km & subsequent Kms Km 19.60
viii) 18" (450 mm) i/d pipes:-
1st chain (1st 30 m) Chain 139.60 30 M 139.60
2nd chain (2nd 30 m) " 25.60 30 M 25.60
3rd to 10th chain (60 to 300 m) " 15.95 30 M 15.95
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 156.85 300 M 156.85
1st Km Km 147.50
2nd Km Km 70.40
3rd Km Km 55.15
1st mile Mile 237.40
Chap-1 (Carriage) Page 15
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
4th Km Km 39.25
2nd mile " 62.50
5th Km Km 36.65
3rd mile " 57.30
6th Km Km 36.05
4th mile " 52.75
7th Km Km 33.65
5th mile " 49.05
8th Km Km 33.25
6th mile " 46.15
9th Km Km 31.30
7th mileand subsequent miles " 32.45
10th Km Km 29.35
11th Km & subsequent Kms Km 25.15
ix) 20" (500 mm) i/d pipes:-
1st chain (1st 30 m) Chain 148.20 30 M 148.20
2nd chain (2nd 30 m) " 27.15 30 M 27.15
3rd to 10th chain (60 to 300 m) " 16.95 30 M 16.95
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 166.50 300 M 166.50
1st Km Km 156.60
2nd Km Km 74.70
3rd Km Km 58.50
1st mile Mile 252.05
4th Km Km 41.65
2nd mile " 66.35
5th Km Km 38.90
3rd mile " 60.85
6th Km Km 38.25
4th mile " 56.00
7th Km Km 35.70
5th mile " 52.10
8th Km Km 35.30
6th mile " 49.00
9th Km Km 33.20
7th mileand subsequent miles " 34.45
10th Km Km 31.15
11th Km & subsequent Kms Km 26.90
x) 24" (600 mm) i/d pipes:-
1st chain (1st 30 m) Chain 164.20 30 M 164.20
2nd chain (2nd 30 m) " 30.10 30 M 30.10
3rd to 10th chain (60 to 300 m) " 18.80 30 M 18.80
1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 184.50 300 M 184.50
1st Km Km 173.55
2nd Km Km 82.75
3rd Km Km 64.80
1st mile Mile 279.25
4th Km Km 46.65
Chap-1 (Carriage) Page 16
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
2nd mile " 73.55
5th Km Km 43.05
3rd mile " 67.40
6th Km Km 42.35
4th mile Mile 62.05
7th Km Km 39.50
5th mile " 57.70
8th Km Km 39.10
6th mile " 54.30
9th Km Km 36.75
7th mileand subsequent miles " 38.15
10th Km Km 34.45
11th Km & subsequent Kms Km 29.55
20 Carriageof PVC pipesB.S.S. Class'B' including loading,
unloading and stacking (Rateper 1000 ft.) (300 metre) :-
i) 3" (75 mm) i/d pipes:-
1st chain (1st 30 m) Chain 22.35 30 M 22.35
2nd chain (2nd 30 m) " 4.10 30 M 4.10
3rd to 10th chain (60 to 300 m) " 2.55 30 M 2.55
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 25.15 300 M 25.15
1st Km Km 23.65
2nd Km Km 11.25
3rd Km Km 8.80
1st mile Mile 38.05
4th Km Km 6.25
2nd mile " 10.00
5th Km Km 5.85
3rd mile " 9.20
6th Km Km. 5.75
4th mile " 8.45
7th Km Km 5.40
5th mile Mile 7.85
8th Km Km 5.30
6th mile " 7.40
9th Km Km 4.95
7th mileand subsequent miles " 5.20
10th Km Km 4.65
11th Km & subsequent Kms Km 4.20
ii) 4" (100 mm) i/d pipes:-
1st chain (1st 30 m) Chain 34.45 30 M 34.45
2nd chain (2nd 30 m) " 6.30 30 M 6.30
3rd to 10th chain (60 to 300 m) " 3.95 30 M 3.95
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 38.70 300 M 38.70
1st Km Km 36.40
2nd Km Km 17.55
Chap-1 (Carriage) Page 17
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
3rd Km Km 13.65
1st mile Mile 58.60
4th Km Km 9.60
2nd mile " 15.45
5th Km Km 8.95
3rd mile " 14.15
6th Km Km 8.80
4th mile " 13.00
7th Km Km 8.20
5th mile " 12.10
8th Km Km 8.10
6th mile " 11.40
9th Km Km 7.65
7th mileand subsequent miles " 8.00
10th Km Km 7.15
11th Km & subsequent Kms Km 6.60
iii) 5" (125 mm) i/d pipes:-
1st chain (1st 30 m) Chain 47.00 30 M 47.00
2nd chain (2nd 30 m) " 8.60 " 8.60
3rd to 10th chain (60 to 300 m) " 5.40 " 5.40
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 52.80 300 M 52.80
1st Km Km 49.70
2nd Km " 23.85
3rd Km " 18.70
1st mile Mile 79.95
4th Km " 13.35
2nd mile " 21.05
5th Km Km. 12.25
3rd mile " 19.30
6th Km " 12.05
4th mile Mile 17.75
7th Km " 11.25
5th mile " 16.50
8th Km 11.10
6th mile " 15.55
9th Km 10.45
7th mileand subsequent miles " 10.90
10th Km 9.80
11th Km & subsequent Kms 8.50
iv) 6" (150 mm) i/d pipes:
1st chain (1st 30 m) Chain 64.80 30 M 64.80
2nd chain (2nd 30 m) " 11.85 30 M 11.85
3rd to 10th chain (60 to 300 m) " 7.40 30 M 7.40
1000 to 3000 ft. (300 to 300 m) 0/00 Ft. 72.80 300 M 72.80
1st Km. Km. 68.50
2nd Km Km. 32.65
Chap-1 (Carriage) Page 18
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
3rd Km Km. 25.60
1st mile Mile 110.20
4th Km Km. 18.20
2nd mile " 29.00
5th Km Km. 17.00
3rd mile " 26.60
6th Km Km. 16.75
4th mile " 24.50
7th Km Km. 15.60
5th mile " 22.75
8th Km Km. 15.45
6th mile " 21.40
9th Km Km. 14.50
7th mileand subsequent miles " 15.05
10th Km Km. 13.60
11th Km & subsequent Kms Km. 11.70
v) 8" (200 mm) i/d pipes:-
1st chain (1st 30 m) Chain 113.65 30 M 113.65
2nd chain (2nd 30 m) " 20.80 30 M 20.80
3rd to 10th chain (60 to 300 m) " 13.00 30 M 13.00
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 127.65 300 M 127.65
1st Km Km 120.10
2nd Km Km 57.30
3rd Km Km 44.90
1st mile Mile 193.25
4th Km Km 31.95
2nd mile " 50.90
5th Km Km 29.80
3rd mile Mile 46.65
6th Km Km 29.35
4th mile " 42.95
7th Km Km 27.40
5th mile " 39.95
8th Km Km 27.10
6th mile " 37.55
9th Km Km 25.45
7th mileand subsequent miles " 26.40
10th Km Km 23.85
11th Km & subsequent Kms Km 20.45
vi) 10" (250 mm) i/d pipes:-
1st chain (1st 30 m) Chain 176.20 30 M 176.20
2nd chain (2nd 30 m) " 32.30 30 M 32.30
3rd to 10th chain (60 to 300 m) " 20.15 30 M 20.15
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 197.95 300 M 197.95
1st Km Km 186.20
2nd Km Km 88.85
Chap-1 (Carriage) Page 19
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
3rd Km Km 69.55
1st mile Mile 299.65
4th Km Km 49.50
2nd mile " 78.90
5th Km Km 46.25
3rd mile " 72.35
6th Km Km 45.45
4th mile " 66.55
7th Km Km 42.45
5th mile " 61.95
8th Km Km 41.95
6th mile " 58.25
9th Km Km 39.50
7th mileand subsequent miles " 40.95
10th Km Km 37.00
11th Km & subsequent Kms Km 31.90
vii) 12" (300 mm) i/d pipes:-
1st chain (1st 30 m) Chain 248.05 30 M 248.05
2nd chain (2nd 30 m) " 45.45 30 M 45.45
3rd to 10th chain (60 to 300 m) " 28.40 30 M 28.40
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 278.70 300 M 278.70
1st Km Km 262.15
2nd Km Km 125.05
3rd Km Km 97.95
1st mile Mile 421.85
4th Km Km 69.75
2nd mile Mile 111.10
5th Km Km 65.10
3rd mile " 101.85
6th Km Km 64.00
4th mile " 93.70
7th Km Km 59.75
5th mile " 87.20
8th Km Km 59.10
6th mile " 82.00
9th Km Km 55.60
7th mileand subsequent miles " 57.65
10th Km Km 52.10
11th Km & subsequent Kms Km 44.85
viii) 14" (350 mm) i/d pipes:-
1st chain (1st 30 m) Chain 322.90 30 M 322.90
2nd chain (2nd 30 m) " 59.15 30 M 59.15
3rd to 10th chain (60 to 300 m) " 36.95 30 M 36.95
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 362.75 300 M 362.75
1st Km Km 341.20
2nd Km Km 162.75
Chap-1 (Carriage) Page 20
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
3rd Km Km 127.50
1st mile Mile 549.10
4th Km Km 90.75
2nd mile " 144.60
5th Km Km 84.75
3rd mile " 132.60
6th Km Km 83.35
4th mile Mile 122.00
7th Km Km 77.75
5th mile " 113.50
8th Km Km 76.95
6th mile " 106.75
9th Km Km 72.35
7th mileand subsequent miles " 75.05
10th Km Km 67.85
11th Km & subsequent Kms Km 58.40
21 Carriageof PVC pipesB.S.S. Class'D' including loading,
unloading and stacking (Ratesper 1000 ft.):-
i) 2" (50 mm) i/d pipes:-
1st chain (1st 30 m) Chain 16.35 30 M 16.35
2nd chain (2nd 30 m) " 3.00 30 M 3.00
3rd to 10th chain (60 to 300 m) " 1.85 30 M 1.85
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 18.35 300 M 18.35
1st Km Km 17.30
2nd Km Km 8.25
3rd Km Km 6.45
1st mile Mile 27.80
4th Km Km 4.60
2nd mile " 7.30
5th Km Km 4.30
3rd mile " 6.70
6th Km Km 4.20
4th mile " 6.20
7th Km Km 3.95
5th mile " 5.75
8th Km Km 3.90
6th mile " 5.40
9th Km Km 3.65
7th mileand subsequent miles " 3.80
10Km Km 3.45
11th Km & subsequent Kms Km 3.00
ii) 2½" (63 mm) i/d pipes:-
1st chain (1st 30 m) Chain 25.45 30 M 25.45
2nd chain (2nd 30 m) " 4.65 30 M 4.65
3rd to 10th chain (60 to 300 m) " 2.90 30 M 2.90
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 28.60 300 M 28.60
Chap-1 (Carriage) Page 21
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
1st Km Km 26.90
2nd Km Km 12.85
3rd Km Km 10.10
1st mile Mile 43.25
4th Km Km 7.20
2nd mile " 11.40
5th Km Km 6.70
3rd mile " 10.45
6th Km Km 6.60
4th mile " 9.60
7th Km Km 6.15
5th mile " 8.95
8th Km Km 5.90
6th mile " 8.40
9th Km Km 5.65
7th mileand subsequent miles " 5.90
10Km Km 5.30
11th Km & subsequent Kms Km 4.60
iii) 3" (75 mm) i/d pipes:-
1st chain (1st 30 m) Chain 35.25 30 M 35.25
2nd chain (2nd 30 m) " 6.45 30 M 6.45
3rd to 10th chain (60 to 300 m) " 4.05 30 M 4.05
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 39.60 300 M 39.60
1st Km Km 37.25
2nd Km Km 17.80
3rd Km Km 13.95
1st mile Mile 59.95
4th Km Km 9.95
2nd mile " 15.80
5th Km Km 9.25
3rd mile " 14.45
6th Km Km 9.10
4th mile " 13.30
7th Km Km 8.50
5th mile Mile 12.40
8th Km Km 8.40
6th mile " 11.65
9th Km Km 7.80
7th mileand subsequent miles " 8.20
10th Km Km 7.30
11th Km & subsequent Kms Km 6.40
iv) 4" (100 mm) i/d pipes:-
1st chain (1st 30 m) Chain 58.35 30 M 58.35
2nd chain (2nd 30 m) " 10.70 30 M 10.70
3rd to 10th chain (60 to 300 m) " 6.70 30 M 6.70
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 65.55 300 M 65.55
1st Km Km 61.65
2nd Km Km 29.40
Chap-1 (Carriage) Page 22
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
3rd Km Km 23.05
1st mile Mile 99.20
4th Km Km 16.40
2nd mile " 26.15
5th Km Km 15.30
3rd mile " 23.95
6th Km Km 15.05
4th mile " 22.05
7th Km Km 14.10
5th mile " 20.50
8th Km Km 13.85
6th mile " 19.30
9th Km Km 13.05
7th mileand subsequent miles " 13.55
10th Km Km 12.20
11th Km & subsequent Kms Km 10.65
v) 5" (125 mm) i/d pipes:-
1st chain (1st 30 m) Chain 87.20 30 M 87.20
2nd chain (2nd 30 m) " 16.00 30 M 16.00
3rd to 10th chain (60 to 300 m) " 10.00 30 M 10.00
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 97.95 300 M 97.95
1st Km Km 92.15
2nd Km Km 43.95
3rd Km Km 34.45
1st mile Mile 148.30
4th Km Km 24.50
2nd mile " 39.05
5th Km Km 22.90
3rd mile " 35.80
6th Km Km 22.50
4th mile " 32.95
7th Km Km 21.00
5th mile " 30.65
8th Km Km 20.80
6th mile 28.85
9th Km Km 19.55
7th mileand subsequent miles 20.25
10th Km Km 18.25
11th Km & subsequent Kms Km 15.85
vi) 6" (150 mm) i/d pipes:-
1st chain (1st 30 m) Chain 125.65 30 M 125.65
2nd chain (2nd 30 m) " 23.00 30 M 23.00
3rd to 10th chain (60 to 300 m) " 14.40 30 M 14.40
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 141.15 300 M 141.15
1st Km Km 132.75
2nd Km Km 63.30
Chap-1 (Carriage) Page 23
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
3rd Km Km 49.60
1st mile Mile 213.65
4th Km Km 35.30
2nd mile 56.25
5th Km Km 32.95
3rd mile 51.60
6th Km Km 32.40
4th mile 47.45
7th Km Km 30.25
5th mile 44.15
8th Km Km 29.90
6th mile 41.55
9th Km Km 28.15
7th mileand subsequent miles 29.20
10th Km Km 26.40
11th Km & subsequent Kms Km 22.80
22 Hand shunting loaded Railway wagonsor
trucks:-
a) upto ¼ mile/ ¼ Km Each 448.95 Each 280.60
b) upto ½ mile/ ½ Km No 812.75 No 507.95
c) upto ¾ mile/ ¾ Km " 1097.30 " 685.80
d) upto 1 (1.6 Km) mile " 1305.75 " 816.10
e) 2nd mileand subsequent miles/ Each Each
2nd and subsequent kilometres No/Mile 864.35 No/Km 540.20
23 Hand shunting empty Railway wagonsor trucks.
a) upto ¼ mile/ ¼ Km Each 260.40 Each 162.75
b) upto ½ mile/ ½ Km No. 431.50 No. 269.70
c) upto ¾ mile/ ¾ Km " 569.05 " 355.65
d) upto 1 mile/ 1 Km " 683.00 " 426.90
e) 2nd mileand subsequent miles/ Each Each
2nd and subsequent kilometres No/Mile 424.40 No/Km 265.25
Chap-2 (Loading/Unloading) Page 24
2. LOADING, UNLOADING & STACKING
1 The rate for loading into and unloading from mobile trucks, trollies and boats, etc. will be the same as for Railway wagons.
Sr. Description Rate (British System) Rate (Metric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
1 Loading or unloading into or from Railway wagons, lead 100 Cft. 1108.80 cu.m 391.65
within one chain, (30m) shingle, sand, ballast, surkhi, ashes,
kankar, brick bats, coal, lime or 1,000 Nos. tiles size
12"x6"x2" (300x150x50 mm) or 9"x4½"x1½"
(225x113x37mm) properly laid & stacked.
2 Loading or unloading bricks into or from Railway wagons
laid and stacked, lead within one chain:-
a) Bricks 10" (250 mm) size. 1000 Nos. 1386.00 1000 Nos. 1386.00
b) Bricks 9" (225 mm) or smaller size. ditto 1108.80 ditto 1108.80
3 Loading or unloading into or from Railway wagons cement 100 Bags 1386.00 100 Bags 1386.00
in bags (from inside or outside the godown) and stacking
within one chain (30 m)
4 Loading or unloading into or from Railway wagons empty 100 Nos. 133.05 100 Nos. 133.05
cement bags (from inside or outside the godown) and
stacking.
5 Loading or unloading into or from Railway wagons (from 100 Mds. 831.60 100 Kg 22.30
inside or outside the godown) and stacking, white lime in
bags.
6 Loading or unloading into or from Railway wagons Per 665.30 Per 654.75
Structural Steel, R.S. joists, broad, narrow or meter gauge Tonne Tonne
rail and rail fastenings, etc.
7 Loading or unloading 45 gallon (204.57 Litres) drums full Each 83.15 Each 83.15
into or from Railway wagons, lead upto one chain.
8 Loading or unloading packages of all sorts, upto one Cwt Each 41.60 Each 41.60 Except cement in jute or
(50 Kg). paper bags.
9 Loading or unloading sleepers other than wooden,
including stacking lead within one chain:-
a) Broad gauge sleepers 100 Nos. 2772.00 100 Nos. 2772.00
b) Metre gauge and narrow gauge sleepers. ditto 1386.00 ditto 1386.00
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
Chap-2 (Loading/Unloading) Page 25
Sr. Description Rate (British System) Rate (Metric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
10 Loading or unloading timber logs or timber for shuttering, Per 346.5 Per 341.05
into or from Railway wagons of any gauge, including Ton Tonne
stacking lead within one chain (30 m)
11 Loading or unloading bhoosa in Railway wagons lead upto 100 Mds. 3326.4 100 Kg 89.1
150 ft. (45 m)
12 Loading or unloading timber scrap or wooden plugs, into or Per 554.40 Per 545.65
from Railway wagons, and stacking within one chain lead. Ton Tonne
13 Loading or unloading pitching stone or spawl from Railway 100 Cft. 410.25 cu.m 144.90
wagons of any gauge (including clearing 5 ft. (1500 mm)
away from the rail).
14 Loading or unloading building stone (including clearing 5 ft. 100 Cft. 532.20 cu.m 188.00
(1.5 m) away from rails).
15 Unloading oil, bitumen tar, etc.
a) Crude oil (to be pumped from tank wagon into tank). 1000 1386.00 100 30.50
Gallon litres
b) Crude oil (drained by gravity). 1000 1386.00 100 30.50
Gallon litres
c) Crude oil materials from railway wagons. 100 Cft. 177.40 cu.m 62.65
d) Fuel oil from tank into empty drums, including Per 492.80 Per 485.00
stacking within one chain (30 m). Ton Tonne
e) Petrol (2 gallon tin) 100 Nos. 698.55 100 Nos. 698.55 The rate includes checking
and weighing the tins.
f) Kerosene oil (4 gallon tin) 100 Nos. 1386.00 100 Nos. 1386.00
16 Removing and stacking within one chain
(30 m) lead:
a) Stone, spawl, brick bats, shingle, sand, lime, 100 Cft. 554.40 cu.m 195.80
surkhi, ashes, kankar and coat, etc.
b) Bricks. 1000 Nos. 1478.40 1000 Nos. 1478.40
c) Broad gauge wooden sleepers. 100 Nos. 887.05 100 Nos. 887.05
d) Metre gauge or narrow gauge wooden sleepers. 100 Nos. 528.00 100 Nos. 528.00
e) Rails girders, pipes, cement etc. Per 246.40 Per 242.50
Ton Tonne
Chap-2 (Loading/Unloading) Page 26
Sr. Description Rate (British System) Rate (Metric System) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
f) Bridge and crossing timbers, etc. 100 No. 2956.80 100 No. 2956.80
17 Loading into wagons girders, rails, permanent way Per 554.40 Per 545.65
material (except wooden sleepers) iron work, M.S. bars, Ton Tonne
pipes, etc. including lead one chain (30 M) and stacking
inside wagons.
18 Unloading from wagons girders, rails, permanent way Per 316.80 Per 311.80
material (except wooden sleepers) iron work, M.S. bars, Ton Tonne
pipes, etc. lead upto one chain (30 m) but excluding
stacking.
19 Loading into wagons wooden broad gauge sleepers, 100 Nos. 2217.60 100 Nos. 2217.60
including one chain (30 m) lead and stacking,.
20 Unloading wooden broad gauge sleepers from wagons, 100 Nos. 1056.00 100 Nos. 1056.00
including one chain (30 m) lead and stacking.
21 Loading metre gauge or narrow gauge wooden sleepers, 100 Nos. 1108.80 100 Nos. 1108.80
including one chain (30 m) lead and stacking inside
wagons.
22 Unloading metre gauge or narrow gauge wooden sleepers, 100 Nos. 583.60 100 Nos. 583.60
including one chain (30 m) lead but excluding stacking.
23 Loading bridge and crossing timbers, including one chain 100 Nos. 4435.20 100 Nos. 4435.20
(30 m) lead and stacking.
24 Unloading bridge and crossing timbers, including one 100 Nos. 2217.60 100 Nos. 2217.60
chain (30 m) lead but excluding stacking.
25 Loading or unloading bitumen, asphalt or tar in drums, into Per 332.65 Per 327.40
or from railway wagons, lead upto one chain (30 m). Ton Tonne
Chap-3 (Earthwork) Page 27
1 Special allowancesfor thehardness, wetnessand slush:-
Thegrant of allowancesfor hard, very hard, wet and slush will besubject to Superinteding Engineer'sapproval. Specific instructionsregarding grant of such
allowancesmay beissued by thevariousAdministrativeDepartmentsand Statutory Bodies. Theearth requiring repeated blowsof Kassi to break it and of
which dry bulk density isnot lessthan 1.5, will betreated ashard.
2 Deduction for shrinkagefrom bank measurements:-
Thefollowing allowancesshould beprovided for material which isnot rammed, or equally consolidated:-
a) Deduction for shrinkagefrom thebank measurementswhen theearthwork isdoneby manual labour.......... 10%
b) Deduction for settlement from thebank measurement when theearthwork isdoneby machines................... 3 to 6%
Beforethework islet out to bedoneby tractors, scrapers, etc. deduction ranging between 3% to 6% should beagreed to with thecontractors.
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
1 Earthwork excavation undressed lead upto asinglethrow 17.1 to 17.5
of Kassi, phaorah or shovel:-
a) In ashes, sand, soft soil or silt clearance. 1000 Cft. 4,158.00 -- cu.m 146.85 --
b) In ordinary soil. 1000 Cft. 4,989.60 -- cu.m 176.25 --
2 Earthwork excavation in ashes, sand and soft soil or silt 1000 Cft. 6,098.40 -- cu.m 215.40 -- ditto
clearance, undressed lead upto 50 ft (15 metre).
3 Bed clearanceand dressing slopesof drainsto required ditto Therateisapplicablewheretheearth
sectionsincluding theremoval of weeds, roots, etc. of thebed to beremoved isof the
disposal of excavated materialswithin 50 ft. (15 metre) lead. typeof ordinary soil. When it issilt or
a) Excavated material undressed. 1000 Cft. 7,761.60 -- cu.m 274.15 -- 1 or 2 above, whichever isapplicable.
b) Excavated material dressed in thespecified manner. 1000 Cft. 8,377.25 -- cu.m 295.90 -- thedrainsof each category.
4
a) Ordinary soil 1000 Cft. 7,761.60 - cu.m 274.15 -
b) Hard soil 1000 Cft. 9,535.70 - cu.m 336.80 -
5 Earthowrk in ordinary soil for embankmentslead upto 100 *411-1 to Therateincludeshirechargesof
ft. (30 m), including ploughing and mixing with bladegrade 411-13 and machinery, cost of fuel, lubricants, pay
or disc harrow or other suitableequipment, and 301-1 & of driver and cleaner. Theratealso
compaction by mechanical meansat optimum moisture 202-3 includesclearing and grubbing
content and dressing to designed section, completein all wherenecessary.
respects:-
i) 95% to 100% maximum modified AASHTO dry density. 1000 Cft. 8,454.35 9,963.35 cu.m 298.60 351.90
ii) 90% maximum modified AASHTO dry density. 1000 Cft. 8,454.35 9,728.30 cu.m 298.60 343.60
iii) 85% maximum modified AASHTO dry density. 1000 Cft. 8,454.35 9,493.25 cu.m 298.60 335.30
6 Regular excavation dressed. 1000 Cft. 5,726.70 -- cu.m 202.25 -- *411-2
7 Earthwork excavation in open cutting upto 5'-0" (1.5 m) 17.1 to
depth for storm water channels, drains, sullagedrainsin 17.5
open areas, roads, streets, lanes, including under pinning of
wallsand shoring to protect existing works, shuttering and
timbering thetrenches, dressed to designed level and
dimensions, trimming, removal of surfacewater from
trenches, back filling and surplusexcavated material
disposed of and dressed within 50 ft. (15 m) lead:-
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
3. EARTHWORK (EXCAVATION & EMBANKMENT)
Borrowpit excavation undressed lead upto 100 ft (30 metre).
Chap-3 (Earthwork) Page 28
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
i) ordinary 1000 Cft. 9,731.05 9,852.50 cu.m 343.70 348.00
ii) hard 1000 Cft. 11,505.10 11,626.55 cu.m 406.35 410.65
iii) very hard 1000 Cft. 13,390.10 13,511.50 cu.m 472.95 477.25
iv) gravel & shingle 1000 Cft. 22,492.80 22,614.25 cu.m 794.45 798.75
8 Earthwork excavation in open cutting 5.01 ft. (1.5 m) to ditto
10.0 ft. (3.0 mm) depth for storm water channels, drains,
sullagedrainsin open areas, roads, streets, lanes, including
under pinning of wallsand shoring to protect existing works,
shuttering and timbering thetrenches, dressed to designed
level and dimensions, trimming, removal of surfacewater
from trenches, back filling and surplusexcavated material
disposed of and dressed within 100 ft. (30 m) lead:-
i) ordinary 1000 Cft. 10,544.15 10,785.70 cu.m 372.40 380.95
ii) hard 1000 Cft. 12,318.25 12,559.80 cu.m 435.10 443.60
iii) very hard 1000 Cft. 14,203.20 14,444.75 cu.m 501.65 510.20
iv) gravel & shingle 1000 Cft. 24,414.70 24,656.30 cu.m 862.35 870.85
9 Excavation in shingleor gravel formation and rock, not 17.1 to 17.5
requiring blasting, undressed lead upto 100 ft (30 m).
i) Dry 1000 Cft. 21,067.20 -- cu.m 744.10 --
ii) Wet 1000 Cft. 24,393.60 -- cu.m 861.60 --
iii) In flowing water 1000 Cft. 31,046.40 -- cu.m 1,096.55 --
10 Earthwork excavation in irrigation channels, drains, etc. to
designed section, gradesand profiles, excavated material ditto
disposed off and dressed within 50 ft. (15 m) lead:-
i) ordinary 1000 Cft. 8,880.95 -- cu.m 313.70 --
ii) hard 1000 Cft. 10,655.05 -- cu.m 376.35 --
iii) very hard 1000 Cft. 12,540.00 -- cu.m 442.90 --
iv) gravel & shingle 1000 Cft. 22,197.10 -- cu.m 784.00 --
11 Excavation in rock dressed to designed section, gradesand
profiles, excavated material disposed off within 100 ft. (30 m) 17.1 to 17.5 Toolsand plantsshall betheliability
and lift upto 5'-0" (1.5 m). of thecontractor.
a) Soft rock, slate, shale, schist lateritework, with pick and 1000 Cft. 21,120.00 -- cu.m 745.95 --
crow bar.
b) Medium hard rock, requiring occasional blasting. 1000 Cft. 34,596.65 35,230.25 cu.m 1,221.95 1,244.35
12 a) Excavation in hard rock requiring blasting and disposal
of excavated material (blasted material) upto 50 ft. (15 17.1 to 17.5 1) Toolsand plantsrequired shall be
m) lead, (including dressing and leveling to designed theliability of theContractor
section,etc. complete).
i) GradeI 1000 Cft. 20,264.65 20,898.25 cu.m 715.75 738.15 2) Reducetherateby 8% if the
ii) GradeII 1000 Cft. 22,049.30 23,105.30 cu.m 778.80 816.10 excavated section isnot dressed or
iii) GradeIII 1000 Cft. 26,410.55 27,677.75 cu.m 932.80 977.60 levelled to designed section.
iv) GradeIV 1000 Cft. 29,383.20 30,861.60 cu.m 1,037.80 1,090.05
v) GradeV 1000 Cft. 32,450.90 34,140.50 cu.m 1,146.15 1,205.85
vi) GradeVI 1000 Cft. 34,869.10 36,769.90 cu.m 1,231.60 1,298.70
b) Excavation in hard rock requiring blasting, but blasting
prohibited, and disposal of excavated material within 50 17.1 to 17.5 1) Toolsand plantsrequired shall be
ft. (15 m) lead (including dressing and levelling to theliability of thecontractor.
designed section, etc. complete):-
Chap-3 (Earthwork) Page 29
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
i) GradeI 1000 Cft. 40,529.30 41,796.50 cu.m 1,431.50 1,476.25 2) Reducetherateby 8% if the
ii) GradeII 1000 Cft. 44,098.55 46,210.55 cu.m 1,557.55 1,632.15 excavated section isnot dressed or
iii) GradeIII 1000 Cft. 52,821.10 55,355.50 cu.m 1,865.65 1,955.15 levelled to designed section.
iv) GradeIV 1000 Cft. 58,766.40 61,723.20 cu.m 2,075.65 2,180.05
v) GradeV 1000 Cft. 64,901.75 68,280.95 cu.m 2,292.35 2,411.70
vi) GradeVI 1000 Cft. 69,738.25 73,539.85 cu.m 2,463.15 2,597.45
13 Rehandling of earthwork:
a) Lead upto asinglethrow of Kassi, phaorah or shovel 1000 Cft. 2,772.00 -- cu.m 97.90 -- ditto
b) Upto alead of 50 ft. (15 m). 1000 Cft. 3,880.80 -- cu.m 137.05 --
14 Rehandling of gravel work or excavated rock, 1000 Cft. 11,088.00 -- cu.m 391.65 -- 17.1 to 17.5
lead upto 50 ft.( 15 m)
15 Filling, watering and ramming earth under floors:- ditto
i) with surplusearth from foundation, etc. 1000 Cft. 5,559.85 -- cu.m 196.35 --
