1. ASIF NAVEED
Personal Details
Date of birth: 05 Apr, 1987
Marital Status: Married
Voice: +966 504894232
E-mail:
Nationality:
asif.naveed11@gmail.com
Pakistani
Present address:
Driving License:
Raudaw1 Al khaleej Riyadh, KSA
YES(Valid till 2018)
Professional Experience
Organisation: Seder Group of Communication (KSA)
Designation: Telecom Engineer
Duration: Jan, 2013 –Present
Responsibilities:
Mobily MS Coordinator
Responsible of more than 1000 mobily sites TT clearance within given
SLA and teams follow up in south region.
Troubleshooting of BTS3900, BBU3900.
Troubleshooting of RTN950,RTN900
Troubleshooting of NEC link,(pasolink)
4G3 survey Coordinator
Responsible of more than 600 4G3 sites survey for Huawei.
Site Survey of LTE1800Mhz with Ericsson for Mobily Network
Site Survey of 3G6, USF5, 4G1 for Huawei.
Making TSSR(Technical site survey report)
Installation and commissioning of BTS3900L, BTS3900.
Installation and configuration of NEC MW Link.
Installation and Power up of DC Rectifier(Lucent,Delta,Benning)
Wateen Telecom Pakistan
Work as a Field Network Technician in Wateen Telecom (Jan 2011 –May 2012 )
Integration and Troubleshooting of BCU (Base Control Unit)
Installation and Configuration of MW Link using Link Pilot and PNMT
Installation and Configuration of Cisco and Jupiter switches.
Installation and Commissioning of Eltek rectifier power alarms using power
suit.
Testing of SDH and DWDM.
Motorola (Pvt.) Ltd.
Designation: Technician
Duration: Jan 2007 – Aug 2010
Responsibilities:
Supervision Installation of Wi Max Sites.
To ensure that CME quality match with approved drawings,
2. To participate in the daily and weekly coordination project progress
review meetings
To manage and evaluate field and design changes regarding Site
installation
To make project progress reports
To monitor the performance of Sub contractor under EPC with respect
to approved project schedules, QC plan and safety standards.
To coordinate with Project Manger and report them.
Skills:
SITE INSTALLATION:
Worked for Wateen on WiMAX Project through MOTOROLA Nation Wide.
Configure DAP Site
Complete DAP Site Installation and Power Up
SUN 440 & 220 Server Install in Wateen MSC
CAP C Install in Wateen MSC
Installation & Configure of CISCO switch (ME3400)
Work On SAAP Site.
ATP with customer (Wateen WiMAX Project)
ATP with customer (Wi-Tribe Project)
Work on Eltek Rectifier
LOS Surveys for MW Links
RF Surveys for new DAP Sites
Project in Bahrain Mena Tel Wi-max
Installation and commissioning of SAAP (smart antenna access point).
Installation and configuration of MENATELECOM Jupiter at customer end.
Optimization of 7MHz system to 10MHz.
Installation and configuration of Cisco and Jupiter switches.
Microwave System:
I can resolve all issues regarding Microwave Installation.
Configure MW Link. Alignment / Panning.
Sagam 0.3m, 0.6m, 1.2m.23GHz, 38GHz.11GHz
NEC 0.3, 0.6, 0.8, 1.2 23GHz, 38GHz. 11GHz
Huawei MW Installation
Wi-Tribe Telecom (Pakistan)
SAR (site acquisition report).
TSSR (technical site survey report).
Line of sight (LOS). For MW Link.
PMCL Project (Mobilink Pakistan)
BTS installation and its troubleshooting (Mobilink,)
Installation and power up of BCU (Base Control Unit)
Installation and power up Of NEC Micro Wave Link
Installation and power up GSM Site (BTS 900, 1800)
Troubleshooting Of GSM Site (900, 1800Mhz)
Installation of Rectifier cabinet.
Drive Test for Mobilink.
Call Testing of PMCL (Mobilink) Cellular Sites in Central Region (Punjab)
3. Educational Background:
Bachelor in Technology (B. Tech) (Electrical)
University: Preston University Lahore
Feb. 2010
Marks obtained: 1094/1300
GPA 3.3
DAE Electrical (2002-2005)
Govt. Swedish Pakistani Institute of Technology Gujrat.
Marks obtained: 71.66 %
Software Competence
Proficient in: < MS Word, MS Excel, MS Power Point
< E Mail (Internet)
Certification:
CCNA (Punjab University Lahore)
• Subnetting
• Network Management
• IP Addressing
• DHCP
Communication Skills
English: Effective communication in both spoken and written.
Urdu: Well Spoken and written
Arabic: Spoken (Fair)