SlideShare a Scribd company logo
1 of 7
Instrument & Telecom Commissioning
Engineer
Kamran Saeed
Add: Khobar Saudi Arabia, Instrumentengine@gmail.com, OiLsensor@hotmail.com
M: 00966(595) 273934 Pak: 0092-345-228115
Skype: k_s_puri (Kamran)
CAREER OBJECTIVE
 A position of dynamic and energetic person to work as RF VSAT
Telecommunication Commissioning Engineer with growth potential and
challenging environment to utilize my technical experience for better prospects of
organization.
PROFESSIONAL EXPERIENCE
.
AU Holding: [ July 24, 2017 to Date ]
 Commissioning Engineer ( Telecom/ Scada & Analyzers )
Current Job Responsibilites:-
Project: Saudi Aramco Monitoring of Wells, Cathodic Protection, Production facilities
RTU & Scada
Contractor: Wipro
Description: Commissioning Testing and performance of new (CP ) NETCONTROL
& GE SCADA automation, UHF/VHF 350 to 360 MHZ Radio Master, Slave Radio
Station, MDS Master Radio, NMS server and PDR Radio configuration and replacement.
Site acceptance test procedures, Scada Remote stations, Visual Checks, Visual
inspection, Radio status, RSSI Check, Frequency Interference Check, Link Check,
and inspection of wave guide at all major Saudi Aramco sites Abquaiq, Harad,
Shedgam, Khurais and other areas
DLPS Alkhobar ,Saudi Arabia 2008 to July 2017
 Working as “ Instrument & Telecom Engineer
Projects: Saudi Aramco
Description: Commissioning of Analyzers in Saudi Aramco Uthmaniya, Mubaraz,
Tanajib, Shedgum and Kaust, for monitoring of Oil, Water, Refinery & Gas Oil
separation Plant.
Project: Sabic & Tasnee
Description: Commissioning and Testing of the Analyzers for monitoring Petrochemical
Waste Water facilities at all segements of Sabic and Tasnee.
Working on STC Fiber Optics Network for OSP, FTTH, Junction and Access network
projects. Using Network Engineering Tool (NE Tool) for supporting the field staff for
troubleshooting fiber optics issues.
Survey for OSP and FTTH installation and Laying all kind of Fiber optical cable for FTTH,
Access and metro network including all type of Civil work. To Manage & reports from
the beginning to completion of FTTH and OSP Projects ,Coordinate with the O&M
department to hand over the OSP Site after the PAT.
Working with different integrators to provide district wise FTTX connectivity in the Saudi
Arabia, Carried out Trouble shouting from MSC to customer end by using different
testing tool like OTDR, power meter, and source meter and laser gun.
Conducting Preliminary Acceptance Test for Fiber Optic cable. Helping field Engineers
and technicians through Fiber Joint Schematic (FJS), Cable Route Diagrams and Granite
Table for troubleshooting the OSP and FTTX issues. For new implementations of DWDM
nodes analyzing the OTDR Traces, section Loss Measurements. Monitoring and
maintaining the Integrity of the Client networks and its vital Elements. Performing
schedules maintenance Issues, trouble tickets and dispatching market personnel as
required.
Prepare survey procedures and coordinate and communicate these with involved
parties’ .Conduct site survey to monitor quality of work performed and prepare regular
reports on the quality of the survey & audit results.
Review site reports, identify technical issues and other blocking issues, and escalate as
necessary. Verify progress and quality of work of the vendors and contractors against
agreed specifications and plans, and report any deviations as per project process.
Working with various internal and external agencies to provide the necessary support
and assistance.
Developed fault tracing procedures for OSP and FTTH network using (EXFO), OTDR and
optical power meter.OTDR testing for Link budgeting and maintaining test
reports. Laying all kind of Fiber optical cable for primary network and secondary
network.
FTTH OSP design approvals according to STC standards and OSP construction activities
as per construction drawing, Perform construction and maintenance of OSP and FTTH
infrastructure according to industry standards.FTTH OSP work including laying/pulling &
jointing of u/g copper and optical fiber cables, cable splicing, cable testing and
reporting, PVC pipes, and construction of Main Holes and all other allied works.
To make connectivity from MSC to cabinet and follow up to subscriber OPTICAL
NETWORK TERMINAL (ONT) according to the STC plan and granite paper. Fiber cable cut
activities (Corrective Maintenance), Preventive Maintenance. Patching in (MSC) by using
LC, FC, SC connectors to make the connectivity between MSC and customer.
Prepare access network design; including fiber access and fiber backbone networks,
employing Fiber-To-The-Node (FTTN), Fiber-To-The-Premises (FTTP), and Fiber-To-The-
Home (FTTH) technology, underground, including Manhole and conduit design as