ii) with new earth excavated from outside, 1000 Cft. 12,116.55 -- cu.m 427.95 --
lead upto onechain (30 m).
16 Extrafor every 50 ft. (15 m) additional lead or part thereof :- Thisrateshall beapplicableupto
1000 ft. total distance, including the
i) for earhtwork soft, ordinary, hard and very hard. 1000 Cft. 99.90 -- cu.m 3.55 -- lead covered in theitem of earthwork
ii) for gravel, shingleor rock. 1000 Cft. 118.85 -- cu.m 4.20 --
17 Transportation of earth all typeswhen thetotal distance, Thisratewill bepaid inaddition to the
including thelead covered in theitem of work, ismorethan rateof earthwork, without deducting
1000 ft. (300 m) thelead covered in theitem of
a) upto ¼ mile(400 m). 1000 Cft. 4,472.30 -- cu.m 157.95 -- earthwork
b) for every 330 ft. (100 m) additional lead or part thereof,
beyond ¼ mile(400 m) upto onemile. (1.6 Km.) 1000 Cft. 36.85 -- cu.m 1.30 --
c) for every ¼ mile(400 m) additional lead or part thereof,
beyond onemile (1.6 Km.) upto 5 mile(8 Km). 1000 Cft. 323.50 -- cu.m 11.45 --
d) for every ½ mile(800 m) additional lead
or part thereof, beyond 5 miles(8 Km). 1000 Cft. 305.45 -- cu.m 10.80 --
18 Dressing and levelling of earhtwork to designed section, etc. 17.10 to 17.5
complete:-
a) Ashes, sand, silt or soft soil. 1000 Cft. 356.95 -- cu.m 12.60 --
b) Ordinary or hard soil. 1000 Cft. 692.75 -- cu.m 24.45 --
c) Gravel work or soft rock not requiring 1000 Cft. 1,673.75 -- cu.m 59.10 --
blasting.
19 Dowel dressing. Per 325.60 -- Metre 10.70 -- ditto Thisrateisin addition to payment for
Chain dressed earhtwork.
20 a) Dressing slopesof banksor ground surface. 100Sft. 145.20 -- sq.m 15.60 -- ditto To bepaid only when exclusively
dressing isdoneand no earthwork is
carried out in embankment or cutting.
Chap-3 (Earthwork) Page 30
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
b) Dressing of earthwork (doneby machinery or otherwise 100Sft. 260.70 -- sq.m 28.05 -- i) Thesurfaceareadressed isto be
and left undressed) to designed section. taken for measurement.
ii) Theitem isapplicablewherethe
dressing isdoneby thecontractor
other than theonewho executed the
work.
21 Excavation in foundation of building, bridgesand other
structures, including dagbelling, dressing, refilling in layersaround 17.1 to 17.5
structurewith excavated earth, watering and ramming lead compositerateby Rs720/- P.%0 Cft or
upto onechain (30 m)lift upto 5 ft (1.5m). Rs25.50/- P.Cu.m and surplusearth will
1) By Manual beadjusted accordingly.
i) in sand, ashesor loosesoil 1000 Cft. 9,989.75 -- Cu.m 352.85 --
ii) in ordinary soil. 1000 Cft. 11,658.25 -- Cu.m 411.75 --
iii) in hard soil or soft murum. 1000 Cft. 13,046.90 -- Cu.m 460.80 --
2) a) By Excavator
i) Sand,ashesor loosesoil Per %0Cft 3,326.40 5,301.05 Cu.m 117.35 187.00
ii) Ordinary soil Per %0Cft 6,098.40 8,191.70 Cu.m 215.15 289.00
iii) Hard soil or Soft murum Per %0Cft 6,375.60 9,048.00 Cu.m 224.95 319.20
i) Sand,ashesor loosesoil Per %0Cft 3,880.80 6,349.15 Cu.m 136.90 224.00
ii) Ordinary soil Per %0Cft 7,207.20 9,823.80 Cu.m 254.25 346.60
iii) Hard soil or Soft murum Per %0Cft 7,484.40 10,824.95 Cu.m 264.05 381.90
c) Lift above15 ft (4.5 m):-
i) Sand,ashesor loosesoil Per %0Cft 4,435.20 7,397.20 Cu.m 156.45 260.95
ii) Ordinary soil Per %0Cft 8,316.00 11,455.90 Cu.m 293.40 404.15
iii) Hard soil or Soft murum Per %0Cft 8,593.20 12,601.85 Cu.m 303.15 444.60
22 Cutting hard rock such asgranite, ballast, hard limestoneor 1000 Cft. 90,847.70 100,326.60 cu.m 3,208.75 3,543.55 17.1 to 17.5 Toolsand plantsrequired shall bethe
sand stone, etc. with chiselsand hammers, for small liability of thecontractor.
foundations.
23 Extrafor excavation requiring shoring. 1000 Cft. 1,478.40 1,884.95 cu.m 52.20 66.60 17.1 to 17.5 Compositerateincludesmaterials,
i.e. plank, etc.
24 Compaction of earthwork (soft, ordinary or hard soil) :- ditto
a) Mixing, moistening earth to optimum moisturecontent 1000 Cft. 1,308.40 -- cu.m 46.20 --
in layersfor compaction, etc. complete.
b) Compaction by rolling with animal driven
roller/hand rammed:
i) soft or sandy soil 1000 Cft. 1,663.20 -- cu.m 58.75 --
1) Theratedoesnot includehire
ii) ordinary soil 1000 Cft. 1,940.40 -- cu.m 68.55 -- chargesof theroller.
2) Roller to be'supplied by
iii) hard soil 1000 Cft. 2,217.60 -- cu.m 78.35 -- Government
iv) admixtureof shingle 1000 Cft. 2,494.80 -- cu.m 88.10 --
c) Ramming earthwork (all typesof soil). 1000 Cft. 1,663.20 -- cu.m 58.75 --
If refilling isnot required, reducelabor and
b) Lift from 5ft (1.5m) to15 ft (4.5 m):-
Chap-3 (Earthwork) Page 31
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
d) Ramming earhtwork behind retaining walls. 1000 Cft. 2,217.60 -- cu.m 78.35 --
25 Compaction of earthwork with power road roller, including 17.1 (a)
ploughing, mixing, moistening earth to optimum moisture *411-5 and Theratealso includeshirechargesof
content in layers, etc. complete: 202-3 machinery, cost of fuel, lubricant, pay
of driver and cleaner, etc.
i) 95% to 100% maximum modified AASHTO dry density. 1000 Cft. -- 1,509.00 cu.m - 53.30
ii) 90% maximum modified AASHTO dry density. 1000 Cft. -- 1,273.95 cu.m - 45.00
iiii) 85% maximum modified AASHTO dry density. 1000 Cft. -- 1,038.90 cu.m - 36.70
26 Extrafor wet earthwork. 1000 Cft. 3,880.80 -- cu.m 137.05 - 17.1 to 17.5 That will support aman'sweight.
27 Extrafor slush or Daldal including dewatering. 1000 Cft. 8,870.40 -- cu.m 313.30 - 17.1 to 17.5 That will not support aman'sweight.
28 Extrafor puddling. 1000 Cft. 6,945.85 -- cu.m 245.35 - ditto
29 Earthwork on small rain water drains, along canal banks, 100 Rft. 1,053.35 -- Metre 34.55 - ditto
roadsand plantation drains, dressed, etc. complete.
30 Filling and compacting soil, earth and bouldersbehind 1000 Cft. 9,979.20 -- cu.m 352.45 -- 17.1 to 17.5
retaining walls(including excavation of soil and lead upto 50
ft.( 15 m).
31 Dag bailing 3" (75 mm) deep. Per mile 4,137.15 -- Per 2,571.25 -- ditto Dag bailing for layout of borrow pit, to
Km bedoneby contractorsat their own
cost.
32 Turfing slopesof banksor lawnswith grasssodsincluding 100Sft. 1,848.00 -- sq.m 198.85 -- ditto
ploughing, laying, setting and watering (Turf got from within a
distanceof 5 miles(8 Km.) and maintenancefor 15 days).
33 Berm cutting:- 17.1 to 17.5
a) lead upto asinglethrow of Kassi, phaoraor shovel 1000 Cft. 4,989.60 -- cu.m 176.25 --
(without dressing).
b) upto 50 ft(15 m)lead (including dressing). 1000 Cft. 8,880.95 -- cu.m 313.70 --
34 Berm trimming both sidesof channels:- 17.1 to 17.5
a) upto 3½ ft. (1.06 m) depth. Per Mile 12,953.60 -- Per Km. 8,096.00 --
b) exceeding 3½ ft. to 5 ft. (1.06 to 1.5 m) depth. Per Mile 18,352.40 -- Per Km. 11,470.25 --
c) exceeding 5 ft. to 8 ft. (1.5 to 2.4 m) depth Per Mile 28,525.20 -- Per Km. 17,828.25 --
35 Ploughing and levelling borrowpits. ditto Areaploughed to bemeasured.
i) upto 3 ft. (0.9 m) depth. Per Acre 2,772.00 -- Per Hect. 6,849.75 --
ii) above3 ft. (0.9 m) depth. Per Acre 5,544.00 -- Per Hect. 13,699.50 --
Chap-3 (Earthwork) Page 32
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
36 Making boundary or serviceroads, including dag-belling, ditto
leveling and dressing:
i) in unploughed land:
a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide. Per Chain 1,390.40 -- Metre 45.60 --
b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide. Per Chain 1,856.80 -- Metre 60.90 --
ii) in ploughed land:
a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide. Per Chain 1,427.80 -- Metre 46.85 --
b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide. Per Chain 1,894.20 -- Metre 62.15 --
37 Earthwork by boats, including hireof boats:- 17.1 to 17.5 For ordinary soil.
i) Digging and loading into boats, upto 50 ft. (15 m) lead. 1000 Cft. 8,316.00 -- cu.m 293.70 --
ii) Carriageby boatsupto 10 chains(300 m). 1000 Cft. 2,052.25 -- cu.m 72.50 --
iii) Extrafor every additional onechain (30 m) or part 1000 Cft. 221.75 -- cu.m 7.85 --
thereof beyond 10 chains(300 m).
iv) Unloading earth from boats. 1000 Cft. 3,880.80 -- cu.m 137.05 --
38 Unloading earth from B.G. trucksand clearing 5 ft. (1.5 m) 1000 Cft. 3,326.40 -- cu.m 117.50 -- 17.1 to 17.5
from rail.
39 Earthwork by tramway, digging and loading in trucks, upto 50 1000 Cft. 7,761.60 -- cu.m 274.15 -- 17.1 to 17.5
ft. (15 m) lead.
40 Unloading earth from B.G. trucksand spreading upto 1000 Cft. 6,237.00 -- cu.m 220.30 -- ditto
15 ft. (4.5 m) from rail.
41 Supplying clean and screened river or pit sand within 5 100Cft. 1,029.30 1,057.30 cu.m 363.55 373.45 ditto Therateincudes:-
chains(150 m). i) removal of top crust of earth
over burden
ii) royalty to thegovernment or cost
to theprivateowner.
42 Earth work excavation in open cutting for sewersand manholesas 17.1 to 17.5 Theratedoesnot includeback filling
shown in drawing including shuttering of wooden vertical planks, struts **13.1 &13.4 after laying of sewer, which ispayable
and beams, dressing to correct section and dimension separately.
according to templatesand levelsand removing surfacewater in all
typesof soil except shingle, gravel and rock.
i) 0 ft. to 7.0 ft. (0 to 2.10 m) depth 1000 Cft. 8,732.75 12,836.55 cu.m 308.45 453.40
ii) 7-01 ft. to 15.0 ft. (2.15 to 4.5 m) depth 1000 Cft. 13,663.30 18,457.30 cu.m 482.60 651.90
iii) above15.0 ft. (4.5 m) depth 1000 Cft. 14,995.20 19,524.75 cu.m 529.65 689.60
43 Earthwork excavation of trenchesin open cutting for sewers 17.1 to 17.5 Theratedoesnot includeback filling
and manholechambers, etc. below sub-soil water level to **13.3 & after laying of sewer, which ispayable
correct section and dimensionsaccording to templatesand 13.5 separately.
levels, including shoring, timbering and shuttering of M.S.
sheetson both sidesof thetrenches:
If wooden planks, beams and struts are not
used at site, the composite rates may be
reduced by 31.5%, 25.7% & 23.2%,
respectively for i), ii) &iii).
Chap-3 (Earthwork) Page 33
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. Unit of Unit of No.
M/ment Labour Composite M/ment Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
i) 0 ft. to 4.0 ft. (0 to 1.20 m) depth below SSWL. 1000 Cft. 13,125.20 18,732.15 cu.m 463.60 661.60
ii) 4.01 ft. to 8.0 ft. (1.22 to 2.4 m) depth below SSWL. 1000 Cft. 16,408.05 24,241.65 cu.m 579.55 856.20
iii) Exceeding 8 ft. (2.4 m) depth below SSWL. 1000 Cft. 24,612.05 33,354.75 cu.m 869.30 1,178.10
44 Excavation of trenchesin all kindsof soil, except cutting 1000 Cft. 8,321.30 -- cu.m 293.90 -- 17.1 to 17.5 Theratedoesnot includeback filling
rock, for watersupply pipelinesupto 5 ft. (1.5 m) depth **8.1 after laying of pipeline, which is
from ground level, including trimming, dressing sides, payableseparately.
leveling thebedsof trenchesto correct gradeand cutting
pitsfor joints, etc. completein all respects.
45 Cutting and removing treeswithin adistanceof 100 ft. (30 m)
a) upto 2½ ft. (760 mm) girth. Each 1,663.20 -- Each 1,663.20
b) above2½ ft. to 6 ft. (760 to 1800 mm) girth. Each 3,234.00 -- Each 3,234.00
46 Uprooting stump and removing within 100 ft. (30 m) from 2 ft. Each 2,079.00 -- Each 2,079.00
to 6 ft. (600 to 1800 mm) girth.
47 Jungleclearanceand removing within 100 ft. (30 m).
a) light 1000 Sft. 277.20 -- sq.m 3.00 --
b) thick 1000 Sft. 554.40 -- sq.m 5.95 --
48 Uprooting Sarkandagrowth and disposal within 100 ft. (30 m) 100Sft. 133.05 -- sq.m 14.30 --
49 Ploughing 3 times. Per 1,126.15 -- Per Hect. 2,782.70 --
Acre
50 Leveling, dressing and making lawns. 100Sft. 554.40 -- sq.m 59.65 --
51 Turfing lawns(excluding cost of turf). 100Sft. 466.40 -- sq.m 50.20 --
52 Earthwork in excavation of drains, irrigation channelsthrough
excavator / drag linesin all kind of soil and conditions(dry,wet
slush,daldal and under water) including itsdisposal and
preparation of working pad for operation of machinery.
(Ratesincludes100 ft lead) 1000 Cft. -- 4,180.00 cu.m -- 147.65
* Specification number correspond to Book of "Specification for Road & BridgeConstruction, 1971".
** Specification number correspond to Book of "Building & RoadsDepartment Specification Vol. II, 1966 (Public Health Works).
The compaction of area will be restored to its
original valuewithout any extrapayment.
Chap-4 (Dismantling) Page 34
1 Ratesfor all finished worksincludetheremoval of surplusdebris, unused material and byproducts.
2 Theratesfor dismantling roofsor upper storey floor, includethedismantling of all materials, except roof
supportssuch asbeamsand trusses.
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
StoneWork
1 Dismantling dry stonemasonry. 100Cft. 942.50 Cu.m 332.90 18.1
2 Dismantling stonemasonry in mud mortar. 100Cft. 1,386.00 Cu.m 489.55 ditto
3 Dismantling stonemasonry in limeor cement mortar. 100Cft. 3,326.40 Cu.m 1,174.90 ditto Add extra13%, 32% and 51% on
labour ratesonly for 2nd, 3rd, 4th
and subsequent floorsrespectively.
4 a) Dismantling dry stoneor spawl pitching. 100Cft. 1,663.20 Cu.m 587.45 ditto
b) Dismantling stoneor spawl pitching (mud grouted). 100Cft. 2,106.70 Cu.m 744.10 ditto
5 Dismantling stoneor spawl pitching and apron in silted 100Cft. 2,772.00 Cu.m 979.05 ditto
condition.
6 Dismantling stonepitching, cement or limegrouted. 100Cft. 4,435.20 Cu.m 1,566.50 ditto
7 Dismantling stonein crates:
a) wooden crates 100Cft. 2,217.60 Cu.m 783.25
b) wirecrates 100Cft. 2,772.00 Cu.m 979.05
8 Dismantling stonewaredrain including baseconcrete. 100Cft. 1,552.30 Cu.m 548.25 ditto
Brick Work
9 100Cft. 554.40 Cu.m 195.80 18.1
10 100Cft. 1,386.00 Cu.m 489.55 ditto
11 100Cft. 942.50 Cu.m 332.90 ditto
12 100Cft. 1,940.40 Cu.m 685.35 18.1 Add extra13%, 32% and 51% on
labour ratesonly for 2nd, 3rd, 4th
13 100Cft. 4,712.40 Cu.m 1,664.40 ditto and subsequent floorsrespectively
against item No. 12, 13, 14 & 15.
14 Dismantling cement block masonry. 100Cft. 4,158.00 Cu.m 1,468.60 ditto
Dismantling brick work in mud mortar.
Dismantling brick work in limeor cement mortar.
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
4. DISMANTLING (DEMOLITION)
Dismantling mud/pisewalling.
Dismantling sun dried brick masonry.
Dismantling dry brick masonry.
Chap-4 (Dismantling) Page 35
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
15 Dismantling Dhajji walling. 100Cft. 1,108.80 Cu.m 391.65 ditto
Concrete
16 Dismantling mud concrete. 100Cft. 2,217.60 Cu.m 783.25 ditto
17 Dismantling limeconcrete. 100Cft. 3,049.20 Cu.m 1,077.00 Add extra13%, 32% and 51% on
labour ratesonly for 2nd, 3rd, 4th
18 Dismantling limeor cement concrete, under water. 100Cft. 11,642.40 Cu.m 4,112.10 and subsequent floorsrespectively
against item No. 17, 19 & 20.
19 a) Dismantling cement concreteplain 100Cft. 6,098.40 Cu.m 2,153.95 ditto
1:4:8.
b) Dismantling cement concreteplain 100Cft. 9,979.20 Cu.m 3,524.65
1:3:6.
c) Dismantling cement concrete1:2:4 100Cft. 12,196.80 Cu.m 4,307.90
plain.
d) Dismantling cement concretewith brick 100Cft. 3,326.40 Cu.m 1,174.90
aggregate.
e) Dismantling D.P.C. of cement concrete 100Cft. 1,663.20 Cu.m 587.45
1½" thick (40 mm) and clearing thesite.
20 Dismantling cement concretereinforced, 100Cft. 19,958.40 Cu.m 7,049.30 ditto
separating reinforcement from concrete,
cleaning and straightening thesame.
Roofing
21 Dismantling sirki sarkandaor thatched 100Sft. 665.30 Sq.m 71.60 18.1
roofing, supported on battensor bellies.
22 a) Dismantling 1st classtileroofing. 100Sft. 1,663.20 Sq.m 178.95 Add extra13%, 32 and 51% on
labour rateonly for 2nd, 3rd, 4th
b) Dismantling 2nd classtileroofing. 100Sft. 1,386.00 Sq.m 149.15 ditto and subsequent floorsrespectively
against itemsNo. 22, 25, 26 and 28.
23 Dismantling from any height, asbestossheetsand ridge 100Sft. 924.00 Sq.m 99.40 18.1
coping.
24 a) Dismantling roof of wooden planksand battens, from 100Sft. 739.20 Sq.m 79.55 ditto
any height.
b) Dismantling wooden ceiling above20' (6.0 m) height 100Sft. 2,882.90 Sq.m 310.20 ditto
in difficult position, including lifting with careand
special scaffolding along liveelectric wiresand with
machinesunderneath.
Chap-4 (Dismantling) Page 36
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
25 Dismantling jack arch roofing, including removal of joists. 100Sft. 2,217.60 Sq.m 238.60 ditto
26 Dismantling R.B. roof completewith mud and plaster, 100Sft. 2,772.00 Sq.m 298.25 ditto
including separating reinforcement, cleaning and
straightening thesame.
27 a) Stripping and stacking slateor tilesfrom thetruss 100Sft. 1,386.00 Sq.m 149.15
roofing.
b) Stripping and stacking C.I. sheet roof. 100Sft. 1,286.20 Sq.m 138.40
c) Extrafor dismantling C.I. sheet roof above20 ft. (6m) 100Sft. 1,755.60 Sq.m 188.90
in difficult position, including lifting with special
scaffolding along liveelectric wirewith machine
underneath.
28 Dismantling slatesor tilesincluding battens, purlinsand 100Sft. 2,217.60 Sq.m 238.60 18.1
planking.
Flooring
29 Dismantling brick or flagged flooring without 100Sft. 942.50 Sq.m 101.40 18.1 Add extra13%, 32% and 51% on
concretefoundation. labour ratesonly for 2nd, 3rd, 4th
and subsequent floorsrespectively
30 Dismantling plank or wooden block flooring, 100Sft. 1,386.00 Sq.m 149.15 ditto against itemsNo. 29 and 30.
etc.
31 Disjoining R.C.C. pipesinsidethetrench and dismantling i) Theratedoesnot includethe
and removing thepipesfrom thetrench and stacking them cost of excavation and refilling of
outside:- trench, or thedemolition of any
masonry or brick work.
a) 6" to 12" (150 to 300 mm) diameter Per Rft 36.95 Metre 121.20
b) 13" to 24" (325 to 600 mm) diameter Per Rft 59.15 Metre 194.00 ii) Bends, elbows, sluicevalves,
c) 25" to 36" (625 to 900 mm) diameter Per Rft 69.30 Metre 227.30 etc. should not bepaid for extraif
d) Above36" (Above900 mm) diameter Per Rft 98.55 Metre 323.25 fixed in thelength of pipelinethat
isbeing dismantled.
WOOD WORK
32 a) Removing door with chowkat. Per 485.10 Per 485.10 18.1 Add extra13%, 32% and 51% on
No. No. labour ratesonly for 2nd, 3rd, 4th
b) Removing windowsand sky lightswith chowkat. ditto 378.85 ditto 378.85 and subsequent floorsrespectively
against itemsNo. 32, 33, 34, 35 &
36.
33 Removing ventilatorsand wooden sunshade, etc. Per No. 198.65 Per No. 198.65 ditto
34 a) Dismantling wooden beamsupto 12' (3.65m) Per No. 346.50 Per No. 346.50 ditto
length.
Chap-4 (Dismantling) Page 37
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
b) Dismantling wooden beamsfrom 12.1' to 23' Per No. 554.40 Per No. 554.40
(3.65 to 7.0 m) length.
35 a) Dismantling wooden partition Jaffry work etc. 100Sft. 660.00 Sq.m 71.00 ditto
b) Dismantling wooden trusses. 100Kg 1,970.45 %Kg 1,970.45
36 Dismantling wooden palisadefencing. Per Lft. 53.90 Metre 176.80 ditto
Iron work
37 Dismantling iron work of trusses, sheds, water tanks, etc. 100Kg 1,970.40 %Kg 1,970.40 18.1 Add extra13%, 32% and 51% on
excluding cutting of rivets. labour ratesonly for 2nd, 3rd, 4th
and subsequent floorsrespectively
against itemsNo. 37 and 38.
38 Dismantling rolled steel beamsor iron rails, etc. 100Kg 909.90 %Kg 909.90 ditto
39 Dismantling iron latrine. Per Unit/ 2,125.20 Per Unit/ 2,125.20 ditto
2 Seats 2 Seats
40 Dismantling tees, bendsor sluicevalvesupto 12" Each per 44.90 Each per 17.95 ditto
(300 mm) bore. inch bore cm bore
41 a) Dismantling B.G. water column. Each 13,860.00 Each 13,860.00 ditto
b) Dismantling M.G. or N.G. water column. Each 9,240.00 Each 9,240.00 ditto
42 Dismantling all typeof wirefencing, including rolling wire 100Lft. 942.50 Metre 30.90 18.1
into bundlesand collecting material.
Miscellaneous
43 Dismantling wirenetting of tenniscourtsand framework. 100Sft. 443.50 Sq.m 47.70 18.1
44 Dismantling cloth ceiling and supporting timber. 100Sft. 831.60 Sq.m 89.50 ditto
45 Dismantling and removing road metalling. 100Cft. 2,217.60 Cu.m 783.25 ditto
46 Dismantling and removing road pavement, etc., including 100Cft. 2,960.50 Cu.m 1,045.65 ditto
screening and stacking of byproductsupto onechain lead
(30 metre).
47 Removing mud plaster from walls. 100Sft. 231.00 Sq.m 24.85 ditto Add extra13%, 32% and 51% on
labour ratesonly for 2nd, 3rd, 4th
48 Removing cement or limeplaster. 100Sft. 462.00 Sq.m 49.70 ditto and subsequent floorsagainst item
No. 47, 48, 49, & 50 respectively
Chap-4 (Dismantling) Page 38
Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
49 Scraping:- 18.1
a) Whitewash or colour wash. 100Sft. 277.20 Sq.m 29.85
b) Ordinary distemper, oil bound distemper, ditto 831.60 Sq.m 89.50
or paint of wall.
50 Dismantling glazed or encaustic tiles, etc. 100Sft. 2,587.20 Sq.m 278.40 18.1
51 Scraping boulders. 100Cft. 3,880.80 Cu.m 1,370.70 18.1
52 Cleaning limeor cement mortar of old stones 100Cft. 1,940.40 Cu.m 685.35 18.1
to beused in masonry.
ElectricWiring
53 Dismantling light, fan and call bell point Per 84.70 85.60 Per 84.70 85.60
including casing and capping/strip open type, point point
and making good damaged surface(building
portion).
54 Dismantling plug point and making good Per 72.60 73.35 Per 72.60 73.35
damaged surface(building portion). point point
55 Dismantling G.I./M.S. conduit/G.I. flexible/PVC pipesor
conduit wiring, etc. of all sizesincluding making good
damaged surface(building portion):-
i) on surface Per foot 15.50 15.65 P.Mtr 50.85 51.35
ii) recessed in wall Per foot 32.85 33.15 P.Mtr 107.75 108.75
Chap-5 (Mortar) Page 39
Dry Material Required for Dry Material Required for
100 Cft. Wet (Ready) Mortar OneCum Wet (Ready) Mortar
S. No. Ratio of Mortar Cement Lime Cement Lime Sand
(50 Kg) Putty Sand (50 Kg.) Putty Cum.
Bag Cft. Cft. Bag. Cum
1 2 3 4 5 6 7 8
1 Cement : Sand
1 : 2 33.48 82 11.83 0.82
1 : 3 23.11 85 8.16 0.85
1 : 4 18.37 90 6.49 0.90
1 : 5 14.70 90 5.19 0.90
1 : 6 13.61 100 4.81 1.00
1 : 7 11.68 100 4.12 1.00
1 : 8 10.21 100 3.61 1.00
2 Cement : Lime : Sand
1 : 1 : 6 12.25 15.0 90 4.33 0.15 0.90
1 : 1 : 7 10.70 13.1 92 3.78 0.13 0.92
1 : 1 : 8 9.39 11.5 92 3.32 0.12 0.92
1 : 1 : 9 8.52 10.44 94 3.00 0.10 0.94
1 : 1 : 10 7.67 9.4 94 2.71 0.09 0.94
1 : 2 : 8 9.19 22.5 90 3.25 0.23 0.90
1 : 2 : 9 8.16 20.0 90 2.88 0.20 0.90
1 : 2 : 10 7.67 18.8 94 2.71 0.19 0.94
1 : 2 : 12 6.39 15.66 94 2.26 0.16 0.94
1 : 3 : 12 6.26 23.0 92 2.21 0.23 0.92
1 : 3 : 14 5.47 20.1 94 1.93 0.20 0.94
1 : 3 : 16 4.82 17.7 94 1.70 0.18 0.94
1 : ¼ : 3 23.11 7.0 85 8.16 0.07 0.85
3 Lime : Sand
1 : 2 43 86 0.43 0.86
1 : 3 31 93 0.31 0.93
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
5. MORTAR
Chap-5 (Mortar) Page 40
Dry Material Required for 100 Cft. Dry Material Required for
Wet (Ready) Mortar oneM3
Wet (Ready) Mortar
S. Ratio of Mortar Clay Lime Sand Surkhi Cinder Clay Lime Sand Surkhi Cinder
No. (Putty) (Putty)
Cft. Cft. Cft. Cft. Cft. M3
M3
M3
M3
M3
1 2 3 4 5 6 7 3 4 5 6 7
4 Mud 135 1.35
5 Lime : Surkhi
2 : 3 49.00 - 73.5 - 0.49 - 0.74 -
1 : 2 40.75 - 81.5 - 0.41 - 0.82 -
1 : 3 30.30 - 91.0 - 0.30 - 0.91 -
6 Lime: Sand : Surkhi
1 : 1 : 1 40.50 40.5 40.5 - 0.41 0.41 0.41
7 Lime : Cinder
1 : 1 57.0 - 57.0 - 0.57 - - 0.57
Wet material required for 100 Cft. Wet material required for 1M³ (35.32 Cft)
masonry (including wastage): masonry ( including wastage) :
1 Brick Masonry :
a) Mud Mortar 35.00 Cft 0.35 M3
b) Cement, Sand 25.00 Cft 0.25 M3
c) Cement, Lime(Putty) Sand 25.00 Cft 0.25 M3
d) Lime(Putty) Sand 25.00 Cft 0.25 M3
2 StoneMasonry :
a) Random rubble, uncoursed
i) Foundation and Plinth 45.00 Cft 0.45 M3
ii) Superstructure 40.00 Cft 0.40 M3
iii) Coursed 35.00 Cft 0.35 M3
b) Ashlar Block in courseor Scabled masonry 30.00 Cft 0.30 M3
c) Ashlar finemasonry 20.00 Cft 0.20 M3
(1) Cement 1 Cft. = 40.8233 Kg
Notes: (2) Unslaked lime 1.7 Cft. = 37.3242 Kg
(3) Slaked lime 2.5 Cft. = 37.3242 Kg
(4) Quick lime 40 Kg Will yield 2.6 Cft. limeputty.
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
5. MORTAR
Chap-6 (Concrete) Page 41
1.
2.
3.
Sr. Description Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
1 Mud concretein foundation including watering and ramming, 100Cft 6,134.05 11,666.05 cu.m 2,166.55 4,120.45
using brick or stoneballast 1½" (40 mm) gauge.
2 Dry rammed brick or stoneballast, 1½" to 2"( 40 mm to 50 100Cft 4,158.00 9,768.00 cu.m 1,468.60 3,450.05
mm) gauge.
3 Cement concretebrick or stoneballast 1½ " to 2" (40 mm to 20.1 -do-
50 mm) gauge, in foundation and plinth:-
(a) Ratio 1: 3: 6 100Cft 8,091.60 29,542.80 Cu.m 2,857.95 10,434.50
(b) Ratio 1: 4: 8 100Cft 8,091.60 25,717.20 Cu.m 2,857.95 9,083.30
(c) Ratio 1:5:10 100Cft 8,091.60 23,684.40 Cu.m 2,857.95 8,365.35
(d) Ratio 1: 6:12 100Cft 8,091.60 22,124.40 Cu.m 2,857.95 7,814.35