applicable, in the area under study. Networks planning and optimization, system
engineering, and maintenance of fiber optic transmission networks constituting long-
haul & METRO networks, Junction & Access.
Testing &Splicing ,Termination, laying and installation of indoor/ outdoor fiber network
for GPON and GSM sites and Survey, Planning and design of OSP (Primary, Secondary &
Junction Network) and other cabling techniques.
Providing Technical support to the new deployment projects like GPON FTTH OSP.End to
end coordination with Multi Vendors Ericsson/Huawei/Alcatel Lucent for ISP Equipment
(OLT & ONT).
.
Responsible for checking and testing of OSP and ISP equipment, operation and
maintenance of Access network, metro network OSP and FTTH. Installation ,signal
testing,OTDR test result and report and trouble shouting of Fiber distribution terminal
(FDT),ODF,Splitter,FDF,ONT,OLT and Fusion splicing of optical fiber.
Making As built/Red line drawings at the end of the work completion. Conduct PAT for
the implemented project. Prepare Site Acceptance Test results & Site Inventory
documentation and follow up with vendors to clear the OILS prior to final acceptance.
Making site inspection to make sure that works are accomplished according to the job
order.Qualtity control management for all FTTH and OSP related jobs.
FTTH/ OSP Engineer
Petro Rabigh Complex– SAAF Line 3 Optical Fiber Project
Client: Saudi Aramco
Supervision of the outside plant (OSP) installations, testing & commissioning team for
Fiber optic cables. Planning & implementation of FTTH, OSP, access and junction
Networks. Troubleshooting, relocations, installation & MDT (Maintenance down Times)
on different Fiber Optic Network. Troubleshooting and support for the FTTH, and FTTB
from PON port up to the customer termination ONT.
Prepare survey procedures and coordinate and communicate these with involved
parties’ .Conduct site survey to monitor quality of work performed and prepare regular
reports on the quality of the survey & audit results.
Responsible for checking and testing of OSP and ISP equipment and operation and
maintenance of Access network, metro network OSP and FTTX. Installation, Signal
testing, OTDR test result and report and trouble shouting of Fiber distribution terminal
(FDT), ODF, Splitter, FDF, ONT, OLT and Fusion splicing of optical fiber.
Splicing, Termination and testing using OTDR, VFL & Power meter of OFC.Proven
communication,planning & leadership skills with focus on conflict & problem resolution.
Trouble Shooting on CISCO Routers and Switches. Routing and Switching, MDT, PAT,
testing & commissioning PMR for the STC Data equipment. Troubleshooting on SDH and
DWDM Systems different vendors.
Developed fault tracing procedures for OSP and FTTH PON network using (EXFO), OTDR
and optical power meter. OTDR testing for Link budgeting and maintaining test
reports. Laying all kind of Fiber optical cable for primary and secondary network.
Survey, Planning and installation of OSP and FTTH (Primary, Secondary & Junction
Network) and other cabling techniques ,OSP and FTTH civil work including laying/pulling
& jointing of u/g copper and optical fiber cables ,cable splicing, cable testing and
reporting ,PVC pipes , and construction of Main Holes and all other allied works.
Making Red line drawings at the end of the work completion. Conduct PAT for the
implemented project. Prepare Site Acceptance Test results & Site Inventory
documentation and follow up with vendors to clear the OILS prior to final acceptance.
Making site inspection to make sure that works are accomplished according to the job
order.Qualtity control management for all FTTH and OSP related jobs.
Site Engineer
Client: Saudi Telecom Company
Location: Yanbu Industrial Area
Laying all kind of Fiber optical cable for primary network and secondary network. Survey
for the installation of optical fiber. Civil work for the laying of all kind of Fiber optical
cable. Installation of Fiber distribution terminal (FDT), ODF, Splitter, FDF and Fusion
splicing of optical fiber. Installation of optical fiber for FTTH and OSP projects and GSM
tower. Installation of splitter terminal box (STB), terminal box (TB), optical network
terminal (ONT), optical distribution frame (ODF).
Carried out Trouble shouting from MSC to customer end by using different testing tool
like OTDR, power meter, and source meter and laser gun. Patching in (MSC) by using LC,
FC, SC connectors to make the connectivity between MSC and customer. To make all
type of optical Fiber installation according to the STC plan and granite paper. To make a
connectivity from MSC to cabinet and follow up to subscriber OPTICAL NETWORK
TERMINAL (ONT) according to the STC plan and granite paper.
Signal testing and trouble shouting of optical fiber by using power meter and source