(e) Ratio 1: 6: 18 100Cft 8,091.60 20,736.00 Cu.m 2,857.95 7,323.95
(f) Ratio 1: 7:20 100Cft 8,091.60 19,951.80 Cu.m 2,857.95 7,047.00
4 Extraon item No. 3 above, for sedimentation tank or filter
bedsof Public Health Engineering Works: Thestoneballast, crushed bajri,
round shinglefrom nallah, or brick
(a) in bed 100Cft 2,634.70 - Cu.m 930.60 - ballast may beused according to
their comparativecheaper ratesin
(b) on slope 100Cft 3,928.30 - Cu.m 1,387.50 - variousareasof theProvince.
5 Cement concreteplain including placing, 20.1
compacting, finishing and curing
complete(including screening and
washing of stoneaggregate):
(a) Ratio 1: 1:2 100Cft 11,003.50 54,653.50 Cu.m 3,886.45 19,303.60
(b) Ratio 1: 1½: 1½ 100Cft 11,003.50 53,884.30 Cu.m 3,886.45 19,031.95
(c) Ratio 1: 1½: 3 100Cft 11,003.50 44,303.50 Cu.m 3,886.45 15,648.00
(d) Ratio 1: 2: 3 100Cft 11,003.50 42,381.10 Cu.m 3,886.45 14,969.00
(e) Ratio 1: 3: 3 100Cft 11,003.50 37,905.10 Cu.m 3,886.45 13,388.10
(f) Ratio 1: 2: 4 100Cft 11,003.50 38,723.50 Cu.m 3,886.45 13,677.15
(g) Ratio 1: 2: 6 100Cft 11,003.50 34,665.10 Cu.m 3,886.45 12,243.70
(h) Ratio 1: 3: 6 100Cft 11,003.50 33,503.50 Cu.m 3,886.45 11,833.45
(i) Ratio 1: 4: 8 100Cft 11,003.50 29,723.50 Cu.m 3,886.45 10,498.35
6. CONCRETE
a) Thecarriagefor thewholedistanceto thesiteof work shall becalculated on thebasisof theratesof theactual meansof transport used in carriage, i.e. road and / or rail, asthecasemay be.
If concretemixer or high frequency vibrator, etc. issupplied by theGovernment, all chargesincluding depreciation will berecovered from thecontractor.
Ratesfor all finished worksincludetheremoval of surplusdebris, unused material and by products.
b) It shall bepayablefrom thenearest approved quarry to siteof work.
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
Thestoneballast, crushed bajri, round shingle
from nallah, or brick ballast may beused
according to siterequirement or asdirected by
theengineer incharge.
Rate(British System) Rate(MetricSystem)
Subsequent carriageof crushed stoneaggregateand bajri will bepaid according to thefollowing:
Chap-6 (Concrete) Page 42
Sr. Description Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
Rate(British System) Rate(MetricSystem)
6 Providing and laying reinforced cement concrete(including 20.4 1) Therateincludesrendering floor
prestressed concrete), using Ordinary Portland Cement / Sulphate surfacesmooth, and theplastering
resisting cement / Slag cement asmay berequired; coarsesand and donefor making up all surfaces
screened graded and washed aggregate, in required shapeand design, after removing centring.
including forms, moulds, shuttering, lifting, compacting,
curing, rendering and finishing exposed surface, complete
(but excluding thecost of steel reinforcement, itsfabrication 2) Plastering doneunder soffit of
and placing in position, etc.):- R.C.C. roof slab meant for human
habitation buildingsshall bepaid
(a) (i) Reinforced cement concretein roof slab, beams, extra.
columnslintels, girdersand other structural memberslaid in
situ or precast laid in position, or prestressed memberscast 3) Thisitem shall not beapplicable
in situ, completein all respects:- to factory madeunits.
(1) TypeA (nominal mix 1:1:2) Per Cft 203.55 739.35 Cu.m 7,189.40 26,113.85
(2) TypeB (nominal mix 1: 1½: 3) Per Cft 203.55 637.75 Cu.m 7,189.40 22,525.35
(3) TypeC (nominal mix 1: 2: 4) Per Cft 203.55 583.25 Cu.m 7,189.40 20,600.40
(a) TypeA (nominal mix 1:1:2)
(i) Upto 9" thick (Avg) Per Cft 259.00 804.05 Cu.m 9,136.95 28,366.30
(ii) MoreThan 9" thick (Avg) Per Cft 238.19 758.35 Cu.m 8,403.50 26,754.05
(b) TypeB (nominal mix 1:1-1/2:3)
(i) Upto 9" thick (Avg) Per Cft 259.00 699.00 Cu.m 9,136.95 24,661.45
(ii) MoreThan 9" thick (Avg) Per Cft 238.19 653.35 Cu.m 8,403.50 23,049.20
(c) TypeC (nominal mix 1:2:4)
(i) Upto 9" thick (Avg) Per Cft 259.00 646.10 Cu.m 9,136.95 22,793.60
(ii) MoreThan 9" thick (Avg) Per Cft 238.20 600.40 Cu.m 8,403.50 21,181.35
(a)(iii) Reinforced cement concretein slab of rafts/ strip
foundation, baseslab of column and retaining walls; etc and
footing beams, other structural membersother than thosementioned in
6(a) (i)&(ii) abovenot requiring form work (i.e. horizontal
shuttering) completein all respects:-
(1) TypeA (nominal mix 1: 1: 2) Per Cft 152.60 635.90 Cu.m 5,389.85 22,460.00
(2) TypeB (nominal mix 1: 1½: 3) Per Cft 152.60 528.40 Cu.m 5,389.85 18,663.10
(3) TypeC (nominal mix 1: 2: 4) Per Cft 152.60 473.85 Cu.m 5,389.85 16,736.40
(b) Precast reinforced cement concreteand prestressed
reinforced cement concretein columns, beams, lintels, stair
cases, shelves, etc.
(1) TypeA (nominal mix 1: 1: 2) Per Cft 198.80 716.75 Cu.m 7,021.60 25,315.60
(2) TypeB (nominal mix 1:1½: 3) Per Cft 198.80 614.55 Cu.m 7,021.60 21,705.90
(3) TypeC (nominal mix 1: 2: 4) Per Cft 198.80 560.65 Cu.m 7,021.60 19,802.15
(c) Erecting and fixing in position, precast cement concrete
or stoneslab in roofsor lintels, etc. lift upto 20 ft., (6m) Per Cft 87.80 109.05 Cu.m 3,101.10 3,851.65
including all charges.
(d) Add extralabour for R.C. concretein Per Cft 41.60 -- Cu.m 1,469.30 -
2nd and subsequent storeys.
4) Compositerateshall bereduced by Rs:
21.50 P.Cft & Rs: 29.00 P.Cft if chenab sand
and local sand isused respectively.
(a) (ii) Reinforced cement concrete in retaining/ Shear walls laid in situ or
precast laid in position, or prestressed members cast in situ ( Formwork on
both sides) , completein all respects:
Chap-6 (Concrete) Page 43
Sr. Description Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
Rate(British System) Rate(MetricSystem)
7 Providing and casting in situ bored reinforced concretepiles *851-1
with typeC concrete(nominal mix 1: 2: 4 ) , using 10% extra to
cement in dry mix, and coursesand, including all labour and 851-10
material (except thecost of steel reinforcement and its
labour for bending and laying in position, etc. which will be
paid separately, including, screening & washing of shingle
and curing:-
i) 18 " (450 mm) diapile Per Rft 1,188.55 1,789.70 Metre 3,898.45 5,870.20
ii) 20" (500 mm) diapile Per Rft 1,453.75 2,195.30 Metre 4,768.30 7,200.60
iii) 22" (550 mm) diapile Per Rft 1,831.20 2,703.45 Metre 6,006.35 8,867.30
iv) 24" (600 mm) diapile Per Rft 2,354.65 3,421.90 Metre 7,723.25 11,223.90
8
i. Compositerateshall bereduced by Rs:
21.50 P.Cft & Rs: 29.00 P.Cft if chenab sand
and local sand isused respectively.
ii. If percussion boring isused based on the
borelog/strata, deriverateaccordingly with
thepermission of Superintending Engineer.
(a) 3000 PSI
(i) 0.46 m / 18 inch Per Rft. 951.05 1,566.05 Meter 3,119.40 5,136.65
(ii) 0.51 m / 20 inch Per Rft. 1,022.35 1,781.60 Meter 3,353.25 5,843.60
(iii) 0.56 m / 22 inch Per Rft. 1,149.40 2,068.15 Meter 3,769.95 6,783.60
(iv) 0.61 m / 24 inch Per Rft. 1,271.90 2,365.25 Meter 4,171.80 7,758.05
(iii) 0.76 m / 30 inch Per Rft. 1,670.25 3,378.65 Meter 5,478.40 11,081.90
(iv) 0.91 m / 36 inch Per Rft. 2,347.75 4,807.80 Meter 7,700.70 15,769.65
(v) 1.07 m / 42 inch Per Rft. 3,037.70 6,386.20 Meter 9,963.65 20,946.75
(vi) 1.22 m / 48 inch Per Rft. 3,235.40 7,608.90 Meter 10,612.15 24,957.20
(vii) 1.37 m / 54 inch Per Rft. 3,446.75 8,981.95 Meter 11,305.25 29,460.85
(viii) 1.52 m / 60 inch Per Rft. 4,793.00 11,626.55 Meter 15,721.10 38,135.10
(ix) 1.68 m / 66 inch Per Rft. 5,497.00 13,765.60 Meter 18,030.15 45,151.15
(x) 1.83 m / 72 inch Per Rft. 5,993.75 15,834.10 Meter 19,659.45 51,935.75
(xi) 1.98 m / 78 inch Per Rft. 6,511.05 18,059.80 Meter 21,356.30 59,236.10
(xii) 2.13 m / 84 inch Per Rft. 7,468.15 20,861.90 Meter 24,495.50 68,427.05
(b) 4000 PSI
(i) 0.46 m / 18 inch Per Rft. 951.05 1,691.65 Meter 3,119.40 5,548.60
(ii) 0.51 m / 20 inch Per Rft. 1,022.35 1,936.65 Meter 3,353.25 6,352.20
(iii) 0.56 m / 22 inch Per Rft. 1,149.40 2,255.65 Meter 3,769.95 7,398.50
(iv) 0.61 m / 24 inch Per Rft. 1,276.40 2,592.95 Meter 4,186.55 8,504.95
(iii) 0.76 m / 30 inch Per Rft. 1,675.00 3,732.05 Meter 5,494.00 12,241.15
(iv) 0.91 m / 36 inch Per Rft. 2,347.75 5,309.95 Meter 7,700.70 17,416.70
(v) 1.07 m / 42 inch Per Rft. 2,934.60 6,966.45 Meter 9,625.45 22,849.95
(vi) 1.22 m / 48 inch Per Rft. 3,235.40 8,501.60 Meter 10,612.15 27,885.20
(vii) 1.37 m / 54 inch Per Rft. 3,446.75 10,111.75 Meter 11,305.25 33,166.50
(viii) 1.52 m / 60 inch Per Rft. 4,793.00 13,021.40 Meter 15,721.10 42,710.15
(ix) 1.68 m / 66 inch Per Rft. 5,497.00 15,453.40 Meter 18,030.15 50,687.10
Compositerateshall bereduced by Rs: 21.50
P.Cft & Rs: 29.00 P.Cft if chenab sand and
local sand isused respectively.
Providing and casting in situ bored reinforced concrete piles using
Ordinary portland cement / Sulphate resisting cement or as may be
required, incuding screening, washing of aggregates, mixing of
constituents using batching plant, Transportation by Transit Mixer,
Pouring in the required proportion to achieve a nominal cylinderical
strength in the field as per ACI-214, with the specified consistency. i/c the
cost of labour, boring, equipment/machinery, plateform (except thecost of
steel reinforcement, its labour for bending and laying in position and boat
plateform etc. which will be paid separately) excluding the cost of
admixtureasapproved and directed by theEngineer Incharge
In ordinary soil
Chap-6 (Concrete) Page 44
Sr. Description Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
Rate(British System) Rate(MetricSystem)
(x) 1.83 m / 72 inch Per Rft. 5,993.75 17,842.65 Meter 19,659.45 58,523.90
(xi) 1.98 m / 78 inch Per Rft. 6,511.05 20,417.05 Meter 21,356.30 66,967.90
(xii) 2.13 m / 84 inch Per Rft. 7,468.15 23,595.85 Meter 24,495.50 77,394.30
9
(a) Reinforced cement concretein roof slab, beams, columnslintels,
girdersand other structural memberslaid in situ or precast laid
in position, or prestressed memberscast in situ, completein all
respects:-
(i) 7000 PSI Per Cft 119.10 738.10 Cu.m 4,201.75 26,039.50
(ii) 6000 PSI Per Cft 119.10 713.05 Cu.m 4,201.75 25,157.05
(iii) 5000 PSI Per Cft 119.10 686.95 Cu.m 4,201.75 24,235.25
(iv) 4000 PSI Per Cft 119.10 666.60 Cu.m 4,201.75 23,516.95
(vi) 3000 PSI Per Cft 119.10 595.55 Cu.m 4,201.75 21,010.70
(b) Retaining/ Shear wallslaid in situ or precast laid in position, or
prestressed memberscast ( Formwork on both sides)
i) 7000 PSI
(i) Upto 9" thick Per Cft 114.50 723.15 Cu.m 4,038.85 25,513.50
(ii) MoreThan 9" Thick Per Cft 114.50 709.25 Cu.m 4,038.85 25,021.65
ii) 6000 PSI
(i) Upto 9" thick Per Cft 114.50 698.15 Cu.m 4,038.85 24,631.05
(ii) MoreThan 9" Thick Per Cft 114.50 684.25 Cu.m 4,038.85 24,139.20
iii) 5000 PSI
(i) Upto 9" thick Per Cft 114.50 672.05 Cu.m 4,038.85 23,709.20
(ii) MoreThan 9" Thick Per Cft 114.50 658.10 Cu.m 4,038.85 23,217.40
iv) 4000 PSI
(i) Upto 9" thick Per Cft 114.50 651.65 Cu.m 4,038.85 22,990.95
(ii) MoreThan 9" Thick Per Cft 114.50 637.75 Cu.m 4,038.85 22,499.15
v). 3000 PSI
(i) Upto 9" thick Per Cft 114.50 580.65 Cu.m 4,038.85 20,484.70
(ii) MoreThan 9" Thick Per Cft 114.50 566.70 Cu.m 4,038.85 19,992.90
( c) Substructure (Foundations, Raft, Strip and Footing Beams)
(i) 7000 PSI Per Cft 64.80 631.60 Cu.m 2,286.55 22,283.70
(ii) 6000 PSI Per Cft 64.80 606.60 Cu.m 2,286.55 21,401.25
(iii) 5000 PSI Per Cft 64.80 580.50 Cu.m 2,286.55 20,479.45
(iv) 4000 PSI Per Cft 64.80 560.10 Cu.m 2,286.55 19,761.15
(vi) 3000 PSI Per Cft 64.80 489.10 Cu.m 2,286.55 17,254.90
Placing, compacting, finishing and curing of concrete using Ordinary
Portland Cement / Sulphate resisting cement / Slag cement as may be
required; including screening, washing of aggregates and mixing of
constituents using batching plant, Transportation by transit mixer, pouring
with pump in the required proportions to achieve a nominal cylindrical
strength in the field as per ACI 214, with the specified consistency. i/c the
cost of shuttering, compaction with Viberator, excluding the cost of
Admixture, asapproved and directed by theEngineer Incharge.
Chap-6 (Concrete) Page 45
Sr. Description Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
Rate(British System) Rate(MetricSystem)
10
i. 1:3:6 P.Cft 57.35 263.15 Cu.m 2,023.90 9,284.65
ii. 1:2:4 P.Cft 57.35 298.10 Cu.m 2,023.90 10,517.45
11 *851.5 The overlap will be paid extra vide FD
Notification No.RO(TECH)FD2-11/2010
dated 08.03.2010.
i) Deformed BarsGrade-40 Per Cwt. 125.15 14,499.25 100 Kg 246.30 28,541.85
ii) Deformed BarsGrade-60 Per Cwt. 125.15 14,682.50 100 Kg 246.30 28,902.55
12 Fabrication of mild steel reinforcement for cement concrete, *821 Therateincludeswastage, overlaps
including cutting, bending, laying in position, making joints and steel chairs, etc. completein all respect.
and fastenings, including cost of binding wireand labour
chargesfor binding of steel reinforcement (also includes
removal of rust from bars):-
(a) Plain bars Per Cwt. 808.50 13,720.85 100 kg 1,591.55 27,009.55
(b) Deformed bars(Grade-40) ditto 808.50 16,030.85 100 kg 1,591.55 31,556.80
('c) Deformed bars(Grade-60) ditto 808.50 16,228.85 100 kg 1,591.55 31,946.55
13 Precast cement concretesolid or faceblocks(1:2:4), Per Cft 156.25 427.20 Cu.m 5,518.75 15,088.70 20.2
including cost of templates.
14 Precast cement concretehollow blocks(1: 2: 4) , including Per Cft 159.00 339.85 Cu.m 5,615.90 12,003.50 20.2
cost of templatesand constructing wallsthereof.
15 Providing and fixing ornamental cement jali 2" (50 mm) thick Per Sft 64.70 112.60 Sq.m 696.15 1,211.60 20.1 to
(1: 2: 4), without steel. 20.4
16 Extralabour for laying concreteplain or reinforced:
(a) above30' (6 m) upto 40'(12 m) height 100Cft 4,435.20 - Cu.m 1,566.50 -
(b) for every additional 10'(3 m) height. 100Cft 2,772.00 - Cu.m 979.05 -
17 Extralabour for work of weirs, rail or road bridges, syphons, and 100Cft 1,108.80 - Cu.m 391.65 -
concreting in superstructure
18 Making reinforced cement concretespout, including fixing in Each 808.50 1,149.60 Each 808.50 1,149.60 20.4
position (2½' x 6" x5") (760 mmx150 mm x 125 mm)
19 Making holesupto 3"(75 mm) dia18"(450 mm) depth in cement Per hole 1,940.40 - Each 1,940.40 - 20.1
concreteor stonemasonry wallsand repairing.
The cost includes mortar (1:5) and labour for
fixing at any height.
Providing ,laying,compacting and curing Cyclopean/plum/rubble concrete
in (40:60) ratio (plum:Concrete) using pre-mixed Cement Concrete of
specified ratio by using Ordinary Portland Cement including screening
washing of aggregate ;mixing of constituents by using batching
plant,transported by transit mixer and pouring under gravity,with specified
consistency i/c the cost of compaction with Viberator but excluding the
cost of Admixture and carriage charges, as approved and directed by the
Engineer Incharge.
The cost includes mortar (1:5) and labour for
fixing at any height.
Fabrication of mild steel reinforcement deformed bar cage of specified
yield strength for R.C.C bored piles including cutting bending, lowering of
cage with crane in position, welding and fastening, including the cost of
binding wire, Crane machine (also includes removal of rust from the bars)
asapproved and directed by theEngineer Incharge.
Chap-6 (Concrete) Page 46
Sr. Description Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
Rate(British System) Rate(MetricSystem)
20 Extralabour for skipping concretein wells. 100Cft 6,776.00 - Cu.m 2,393.30 - 20.1
21 Nicking concretesurface:
(a) Cement concretesurface 100Sft 739.20 - Sq.m 79.55 -
(b) Limeconcretesurface 100Sft 243.95 - Sq.m 26.25 -
22 Preparing, watering and ramming surfacefor laying concrete
(for Headworksonly):-
(a) Horizontal floor 100Sft 691.15 - Sq.m 74.35 -
(b) Glacisand crest 100Sft 1,016.40 - Sq.m 109.35 -
(c) Inverted filters 100Sft 323.40 - Sq.m 34.80 -
23 Fabrication of high tensilesteel prestressing cablesfor 100 Kg. 9,901.95 73,202.80 100 Kg. 9,901.95 73,202.80 *811-1 Therateincludeswastagein
prestressed (post tensioned) concrete, including assembling by to cutting and breakagein stressing,
drawing theH.T. wirethrough metal spacer plate, inserting in helix 811-11 etc.
coreand taping or tying, sheathing in longitudinally welded metal
corrugated sheath, positioning , anchoragewith maleand female
set of anchoragecone, forming ductsfor transversecable,
stressing cableswith jack at both endsasper stressing schedule,
maintaining stressing record and supply thesamein theapproved
proformato theEngineer-in-charge, making loop at blind end,
including all materialsrequired for it, grouting thecableductswith
cement, cutting projected endsand making good recesses, etc.,
completein all respects.
24 Fabrication of High Tensilesteel reinforcement for prestressed 100kg 5,808.00 69,866.25 100kg 5,808.00 69,866.25 1) Therateincludeswastagein
(pretension) concretework, including inserting wirein moulds, cutting and breakagein stressing,etc.
providing M.S. shear bars, spacersand lift hooks, maleand
femaleanchorage, tiedown, struts, stressing cables, maintaining 2) Quantity of H. T. wirewill form
stressrecord and supply thesamein approved proformato the basisof payment.
Engineer-in-charge, cutting wiresand projecting endsand making 3) Thisitem shall not beapplicable
good recesses, etc., completein all respects. to factory madeunits.
25 Lifting, transporting and placing precast prestressed concrete *811-1
B eam, Girder and other members(excluding battens) etc. in to
Position on thebridgeto correct alignment and level, etc. 811-11
complete
i) Beam upto 50 ft. (15 m) length 100Cft -- 3,198.35 Cu.m -- 1,129.65
ii) Beam above50 ft. (15m) upto 75 ft. (22.5m) length 100Cft -- 4,447.08 Cu.m -- 1,570.70
iii) Beam above75ft. (22.5m) upto 100ft. (30m) length 100Cft -- 6,214.10 Cu.m -- 2,194.80
iv) Beam above100ft. (30m) upto 150ft.(45m) length 100Cft -- 8,142.30 Cu.m -- 2,875.85
v) Beam above150ft. (45m) length 100Cft -- 10,205.60 Cu.m -- 3,604.60
26 Providing and laying foam concrete3 inch (75 mm) thick, Per Sft. 62.35 132.70 Sq.m. 670.90 1,427.85
using cement sand in theratio of 1:2 and aluminium powder
at therateof 0.2% of thecement, sand mix,
Chap-6 (Concrete) Page 47
Sr. Description Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
Rate(British System) Rate(MetricSystem)
27 Providing and fixing 6 in(150 mm). widecurved sheet of
required shapefixed on faceof theconstruction joint with G.I.
screw,1.5 in (40 mm) long to cover construction joints
vertically:-
i) aluminium sheet 1/16 in(1.5 mm) thick Per Rft. 33.75 162.25 Metre 110.70 532.20
ii) G.I. sheet, 18 SWG Per Rft. 34.55 257.85 Metre 113.30 845.75
28 Providing and fixing 1/8" (3 mm) thick 3" (75 mm) widealuminium
strip on horizontal and vertical expansion jointsin walls, columns,
ceilingsand floorsetc., including cost of clips/screwsetc.,
completein all respects:-
a) On interior surface(without mastic strip) Per Rft. 30.80 159.30 Metre 101.00 522.50
b) On exterior surface(with mastic strip) Per Rft. 30.80 171.30 Metre 101.00 561.85
29 Providing and fixing 1/16" (1.5 mm) thick copper flashing on Per Sft. 32.35 188.75 Sq.m 348.10 2,030.95
expansion jointscompletein all respects.
30 Providing and fixing 6 in (150 mm). wideG.I. sheet 18SWG. Per Rft. 11.40 205.60 Metre 37.40 674.35
stopper to expansion joint.
31 Providing embeding 10" (250 mm) wide¼" (6 mm) thick Per Rft. 46.20 310.20 Metre 151.55 1,017.40
rubber water stopper in expansion jointsof R.C.C. roof
slab completein all respects.
31A
i) 10"wide6 mm thick P.Rft 46.20 346.20 Meter 497.10 3,725.10
ii) 10" wide10 mm thick P.Rft 46.20 766.20 Meter 497.10 8,244.30
32 Filling expansion jointswith bitumen. sand & saw dust in Per Rft P.Metre/
ratio 1:2:2. per inch 6.95 34.60 Per 25 mm 22.80 113.50
width Width
33 Filling expansion jointswith bitumen. Per Rft. 120.10 - Metre 393.95 -
34 Laying asphaltic mixturein expansion joints. Per Rft. 97.00 - Metre 318.15 - Material to bepaid on actuals.
35 Providing and fixing theremopore(foamed polythene)
sheet in horizontal and vertical expansion joints:
a) 1" (25 mm) thick thermoporesheet Per Sft. 12.95 21.15 Sq.m 139.35 227.55
b) 1½" (40 mm) thick thermoporesheet ditto 12.95 27.00 " 139.35 290.50
36 Providing and laying damp proof courseof cement concrete
1:2: 4(using cement, sand and shingle), including bitumen
coating :-
Providing and embedding 10" (250mm) wide PVC water stopper in
expansion joints of RCC structures (Retaining walls, water tanks, Slabs)
completein all respect.
Chap-6 (Concrete) Page 48
Sr. Description Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
Rate(British System) Rate(MetricSystem)
(a) with onecoat bitumen and onecoat polythenesheet
500gauge
i) 1½" thick (40 mm) 100Sft 2,882.00 9,240.05 Sq.m 310.10 994.25
ii) 2" thick (50 mm) 100Sft 2,882.00 10,356.85 Sq.m 310.10 1,114.40
iii) 3" thick (75 mm) 100Sft 3,005.20 12,889.05 Sq.m 323.35 1,386.85
(b) with 2 coatsof bitumen:
i) 1½" thick (40 mm) 100Sft 2,882.00 9,724.15 Sq.m 310.10 1,046.30
ii) 2" thick (50 mm) 100Sft 2,882.00 10,839.80 Sq.m 310.10 1,166.35
iii) 3" thick (75 mm) 100Sft 3,005.20 13,372.00 Sq.m 323.35 1,438.85
37 Providing and laying damp proof coursewith cement sand
plaster and bitumen coating:-
(a) with onecoat of bitumen and onecoat of polythenesheet
500 gauge:-
i) Ratio 1: 4
a) ½" thick (13 mm) 100Sft 2,697.20 6,154.90 Sq.m 290.20 662.25
b) ¾" thick (20 mm) 100Sft 2,697.20 6,694.15 Sq.m 290.20 720.30
ii) Ratio 1:3
a) ½ " thick (13 mm) 100Sft 2,697.20 6,329.20 Sq.m 290.20 681.00
b) ¾ " thick (20mm) 100Sft 2,697.20 6,900.05 Sq.m 290.20 742.45
iii) Ratio 1:2
a) ½ " thick (13 mm) 100Sft 2,697.20 6,480.10 Sq.m 290.20 697.25
b) ¾ " thick (20 mm) 100Sft 2,697.20 7,284.10 Sq.m 290.20 783.75
(b) with 2 coatsof bitumen:-
i) Ratio 1: 4
a) ½" thick (13 mm) 100Sft 2,697.20 6,267.15 Sq.m 290.20 674.35
b) ¾" thick (20 mm) 100Sft 2,697.20 6,805.95 Sq.m 290.20 732.30
ii) Ratio 1:3
a) ½ " thick (13 mm) 100Sft 2,697.20 6,447.15 Sq.m 290.20 693.70
b) ¾ " thick (20 mm) 100Sft 2,697.20 7,017.95 Sq.m 290.20 755.15
iii) Ratio 1:2
a) ½ " thick (13 mm) 100Sft 2,697.20 6,881.05 Sq.m 290.20 740.40
b) ¾ " thick (20 mm) 100Sft 2,697.20 7,735.45 Sq.m 290.20 832.35
38 Providing and laying vertical damp proof coursewith cement
sand plaster and bitumen coating:-
(a) with onecoat of bitumen and onecoat of polythenesheet
500 gauge:
Chap-6 (Concrete) Page 49
Sr. Description Spec. Remarks
No. No.
Unit Labour Composite Unit Labour Composite
MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
Rate(British System) Rate(MetricSystem)
i) Ratio 1: 4
a) ½" thick (13 mm) 100Sft 2,697.20 5,870.50 Sq.m 290.20 631.65
b) ¾" thick (20 mm) 100Sft 2,697.20 6,411.10 Sq.m 290.20 689.85
ii) Ratio 1:3
a) ½ " thick (13 mm) 100Sft 2,697.20 6,046.20 Sq.m 290.20 650.55
b) ¾ " thick (20 mm) 100Sft 2,697.20 6,617.05 Sq.m 290.20 712.00
iii) Ratio 1:2
a) ½ " thick (13 mm) 100Sft 2,697.20 6,480.10 Sq.m 290.20 697.25
b) ¾ " thick (20 mm) 100Sft 2,697.20 7,334.50 Sq.m 290.20 789.20
(b) with 2 coatsof bitumen:-
i) Ratio 1: 4
a) ½" thick (13 mm) 100Sft 2,697.20 6,266.05 Sq.m 290.20 674.25
b) ¾" thick (20 mm) 100Sft 2,697.20 6,805.95 Sq.m 290.20 732.30
ii) Ratio 1:3
a) ½ " thick (13 mm) 100Sft 2,697.20 6,441.00 Sq.m 290.20 693.05
b) ¾ " thick (20 mm) 100Sft 2,697.20 7,011.85 Sq.m 290.20 754.50
iii) Ratio 1:2
a) ½ " thick (13 mm) 100Sft 2,697.20 6,875.05 Sq.m 290.20 739.75
b) ¾ " thick (20 mm) 100Sft 2,697.20 7,729.25 Sq.m 290.20 831.65
39 Grouting concretebetween, thegroovesof gates, including 100Cft 12,949.20 - Cu.m. 4,573.65 -
shuttering.
40 Chiesel dressing concretesurfaceon sidesof grooves. 100Sft 406.55 - Sq.m 43.75 -
41 Laying and ramming dry ballast or kankar. 100Cft 4,504.50 - Cu.m 1,591.00 -
42 Hoisting and placing in position R.C.C. shelves. per No. 144.40 - per No. 144.40 -
43 Breaking brick ballast, screening and stacking:-
(a) 2"(50 mm) ring 100Cft. 3,465.00 - Cu.m 1,223.85 -
(b) 1½ "(40 mm) ring 100Cft. 3,880.80 - Cu.m 1,370.70 -
(c) 1" (25 mm) ring 100Cft. 4,504.50 - Cu.m 1,591.00 -
(d) Jhamaballast ¾"(20 mm) ring 100Cft. 5,197.50 - Cu.m 1,835.75 -
44 Supplying and fixing broken glasseson court yard walls, Per Rft 108.35 187.40 metre 355.40 614.65
including 1:3: 6 cement concretecoping.
45 Crushing stoneballast by machine. 100Cft 3,465.00 - Cu.m. 1,223.85 - This does not include the charges for working
of crushers, but includes manual labour for
carriageof stone to crusher within threechains
(90 m) and also stacking the product after
crushing within threechains
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdf

More Related Content

Similar to Sahiwal 1-2023.pdf

Experimental study on flexural behavior of the self compacting concrete with ...
Experimental study on flexural behavior of the self compacting concrete with ...Experimental study on flexural behavior of the self compacting concrete with ...
Experimental study on flexural behavior of the self compacting concrete with ...IAEME Publication
 
EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...
EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...
EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...IAEME Publication
 
CONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMNCONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMNAkshika Mahanama
 
Six week industrial training presentation BY GUPTA TARUN
Six week industrial training presentation BY GUPTA TARUNSix week industrial training presentation BY GUPTA TARUN
Six week industrial training presentation BY GUPTA TARUNTarun2222
 
Rate Analysis Site Meeting
Rate Analysis   Site MeetingRate Analysis   Site Meeting
Rate Analysis Site MeetingSanjay Patnaik
 
Project Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanProject Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanDavid H Moloney
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfAvin Kharel
 
Effect of al2 o3 on wear resistance in aluminum matrix composite produced by ...
Effect of al2 o3 on wear resistance in aluminum matrix composite produced by ...Effect of al2 o3 on wear resistance in aluminum matrix composite produced by ...
Effect of al2 o3 on wear resistance in aluminum matrix composite produced by ...IAEME Publication
 
EFFECT OF AL2O3 ON WEAR RESISTANCE IN ALUMINUM MATRIX COMPOSITE PRODUCED BY S...
EFFECT OF AL2O3 ON WEAR RESISTANCE IN ALUMINUM MATRIX COMPOSITE PRODUCED BY S...EFFECT OF AL2O3 ON WEAR RESISTANCE IN ALUMINUM MATRIX COMPOSITE PRODUCED BY S...
EFFECT OF AL2O3 ON WEAR RESISTANCE IN ALUMINUM MATRIX COMPOSITE PRODUCED BY S...IAEME Publication
 
Rutting resistance of filler modified bituminous concrete surfaces 2
Rutting resistance of filler modified bituminous concrete surfaces 2Rutting resistance of filler modified bituminous concrete surfaces 2
Rutting resistance of filler modified bituminous concrete surfaces 2IAEME Publication
 
Final year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement DesignFinal year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement DesignRiaz Zalil
 
Construction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptConstruction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptbala506586
 
3M cable and electrical products catalogue and 3M Cable Price List - Shopelect
3M cable and electrical products catalogue and 3M Cable Price List - Shopelect3M cable and electrical products catalogue and 3M Cable Price List - Shopelect
3M cable and electrical products catalogue and 3M Cable Price List - Shopelecttwinkleerai
 
metro system & engineering - Copy.ppt
metro system & engineering - Copy.pptmetro system & engineering - Copy.ppt
metro system & engineering - Copy.pptSudiptaKolay2
 
083 infra finalanupam
083 infra finalanupam083 infra finalanupam
083 infra finalanupamCROW
 
232365141 1-qs-techinical-data
232365141 1-qs-techinical-data232365141 1-qs-techinical-data
232365141 1-qs-techinical-datahlksd
 
Block 81 Ramnagar_SoR_MORTH.pdf
Block 81 Ramnagar_SoR_MORTH.pdfBlock 81 Ramnagar_SoR_MORTH.pdf
Block 81 Ramnagar_SoR_MORTH.pdfNiraj930760
 

Similar to Sahiwal 1-2023.pdf (20)

Experimental study on flexural behavior of the self compacting concrete with ...
Experimental study on flexural behavior of the self compacting concrete with ...Experimental study on flexural behavior of the self compacting concrete with ...
Experimental study on flexural behavior of the self compacting concrete with ...
 
EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...
EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...
EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...
 
CONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMNCONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMN
 
Six week industrial training presentation BY GUPTA TARUN
Six week industrial training presentation BY GUPTA TARUNSix week industrial training presentation BY GUPTA TARUN
Six week industrial training presentation BY GUPTA TARUN
 
Rate Analysis Site Meeting
Rate Analysis   Site MeetingRate Analysis   Site Meeting
Rate Analysis Site Meeting
 
Project Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanProject Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, Oman
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
 
Effect of al2 o3 on wear resistance in aluminum matrix composite produced by ...
Effect of al2 o3 on wear resistance in aluminum matrix composite produced by ...Effect of al2 o3 on wear resistance in aluminum matrix composite produced by ...
Effect of al2 o3 on wear resistance in aluminum matrix composite produced by ...
 
EFFECT OF AL2O3 ON WEAR RESISTANCE IN ALUMINUM MATRIX COMPOSITE PRODUCED BY S...
EFFECT OF AL2O3 ON WEAR RESISTANCE IN ALUMINUM MATRIX COMPOSITE PRODUCED BY S...EFFECT OF AL2O3 ON WEAR RESISTANCE IN ALUMINUM MATRIX COMPOSITE PRODUCED BY S...
EFFECT OF AL2O3 ON WEAR RESISTANCE IN ALUMINUM MATRIX COMPOSITE PRODUCED BY S...
 
Rutting resistance of filler modified bituminous concrete surfaces 2
Rutting resistance of filler modified bituminous concrete surfaces 2Rutting resistance of filler modified bituminous concrete surfaces 2
Rutting resistance of filler modified bituminous concrete surfaces 2
 
30120140501014
3012014050101430120140501014
30120140501014
 
Final year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement DesignFinal year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement Design
 
Strauto 2015
Strauto 2015Strauto 2015
Strauto 2015
 
Construction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptConstruction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.ppt
 
Bridge loading
Bridge loadingBridge loading
Bridge loading
 
3M cable and electrical products catalogue and 3M Cable Price List - Shopelect
3M cable and electrical products catalogue and 3M Cable Price List - Shopelect3M cable and electrical products catalogue and 3M Cable Price List - Shopelect
3M cable and electrical products catalogue and 3M Cable Price List - Shopelect
 
metro system & engineering - Copy.ppt
metro system & engineering - Copy.pptmetro system & engineering - Copy.ppt
metro system & engineering - Copy.ppt
 
083 infra finalanupam
083 infra finalanupam083 infra finalanupam
083 infra finalanupam
 
232365141 1-qs-techinical-data
232365141 1-qs-techinical-data232365141 1-qs-techinical-data
232365141 1-qs-techinical-data
 
Block 81 Ramnagar_SoR_MORTH.pdf
Block 81 Ramnagar_SoR_MORTH.pdfBlock 81 Ramnagar_SoR_MORTH.pdf
Block 81 Ramnagar_SoR_MORTH.pdf
 

Recently uploaded

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...ppkakm
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...jabtakhaidam7
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 

Recently uploaded (20)