meter. To handover all jobs to STC as per STC standards and requirements. Prioritizes
on-site installation activities to support the project schedule provided by the Project
Manager. Coordinating with the logistic team to make sure material and equipment
delivered at the site in time.
Review site reports, identify discrepancies, technical issues and other blocking issues,
and escalate as necessary .In coordination with contractors, vendors and Customer,
prepare acceptance schedule and related documents. Verify progress and quality of work
of the vendors and contractors against agreed specifications and plans, and report any
deviations as per project process. Working with various internal and external agencies to
provide the necessary support and assistance.
BTC
 Senior Engineer Operations
Responsibilities:-
I. Sawan Gas Plant & Sawan Rigs (Total Nos of Rig 25 )
Description: Installation, configurations, commissioning and testing of RF SCPC
Earth Station Gas Rigs of M/s OMV’s (Austrian Company) 25 Rigs.
Establishment of data and voice Communication involve RF high frequency
wireless connection from Gas Sawan Rig (05), Sawan (10) and Duljan sites to their
head office there at Islamabad via SCPC Link. Installation involve civil work for
construction of base, installation of 3.0 M antenna, Low Noise Amplifier, OMT,
SPT, Down converter, Upconverters and commissioning part consist of
configuration of RF Agilis ASM 4800 modems. The assignment was being
conducted regularly with interval of two months
II. BHPBILLITION (Oil & Gas sector):
Description: Rectification of faults in their 128kpbs, voice and data satellite RF
communication link there at Zamzama Gas plant, Dadu, which is connected to head
office in city of Islamabad.
III. T.V One (Teleport)
Description: Commissioning and testing of Satellite Encoder, Encoder’s Redundant
Switches, 200 Watts Solid State Power Amplifier and maintenance of RF 6GHZ
link. Propagation of Distribution Amplifier’s 0.75 V Video Signal to transponder
via Encoder & Encoder Switches.
IV. PAKTEL (Mobile Phone Operator)
Description: Diagnoses of fault at their BTS sites. Operation comprises adjustment
of power in Comstream Paradise modem, attenuation, frequencies in SPT (Agilis) at
Karachi as well as Gwader BTS sites. Detection of fault with the help of spectrum
analyzer such as spike in carrier while transmitting signal.
 Commissioning of Radio (Wimen –II 24 db, 2.4GHZ). Antennas and
Transceiver unit with line of sight alignment to another Microwave Antenna
network system, with 512 Kbps baud rate.
 Designing and preparation of Radio & Satellite Link Budge.
 Installation of Power sections in Up converters during time of no power.
V. PAKISTAN INTERNATIONAL AIRLINES (PIA)
Description: Installation and commissioning of Earth Station at Karachi Airport.
Configured as a main HUB for Quetta and Faisalabad Airports. ASM 4800 and
COMTECH EF 600 satellite modems with Ring Focus 3.0 M Antenna were
commissioned in order to connect with remote earth station with both cities via
Satellite.
VI. WAQT T.V
Description: preparation of Civil work (Earth Station Base for 3.7 meter
Anntena).Installation & Commissioning of their link from Lahore, Islamabad to
Karachi using satellite (Paksat).
VII. PRIME BANK:
Description:Installation, commissioning & testing of Mesh Satellite Network at
Clifton Branch ,Zamzama Karachi linked and configured with Lahore and
Islamabad Branch via Satellite (AP-STAR-2R). 3.7m Antenna powered by 20
Watts Agilis SPT with pair of Comtech CDM 5700 modem. Civil Work Comprises
construction of base and prior construction analysis also included in project
VIII. ALLIED BANK
Description: Installation, commissioning & testing of DVB-S2, remote satellite
link to connect it with other branches for exchanging the data and internet traffic.
1.2M Ku Band Antenna, BUC and Access Broad Band Terminal (Efficient
Channel Coding Inc, USA) were used.
IX. BUSINESS PLUS
Description: Maintenance of T.V channel transmitting video signals over PAKSAT
satellite. Fault diagnostic and rectification comprising diagnostic of all electrical
and electronic equipment involve in the RF transmission.
QUALIFICATION
 B.E 1998-99
 Certification: Fiber Optics
 Certification: Radyne RF Equipments.USA (Installation of Satellite Modems,
Upconverter, NMS, Downconverters, RCS, SSPA at Pakistan Telecommunication
Ltd, Karachi
TRAININGS____________________________________________________________
 Satellite Earth Station, Dhahmandro Pakistan 2005
 T.D California,U.S.A. November 2013.
PERSONAL PROFILE
Marital Status : Married
Nationality : Pakistani
Iqama # : Transferable
Languages : English, Urdu, Punjabi, Basic Arabic.
REFERENCES
1. Mr. Ashraf, PMT , Saudi Aramco, Mobile: 0552352735
2. Mr. Yahya Al Janabi , Saudi Aramco Phone:013- 8768079