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 

Sahiwal 1-2023.pdf

  • 1. Prepared & Compiled by Haroon Tahir haroon.aro.fd@gmail.com FINANCE DEPARTMENT MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
  • 2. Ch.No. Chapter 1 Carriage 3 to 23 2 Loading, Unloading & Stacking 24 to 26 3 Earthwork (Excavation & Embankment) 27 to 33 4 Dismantling (Demolition) 34 to 38 5 Mortar. 39 to 40 6 Concrete 41 to 51 7 Brickwork 52 to 57 8 Stone Masonry 58 to 60 9 Roofing 61 to 67 10 Flooring. 68 to 74 11 Surface Rendering 75 to 79 12 Wood Work 80 to 91 13 Painting & Varnishing. 92 to 98 14 Lining of Canals 99 to 100 15 Sheet Piling 101 to 102 16 Protection & Diversion Work 103 to 112 17 Outlets 113 to 114 18 Road & Road Structure 115 to 124 19 Plumbing, Sanitary Installation & Gas Fittings 125 to 133 20 Surface Drainage. 134 to 135 21 Sewerage 136 to 140 22 Sinking of Wells 141 to 143 23 Tubewell & Water Supply 144 to 166 24 Electric Installation 167 to 202 25 Iron Work 203 to 211 26 Miscellaneous 212 to 216 27 Heating Ventilation & Air Conditioning 217 to 223 TABLE OF CONTENTS Page No.
  • 3. Chap-1 (Carriage) Page 3 1. CARRIAGE Note: 1 Theratesareapplicableto carriageof material on paccaroadsonly. For kacharoadsan allowanceof 25% extrashall beallowed for 2nd and subsequent mileage(Km) rates. Rate upto 1st mile(1st Km) ishowever common to both kachaand paccaroads. Note: 2 For hilly areas80% abovetheratesin theplain areasshall beallowed for total mileage(Km) covered. Note: 3 In caseof articleslonger than 15 ft. (4.6 m) carried in trucks, thefollowing ratesshall beallowed:- i) Above15 ft. to 25 ft. (4.6 to 7.6 m) :- Total ratesto bepaid for 15 ft. to 25 ft. (4.6 to 7.6 m) length will be1.5 timesof the rategiven in theCompositeScheduleof Rates. ii) Above25 ft. (7.6 m) :- Thetotal rateto bepaid for above25 ft. (7.6 m) length will be2 timesof therategiven in the CompositeScheduleof Rates. Thelength measured shall not betheactual length, but thelength of theform of consignment asactually received. Note: 4 Theterm 'mile' (Km) whenever used isto mean statutemile(Km). Note: 5 Theratesincludeloading and unloading of material from theconveyanceand stacking asdirected. Note: 6 Theratesfor carriageby boat or steamer shall bethesameasby any other mechanical meanson land. Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite 1 Carriageof 100 Cft. (2.83 cu.m) of all materialslikestone 16.1 aggregate, spawl, kankar lime(unslaked), surkhi, etc. or 150 Cft. (4.25 cu.m) of timber, by truck or by any other meansowned by thecontractor. 1st chain (1st 30 m) Chain 288.95 30M 288.95 2nd chain (2nd 30 m) " 52.95 30M 52.95 3rd to 10th chain (60 to 300 m) " 33.05 30M 33.05 1000 to 3000 ft. (300 to 900 m) 1000 ft. 324.70 300 M 324.70 1st Km Km 305.40 2nd Km Km 145.65 3rd Km Km 114.10 4th Km Km 81.20 5th Km Km 75.85 6th Km Km 74.60 7th Km Km 69.60 8th Km Km 68.85 9th Km Km 64.75 10th Km Km 60.75 11th Kmsto 200Kms Km 52.20 201 Kmsto 250 Kms Km 3.25 251 Kms& susequent Kms Km 2.00 MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL Add 20% extra for the item "Recouping of ReserveStock of stone for Flood Protection Work in Irrigation Department".
  • 4. Chap-1 (Carriage) Page 4 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 2 Carriageof 5 tonsof all material likecoal, stonelime 16.1 Cement carried in containersother (unslaked), etc. B.G. Rail fastenings, pointsand crossing, than bagswill bepaid according to BridgeGirders, pipes, sheets, Rail, M.S. bars, etc. etc. thisitem. Theword "pipes" covers by truck or any other meansowned by thecontractor. G.I,C.I,R.C.C. and P.C.C. 1st chain (1st 30 m) Chain 288.95 30M 288.95 2nd chain (2nd 30 m) " 52.95 30M 52.95 3rd to 10th chain (60 to 300 m) " 33.05 30M 33.05 1000 to 3000 ft. (300 to 900 m) 1000 Ft. 324.70 300M 324.70 1st Km Km 305.40 2nd Km Km 145.65 3rd Km Km 114.10 4th Km Km 81.20 1st mile Mile 491.45 5th Km Km 75.85 2nd mile " 129.40 6th Km Km 74.60 3rd mile Mile 118.65 7th Km Km 69.60 4th mile " 109.20 8th Km Km 68.85 5th mile 101.55 9th Km Km 64.75 6th mile 95.55 10th Km Km 60.75 1 " 67.15 11th Kmsto 200Kms Km 52.20 201 Kmsto 250 Kms Km 3.25 251 Kms& susequent Kms Km 2.00 3 Carriageof 100 maundsof fuel wood by truck 16.1 or any other meansowned by thecontractor: 1st chain (1st 30 m) Chain 288.95 30 M 288.95 2nd chain (2nd 30 m) " 52.95 30 M 52.95 3rd to 10th chain (60 to 300 m) " 33.05 30 M 33.05 1000 to 3000 ft. (300 to 900 m) 1000 ft 324.70 300 M 324.70 1st Km Km 305.40 2nd Km Km 145.65 3rd Km Km 114.10 4th Km Km 81.20 1st mile Mile 491.45 5th Km Km 75.85 2nd mile " 129.40 6th Km Km 74.60 3rd mile " 118.65 7th Km Km 69.60 4th mile " 109.20 8th Km Km 68.85 5th mile " 101.55 9th Km Km 64.75 6th mile " 95.55
  • 5. Chap-1 (Carriage) Page 5 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 10th Km Km 60.75 7th mileand subsequent miles " 67.15 11th & subsequent Kms Km 52.20 4 Carriageof 1000 Nos. bricks10"x5"x3" (250x125x75 mm) ditto Reducetherateby 33% in caseof or 1000 Nos. tiles12"x6"x2" (300x150x50 mm) by truck or carriageof 1000 Nos. tilessize any other meansowned by thecontractor :- 12"x6"x1¼" (300 x 150 x 30 mm). 1st chain (1st 30 m) Chain 288.95 30 M 288.95 2nd chain (2nd 30 m) " 52.95 30 M 52.95 3rd to 10th chain (60 to 300 m) " 33.05 30 M 33.05 1000 to 3000 ft. (300 to 900 m) 1000 Ft 324.70 300 M 324.70 1st Km Km 305.40 2nd Km Km 145.65 3rd Km Km 114.10 4th Km Km 81.20 1st mile Mile 491.45 5th Km Km 75.85 2nd mile " 129.40 6th Km Km 74.60 3rd mile " 118.65 7th Km Km 69.60 4th mile " 109.20 8th Km Km 68.85 5th mile " 101.55 9th Km Km 64.75 6th mile " 95.55 10th Km Km 60.75 7th mileand subsequent miles " 67.15 11th & subsequent Kms Km 52.20 5 Carriageof 100 cft. (2.83 cu.m) of all material likestone, 16.1 Material trolly to besupplied by the aggregate, spawl, kankar lime(unslaked), surkhi, etc. or Government and maintained and run 150 cft. (4.25 cu.m) of timber, by meansof material trolly. by thecontractor. 1st chain (1st 30 m) Chain 288.95 30 M 288.95 2nd chain to 10th chain (2nd 30 m to 300 m) " 52.95 30 M 52.95 1000 to 3000 ft. (300 to 900 m) 1000 Ft. 324.70 300 M 324.70 1st Km Km 250.45 2nd Km Km 193.75 3rd Km Km 106.95 4th Km Km 85.15 1st mile Mile 403.05 5th Km Km 75.45 2nd mile 155.30 6th Km Km 72.55 3rd mile 134.00 7th Km Km 61.60 8th Km Km 60.95 9th Km Km 57.25 6th mile 95.55 10th Km Km 53.70 7th mile and subsequent miles 67.15 11th Kmsto 200Kms Km 47.95 201 Kmsto 250 Kms Km 3.25 251 Kms& susequent Kms Km 2.00
  • 6. Chap-1 (Carriage) Page 6 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 6 Carriageof 5 tonsof all material likecoal, stonelime 16.1 Material trolly to besupplied by the (unslaked), etc. B.G. Rail fastening, pointsand crossing, Government and maintained and run Bridgegirders, pipes, sheets, Rail, M.S. bars, etc. etc. by by thecontractor. meansof material trolly. 1st chain (1st 30 m) Chain 288.95 30 M 288.95 2nd chain (2nd 30 m) " 52.95 30 M 52.95 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 324.70 300 M 324.70 1st Km Km 250.45 2nd Km Km 193.75 3rd Km Km 106.95 4th Km Km 85.15 5th Km Km 75.45 6th Km Km 72.55 3rd mileand subsequent miles 134 7th Km Km 61.60 4th mile 109.20 8th Km Km 60.95 9th Km Km 57.25 10th Km Km 53.70 q 11th Kmsto 200Kms Km 47.95 201 Kmsto 250 Kms Km 3.25 251 Kms& susequent Kms Km 2.00 7 Carriageof 100 maundsof fuel wood, by meansof ditto Material trolly to besupplied material trolly. by theGovernment and 1st chain (1st 30 m) Chain 288.95 30 M 288.95 maintained and run by the 2nd chain (2nd 30 m) " 52.95 30 M 52.95 contractor. 1000 to 3000 ft. (300 to 900 m) 1000 Ft 324.70 300 M 324.70 1st Km Km 250.45 2nd Km Km 193.75 3rd Km Km 106.95 4th Km Km 85.15 1st mile Mile 403.05 5th Km Km 75.45 2nd mile " 155.30 6th Km Km 72.55 3rd milesubsequent miles " 134.00 7th Km Km 61.60 4th mile 109.20 8th Km Km 60.95 5th mile 101.55 9th Km Km 57.25 6th mile 95.55 10th Km Km 53.70 7th mile and subsequent miles 67.15 11th & subsequent Kms Km 47.95 8 Carriageof 1000 Nos. tiles12"x6"x2" (300x150x50 mm), ditto Material trolly to besupplied by the by meansof material trolly. Government and maintained and run 1st chain (1st 30 m) Chain 288.95 30 M 288.95 by thecontractor. 2nd chain (2nd 30 m) " 52.95 30 M 52.95 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 324.70 300 M 324.70 1st Km Km 250.45
  • 7. Chap-1 (Carriage) Page 7 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 2nd Km Km 193.75 16.1 3rd Km Km 106.95 4th Km Km 85.15 1st mile Mile 403.05 5th Km Km 75.45 2nd mile " 155.30 6th Km Km 72.55 3rd milesubsequent miles " 134.00 7th Km Km 61.60 4th mile 109.20 8th. Km 60.95 5th mile 101.55 9th Km Km 57.25 6th mile 95.55 10th Km Km 53.70 7th mile and subsequent miles 67.15 11th & subsequent Kms Km 47.95 9 Carriageof 1000 No. bricks, 9"x4½"x3" ditto (225x113x75 mm) or 8"x4"x4" (200x100x100 mm) (nominal) 1st chain (1st 30 m) Chain 236.75 30 M 236.75 2nd chain (2nd 30 m) " 51.50 30 M 51.50 3rd to 10th chain (60 to 300 m) " 27.13 30 M 27.13 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 265.84 300 M 265.84 1st Km Km 250.35 2nd Km Km 119.15 3rd Km Km 93.45 4th Km Km 67.00 1st mile Mile 402.85 5th Km Km 64.05 2nd mile " 106.05 6th Km Km 62.60 3rd mile " 100.40 7th Km Km 57.05 4th mile " 89.50 8th Km Km 56.40 5th mile " 83.20 9th Km Km 53.00 6th mile " 78.25 10th Km Km 49.70 7th mileand subsequent miles " 55.10 11th & subsequent Kms Km 42.65 10 Carriageof 1000 No. tiles9"x4½"x1½" 16.1 (225x113x38 mm). 1st chain (1st 30 m) Chain 142.88 30 M 142.88 2nd chain (2nd 30 m) " 26.15 30 M 26.15 16.1 3rd to 10th chain (60 to 300 m) " 16.21 30 M 16.21 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 160.59 300 M 160.59 1st Km Km 151.10
  • 8. Chap-1 (Carriage) Page 8 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 2nd Km Km 72.10 3rd Km Km 56.50 4th Km Km 40.15 1st mile Mile 243.15 5th Km Km 37.25 2nd mile " 64.05 6th Km Km 36.70 3rd mile " 58.25 7th Km Km 34.45 4th mile " 54.05 8th Km Km 34.10 5th mile " 50.20 9th Km Km 32.00 6th mile " 47.30 10th Km Km 30.10 7th mileand subsequent miles " 33.15 11th & subsequent Kms Km 25.80 11 Carriageof 1 Cwt. (50 Kg) cement in bags. ditto 1st chain (1st 30 m) Chain 5.45 30 M 5.45 2nd chain (2nd 30 m) " 0.65 30 M 0.65 3rd to 10th chain (60 to 300 m) " 0.31 30 M 0.31 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 3.20 300 M 3.20 1st Km Km 3.75 1st mile Mile 6.05 2nd Km Km 2.60 2nd mile " 2.00 3rd Km Km 1.15 3rd milesubsequent miles " 1.05 4th Km and subsequent kilometers. Km 0.70 12 Carriageof 100 Nos. empty cement bagsincluding 16.1 bundling. 1st 1000 (300 m) ft. 0/00 Ft. 79.66 300 M 79.66 1000 to 3000 (300 to 900 m) ft. " 9.92 300 M 9.92 1st Km Km 9.20 1st mile Mile 14.80 2nd Km Km 10.60 2nd mileto 6th mile Mile 1.95 3rd Km Km 4.35 7th mileand subsequent miles " 8.20 4th Km & subsequent Kms Km 4.20 13 Carriageof 100 (2.83 cu.m) cft. of Sarkandaor pilchi, frash ditto Previouslead of collection not or brushwood, by boat or road :- to bededucted from thenext lead of carriage. 1st chain (1st 30 m) Chain 118.21 30 M 118.21
  • 9. Chap-1 (Carriage) Page 9 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 2nd chain (2nd 30 m) " 52.95 30 M 52.95 3rd to 10th chain (60 to 300 m) " 16.21 30 M 16.21 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 133.40 300 M 133.40 1st Km Km 145.10 1st mile Mile 216.25 2nd Km Km 72.10 2nd mile " 180.90 3rd Km Km 56.50 3rd mile " 154.15 4th Km Km 40.15 4th mile " 114.75 5th Km Km 37.25 5th mile " 96.40 6th Km Km 36.70 6th mile 78.25 7th Km Km 34.45 7th mileand subsequent miles 55.10 8th Km Km 34.10 9th Km Km 32.00 10th Km Km 30.10 11th Km & subsequent Km 25.80 14 Carriageof light machinery weighing upto 3 tonne Ton Tonne ditto upto 1000 ft. (300 metre) 0/00 ft. 965.14 300 M 965.14 Exceeding 1000 to 5000 ft (300 to 1500metre) 1000 ft. 233.85 " 233.85 1st Km Km 300.45 1st mile Mile 483.50 2nd Km Km 142.00 2nd mile " 102.25 3rd Km Km 98.80 3rd mile " 98.50 4th Km Km 65.55 4th mile " 80.40 5th Km Km 62.90 5th mile " 82.60 6th Km Km 60.50 6th mile " 64.90 7th Km Km 52.30 7th mileand subsequent miles " 52.50 8th Km Km 52.05 9th Km Km 51.50 10th Km Km 41.20 11th Km & susequent Km 37.40
  • 10. Chap-1 (Carriage) Page 10 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 15 Carriageof small consignmentsweighing upto 5 maunds 16.1 For consignment weighing 5 to 10 (job rates) : maunds, ratebeincreased by 25%; and for consignmentsweighing 10 Consig- to 20 maunds, ratebeincreased by Upto 1000 ft. (300 metre) ment/ 78.38 Consign- 78.38 100%. 1000 ft. ment/ Exceeding 1000 to 3000 ft. (300 to 900 1000 ft. 53.75 300 M 53.75 metre) 1st Km Consign- 47.05 1st mile Consign- 75.70 ment/ Km 2nd Km ment/Mile 29.85 2nd mileand subsequent miles " 15.85 " 3rd Km & subsequent " 10.45 16 Carriageof consignmentsjob. i) Cooly load for distance:- Each Each a) Upto 5 Km Consignment 98.40 Consignment 98.40 b) Above5 to 13 Km " 251.85 " 251.85 ii) Carriageof consignmentsodd jobs. Each Each a) Donkey load for distanceupto 500 feet. Consignment 10.85 Consignment 10.85 b) Upto 1000 feet. " 16.45 " 16.45 c) Upto ½ Mile/ 0.8 Km " 20.80 " 20.80 d) Upto oneMile/ 1.6 Km " 26.00 " 26.00 e) Upto threeMiles/ 4.8 Km " 45.95 " 45.95 f) Exceeding 3 Miles/ 16 km " 82.25 " 82.25 Each Each iii) Cart load for adistance:- Consign- Consig- ment nment a) upto 4 Miles/ 6.4 Km " 89.85 " 89.85 b) Exceeding 4 Miles(6.4 Km) to10 Miles(16 Km) " 163.55 " 163.55 iv) Camel load for adistance:- a) upto 4 Miles/ 6.4 Km.) " 66.45 " 66.45 b) exceeding 4 to 12 mills(6.4 Km to 19.2 Km) " 100.75 " 100.75 17 Hirechargesof:- 1. Thisitem will beallowed with prior concurrenceof Superintending i) truck (10 Ton Capacity) Per 4000.00 Per 4,000.00 Engineer. day day 2. Therateincludespay of driver ii) tractor with trolly " 10736.00 " 1,000.00 and cleaner only. Therepairsshall betheresponsibility of theowner iii) tractor without trolly " 10736.00 " 800.00 and thecost of lubrication, fuel,
  • 11. Chap-1 (Carriage) Page 11 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL loading and unloading shall bepaid by theborrower. 18 Carriageof bitumen, tar or other lubricants, in drums: 16.1 0 Kilometer to 100 Kilometers P.Ton 1,275.10 0 Kilometer to 200 Kilometers P.Ton 1,665.60 0 Kilometer to 250 Kilometers Per 80.60 P.Ton 1,935.60 251 to susequent Kilometers Ton P.Ton 14.95 2nd mile " 15.10 " 3rd mile 24.65 19 Carriageof Asbestoscement pipesBSSClass'B" with comet joint and rubber ring, including loading, unloading and stacking (rateper 100 Rft. (30 m pipes):- i) 3" (75 mm) i/d pipes:- 1st chain (1st 30 m) Chain 11.40 30 M 11.40 2nd chain (2nd 30 m) " 2.10 30 M 2.10 3rd to 10th chain (60 to 300 m) " 1.30 30 M 1.30 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 12.80 300 M 12.80 1st Km Km 12.05 2nd Km Km 5.70 3rd Km Km 4.45 1st mile Mile 19.40 4th Km Km 3.20 2nd mile " 5.10 5th Km Km 3.00 3rd mile " 4.70 6th Km Km 2.90 4th mile " 4.30 7th Km Km 2.70 5th mile " 4.00 8th Km Km 2.65 6th mile " 3.75 9th Km Km 2.50 7th mileand subsequent miles " 2.65 10th Km Km 2.35 11th Km & Susequent Km 2.30 ii) 4" (100 mm) i/d pipes:- 1st chain (1st 30 m) Chain 14.95 30 M 14.95 2nd chain (2nd 30 m) " 2.75 30 M 2.75 3rd to 10th chain (60 to 300 m) " 1.70 30 M 1.70 1000 to 9000 ft. (300 to 900 m) 0/00 Ft. 16.80 300 M 16.80
  • 12. Chap-1 (Carriage) Page 12 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 1st Km Km 15.80 1st mile Mile 25.40 2nd Km Km 7.50 2nd mile " 6.70 3rd Km Km 5.85 3rd mile " 6.15 4th Km Km 4.15 4th mile " 5.65 5th Km Km 3.90 5th mile " 5.25 6th Km Km 3.80 6th mile " 4.95 7th Km Km 3.55 7th mileand subsequent miles " 3.45 8th Km Km 3.50 9th Km Km 3.30 10th Km Km 3.10 11th Km & subsequent Km Km 3.00 iii) 6" (150 mm) i/d pipes:- 1st chain (1st 30 m) Chain 22.40 30 M 22.40 2nd chain (2nd 30 m) " 4.10 30 M 4.10 3rd to 10th chain (60 to 300 m) " 2.55 30 M 2.55 1000 to 9000 ft. (300 to 900 m) 0/00 Ft. 25.20 300 M 25.20 1st Km Km 23.70 2nd Km Km 11.30 3rd Km Km 8.85 1st mile Mile 38.15 4th Km Km 6.30 2nd mile " 10.05 5th Km Km 5.85 3rd mile " 9.20 6th Km Km 5.75 4th mile " 8.45 7th Km Km 5.35 5th mile " 7.90 8th Km Km 5.25 6th mile " 7.40 9th Km Km 5.00 7th mileand subsequent miles " 5.20 10th Km Km 4.65 11th Km & subsequent Km Km 4.25 iv) 8" (200 mm) i/d pipes: 1st chain (1st 30 m) Chain 37.90 30 M 37.90 2nd chain (2nd 30 m) " 6.95 30 M 6.95 3rd to 10th chain (60 to 300 m) " 4.35 30 M 4.35 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 42.60 300 M 42.60 1st Km Km 40.10
  • 13. Chap-1 (Carriage) Page 13 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 2nd Km Km 20.05 3rd Km Km 15.25 1st mile Mile 64.50 4th Km Km 10.85 2nd mile " 17.00 5th Km Km 10.10 3rd mile " 15.55 6th Km Km 9.95 4th mile " 14.35 7th Km Km 9.30 5th mile " 13.35 8th Km Km 9.10 6th mile " 12.55 9th Km Km 7.90 7th mileand subsequent miles " 8.80 10th Km Km 2.60 11th Km & subsequent Km Km 2.25 v) 10" (250 mm) i/d pipes:- 1st chain (1st 30 m) Chain 50.95 30 M 50.95 2nd chain (2nd 30 m) " 9.35 30 M 9.35 3rd to 10th chain (60 to 300 m) " 5.85 30 M 5.85 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 57.25 300 M 57.25 1st Km Km 53.90 2nd Km Km 25.60 3rd Km Km 20.05 1st mile Mile 86.70 4th Km Km 14.20 2nd mile " 22.85 5th Km Km 13.25 3rd mile " 20.95 6th Km Km 13.05 4th mile Mile 19.25 7th Km Km 12.40 5th mile " 17.90 8th Km Km 12.25 6th mile " 16.85 9th Km Km 11.55 7th mileand subsequent miles " 11.85 10th Km Km 10.85 11th Km & subsequent Kms Km 9.25 vi) 12" (300 mm) i/d pipes: 1st chain (1st 30 m) Chain 66.30 30 M 66.30 2nd chain (2nd 30 m) " 12.15 30 M 12.15 3rd to 10th chain (60 to 300 m) " 7.60 30 M 7.60 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 74.45 300 M 74.45 1st Km Km 70.05 2nd Km Km 34.25 3rd Km Km 26.45
  • 14. Chap-1 (Carriage) Page 14 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 4th Km Km 18.50 1st mile Mile 112.70 5th Km Km 17.25 2nd mile " 29.70 6th Km Km 16.95 3rd mile " 27.20 7th Km Km 15.80 4th mile " 25.05 8th Km Km 15.65 5th mile " 23.30 9th Km Km 14.70 6th mile " 21.90 10th Km Km 13.75 7th mileand subsequent miles " 15.40 11th Km & subsequent Kms Km 11.95 vii) 16" (400 mm) i/d pipes:- 1st chain (1st 30 m) Chain 108.65 30 M 108.65 2nd chain (2nd 30 m) " 19.90 30 M 19.90 3rd to 10th chain (60 to 300 m) " 12.45 30 M 12.45 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 122.05 300 M 122.05 1st Km Km 114.80 2nd Km Km 55.00 3rd Km Km 42.85 1st mile Mile 184.75 4th Km Km 30.50 2nd mile " 48.65 5th Km Km 28.50 3rd mile " 44.60 6th Km Km 28.00 4th mile " 41.05 7th Km Km 26.15 5th mile " 38.20 8th Km Km 25.85 6th mile " 35.90 9th Km Km 24.30 7th mileand subsequent miles " 25.25 10th Km Km 22.80 11th Km & subsequent Kms Km 19.60 viii) 18" (450 mm) i/d pipes:- 1st chain (1st 30 m) Chain 139.60 30 M 139.60 2nd chain (2nd 30 m) " 25.60 30 M 25.60 3rd to 10th chain (60 to 300 m) " 15.95 30 M 15.95 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 156.85 300 M 156.85 1st Km Km 147.50 2nd Km Km 70.40 3rd Km Km 55.15 1st mile Mile 237.40
  • 15. Chap-1 (Carriage) Page 15 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 4th Km Km 39.25 2nd mile " 62.50 5th Km Km 36.65 3rd mile " 57.30 6th Km Km 36.05 4th mile " 52.75 7th Km Km 33.65 5th mile " 49.05 8th Km Km 33.25 6th mile " 46.15 9th Km Km 31.30 7th mileand subsequent miles " 32.45 10th Km Km 29.35 11th Km & subsequent Kms Km 25.15 ix) 20" (500 mm) i/d pipes:- 1st chain (1st 30 m) Chain 148.20 30 M 148.20 2nd chain (2nd 30 m) " 27.15 30 M 27.15 3rd to 10th chain (60 to 300 m) " 16.95 30 M 16.95 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 166.50 300 M 166.50 1st Km Km 156.60 2nd Km Km 74.70 3rd Km Km 58.50 1st mile Mile 252.05 4th Km Km 41.65 2nd mile " 66.35 5th Km Km 38.90 3rd mile " 60.85 6th Km Km 38.25 4th mile " 56.00 7th Km Km 35.70 5th mile " 52.10 8th Km Km 35.30 6th mile " 49.00 9th Km Km 33.20 7th mileand subsequent miles " 34.45 10th Km Km 31.15 11th Km & subsequent Kms Km 26.90 x) 24" (600 mm) i/d pipes:- 1st chain (1st 30 m) Chain 164.20 30 M 164.20 2nd chain (2nd 30 m) " 30.10 30 M 30.10 3rd to 10th chain (60 to 300 m) " 18.80 30 M 18.80 1000 to 5000 ft. (300 to 1500 m) 0/00 Ft. 184.50 300 M 184.50 1st Km Km 173.55 2nd Km Km 82.75 3rd Km Km 64.80 1st mile Mile 279.25 4th Km Km 46.65
  • 16. Chap-1 (Carriage) Page 16 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 2nd mile " 73.55 5th Km Km 43.05 3rd mile " 67.40 6th Km Km 42.35 4th mile Mile 62.05 7th Km Km 39.50 5th mile " 57.70 8th Km Km 39.10 6th mile " 54.30 9th Km Km 36.75 7th mileand subsequent miles " 38.15 10th Km Km 34.45 11th Km & subsequent Kms Km 29.55 20 Carriageof PVC pipesB.S.S. Class'B' including loading, unloading and stacking (Rateper 1000 ft.) (300 metre) :- i) 3" (75 mm) i/d pipes:- 1st chain (1st 30 m) Chain 22.35 30 M 22.35 2nd chain (2nd 30 m) " 4.10 30 M 4.10 3rd to 10th chain (60 to 300 m) " 2.55 30 M 2.55 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 25.15 300 M 25.15 1st Km Km 23.65 2nd Km Km 11.25 3rd Km Km 8.80 1st mile Mile 38.05 4th Km Km 6.25 2nd mile " 10.00 5th Km Km 5.85 3rd mile " 9.20 6th Km Km. 5.75 4th mile " 8.45 7th Km Km 5.40 5th mile Mile 7.85 8th Km Km 5.30 6th mile " 7.40 9th Km Km 4.95 7th mileand subsequent miles " 5.20 10th Km Km 4.65 11th Km & subsequent Kms Km 4.20 ii) 4" (100 mm) i/d pipes:- 1st chain (1st 30 m) Chain 34.45 30 M 34.45 2nd chain (2nd 30 m) " 6.30 30 M 6.30 3rd to 10th chain (60 to 300 m) " 3.95 30 M 3.95 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 38.70 300 M 38.70 1st Km Km 36.40 2nd Km Km 17.55
  • 17. Chap-1 (Carriage) Page 17 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 3rd Km Km 13.65 1st mile Mile 58.60 4th Km Km 9.60 2nd mile " 15.45 5th Km Km 8.95 3rd mile " 14.15 6th Km Km 8.80 4th mile " 13.00 7th Km Km 8.20 5th mile " 12.10 8th Km Km 8.10 6th mile " 11.40 9th Km Km 7.65 7th mileand subsequent miles " 8.00 10th Km Km 7.15 11th Km & subsequent Kms Km 6.60 iii) 5" (125 mm) i/d pipes:- 1st chain (1st 30 m) Chain 47.00 30 M 47.00 2nd chain (2nd 30 m) " 8.60 " 8.60 3rd to 10th chain (60 to 300 m) " 5.40 " 5.40 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 52.80 300 M 52.80 1st Km Km 49.70 2nd Km " 23.85 3rd Km " 18.70 1st mile Mile 79.95 4th Km " 13.35 2nd mile " 21.05 5th Km Km. 12.25 3rd mile " 19.30 6th Km " 12.05 4th mile Mile 17.75 7th Km " 11.25 5th mile " 16.50 8th Km 11.10 6th mile " 15.55 9th Km 10.45 7th mileand subsequent miles " 10.90 10th Km 9.80 11th Km & subsequent Kms 8.50 iv) 6" (150 mm) i/d pipes: 1st chain (1st 30 m) Chain 64.80 30 M 64.80 2nd chain (2nd 30 m) " 11.85 30 M 11.85 3rd to 10th chain (60 to 300 m) " 7.40 30 M 7.40 1000 to 3000 ft. (300 to 300 m) 0/00 Ft. 72.80 300 M 72.80 1st Km. Km. 68.50 2nd Km Km. 32.65
  • 18. Chap-1 (Carriage) Page 18 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 3rd Km Km. 25.60 1st mile Mile 110.20 4th Km Km. 18.20 2nd mile " 29.00 5th Km Km. 17.00 3rd mile " 26.60 6th Km Km. 16.75 4th mile " 24.50 7th Km Km. 15.60 5th mile " 22.75 8th Km Km. 15.45 6th mile " 21.40 9th Km Km. 14.50 7th mileand subsequent miles " 15.05 10th Km Km. 13.60 11th Km & subsequent Kms Km. 11.70 v) 8" (200 mm) i/d pipes:- 1st chain (1st 30 m) Chain 113.65 30 M 113.65 2nd chain (2nd 30 m) " 20.80 30 M 20.80 3rd to 10th chain (60 to 300 m) " 13.00 30 M 13.00 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 127.65 300 M 127.65 1st Km Km 120.10 2nd Km Km 57.30 3rd Km Km 44.90 1st mile Mile 193.25 4th Km Km 31.95 2nd mile " 50.90 5th Km Km 29.80 3rd mile Mile 46.65 6th Km Km 29.35 4th mile " 42.95 7th Km Km 27.40 5th mile " 39.95 8th Km Km 27.10 6th mile " 37.55 9th Km Km 25.45 7th mileand subsequent miles " 26.40 10th Km Km 23.85 11th Km & subsequent Kms Km 20.45 vi) 10" (250 mm) i/d pipes:- 1st chain (1st 30 m) Chain 176.20 30 M 176.20 2nd chain (2nd 30 m) " 32.30 30 M 32.30 3rd to 10th chain (60 to 300 m) " 20.15 30 M 20.15 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 197.95 300 M 197.95 1st Km Km 186.20 2nd Km Km 88.85
  • 19. Chap-1 (Carriage) Page 19 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 3rd Km Km 69.55 1st mile Mile 299.65 4th Km Km 49.50 2nd mile " 78.90 5th Km Km 46.25 3rd mile " 72.35 6th Km Km 45.45 4th mile " 66.55 7th Km Km 42.45 5th mile " 61.95 8th Km Km 41.95 6th mile " 58.25 9th Km Km 39.50 7th mileand subsequent miles " 40.95 10th Km Km 37.00 11th Km & subsequent Kms Km 31.90 vii) 12" (300 mm) i/d pipes:- 1st chain (1st 30 m) Chain 248.05 30 M 248.05 2nd chain (2nd 30 m) " 45.45 30 M 45.45 3rd to 10th chain (60 to 300 m) " 28.40 30 M 28.40 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 278.70 300 M 278.70 1st Km Km 262.15 2nd Km Km 125.05 3rd Km Km 97.95 1st mile Mile 421.85 4th Km Km 69.75 2nd mile Mile 111.10 5th Km Km 65.10 3rd mile " 101.85 6th Km Km 64.00 4th mile " 93.70 7th Km Km 59.75 5th mile " 87.20 8th Km Km 59.10 6th mile " 82.00 9th Km Km 55.60 7th mileand subsequent miles " 57.65 10th Km Km 52.10 11th Km & subsequent Kms Km 44.85 viii) 14" (350 mm) i/d pipes:- 1st chain (1st 30 m) Chain 322.90 30 M 322.90 2nd chain (2nd 30 m) " 59.15 30 M 59.15 3rd to 10th chain (60 to 300 m) " 36.95 30 M 36.95 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 362.75 300 M 362.75 1st Km Km 341.20 2nd Km Km 162.75
  • 20. Chap-1 (Carriage) Page 20 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 3rd Km Km 127.50 1st mile Mile 549.10 4th Km Km 90.75 2nd mile " 144.60 5th Km Km 84.75 3rd mile " 132.60 6th Km Km 83.35 4th mile Mile 122.00 7th Km Km 77.75 5th mile " 113.50 8th Km Km 76.95 6th mile " 106.75 9th Km Km 72.35 7th mileand subsequent miles " 75.05 10th Km Km 67.85 11th Km & subsequent Kms Km 58.40 21 Carriageof PVC pipesB.S.S. Class'D' including loading, unloading and stacking (Ratesper 1000 ft.):- i) 2" (50 mm) i/d pipes:- 1st chain (1st 30 m) Chain 16.35 30 M 16.35 2nd chain (2nd 30 m) " 3.00 30 M 3.00 3rd to 10th chain (60 to 300 m) " 1.85 30 M 1.85 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 18.35 300 M 18.35 1st Km Km 17.30 2nd Km Km 8.25 3rd Km Km 6.45 1st mile Mile 27.80 4th Km Km 4.60 2nd mile " 7.30 5th Km Km 4.30 3rd mile " 6.70 6th Km Km 4.20 4th mile " 6.20 7th Km Km 3.95 5th mile " 5.75 8th Km Km 3.90 6th mile " 5.40 9th Km Km 3.65 7th mileand subsequent miles " 3.80 10Km Km 3.45 11th Km & subsequent Kms Km 3.00 ii) 2½" (63 mm) i/d pipes:- 1st chain (1st 30 m) Chain 25.45 30 M 25.45 2nd chain (2nd 30 m) " 4.65 30 M 4.65 3rd to 10th chain (60 to 300 m) " 2.90 30 M 2.90 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 28.60 300 M 28.60
  • 21. Chap-1 (Carriage) Page 21 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 1st Km Km 26.90 2nd Km Km 12.85 3rd Km Km 10.10 1st mile Mile 43.25 4th Km Km 7.20 2nd mile " 11.40 5th Km Km 6.70 3rd mile " 10.45 6th Km Km 6.60 4th mile " 9.60 7th Km Km 6.15 5th mile " 8.95 8th Km Km 5.90 6th mile " 8.40 9th Km Km 5.65 7th mileand subsequent miles " 5.90 10Km Km 5.30 11th Km & subsequent Kms Km 4.60 iii) 3" (75 mm) i/d pipes:- 1st chain (1st 30 m) Chain 35.25 30 M 35.25 2nd chain (2nd 30 m) " 6.45 30 M 6.45 3rd to 10th chain (60 to 300 m) " 4.05 30 M 4.05 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 39.60 300 M 39.60 1st Km Km 37.25 2nd Km Km 17.80 3rd Km Km 13.95 1st mile Mile 59.95 4th Km Km 9.95 2nd mile " 15.80 5th Km Km 9.25 3rd mile " 14.45 6th Km Km 9.10 4th mile " 13.30 7th Km Km 8.50 5th mile Mile 12.40 8th Km Km 8.40 6th mile " 11.65 9th Km Km 7.80 7th mileand subsequent miles " 8.20 10th Km Km 7.30 11th Km & subsequent Kms Km 6.40 iv) 4" (100 mm) i/d pipes:- 1st chain (1st 30 m) Chain 58.35 30 M 58.35 2nd chain (2nd 30 m) " 10.70 30 M 10.70 3rd to 10th chain (60 to 300 m) " 6.70 30 M 6.70 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 65.55 300 M 65.55 1st Km Km 61.65 2nd Km Km 29.40
  • 22. Chap-1 (Carriage) Page 22 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 3rd Km Km 23.05 1st mile Mile 99.20 4th Km Km 16.40 2nd mile " 26.15 5th Km Km 15.30 3rd mile " 23.95 6th Km Km 15.05 4th mile " 22.05 7th Km Km 14.10 5th mile " 20.50 8th Km Km 13.85 6th mile " 19.30 9th Km Km 13.05 7th mileand subsequent miles " 13.55 10th Km Km 12.20 11th Km & subsequent Kms Km 10.65 v) 5" (125 mm) i/d pipes:- 1st chain (1st 30 m) Chain 87.20 30 M 87.20 2nd chain (2nd 30 m) " 16.00 30 M 16.00 3rd to 10th chain (60 to 300 m) " 10.00 30 M 10.00 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 97.95 300 M 97.95 1st Km Km 92.15 2nd Km Km 43.95 3rd Km Km 34.45 1st mile Mile 148.30 4th Km Km 24.50 2nd mile " 39.05 5th Km Km 22.90 3rd mile " 35.80 6th Km Km 22.50 4th mile " 32.95 7th Km Km 21.00 5th mile " 30.65 8th Km Km 20.80 6th mile 28.85 9th Km Km 19.55 7th mileand subsequent miles 20.25 10th Km Km 18.25 11th Km & subsequent Kms Km 15.85 vi) 6" (150 mm) i/d pipes:- 1st chain (1st 30 m) Chain 125.65 30 M 125.65 2nd chain (2nd 30 m) " 23.00 30 M 23.00 3rd to 10th chain (60 to 300 m) " 14.40 30 M 14.40 1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 141.15 300 M 141.15 1st Km Km 132.75 2nd Km Km 63.30
  • 23. Chap-1 (Carriage) Page 23 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 3rd Km Km 49.60 1st mile Mile 213.65 4th Km Km 35.30 2nd mile 56.25 5th Km Km 32.95 3rd mile 51.60 6th Km Km 32.40 4th mile 47.45 7th Km Km 30.25 5th mile 44.15 8th Km Km 29.90 6th mile 41.55 9th Km Km 28.15 7th mileand subsequent miles 29.20 10th Km Km 26.40 11th Km & subsequent Kms Km 22.80 22 Hand shunting loaded Railway wagonsor trucks:- a) upto ¼ mile/ ¼ Km Each 448.95 Each 280.60 b) upto ½ mile/ ½ Km No 812.75 No 507.95 c) upto ¾ mile/ ¾ Km " 1097.30 " 685.80 d) upto 1 (1.6 Km) mile " 1305.75 " 816.10 e) 2nd mileand subsequent miles/ Each Each 2nd and subsequent kilometres No/Mile 864.35 No/Km 540.20 23 Hand shunting empty Railway wagonsor trucks. a) upto ¼ mile/ ¼ Km Each 260.40 Each 162.75 b) upto ½ mile/ ½ Km No. 431.50 No. 269.70 c) upto ¾ mile/ ¾ Km " 569.05 " 355.65 d) upto 1 mile/ 1 Km " 683.00 " 426.90 e) 2nd mileand subsequent miles/ Each Each 2nd and subsequent kilometres No/Mile 424.40 No/Km 265.25
  • 24. Chap-2 (Loading/Unloading) Page 24 2. LOADING, UNLOADING & STACKING 1 The rate for loading into and unloading from mobile trucks, trollies and boats, etc. will be the same as for Railway wagons. Sr. Description Rate (British System) Rate (Metric System) Spec. Remarks No. No. Unit Labour Composite Unit Labour Composite 1 Loading or unloading into or from Railway wagons, lead 100 Cft. 1108.80 cu.m 391.65 within one chain, (30m) shingle, sand, ballast, surkhi, ashes, kankar, brick bats, coal, lime or 1,000 Nos. tiles size 12"x6"x2" (300x150x50 mm) or 9"x4½"x1½" (225x113x37mm) properly laid & stacked. 2 Loading or unloading bricks into or from Railway wagons laid and stacked, lead within one chain:- a) Bricks 10" (250 mm) size. 1000 Nos. 1386.00 1000 Nos. 1386.00 b) Bricks 9" (225 mm) or smaller size. ditto 1108.80 ditto 1108.80 3 Loading or unloading into or from Railway wagons cement 100 Bags 1386.00 100 Bags 1386.00 in bags (from inside or outside the godown) and stacking within one chain (30 m) 4 Loading or unloading into or from Railway wagons empty 100 Nos. 133.05 100 Nos. 133.05 cement bags (from inside or outside the godown) and stacking. 5 Loading or unloading into or from Railway wagons (from 100 Mds. 831.60 100 Kg 22.30 inside or outside the godown) and stacking, white lime in bags. 6 Loading or unloading into or from Railway wagons Per 665.30 Per 654.75 Structural Steel, R.S. joists, broad, narrow or meter gauge Tonne Tonne rail and rail fastenings, etc. 7 Loading or unloading 45 gallon (204.57 Litres) drums full Each 83.15 Each 83.15 into or from Railway wagons, lead upto one chain. 8 Loading or unloading packages of all sorts, upto one Cwt Each 41.60 Each 41.60 Except cement in jute or (50 Kg). paper bags. 9 Loading or unloading sleepers other than wooden, including stacking lead within one chain:- a) Broad gauge sleepers 100 Nos. 2772.00 100 Nos. 2772.00 b) Metre gauge and narrow gauge sleepers. ditto 1386.00 ditto 1386.00 MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL
  • 25. Chap-2 (Loading/Unloading) Page 25 Sr. Description Rate (British System) Rate (Metric System) Spec. Remarks No. No. Unit Labour Composite Unit Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 10 Loading or unloading timber logs or timber for shuttering, Per 346.5 Per 341.05 into or from Railway wagons of any gauge, including Ton Tonne stacking lead within one chain (30 m) 11 Loading or unloading bhoosa in Railway wagons lead upto 100 Mds. 3326.4 100 Kg 89.1 150 ft. (45 m) 12 Loading or unloading timber scrap or wooden plugs, into or Per 554.40 Per 545.65 from Railway wagons, and stacking within one chain lead. Ton Tonne 13 Loading or unloading pitching stone or spawl from Railway 100 Cft. 410.25 cu.m 144.90 wagons of any gauge (including clearing 5 ft. (1500 mm) away from the rail). 14 Loading or unloading building stone (including clearing 5 ft. 100 Cft. 532.20 cu.m 188.00 (1.5 m) away from rails). 15 Unloading oil, bitumen tar, etc. a) Crude oil (to be pumped from tank wagon into tank). 1000 1386.00 100 30.50 Gallon litres b) Crude oil (drained by gravity). 1000 1386.00 100 30.50 Gallon litres c) Crude oil materials from railway wagons. 100 Cft. 177.40 cu.m 62.65 d) Fuel oil from tank into empty drums, including Per 492.80 Per 485.00 stacking within one chain (30 m). Ton Tonne e) Petrol (2 gallon tin) 100 Nos. 698.55 100 Nos. 698.55 The rate includes checking and weighing the tins. f) Kerosene oil (4 gallon tin) 100 Nos. 1386.00 100 Nos. 1386.00 16 Removing and stacking within one chain (30 m) lead: a) Stone, spawl, brick bats, shingle, sand, lime, 100 Cft. 554.40 cu.m 195.80 surkhi, ashes, kankar and coat, etc. b) Bricks. 1000 Nos. 1478.40 1000 Nos. 1478.40 c) Broad gauge wooden sleepers. 100 Nos. 887.05 100 Nos. 887.05 d) Metre gauge or narrow gauge wooden sleepers. 100 Nos. 528.00 100 Nos. 528.00 e) Rails girders, pipes, cement etc. Per 246.40 Per 242.50 Ton Tonne
  • 26. Chap-2 (Loading/Unloading) Page 26 Sr. Description Rate (British System) Rate (Metric System) Spec. Remarks No. No. Unit Labour Composite Unit Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL f) Bridge and crossing timbers, etc. 100 No. 2956.80 100 No. 2956.80 17 Loading into wagons girders, rails, permanent way Per 554.40 Per 545.65 material (except wooden sleepers) iron work, M.S. bars, Ton Tonne pipes, etc. including lead one chain (30 M) and stacking inside wagons. 18 Unloading from wagons girders, rails, permanent way Per 316.80 Per 311.80 material (except wooden sleepers) iron work, M.S. bars, Ton Tonne pipes, etc. lead upto one chain (30 m) but excluding stacking. 19 Loading into wagons wooden broad gauge sleepers, 100 Nos. 2217.60 100 Nos. 2217.60 including one chain (30 m) lead and stacking,. 20 Unloading wooden broad gauge sleepers from wagons, 100 Nos. 1056.00 100 Nos. 1056.00 including one chain (30 m) lead and stacking. 21 Loading metre gauge or narrow gauge wooden sleepers, 100 Nos. 1108.80 100 Nos. 1108.80 including one chain (30 m) lead and stacking inside wagons. 22 Unloading metre gauge or narrow gauge wooden sleepers, 100 Nos. 583.60 100 Nos. 583.60 including one chain (30 m) lead but excluding stacking. 23 Loading bridge and crossing timbers, including one chain 100 Nos. 4435.20 100 Nos. 4435.20 (30 m) lead and stacking. 24 Unloading bridge and crossing timbers, including one 100 Nos. 2217.60 100 Nos. 2217.60 chain (30 m) lead but excluding stacking. 25 Loading or unloading bitumen, asphalt or tar in drums, into Per 332.65 Per 327.40 or from railway wagons, lead upto one chain (30 m). Ton Tonne
  • 27. Chap-3 (Earthwork) Page 27 1 Special allowancesfor thehardness, wetnessand slush:- Thegrant of allowancesfor hard, very hard, wet and slush will besubject to Superinteding Engineer'sapproval. Specific instructionsregarding grant of such allowancesmay beissued by thevariousAdministrativeDepartmentsand Statutory Bodies. Theearth requiring repeated blowsof Kassi to break it and of which dry bulk density isnot lessthan 1.5, will betreated ashard. 2 Deduction for shrinkagefrom bank measurements:- Thefollowing allowancesshould beprovided for material which isnot rammed, or equally consolidated:- a) Deduction for shrinkagefrom thebank measurementswhen theearthwork isdoneby manual labour.......... 10% b) Deduction for settlement from thebank measurement when theearthwork isdoneby machines................... 3 to 6% Beforethework islet out to bedoneby tractors, scrapers, etc. deduction ranging between 3% to 6% should beagreed to with thecontractors. Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite 1 Earthwork excavation undressed lead upto asinglethrow 17.1 to 17.5 of Kassi, phaorah or shovel:- a) In ashes, sand, soft soil or silt clearance. 1000 Cft. 4,158.00 -- cu.m 146.85 -- b) In ordinary soil. 1000 Cft. 4,989.60 -- cu.m 176.25 -- 2 Earthwork excavation in ashes, sand and soft soil or silt 1000 Cft. 6,098.40 -- cu.m 215.40 -- ditto clearance, undressed lead upto 50 ft (15 metre). 3 Bed clearanceand dressing slopesof drainsto required ditto Therateisapplicablewheretheearth sectionsincluding theremoval of weeds, roots, etc. of thebed to beremoved isof the disposal of excavated materialswithin 50 ft. (15 metre) lead. typeof ordinary soil. When it issilt or a) Excavated material undressed. 1000 Cft. 7,761.60 -- cu.m 274.15 -- 1 or 2 above, whichever isapplicable. b) Excavated material dressed in thespecified manner. 1000 Cft. 8,377.25 -- cu.m 295.90 -- thedrainsof each category. 4 a) Ordinary soil 1000 Cft. 7,761.60 - cu.m 274.15 - b) Hard soil 1000 Cft. 9,535.70 - cu.m 336.80 - 5 Earthowrk in ordinary soil for embankmentslead upto 100 *411-1 to Therateincludeshirechargesof ft. (30 m), including ploughing and mixing with bladegrade 411-13 and machinery, cost of fuel, lubricants, pay or disc harrow or other suitableequipment, and 301-1 & of driver and cleaner. Theratealso compaction by mechanical meansat optimum moisture 202-3 includesclearing and grubbing content and dressing to designed section, completein all wherenecessary. respects:- i) 95% to 100% maximum modified AASHTO dry density. 1000 Cft. 8,454.35 9,963.35 cu.m 298.60 351.90 ii) 90% maximum modified AASHTO dry density. 1000 Cft. 8,454.35 9,728.30 cu.m 298.60 343.60 iii) 85% maximum modified AASHTO dry density. 1000 Cft. 8,454.35 9,493.25 cu.m 298.60 335.30 6 Regular excavation dressed. 1000 Cft. 5,726.70 -- cu.m 202.25 -- *411-2 7 Earthwork excavation in open cutting upto 5'-0" (1.5 m) 17.1 to depth for storm water channels, drains, sullagedrainsin 17.5 open areas, roads, streets, lanes, including under pinning of wallsand shoring to protect existing works, shuttering and timbering thetrenches, dressed to designed level and dimensions, trimming, removal of surfacewater from trenches, back filling and surplusexcavated material disposed of and dressed within 50 ft. (15 m) lead:- MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 3. EARTHWORK (EXCAVATION & EMBANKMENT) Borrowpit excavation undressed lead upto 100 ft (30 metre).
  • 28. Chap-3 (Earthwork) Page 28 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL i) ordinary 1000 Cft. 9,731.05 9,852.50 cu.m 343.70 348.00 ii) hard 1000 Cft. 11,505.10 11,626.55 cu.m 406.35 410.65 iii) very hard 1000 Cft. 13,390.10 13,511.50 cu.m 472.95 477.25 iv) gravel & shingle 1000 Cft. 22,492.80 22,614.25 cu.m 794.45 798.75 8 Earthwork excavation in open cutting 5.01 ft. (1.5 m) to ditto 10.0 ft. (3.0 mm) depth for storm water channels, drains, sullagedrainsin open areas, roads, streets, lanes, including under pinning of wallsand shoring to protect existing works, shuttering and timbering thetrenches, dressed to designed level and dimensions, trimming, removal of surfacewater from trenches, back filling and surplusexcavated material disposed of and dressed within 100 ft. (30 m) lead:- i) ordinary 1000 Cft. 10,544.15 10,785.70 cu.m 372.40 380.95 ii) hard 1000 Cft. 12,318.25 12,559.80 cu.m 435.10 443.60 iii) very hard 1000 Cft. 14,203.20 14,444.75 cu.m 501.65 510.20 iv) gravel & shingle 1000 Cft. 24,414.70 24,656.30 cu.m 862.35 870.85 9 Excavation in shingleor gravel formation and rock, not 17.1 to 17.5 requiring blasting, undressed lead upto 100 ft (30 m). i) Dry 1000 Cft. 21,067.20 -- cu.m 744.10 -- ii) Wet 1000 Cft. 24,393.60 -- cu.m 861.60 -- iii) In flowing water 1000 Cft. 31,046.40 -- cu.m 1,096.55 -- 10 Earthwork excavation in irrigation channels, drains, etc. to designed section, gradesand profiles, excavated material ditto disposed off and dressed within 50 ft. (15 m) lead:- i) ordinary 1000 Cft. 8,880.95 -- cu.m 313.70 -- ii) hard 1000 Cft. 10,655.05 -- cu.m 376.35 -- iii) very hard 1000 Cft. 12,540.00 -- cu.m 442.90 -- iv) gravel & shingle 1000 Cft. 22,197.10 -- cu.m 784.00 -- 11 Excavation in rock dressed to designed section, gradesand profiles, excavated material disposed off within 100 ft. (30 m) 17.1 to 17.5 Toolsand plantsshall betheliability and lift upto 5'-0" (1.5 m). of thecontractor. a) Soft rock, slate, shale, schist lateritework, with pick and 1000 Cft. 21,120.00 -- cu.m 745.95 -- crow bar. b) Medium hard rock, requiring occasional blasting. 1000 Cft. 34,596.65 35,230.25 cu.m 1,221.95 1,244.35 12 a) Excavation in hard rock requiring blasting and disposal of excavated material (blasted material) upto 50 ft. (15 17.1 to 17.5 1) Toolsand plantsrequired shall be m) lead, (including dressing and leveling to designed theliability of theContractor section,etc. complete). i) GradeI 1000 Cft. 20,264.65 20,898.25 cu.m 715.75 738.15 2) Reducetherateby 8% if the ii) GradeII 1000 Cft. 22,049.30 23,105.30 cu.m 778.80 816.10 excavated section isnot dressed or iii) GradeIII 1000 Cft. 26,410.55 27,677.75 cu.m 932.80 977.60 levelled to designed section. iv) GradeIV 1000 Cft. 29,383.20 30,861.60 cu.m 1,037.80 1,090.05 v) GradeV 1000 Cft. 32,450.90 34,140.50 cu.m 1,146.15 1,205.85 vi) GradeVI 1000 Cft. 34,869.10 36,769.90 cu.m 1,231.60 1,298.70 b) Excavation in hard rock requiring blasting, but blasting prohibited, and disposal of excavated material within 50 17.1 to 17.5 1) Toolsand plantsrequired shall be ft. (15 m) lead (including dressing and levelling to theliability of thecontractor. designed section, etc. complete):-
  • 29. Chap-3 (Earthwork) Page 29 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL i) GradeI 1000 Cft. 40,529.30 41,796.50 cu.m 1,431.50 1,476.25 2) Reducetherateby 8% if the ii) GradeII 1000 Cft. 44,098.55 46,210.55 cu.m 1,557.55 1,632.15 excavated section isnot dressed or iii) GradeIII 1000 Cft. 52,821.10 55,355.50 cu.m 1,865.65 1,955.15 levelled to designed section. iv) GradeIV 1000 Cft. 58,766.40 61,723.20 cu.m 2,075.65 2,180.05 v) GradeV 1000 Cft. 64,901.75 68,280.95 cu.m 2,292.35 2,411.70 vi) GradeVI 1000 Cft. 69,738.25 73,539.85 cu.m 2,463.15 2,597.45 13 Rehandling of earthwork: a) Lead upto asinglethrow of Kassi, phaorah or shovel 1000 Cft. 2,772.00 -- cu.m 97.90 -- ditto b) Upto alead of 50 ft. (15 m). 1000 Cft. 3,880.80 -- cu.m 137.05 -- 14 Rehandling of gravel work or excavated rock, 1000 Cft. 11,088.00 -- cu.m 391.65 -- 17.1 to 17.5 lead upto 50 ft.( 15 m) 15 Filling, watering and ramming earth under floors:- ditto i) with surplusearth from foundation, etc. 1000 Cft. 5,559.85 -- cu.m 196.35 -- ii) with new earth excavated from outside, 1000 Cft. 12,116.55 -- cu.m 427.95 -- lead upto onechain (30 m). 16 Extrafor every 50 ft. (15 m) additional lead or part thereof :- Thisrateshall beapplicableupto 1000 ft. total distance, including the i) for earhtwork soft, ordinary, hard and very hard. 1000 Cft. 99.90 -- cu.m 3.55 -- lead covered in theitem of earthwork ii) for gravel, shingleor rock. 1000 Cft. 118.85 -- cu.m 4.20 -- 17 Transportation of earth all typeswhen thetotal distance, Thisratewill bepaid inaddition to the including thelead covered in theitem of work, ismorethan rateof earthwork, without deducting 1000 ft. (300 m) thelead covered in theitem of a) upto ¼ mile(400 m). 1000 Cft. 4,472.30 -- cu.m 157.95 -- earthwork b) for every 330 ft. (100 m) additional lead or part thereof, beyond ¼ mile(400 m) upto onemile. (1.6 Km.) 1000 Cft. 36.85 -- cu.m 1.30 -- c) for every ¼ mile(400 m) additional lead or part thereof, beyond onemile (1.6 Km.) upto 5 mile(8 Km). 1000 Cft. 323.50 -- cu.m 11.45 -- d) for every ½ mile(800 m) additional lead or part thereof, beyond 5 miles(8 Km). 1000 Cft. 305.45 -- cu.m 10.80 -- 18 Dressing and levelling of earhtwork to designed section, etc. 17.10 to 17.5 complete:- a) Ashes, sand, silt or soft soil. 1000 Cft. 356.95 -- cu.m 12.60 -- b) Ordinary or hard soil. 1000 Cft. 692.75 -- cu.m 24.45 -- c) Gravel work or soft rock not requiring 1000 Cft. 1,673.75 -- cu.m 59.10 -- blasting. 19 Dowel dressing. Per 325.60 -- Metre 10.70 -- ditto Thisrateisin addition to payment for Chain dressed earhtwork. 20 a) Dressing slopesof banksor ground surface. 100Sft. 145.20 -- sq.m 15.60 -- ditto To bepaid only when exclusively dressing isdoneand no earthwork is carried out in embankment or cutting.
  • 30. Chap-3 (Earthwork) Page 30 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL b) Dressing of earthwork (doneby machinery or otherwise 100Sft. 260.70 -- sq.m 28.05 -- i) Thesurfaceareadressed isto be and left undressed) to designed section. taken for measurement. ii) Theitem isapplicablewherethe dressing isdoneby thecontractor other than theonewho executed the work. 21 Excavation in foundation of building, bridgesand other structures, including dagbelling, dressing, refilling in layersaround 17.1 to 17.5 structurewith excavated earth, watering and ramming lead compositerateby Rs720/- P.%0 Cft or upto onechain (30 m)lift upto 5 ft (1.5m). Rs25.50/- P.Cu.m and surplusearth will 1) By Manual beadjusted accordingly. i) in sand, ashesor loosesoil 1000 Cft. 9,989.75 -- Cu.m 352.85 -- ii) in ordinary soil. 1000 Cft. 11,658.25 -- Cu.m 411.75 -- iii) in hard soil or soft murum. 1000 Cft. 13,046.90 -- Cu.m 460.80 -- 2) a) By Excavator i) Sand,ashesor loosesoil Per %0Cft 3,326.40 5,301.05 Cu.m 117.35 187.00 ii) Ordinary soil Per %0Cft 6,098.40 8,191.70 Cu.m 215.15 289.00 iii) Hard soil or Soft murum Per %0Cft 6,375.60 9,048.00 Cu.m 224.95 319.20 i) Sand,ashesor loosesoil Per %0Cft 3,880.80 6,349.15 Cu.m 136.90 224.00 ii) Ordinary soil Per %0Cft 7,207.20 9,823.80 Cu.m 254.25 346.60 iii) Hard soil or Soft murum Per %0Cft 7,484.40 10,824.95 Cu.m 264.05 381.90 c) Lift above15 ft (4.5 m):- i) Sand,ashesor loosesoil Per %0Cft 4,435.20 7,397.20 Cu.m 156.45 260.95 ii) Ordinary soil Per %0Cft 8,316.00 11,455.90 Cu.m 293.40 404.15 iii) Hard soil or Soft murum Per %0Cft 8,593.20 12,601.85 Cu.m 303.15 444.60 22 Cutting hard rock such asgranite, ballast, hard limestoneor 1000 Cft. 90,847.70 100,326.60 cu.m 3,208.75 3,543.55 17.1 to 17.5 Toolsand plantsrequired shall bethe sand stone, etc. with chiselsand hammers, for small liability of thecontractor. foundations. 23 Extrafor excavation requiring shoring. 1000 Cft. 1,478.40 1,884.95 cu.m 52.20 66.60 17.1 to 17.5 Compositerateincludesmaterials, i.e. plank, etc. 24 Compaction of earthwork (soft, ordinary or hard soil) :- ditto a) Mixing, moistening earth to optimum moisturecontent 1000 Cft. 1,308.40 -- cu.m 46.20 -- in layersfor compaction, etc. complete. b) Compaction by rolling with animal driven roller/hand rammed: i) soft or sandy soil 1000 Cft. 1,663.20 -- cu.m 58.75 -- 1) Theratedoesnot includehire ii) ordinary soil 1000 Cft. 1,940.40 -- cu.m 68.55 -- chargesof theroller. 2) Roller to be'supplied by iii) hard soil 1000 Cft. 2,217.60 -- cu.m 78.35 -- Government iv) admixtureof shingle 1000 Cft. 2,494.80 -- cu.m 88.10 -- c) Ramming earthwork (all typesof soil). 1000 Cft. 1,663.20 -- cu.m 58.75 -- If refilling isnot required, reducelabor and b) Lift from 5ft (1.5m) to15 ft (4.5 m):-
  • 31. Chap-3 (Earthwork) Page 31 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL d) Ramming earhtwork behind retaining walls. 1000 Cft. 2,217.60 -- cu.m 78.35 -- 25 Compaction of earthwork with power road roller, including 17.1 (a) ploughing, mixing, moistening earth to optimum moisture *411-5 and Theratealso includeshirechargesof content in layers, etc. complete: 202-3 machinery, cost of fuel, lubricant, pay of driver and cleaner, etc. i) 95% to 100% maximum modified AASHTO dry density. 1000 Cft. -- 1,509.00 cu.m - 53.30 ii) 90% maximum modified AASHTO dry density. 1000 Cft. -- 1,273.95 cu.m - 45.00 iiii) 85% maximum modified AASHTO dry density. 1000 Cft. -- 1,038.90 cu.m - 36.70 26 Extrafor wet earthwork. 1000 Cft. 3,880.80 -- cu.m 137.05 - 17.1 to 17.5 That will support aman'sweight. 27 Extrafor slush or Daldal including dewatering. 1000 Cft. 8,870.40 -- cu.m 313.30 - 17.1 to 17.5 That will not support aman'sweight. 28 Extrafor puddling. 1000 Cft. 6,945.85 -- cu.m 245.35 - ditto 29 Earthwork on small rain water drains, along canal banks, 100 Rft. 1,053.35 -- Metre 34.55 - ditto roadsand plantation drains, dressed, etc. complete. 30 Filling and compacting soil, earth and bouldersbehind 1000 Cft. 9,979.20 -- cu.m 352.45 -- 17.1 to 17.5 retaining walls(including excavation of soil and lead upto 50 ft.( 15 m). 31 Dag bailing 3" (75 mm) deep. Per mile 4,137.15 -- Per 2,571.25 -- ditto Dag bailing for layout of borrow pit, to Km bedoneby contractorsat their own cost. 32 Turfing slopesof banksor lawnswith grasssodsincluding 100Sft. 1,848.00 -- sq.m 198.85 -- ditto ploughing, laying, setting and watering (Turf got from within a distanceof 5 miles(8 Km.) and maintenancefor 15 days). 33 Berm cutting:- 17.1 to 17.5 a) lead upto asinglethrow of Kassi, phaoraor shovel 1000 Cft. 4,989.60 -- cu.m 176.25 -- (without dressing). b) upto 50 ft(15 m)lead (including dressing). 1000 Cft. 8,880.95 -- cu.m 313.70 -- 34 Berm trimming both sidesof channels:- 17.1 to 17.5 a) upto 3½ ft. (1.06 m) depth. Per Mile 12,953.60 -- Per Km. 8,096.00 -- b) exceeding 3½ ft. to 5 ft. (1.06 to 1.5 m) depth. Per Mile 18,352.40 -- Per Km. 11,470.25 -- c) exceeding 5 ft. to 8 ft. (1.5 to 2.4 m) depth Per Mile 28,525.20 -- Per Km. 17,828.25 -- 35 Ploughing and levelling borrowpits. ditto Areaploughed to bemeasured. i) upto 3 ft. (0.9 m) depth. Per Acre 2,772.00 -- Per Hect. 6,849.75 -- ii) above3 ft. (0.9 m) depth. Per Acre 5,544.00 -- Per Hect. 13,699.50 --
  • 32. Chap-3 (Earthwork) Page 32 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 36 Making boundary or serviceroads, including dag-belling, ditto leveling and dressing: i) in unploughed land: a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide. Per Chain 1,390.40 -- Metre 45.60 -- b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide. Per Chain 1,856.80 -- Metre 60.90 -- ii) in ploughed land: a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide. Per Chain 1,427.80 -- Metre 46.85 -- b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide. Per Chain 1,894.20 -- Metre 62.15 -- 37 Earthwork by boats, including hireof boats:- 17.1 to 17.5 For ordinary soil. i) Digging and loading into boats, upto 50 ft. (15 m) lead. 1000 Cft. 8,316.00 -- cu.m 293.70 -- ii) Carriageby boatsupto 10 chains(300 m). 1000 Cft. 2,052.25 -- cu.m 72.50 -- iii) Extrafor every additional onechain (30 m) or part 1000 Cft. 221.75 -- cu.m 7.85 -- thereof beyond 10 chains(300 m). iv) Unloading earth from boats. 1000 Cft. 3,880.80 -- cu.m 137.05 -- 38 Unloading earth from B.G. trucksand clearing 5 ft. (1.5 m) 1000 Cft. 3,326.40 -- cu.m 117.50 -- 17.1 to 17.5 from rail. 39 Earthwork by tramway, digging and loading in trucks, upto 50 1000 Cft. 7,761.60 -- cu.m 274.15 -- 17.1 to 17.5 ft. (15 m) lead. 40 Unloading earth from B.G. trucksand spreading upto 1000 Cft. 6,237.00 -- cu.m 220.30 -- ditto 15 ft. (4.5 m) from rail. 41 Supplying clean and screened river or pit sand within 5 100Cft. 1,029.30 1,057.30 cu.m 363.55 373.45 ditto Therateincudes:- chains(150 m). i) removal of top crust of earth over burden ii) royalty to thegovernment or cost to theprivateowner. 42 Earth work excavation in open cutting for sewersand manholesas 17.1 to 17.5 Theratedoesnot includeback filling shown in drawing including shuttering of wooden vertical planks, struts **13.1 &13.4 after laying of sewer, which ispayable and beams, dressing to correct section and dimension separately. according to templatesand levelsand removing surfacewater in all typesof soil except shingle, gravel and rock. i) 0 ft. to 7.0 ft. (0 to 2.10 m) depth 1000 Cft. 8,732.75 12,836.55 cu.m 308.45 453.40 ii) 7-01 ft. to 15.0 ft. (2.15 to 4.5 m) depth 1000 Cft. 13,663.30 18,457.30 cu.m 482.60 651.90 iii) above15.0 ft. (4.5 m) depth 1000 Cft. 14,995.20 19,524.75 cu.m 529.65 689.60 43 Earthwork excavation of trenchesin open cutting for sewers 17.1 to 17.5 Theratedoesnot includeback filling and manholechambers, etc. below sub-soil water level to **13.3 & after laying of sewer, which ispayable correct section and dimensionsaccording to templatesand 13.5 separately. levels, including shoring, timbering and shuttering of M.S. sheetson both sidesof thetrenches: If wooden planks, beams and struts are not used at site, the composite rates may be reduced by 31.5%, 25.7% & 23.2%, respectively for i), ii) &iii).
  • 33. Chap-3 (Earthwork) Page 33 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. Unit of Unit of No. M/ment Labour Composite M/ment Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL i) 0 ft. to 4.0 ft. (0 to 1.20 m) depth below SSWL. 1000 Cft. 13,125.20 18,732.15 cu.m 463.60 661.60 ii) 4.01 ft. to 8.0 ft. (1.22 to 2.4 m) depth below SSWL. 1000 Cft. 16,408.05 24,241.65 cu.m 579.55 856.20 iii) Exceeding 8 ft. (2.4 m) depth below SSWL. 1000 Cft. 24,612.05 33,354.75 cu.m 869.30 1,178.10 44 Excavation of trenchesin all kindsof soil, except cutting 1000 Cft. 8,321.30 -- cu.m 293.90 -- 17.1 to 17.5 Theratedoesnot includeback filling rock, for watersupply pipelinesupto 5 ft. (1.5 m) depth **8.1 after laying of pipeline, which is from ground level, including trimming, dressing sides, payableseparately. leveling thebedsof trenchesto correct gradeand cutting pitsfor joints, etc. completein all respects. 45 Cutting and removing treeswithin adistanceof 100 ft. (30 m) a) upto 2½ ft. (760 mm) girth. Each 1,663.20 -- Each 1,663.20 b) above2½ ft. to 6 ft. (760 to 1800 mm) girth. Each 3,234.00 -- Each 3,234.00 46 Uprooting stump and removing within 100 ft. (30 m) from 2 ft. Each 2,079.00 -- Each 2,079.00 to 6 ft. (600 to 1800 mm) girth. 47 Jungleclearanceand removing within 100 ft. (30 m). a) light 1000 Sft. 277.20 -- sq.m 3.00 -- b) thick 1000 Sft. 554.40 -- sq.m 5.95 -- 48 Uprooting Sarkandagrowth and disposal within 100 ft. (30 m) 100Sft. 133.05 -- sq.m 14.30 -- 49 Ploughing 3 times. Per 1,126.15 -- Per Hect. 2,782.70 -- Acre 50 Leveling, dressing and making lawns. 100Sft. 554.40 -- sq.m 59.65 -- 51 Turfing lawns(excluding cost of turf). 100Sft. 466.40 -- sq.m 50.20 -- 52 Earthwork in excavation of drains, irrigation channelsthrough excavator / drag linesin all kind of soil and conditions(dry,wet slush,daldal and under water) including itsdisposal and preparation of working pad for operation of machinery. (Ratesincludes100 ft lead) 1000 Cft. -- 4,180.00 cu.m -- 147.65 * Specification number correspond to Book of "Specification for Road & BridgeConstruction, 1971". ** Specification number correspond to Book of "Building & RoadsDepartment Specification Vol. II, 1966 (Public Health Works). The compaction of area will be restored to its original valuewithout any extrapayment.
  • 34. Chap-4 (Dismantling) Page 34 1 Ratesfor all finished worksincludetheremoval of surplusdebris, unused material and byproducts. 2 Theratesfor dismantling roofsor upper storey floor, includethedismantling of all materials, except roof supportssuch asbeamsand trusses. Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. No. Unit Labour Composite Unit Labour Composite StoneWork 1 Dismantling dry stonemasonry. 100Cft. 942.50 Cu.m 332.90 18.1 2 Dismantling stonemasonry in mud mortar. 100Cft. 1,386.00 Cu.m 489.55 ditto 3 Dismantling stonemasonry in limeor cement mortar. 100Cft. 3,326.40 Cu.m 1,174.90 ditto Add extra13%, 32% and 51% on labour ratesonly for 2nd, 3rd, 4th and subsequent floorsrespectively. 4 a) Dismantling dry stoneor spawl pitching. 100Cft. 1,663.20 Cu.m 587.45 ditto b) Dismantling stoneor spawl pitching (mud grouted). 100Cft. 2,106.70 Cu.m 744.10 ditto 5 Dismantling stoneor spawl pitching and apron in silted 100Cft. 2,772.00 Cu.m 979.05 ditto condition. 6 Dismantling stonepitching, cement or limegrouted. 100Cft. 4,435.20 Cu.m 1,566.50 ditto 7 Dismantling stonein crates: a) wooden crates 100Cft. 2,217.60 Cu.m 783.25 b) wirecrates 100Cft. 2,772.00 Cu.m 979.05 8 Dismantling stonewaredrain including baseconcrete. 100Cft. 1,552.30 Cu.m 548.25 ditto Brick Work 9 100Cft. 554.40 Cu.m 195.80 18.1 10 100Cft. 1,386.00 Cu.m 489.55 ditto 11 100Cft. 942.50 Cu.m 332.90 ditto 12 100Cft. 1,940.40 Cu.m 685.35 18.1 Add extra13%, 32% and 51% on labour ratesonly for 2nd, 3rd, 4th 13 100Cft. 4,712.40 Cu.m 1,664.40 ditto and subsequent floorsrespectively against item No. 12, 13, 14 & 15. 14 Dismantling cement block masonry. 100Cft. 4,158.00 Cu.m 1,468.60 ditto Dismantling brick work in mud mortar. Dismantling brick work in limeor cement mortar. MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 4. DISMANTLING (DEMOLITION) Dismantling mud/pisewalling. Dismantling sun dried brick masonry. Dismantling dry brick masonry.
  • 35. Chap-4 (Dismantling) Page 35 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. No. Unit Labour Composite Unit Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 15 Dismantling Dhajji walling. 100Cft. 1,108.80 Cu.m 391.65 ditto Concrete 16 Dismantling mud concrete. 100Cft. 2,217.60 Cu.m 783.25 ditto 17 Dismantling limeconcrete. 100Cft. 3,049.20 Cu.m 1,077.00 Add extra13%, 32% and 51% on labour ratesonly for 2nd, 3rd, 4th 18 Dismantling limeor cement concrete, under water. 100Cft. 11,642.40 Cu.m 4,112.10 and subsequent floorsrespectively against item No. 17, 19 & 20. 19 a) Dismantling cement concreteplain 100Cft. 6,098.40 Cu.m 2,153.95 ditto 1:4:8. b) Dismantling cement concreteplain 100Cft. 9,979.20 Cu.m 3,524.65 1:3:6. c) Dismantling cement concrete1:2:4 100Cft. 12,196.80 Cu.m 4,307.90 plain. d) Dismantling cement concretewith brick 100Cft. 3,326.40 Cu.m 1,174.90 aggregate. e) Dismantling D.P.C. of cement concrete 100Cft. 1,663.20 Cu.m 587.45 1½" thick (40 mm) and clearing thesite. 20 Dismantling cement concretereinforced, 100Cft. 19,958.40 Cu.m 7,049.30 ditto separating reinforcement from concrete, cleaning and straightening thesame. Roofing 21 Dismantling sirki sarkandaor thatched 100Sft. 665.30 Sq.m 71.60 18.1 roofing, supported on battensor bellies. 22 a) Dismantling 1st classtileroofing. 100Sft. 1,663.20 Sq.m 178.95 Add extra13%, 32 and 51% on labour rateonly for 2nd, 3rd, 4th b) Dismantling 2nd classtileroofing. 100Sft. 1,386.00 Sq.m 149.15 ditto and subsequent floorsrespectively against itemsNo. 22, 25, 26 and 28. 23 Dismantling from any height, asbestossheetsand ridge 100Sft. 924.00 Sq.m 99.40 18.1 coping. 24 a) Dismantling roof of wooden planksand battens, from 100Sft. 739.20 Sq.m 79.55 ditto any height. b) Dismantling wooden ceiling above20' (6.0 m) height 100Sft. 2,882.90 Sq.m 310.20 ditto in difficult position, including lifting with careand special scaffolding along liveelectric wiresand with machinesunderneath.
  • 36. Chap-4 (Dismantling) Page 36 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. No. Unit Labour Composite Unit Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 25 Dismantling jack arch roofing, including removal of joists. 100Sft. 2,217.60 Sq.m 238.60 ditto 26 Dismantling R.B. roof completewith mud and plaster, 100Sft. 2,772.00 Sq.m 298.25 ditto including separating reinforcement, cleaning and straightening thesame. 27 a) Stripping and stacking slateor tilesfrom thetruss 100Sft. 1,386.00 Sq.m 149.15 roofing. b) Stripping and stacking C.I. sheet roof. 100Sft. 1,286.20 Sq.m 138.40 c) Extrafor dismantling C.I. sheet roof above20 ft. (6m) 100Sft. 1,755.60 Sq.m 188.90 in difficult position, including lifting with special scaffolding along liveelectric wirewith machine underneath. 28 Dismantling slatesor tilesincluding battens, purlinsand 100Sft. 2,217.60 Sq.m 238.60 18.1 planking. Flooring 29 Dismantling brick or flagged flooring without 100Sft. 942.50 Sq.m 101.40 18.1 Add extra13%, 32% and 51% on concretefoundation. labour ratesonly for 2nd, 3rd, 4th and subsequent floorsrespectively 30 Dismantling plank or wooden block flooring, 100Sft. 1,386.00 Sq.m 149.15 ditto against itemsNo. 29 and 30. etc. 31 Disjoining R.C.C. pipesinsidethetrench and dismantling i) Theratedoesnot includethe and removing thepipesfrom thetrench and stacking them cost of excavation and refilling of outside:- trench, or thedemolition of any masonry or brick work. a) 6" to 12" (150 to 300 mm) diameter Per Rft 36.95 Metre 121.20 b) 13" to 24" (325 to 600 mm) diameter Per Rft 59.15 Metre 194.00 ii) Bends, elbows, sluicevalves, c) 25" to 36" (625 to 900 mm) diameter Per Rft 69.30 Metre 227.30 etc. should not bepaid for extraif d) Above36" (Above900 mm) diameter Per Rft 98.55 Metre 323.25 fixed in thelength of pipelinethat isbeing dismantled. WOOD WORK 32 a) Removing door with chowkat. Per 485.10 Per 485.10 18.1 Add extra13%, 32% and 51% on No. No. labour ratesonly for 2nd, 3rd, 4th b) Removing windowsand sky lightswith chowkat. ditto 378.85 ditto 378.85 and subsequent floorsrespectively against itemsNo. 32, 33, 34, 35 & 36. 33 Removing ventilatorsand wooden sunshade, etc. Per No. 198.65 Per No. 198.65 ditto 34 a) Dismantling wooden beamsupto 12' (3.65m) Per No. 346.50 Per No. 346.50 ditto length.
  • 37. Chap-4 (Dismantling) Page 37 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. No. Unit Labour Composite Unit Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL b) Dismantling wooden beamsfrom 12.1' to 23' Per No. 554.40 Per No. 554.40 (3.65 to 7.0 m) length. 35 a) Dismantling wooden partition Jaffry work etc. 100Sft. 660.00 Sq.m 71.00 ditto b) Dismantling wooden trusses. 100Kg 1,970.45 %Kg 1,970.45 36 Dismantling wooden palisadefencing. Per Lft. 53.90 Metre 176.80 ditto Iron work 37 Dismantling iron work of trusses, sheds, water tanks, etc. 100Kg 1,970.40 %Kg 1,970.40 18.1 Add extra13%, 32% and 51% on excluding cutting of rivets. labour ratesonly for 2nd, 3rd, 4th and subsequent floorsrespectively against itemsNo. 37 and 38. 38 Dismantling rolled steel beamsor iron rails, etc. 100Kg 909.90 %Kg 909.90 ditto 39 Dismantling iron latrine. Per Unit/ 2,125.20 Per Unit/ 2,125.20 ditto 2 Seats 2 Seats 40 Dismantling tees, bendsor sluicevalvesupto 12" Each per 44.90 Each per 17.95 ditto (300 mm) bore. inch bore cm bore 41 a) Dismantling B.G. water column. Each 13,860.00 Each 13,860.00 ditto b) Dismantling M.G. or N.G. water column. Each 9,240.00 Each 9,240.00 ditto 42 Dismantling all typeof wirefencing, including rolling wire 100Lft. 942.50 Metre 30.90 18.1 into bundlesand collecting material. Miscellaneous 43 Dismantling wirenetting of tenniscourtsand framework. 100Sft. 443.50 Sq.m 47.70 18.1 44 Dismantling cloth ceiling and supporting timber. 100Sft. 831.60 Sq.m 89.50 ditto 45 Dismantling and removing road metalling. 100Cft. 2,217.60 Cu.m 783.25 ditto 46 Dismantling and removing road pavement, etc., including 100Cft. 2,960.50 Cu.m 1,045.65 ditto screening and stacking of byproductsupto onechain lead (30 metre). 47 Removing mud plaster from walls. 100Sft. 231.00 Sq.m 24.85 ditto Add extra13%, 32% and 51% on labour ratesonly for 2nd, 3rd, 4th 48 Removing cement or limeplaster. 100Sft. 462.00 Sq.m 49.70 ditto and subsequent floorsagainst item No. 47, 48, 49, & 50 respectively
  • 38. Chap-4 (Dismantling) Page 38 Sr. Description Rate(British System) Rate(MetricSystem) Spec. Remarks No. No. Unit Labour Composite Unit Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 49 Scraping:- 18.1 a) Whitewash or colour wash. 100Sft. 277.20 Sq.m 29.85 b) Ordinary distemper, oil bound distemper, ditto 831.60 Sq.m 89.50 or paint of wall. 50 Dismantling glazed or encaustic tiles, etc. 100Sft. 2,587.20 Sq.m 278.40 18.1 51 Scraping boulders. 100Cft. 3,880.80 Cu.m 1,370.70 18.1 52 Cleaning limeor cement mortar of old stones 100Cft. 1,940.40 Cu.m 685.35 18.1 to beused in masonry. ElectricWiring 53 Dismantling light, fan and call bell point Per 84.70 85.60 Per 84.70 85.60 including casing and capping/strip open type, point point and making good damaged surface(building portion). 54 Dismantling plug point and making good Per 72.60 73.35 Per 72.60 73.35 damaged surface(building portion). point point 55 Dismantling G.I./M.S. conduit/G.I. flexible/PVC pipesor conduit wiring, etc. of all sizesincluding making good damaged surface(building portion):- i) on surface Per foot 15.50 15.65 P.Mtr 50.85 51.35 ii) recessed in wall Per foot 32.85 33.15 P.Mtr 107.75 108.75
  • 39. Chap-5 (Mortar) Page 39 Dry Material Required for Dry Material Required for 100 Cft. Wet (Ready) Mortar OneCum Wet (Ready) Mortar S. No. Ratio of Mortar Cement Lime Cement Lime Sand (50 Kg) Putty Sand (50 Kg.) Putty Cum. Bag Cft. Cft. Bag. Cum 1 2 3 4 5 6 7 8 1 Cement : Sand 1 : 2 33.48 82 11.83 0.82 1 : 3 23.11 85 8.16 0.85 1 : 4 18.37 90 6.49 0.90 1 : 5 14.70 90 5.19 0.90 1 : 6 13.61 100 4.81 1.00 1 : 7 11.68 100 4.12 1.00 1 : 8 10.21 100 3.61 1.00 2 Cement : Lime : Sand 1 : 1 : 6 12.25 15.0 90 4.33 0.15 0.90 1 : 1 : 7 10.70 13.1 92 3.78 0.13 0.92 1 : 1 : 8 9.39 11.5 92 3.32 0.12 0.92 1 : 1 : 9 8.52 10.44 94 3.00 0.10 0.94 1 : 1 : 10 7.67 9.4 94 2.71 0.09 0.94 1 : 2 : 8 9.19 22.5 90 3.25 0.23 0.90 1 : 2 : 9 8.16 20.0 90 2.88 0.20 0.90 1 : 2 : 10 7.67 18.8 94 2.71 0.19 0.94 1 : 2 : 12 6.39 15.66 94 2.26 0.16 0.94 1 : 3 : 12 6.26 23.0 92 2.21 0.23 0.92 1 : 3 : 14 5.47 20.1 94 1.93 0.20 0.94 1 : 3 : 16 4.82 17.7 94 1.70 0.18 0.94 1 : ¼ : 3 23.11 7.0 85 8.16 0.07 0.85 3 Lime : Sand 1 : 2 43 86 0.43 0.86 1 : 3 31 93 0.31 0.93 MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 5. MORTAR
  • 40. Chap-5 (Mortar) Page 40 Dry Material Required for 100 Cft. Dry Material Required for Wet (Ready) Mortar oneM3 Wet (Ready) Mortar S. Ratio of Mortar Clay Lime Sand Surkhi Cinder Clay Lime Sand Surkhi Cinder No. (Putty) (Putty) Cft. Cft. Cft. Cft. Cft. M3 M3 M3 M3 M3 1 2 3 4 5 6 7 3 4 5 6 7 4 Mud 135 1.35 5 Lime : Surkhi 2 : 3 49.00 - 73.5 - 0.49 - 0.74 - 1 : 2 40.75 - 81.5 - 0.41 - 0.82 - 1 : 3 30.30 - 91.0 - 0.30 - 0.91 - 6 Lime: Sand : Surkhi 1 : 1 : 1 40.50 40.5 40.5 - 0.41 0.41 0.41 7 Lime : Cinder 1 : 1 57.0 - 57.0 - 0.57 - - 0.57 Wet material required for 100 Cft. Wet material required for 1M³ (35.32 Cft) masonry (including wastage): masonry ( including wastage) : 1 Brick Masonry : a) Mud Mortar 35.00 Cft 0.35 M3 b) Cement, Sand 25.00 Cft 0.25 M3 c) Cement, Lime(Putty) Sand 25.00 Cft 0.25 M3 d) Lime(Putty) Sand 25.00 Cft 0.25 M3 2 StoneMasonry : a) Random rubble, uncoursed i) Foundation and Plinth 45.00 Cft 0.45 M3 ii) Superstructure 40.00 Cft 0.40 M3 iii) Coursed 35.00 Cft 0.35 M3 b) Ashlar Block in courseor Scabled masonry 30.00 Cft 0.30 M3 c) Ashlar finemasonry 20.00 Cft 0.20 M3 (1) Cement 1 Cft. = 40.8233 Kg Notes: (2) Unslaked lime 1.7 Cft. = 37.3242 Kg (3) Slaked lime 2.5 Cft. = 37.3242 Kg (4) Quick lime 40 Kg Will yield 2.6 Cft. limeputty. MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL 5. MORTAR
  • 41. Chap-6 (Concrete) Page 41 1. 2. 3. Sr. Description Spec. Remarks No. No. Unit Labour Composite Unit Labour Composite 1 Mud concretein foundation including watering and ramming, 100Cft 6,134.05 11,666.05 cu.m 2,166.55 4,120.45 using brick or stoneballast 1½" (40 mm) gauge. 2 Dry rammed brick or stoneballast, 1½" to 2"( 40 mm to 50 100Cft 4,158.00 9,768.00 cu.m 1,468.60 3,450.05 mm) gauge. 3 Cement concretebrick or stoneballast 1½ " to 2" (40 mm to 20.1 -do- 50 mm) gauge, in foundation and plinth:- (a) Ratio 1: 3: 6 100Cft 8,091.60 29,542.80 Cu.m 2,857.95 10,434.50 (b) Ratio 1: 4: 8 100Cft 8,091.60 25,717.20 Cu.m 2,857.95 9,083.30 (c) Ratio 1:5:10 100Cft 8,091.60 23,684.40 Cu.m 2,857.95 8,365.35 (d) Ratio 1: 6:12 100Cft 8,091.60 22,124.40 Cu.m 2,857.95 7,814.35 (e) Ratio 1: 6: 18 100Cft 8,091.60 20,736.00 Cu.m 2,857.95 7,323.95 (f) Ratio 1: 7:20 100Cft 8,091.60 19,951.80 Cu.m 2,857.95 7,047.00 4 Extraon item No. 3 above, for sedimentation tank or filter bedsof Public Health Engineering Works: Thestoneballast, crushed bajri, round shinglefrom nallah, or brick (a) in bed 100Cft 2,634.70 - Cu.m 930.60 - ballast may beused according to their comparativecheaper ratesin (b) on slope 100Cft 3,928.30 - Cu.m 1,387.50 - variousareasof theProvince. 5 Cement concreteplain including placing, 20.1 compacting, finishing and curing complete(including screening and washing of stoneaggregate): (a) Ratio 1: 1:2 100Cft 11,003.50 54,653.50 Cu.m 3,886.45 19,303.60 (b) Ratio 1: 1½: 1½ 100Cft 11,003.50 53,884.30 Cu.m 3,886.45 19,031.95 (c) Ratio 1: 1½: 3 100Cft 11,003.50 44,303.50 Cu.m 3,886.45 15,648.00 (d) Ratio 1: 2: 3 100Cft 11,003.50 42,381.10 Cu.m 3,886.45 14,969.00 (e) Ratio 1: 3: 3 100Cft 11,003.50 37,905.10 Cu.m 3,886.45 13,388.10 (f) Ratio 1: 2: 4 100Cft 11,003.50 38,723.50 Cu.m 3,886.45 13,677.15 (g) Ratio 1: 2: 6 100Cft 11,003.50 34,665.10 Cu.m 3,886.45 12,243.70 (h) Ratio 1: 3: 6 100Cft 11,003.50 33,503.50 Cu.m 3,886.45 11,833.45 (i) Ratio 1: 4: 8 100Cft 11,003.50 29,723.50 Cu.m 3,886.45 10,498.35 6. CONCRETE a) Thecarriagefor thewholedistanceto thesiteof work shall becalculated on thebasisof theratesof theactual meansof transport used in carriage, i.e. road and / or rail, asthecasemay be. If concretemixer or high frequency vibrator, etc. issupplied by theGovernment, all chargesincluding depreciation will berecovered from thecontractor. Ratesfor all finished worksincludetheremoval of surplusdebris, unused material and by products. b) It shall bepayablefrom thenearest approved quarry to siteof work. MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL Thestoneballast, crushed bajri, round shingle from nallah, or brick ballast may beused according to siterequirement or asdirected by theengineer incharge. Rate(British System) Rate(MetricSystem) Subsequent carriageof crushed stoneaggregateand bajri will bepaid according to thefollowing:
  • 42. Chap-6 (Concrete) Page 42 Sr. Description Spec. Remarks No. No. Unit Labour Composite Unit Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL Rate(British System) Rate(MetricSystem) 6 Providing and laying reinforced cement concrete(including 20.4 1) Therateincludesrendering floor prestressed concrete), using Ordinary Portland Cement / Sulphate surfacesmooth, and theplastering resisting cement / Slag cement asmay berequired; coarsesand and donefor making up all surfaces screened graded and washed aggregate, in required shapeand design, after removing centring. including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding thecost of steel reinforcement, itsfabrication 2) Plastering doneunder soffit of and placing in position, etc.):- R.C.C. roof slab meant for human habitation buildingsshall bepaid (a) (i) Reinforced cement concretein roof slab, beams, extra. columnslintels, girdersand other structural memberslaid in situ or precast laid in position, or prestressed memberscast 3) Thisitem shall not beapplicable in situ, completein all respects:- to factory madeunits. (1) TypeA (nominal mix 1:1:2) Per Cft 203.55 739.35 Cu.m 7,189.40 26,113.85 (2) TypeB (nominal mix 1: 1½: 3) Per Cft 203.55 637.75 Cu.m 7,189.40 22,525.35 (3) TypeC (nominal mix 1: 2: 4) Per Cft 203.55 583.25 Cu.m 7,189.40 20,600.40 (a) TypeA (nominal mix 1:1:2) (i) Upto 9" thick (Avg) Per Cft 259.00 804.05 Cu.m 9,136.95 28,366.30 (ii) MoreThan 9" thick (Avg) Per Cft 238.19 758.35 Cu.m 8,403.50 26,754.05 (b) TypeB (nominal mix 1:1-1/2:3) (i) Upto 9" thick (Avg) Per Cft 259.00 699.00 Cu.m 9,136.95 24,661.45 (ii) MoreThan 9" thick (Avg) Per Cft 238.19 653.35 Cu.m 8,403.50 23,049.20 (c) TypeC (nominal mix 1:2:4) (i) Upto 9" thick (Avg) Per Cft 259.00 646.10 Cu.m 9,136.95 22,793.60 (ii) MoreThan 9" thick (Avg) Per Cft 238.20 600.40 Cu.m 8,403.50 21,181.35 (a)(iii) Reinforced cement concretein slab of rafts/ strip foundation, baseslab of column and retaining walls; etc and footing beams, other structural membersother than thosementioned in 6(a) (i)&(ii) abovenot requiring form work (i.e. horizontal shuttering) completein all respects:- (1) TypeA (nominal mix 1: 1: 2) Per Cft 152.60 635.90 Cu.m 5,389.85 22,460.00 (2) TypeB (nominal mix 1: 1½: 3) Per Cft 152.60 528.40 Cu.m 5,389.85 18,663.10 (3) TypeC (nominal mix 1: 2: 4) Per Cft 152.60 473.85 Cu.m 5,389.85 16,736.40 (b) Precast reinforced cement concreteand prestressed reinforced cement concretein columns, beams, lintels, stair cases, shelves, etc. (1) TypeA (nominal mix 1: 1: 2) Per Cft 198.80 716.75 Cu.m 7,021.60 25,315.60 (2) TypeB (nominal mix 1:1½: 3) Per Cft 198.80 614.55 Cu.m 7,021.60 21,705.90 (3) TypeC (nominal mix 1: 2: 4) Per Cft 198.80 560.65 Cu.m 7,021.60 19,802.15 (c) Erecting and fixing in position, precast cement concrete or stoneslab in roofsor lintels, etc. lift upto 20 ft., (6m) Per Cft 87.80 109.05 Cu.m 3,101.10 3,851.65 including all charges. (d) Add extralabour for R.C. concretein Per Cft 41.60 -- Cu.m 1,469.30 - 2nd and subsequent storeys. 4) Compositerateshall bereduced by Rs: 21.50 P.Cft & Rs: 29.00 P.Cft if chenab sand and local sand isused respectively. (a) (ii) Reinforced cement concrete in retaining/ Shear walls laid in situ or precast laid in position, or prestressed members cast in situ ( Formwork on both sides) , completein all respects:
  • 43. Chap-6 (Concrete) Page 43 Sr. Description Spec. Remarks No. No. Unit Labour Composite Unit Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL Rate(British System) Rate(MetricSystem) 7 Providing and casting in situ bored reinforced concretepiles *851-1 with typeC concrete(nominal mix 1: 2: 4 ) , using 10% extra to cement in dry mix, and coursesand, including all labour and 851-10 material (except thecost of steel reinforcement and its labour for bending and laying in position, etc. which will be paid separately, including, screening & washing of shingle and curing:- i) 18 " (450 mm) diapile Per Rft 1,188.55 1,789.70 Metre 3,898.45 5,870.20 ii) 20" (500 mm) diapile Per Rft 1,453.75 2,195.30 Metre 4,768.30 7,200.60 iii) 22" (550 mm) diapile Per Rft 1,831.20 2,703.45 Metre 6,006.35 8,867.30 iv) 24" (600 mm) diapile Per Rft 2,354.65 3,421.90 Metre 7,723.25 11,223.90 8 i. Compositerateshall bereduced by Rs: 21.50 P.Cft & Rs: 29.00 P.Cft if chenab sand and local sand isused respectively. ii. If percussion boring isused based on the borelog/strata, deriverateaccordingly with thepermission of Superintending Engineer. (a) 3000 PSI (i) 0.46 m / 18 inch Per Rft. 951.05 1,566.05 Meter 3,119.40 5,136.65 (ii) 0.51 m / 20 inch Per Rft. 1,022.35 1,781.60 Meter 3,353.25 5,843.60 (iii) 0.56 m / 22 inch Per Rft. 1,149.40 2,068.15 Meter 3,769.95 6,783.60 (iv) 0.61 m / 24 inch Per Rft. 1,271.90 2,365.25 Meter 4,171.80 7,758.05 (iii) 0.76 m / 30 inch Per Rft. 1,670.25 3,378.65 Meter 5,478.40 11,081.90 (iv) 0.91 m / 36 inch Per Rft. 2,347.75 4,807.80 Meter 7,700.70 15,769.65 (v) 1.07 m / 42 inch Per Rft. 3,037.70 6,386.20 Meter 9,963.65 20,946.75 (vi) 1.22 m / 48 inch Per Rft. 3,235.40 7,608.90 Meter 10,612.15 24,957.20 (vii) 1.37 m / 54 inch Per Rft. 3,446.75 8,981.95 Meter 11,305.25 29,460.85 (viii) 1.52 m / 60 inch Per Rft. 4,793.00 11,626.55 Meter 15,721.10 38,135.10 (ix) 1.68 m / 66 inch Per Rft. 5,497.00 13,765.60 Meter 18,030.15 45,151.15 (x) 1.83 m / 72 inch Per Rft. 5,993.75 15,834.10 Meter 19,659.45 51,935.75 (xi) 1.98 m / 78 inch Per Rft. 6,511.05 18,059.80 Meter 21,356.30 59,236.10 (xii) 2.13 m / 84 inch Per Rft. 7,468.15 20,861.90 Meter 24,495.50 68,427.05 (b) 4000 PSI (i) 0.46 m / 18 inch Per Rft. 951.05 1,691.65 Meter 3,119.40 5,548.60 (ii) 0.51 m / 20 inch Per Rft. 1,022.35 1,936.65 Meter 3,353.25 6,352.20 (iii) 0.56 m / 22 inch Per Rft. 1,149.40 2,255.65 Meter 3,769.95 7,398.50 (iv) 0.61 m / 24 inch Per Rft. 1,276.40 2,592.95 Meter 4,186.55 8,504.95 (iii) 0.76 m / 30 inch Per Rft. 1,675.00 3,732.05 Meter 5,494.00 12,241.15 (iv) 0.91 m / 36 inch Per Rft. 2,347.75 5,309.95 Meter 7,700.70 17,416.70 (v) 1.07 m / 42 inch Per Rft. 2,934.60 6,966.45 Meter 9,625.45 22,849.95 (vi) 1.22 m / 48 inch Per Rft. 3,235.40 8,501.60 Meter 10,612.15 27,885.20 (vii) 1.37 m / 54 inch Per Rft. 3,446.75 10,111.75 Meter 11,305.25 33,166.50 (viii) 1.52 m / 60 inch Per Rft. 4,793.00 13,021.40 Meter 15,721.10 42,710.15 (ix) 1.68 m / 66 inch Per Rft. 5,497.00 15,453.40 Meter 18,030.15 50,687.10 Compositerateshall bereduced by Rs: 21.50 P.Cft & Rs: 29.00 P.Cft if chenab sand and local sand isused respectively. Providing and casting in situ bored reinforced concrete piles using Ordinary portland cement / Sulphate resisting cement or as may be required, incuding screening, washing of aggregates, mixing of constituents using batching plant, Transportation by Transit Mixer, Pouring in the required proportion to achieve a nominal cylinderical strength in the field as per ACI-214, with the specified consistency. i/c the cost of labour, boring, equipment/machinery, plateform (except thecost of steel reinforcement, its labour for bending and laying in position and boat plateform etc. which will be paid separately) excluding the cost of admixtureasapproved and directed by theEngineer Incharge In ordinary soil
  • 44. Chap-6 (Concrete) Page 44 Sr. Description Spec. Remarks No. No. Unit Labour Composite Unit Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL Rate(British System) Rate(MetricSystem) (x) 1.83 m / 72 inch Per Rft. 5,993.75 17,842.65 Meter 19,659.45 58,523.90 (xi) 1.98 m / 78 inch Per Rft. 6,511.05 20,417.05 Meter 21,356.30 66,967.90 (xii) 2.13 m / 84 inch Per Rft. 7,468.15 23,595.85 Meter 24,495.50 77,394.30 9 (a) Reinforced cement concretein roof slab, beams, columnslintels, girdersand other structural memberslaid in situ or precast laid in position, or prestressed memberscast in situ, completein all respects:- (i) 7000 PSI Per Cft 119.10 738.10 Cu.m 4,201.75 26,039.50 (ii) 6000 PSI Per Cft 119.10 713.05 Cu.m 4,201.75 25,157.05 (iii) 5000 PSI Per Cft 119.10 686.95 Cu.m 4,201.75 24,235.25 (iv) 4000 PSI Per Cft 119.10 666.60 Cu.m 4,201.75 23,516.95 (vi) 3000 PSI Per Cft 119.10 595.55 Cu.m 4,201.75 21,010.70 (b) Retaining/ Shear wallslaid in situ or precast laid in position, or prestressed memberscast ( Formwork on both sides) i) 7000 PSI (i) Upto 9" thick Per Cft 114.50 723.15 Cu.m 4,038.85 25,513.50 (ii) MoreThan 9" Thick Per Cft 114.50 709.25 Cu.m 4,038.85 25,021.65 ii) 6000 PSI (i) Upto 9" thick Per Cft 114.50 698.15 Cu.m 4,038.85 24,631.05 (ii) MoreThan 9" Thick Per Cft 114.50 684.25 Cu.m 4,038.85 24,139.20 iii) 5000 PSI (i) Upto 9" thick Per Cft 114.50 672.05 Cu.m 4,038.85 23,709.20 (ii) MoreThan 9" Thick Per Cft 114.50 658.10 Cu.m 4,038.85 23,217.40 iv) 4000 PSI (i) Upto 9" thick Per Cft 114.50 651.65 Cu.m 4,038.85 22,990.95 (ii) MoreThan 9" Thick Per Cft 114.50 637.75 Cu.m 4,038.85 22,499.15 v). 3000 PSI (i) Upto 9" thick Per Cft 114.50 580.65 Cu.m 4,038.85 20,484.70 (ii) MoreThan 9" Thick Per Cft 114.50 566.70 Cu.m 4,038.85 19,992.90 ( c) Substructure (Foundations, Raft, Strip and Footing Beams) (i) 7000 PSI Per Cft 64.80 631.60 Cu.m 2,286.55 22,283.70 (ii) 6000 PSI Per Cft 64.80 606.60 Cu.m 2,286.55 21,401.25 (iii) 5000 PSI Per Cft 64.80 580.50 Cu.m 2,286.55 20,479.45 (iv) 4000 PSI Per Cft 64.80 560.10 Cu.m 2,286.55 19,761.15 (vi) 3000 PSI Per Cft 64.80 489.10 Cu.m 2,286.55 17,254.90 Placing, compacting, finishing and curing of concrete using Ordinary Portland Cement / Sulphate resisting cement / Slag cement as may be required; including screening, washing of aggregates and mixing of constituents using batching plant, Transportation by transit mixer, pouring with pump in the required proportions to achieve a nominal cylindrical strength in the field as per ACI 214, with the specified consistency. i/c the cost of shuttering, compaction with Viberator, excluding the cost of Admixture, asapproved and directed by theEngineer Incharge.
  • 45. Chap-6 (Concrete) Page 45 Sr. Description Spec. Remarks No. No. Unit Labour Composite Unit Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL Rate(British System) Rate(MetricSystem) 10 i. 1:3:6 P.Cft 57.35 263.15 Cu.m 2,023.90 9,284.65 ii. 1:2:4 P.Cft 57.35 298.10 Cu.m 2,023.90 10,517.45 11 *851.5 The overlap will be paid extra vide FD Notification No.RO(TECH)FD2-11/2010 dated 08.03.2010. i) Deformed BarsGrade-40 Per Cwt. 125.15 14,499.25 100 Kg 246.30 28,541.85 ii) Deformed BarsGrade-60 Per Cwt. 125.15 14,682.50 100 Kg 246.30 28,902.55 12 Fabrication of mild steel reinforcement for cement concrete, *821 Therateincludeswastage, overlaps including cutting, bending, laying in position, making joints and steel chairs, etc. completein all respect. and fastenings, including cost of binding wireand labour chargesfor binding of steel reinforcement (also includes removal of rust from bars):- (a) Plain bars Per Cwt. 808.50 13,720.85 100 kg 1,591.55 27,009.55 (b) Deformed bars(Grade-40) ditto 808.50 16,030.85 100 kg 1,591.55 31,556.80 ('c) Deformed bars(Grade-60) ditto 808.50 16,228.85 100 kg 1,591.55 31,946.55 13 Precast cement concretesolid or faceblocks(1:2:4), Per Cft 156.25 427.20 Cu.m 5,518.75 15,088.70 20.2 including cost of templates. 14 Precast cement concretehollow blocks(1: 2: 4) , including Per Cft 159.00 339.85 Cu.m 5,615.90 12,003.50 20.2 cost of templatesand constructing wallsthereof. 15 Providing and fixing ornamental cement jali 2" (50 mm) thick Per Sft 64.70 112.60 Sq.m 696.15 1,211.60 20.1 to (1: 2: 4), without steel. 20.4 16 Extralabour for laying concreteplain or reinforced: (a) above30' (6 m) upto 40'(12 m) height 100Cft 4,435.20 - Cu.m 1,566.50 - (b) for every additional 10'(3 m) height. 100Cft 2,772.00 - Cu.m 979.05 - 17 Extralabour for work of weirs, rail or road bridges, syphons, and 100Cft 1,108.80 - Cu.m 391.65 - concreting in superstructure 18 Making reinforced cement concretespout, including fixing in Each 808.50 1,149.60 Each 808.50 1,149.60 20.4 position (2½' x 6" x5") (760 mmx150 mm x 125 mm) 19 Making holesupto 3"(75 mm) dia18"(450 mm) depth in cement Per hole 1,940.40 - Each 1,940.40 - 20.1 concreteor stonemasonry wallsand repairing. The cost includes mortar (1:5) and labour for fixing at any height. Providing ,laying,compacting and curing Cyclopean/plum/rubble concrete in (40:60) ratio (plum:Concrete) using pre-mixed Cement Concrete of specified ratio by using Ordinary Portland Cement including screening washing of aggregate ;mixing of constituents by using batching plant,transported by transit mixer and pouring under gravity,with specified consistency i/c the cost of compaction with Viberator but excluding the cost of Admixture and carriage charges, as approved and directed by the Engineer Incharge. The cost includes mortar (1:5) and labour for fixing at any height. Fabrication of mild steel reinforcement deformed bar cage of specified yield strength for R.C.C bored piles including cutting bending, lowering of cage with crane in position, welding and fastening, including the cost of binding wire, Crane machine (also includes removal of rust from the bars) asapproved and directed by theEngineer Incharge.
  • 46. Chap-6 (Concrete) Page 46 Sr. Description Spec. Remarks No. No. Unit Labour Composite Unit Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL Rate(British System) Rate(MetricSystem) 20 Extralabour for skipping concretein wells. 100Cft 6,776.00 - Cu.m 2,393.30 - 20.1 21 Nicking concretesurface: (a) Cement concretesurface 100Sft 739.20 - Sq.m 79.55 - (b) Limeconcretesurface 100Sft 243.95 - Sq.m 26.25 - 22 Preparing, watering and ramming surfacefor laying concrete (for Headworksonly):- (a) Horizontal floor 100Sft 691.15 - Sq.m 74.35 - (b) Glacisand crest 100Sft 1,016.40 - Sq.m 109.35 - (c) Inverted filters 100Sft 323.40 - Sq.m 34.80 - 23 Fabrication of high tensilesteel prestressing cablesfor 100 Kg. 9,901.95 73,202.80 100 Kg. 9,901.95 73,202.80 *811-1 Therateincludeswastagein prestressed (post tensioned) concrete, including assembling by to cutting and breakagein stressing, drawing theH.T. wirethrough metal spacer plate, inserting in helix 811-11 etc. coreand taping or tying, sheathing in longitudinally welded metal corrugated sheath, positioning , anchoragewith maleand female set of anchoragecone, forming ductsfor transversecable, stressing cableswith jack at both endsasper stressing schedule, maintaining stressing record and supply thesamein theapproved proformato theEngineer-in-charge, making loop at blind end, including all materialsrequired for it, grouting thecableductswith cement, cutting projected endsand making good recesses, etc., completein all respects. 24 Fabrication of High Tensilesteel reinforcement for prestressed 100kg 5,808.00 69,866.25 100kg 5,808.00 69,866.25 1) Therateincludeswastagein (pretension) concretework, including inserting wirein moulds, cutting and breakagein stressing,etc. providing M.S. shear bars, spacersand lift hooks, maleand femaleanchorage, tiedown, struts, stressing cables, maintaining 2) Quantity of H. T. wirewill form stressrecord and supply thesamein approved proformato the basisof payment. Engineer-in-charge, cutting wiresand projecting endsand making 3) Thisitem shall not beapplicable good recesses, etc., completein all respects. to factory madeunits. 25 Lifting, transporting and placing precast prestressed concrete *811-1 B eam, Girder and other members(excluding battens) etc. in to Position on thebridgeto correct alignment and level, etc. 811-11 complete i) Beam upto 50 ft. (15 m) length 100Cft -- 3,198.35 Cu.m -- 1,129.65 ii) Beam above50 ft. (15m) upto 75 ft. (22.5m) length 100Cft -- 4,447.08 Cu.m -- 1,570.70 iii) Beam above75ft. (22.5m) upto 100ft. (30m) length 100Cft -- 6,214.10 Cu.m -- 2,194.80 iv) Beam above100ft. (30m) upto 150ft.(45m) length 100Cft -- 8,142.30 Cu.m -- 2,875.85 v) Beam above150ft. (45m) length 100Cft -- 10,205.60 Cu.m -- 3,604.60 26 Providing and laying foam concrete3 inch (75 mm) thick, Per Sft. 62.35 132.70 Sq.m. 670.90 1,427.85 using cement sand in theratio of 1:2 and aluminium powder at therateof 0.2% of thecement, sand mix,
  • 47. Chap-6 (Concrete) Page 47 Sr. Description Spec. Remarks No. No. Unit Labour Composite Unit Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL Rate(British System) Rate(MetricSystem) 27 Providing and fixing 6 in(150 mm). widecurved sheet of required shapefixed on faceof theconstruction joint with G.I. screw,1.5 in (40 mm) long to cover construction joints vertically:- i) aluminium sheet 1/16 in(1.5 mm) thick Per Rft. 33.75 162.25 Metre 110.70 532.20 ii) G.I. sheet, 18 SWG Per Rft. 34.55 257.85 Metre 113.30 845.75 28 Providing and fixing 1/8" (3 mm) thick 3" (75 mm) widealuminium strip on horizontal and vertical expansion jointsin walls, columns, ceilingsand floorsetc., including cost of clips/screwsetc., completein all respects:- a) On interior surface(without mastic strip) Per Rft. 30.80 159.30 Metre 101.00 522.50 b) On exterior surface(with mastic strip) Per Rft. 30.80 171.30 Metre 101.00 561.85 29 Providing and fixing 1/16" (1.5 mm) thick copper flashing on Per Sft. 32.35 188.75 Sq.m 348.10 2,030.95 expansion jointscompletein all respects. 30 Providing and fixing 6 in (150 mm). wideG.I. sheet 18SWG. Per Rft. 11.40 205.60 Metre 37.40 674.35 stopper to expansion joint. 31 Providing embeding 10" (250 mm) wide¼" (6 mm) thick Per Rft. 46.20 310.20 Metre 151.55 1,017.40 rubber water stopper in expansion jointsof R.C.C. roof slab completein all respects. 31A i) 10"wide6 mm thick P.Rft 46.20 346.20 Meter 497.10 3,725.10 ii) 10" wide10 mm thick P.Rft 46.20 766.20 Meter 497.10 8,244.30 32 Filling expansion jointswith bitumen. sand & saw dust in Per Rft P.Metre/ ratio 1:2:2. per inch 6.95 34.60 Per 25 mm 22.80 113.50 width Width 33 Filling expansion jointswith bitumen. Per Rft. 120.10 - Metre 393.95 - 34 Laying asphaltic mixturein expansion joints. Per Rft. 97.00 - Metre 318.15 - Material to bepaid on actuals. 35 Providing and fixing theremopore(foamed polythene) sheet in horizontal and vertical expansion joints: a) 1" (25 mm) thick thermoporesheet Per Sft. 12.95 21.15 Sq.m 139.35 227.55 b) 1½" (40 mm) thick thermoporesheet ditto 12.95 27.00 " 139.35 290.50 36 Providing and laying damp proof courseof cement concrete 1:2: 4(using cement, sand and shingle), including bitumen coating :- Providing and embedding 10" (250mm) wide PVC water stopper in expansion joints of RCC structures (Retaining walls, water tanks, Slabs) completein all respect.
  • 48. Chap-6 (Concrete) Page 48 Sr. Description Spec. Remarks No. No. Unit Labour Composite Unit Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL Rate(British System) Rate(MetricSystem) (a) with onecoat bitumen and onecoat polythenesheet 500gauge i) 1½" thick (40 mm) 100Sft 2,882.00 9,240.05 Sq.m 310.10 994.25 ii) 2" thick (50 mm) 100Sft 2,882.00 10,356.85 Sq.m 310.10 1,114.40 iii) 3" thick (75 mm) 100Sft 3,005.20 12,889.05 Sq.m 323.35 1,386.85 (b) with 2 coatsof bitumen: i) 1½" thick (40 mm) 100Sft 2,882.00 9,724.15 Sq.m 310.10 1,046.30 ii) 2" thick (50 mm) 100Sft 2,882.00 10,839.80 Sq.m 310.10 1,166.35 iii) 3" thick (75 mm) 100Sft 3,005.20 13,372.00 Sq.m 323.35 1,438.85 37 Providing and laying damp proof coursewith cement sand plaster and bitumen coating:- (a) with onecoat of bitumen and onecoat of polythenesheet 500 gauge:- i) Ratio 1: 4 a) ½" thick (13 mm) 100Sft 2,697.20 6,154.90 Sq.m 290.20 662.25 b) ¾" thick (20 mm) 100Sft 2,697.20 6,694.15 Sq.m 290.20 720.30 ii) Ratio 1:3 a) ½ " thick (13 mm) 100Sft 2,697.20 6,329.20 Sq.m 290.20 681.00 b) ¾ " thick (20mm) 100Sft 2,697.20 6,900.05 Sq.m 290.20 742.45 iii) Ratio 1:2 a) ½ " thick (13 mm) 100Sft 2,697.20 6,480.10 Sq.m 290.20 697.25 b) ¾ " thick (20 mm) 100Sft 2,697.20 7,284.10 Sq.m 290.20 783.75 (b) with 2 coatsof bitumen:- i) Ratio 1: 4 a) ½" thick (13 mm) 100Sft 2,697.20 6,267.15 Sq.m 290.20 674.35 b) ¾" thick (20 mm) 100Sft 2,697.20 6,805.95 Sq.m 290.20 732.30 ii) Ratio 1:3 a) ½ " thick (13 mm) 100Sft 2,697.20 6,447.15 Sq.m 290.20 693.70 b) ¾ " thick (20 mm) 100Sft 2,697.20 7,017.95 Sq.m 290.20 755.15 iii) Ratio 1:2 a) ½ " thick (13 mm) 100Sft 2,697.20 6,881.05 Sq.m 290.20 740.40 b) ¾ " thick (20 mm) 100Sft 2,697.20 7,735.45 Sq.m 290.20 832.35 38 Providing and laying vertical damp proof coursewith cement sand plaster and bitumen coating:- (a) with onecoat of bitumen and onecoat of polythenesheet 500 gauge:
  • 49. Chap-6 (Concrete) Page 49 Sr. Description Spec. Remarks No. No. Unit Labour Composite Unit Labour Composite MRS, 1st BI-ANNUAL-2023 (01.01.2023 to 30.06.2023) DISTRICT SAHIWAL Rate(British System) Rate(MetricSystem) i) Ratio 1: 4 a) ½" thick (13 mm) 100Sft 2,697.20 5,870.50 Sq.m 290.20 631.65 b) ¾" thick (20 mm) 100Sft 2,697.20 6,411.10 Sq.m 290.20 689.85 ii) Ratio 1:3 a) ½ " thick (13 mm) 100Sft 2,697.20 6,046.20 Sq.m 290.20 650.55 b) ¾ " thick (20 mm) 100Sft 2,697.20 6,617.05 Sq.m 290.20 712.00 iii) Ratio 1:2 a) ½ " thick (13 mm) 100Sft 2,697.20 6,480.10 Sq.m 290.20 697.25 b) ¾ " thick (20 mm) 100Sft 2,697.20 7,334.50 Sq.m 290.20 789.20 (b) with 2 coatsof bitumen:- i) Ratio 1: 4 a) ½" thick (13 mm) 100Sft 2,697.20 6,266.05 Sq.m 290.20 674.25 b) ¾" thick (20 mm) 100Sft 2,697.20 6,805.95 Sq.m 290.20 732.30 ii) Ratio 1:3 a) ½ " thick (13 mm) 100Sft 2,697.20 6,441.00 Sq.m 290.20 693.05 b) ¾ " thick (20 mm) 100Sft 2,697.20 7,011.85 Sq.m 290.20 754.50 iii) Ratio 1:2 a) ½ " thick (13 mm) 100Sft 2,697.20 6,875.05 Sq.m 290.20 739.75 b) ¾ " thick (20 mm) 100Sft 2,697.20 7,729.25 Sq.m 290.20 831.65 39 Grouting concretebetween, thegroovesof gates, including 100Cft 12,949.20 - Cu.m. 4,573.65 - shuttering. 40 Chiesel dressing concretesurfaceon sidesof grooves. 100Sft 406.55 - Sq.m 43.75 - 41 Laying and ramming dry ballast or kankar. 100Cft 4,504.50 - Cu.m 1,591.00 - 42 Hoisting and placing in position R.C.C. shelves. per No. 144.40 - per No. 144.40 - 43 Breaking brick ballast, screening and stacking:- (a) 2"(50 mm) ring 100Cft. 3,465.00 - Cu.m 1,223.85 - (b) 1½ "(40 mm) ring 100Cft. 3,880.80 - Cu.m 1,370.70 - (c) 1" (25 mm) ring 100Cft. 4,504.50 - Cu.m 1,591.00 - (d) Jhamaballast ¾"(20 mm) ring 100Cft. 5,197.50 - Cu.m 1,835.75 - 44 Supplying and fixing broken glasseson court yard walls, Per Rft 108.35 187.40 metre 355.40 614.65 including 1:3: 6 cement concretecoping. 45 Crushing stoneballast by machine. 100Cft 3,465.00 - Cu.m. 1,223.85 - This does not include the charges for working of crushers, but includes manual labour for carriageof stone to crusher within threechains (90 m) and also stacking the product after crushing within threechains