More Related Content

What's hot

Fiberhome Smart ODN Solution
Fiberhome Smart ODN SolutionFiberhome Smart ODN Solution
Fiberhome Smart ODN SolutionJethrow Hwayerera
 
Bts installation & commisioning
Bts installation & commisioningBts installation & commisioning
Bts installation & commisioningAIRTEL
 
EPON Technology and its Application in China Telecomʹs Access Network Migration
EPON Technology and its Application in China Telecomʹs Access Network MigrationEPON Technology and its Application in China Telecomʹs Access Network Migration
EPON Technology and its Application in China Telecomʹs Access Network MigrationIEEE Standards Association (IEEE SA)
 
Technological and Cost based comparison of NGPON
Technological and Cost based comparison of NGPONTechnological and Cost based comparison of NGPON
Technological and Cost based comparison of NGPONRAHUL KANEKAR
 
Transformation of the Enterprise Network using Passive Optical LAN
Transformation of the Enterprise Network using Passive Optical LANTransformation of the Enterprise Network using Passive Optical LAN
Transformation of the Enterprise Network using Passive Optical LANARolen
 
What’s the Difference Between GPON and EPON
What’s the Difference Between GPON and EPONWhat’s the Difference Between GPON and EPON
What’s the Difference Between GPON and EPONHuanetwork
 
Ont, olt and mdu in gpon technology
Ont, olt and mdu in gpon technologyOnt, olt and mdu in gpon technology
Ont, olt and mdu in gpon technologyHuanetwork
 
The Outlook of Broad Band Optical Access Networks
The Outlook of Broad Band Optical Access NetworksThe Outlook of Broad Band Optical Access Networks
The Outlook of Broad Band Optical Access NetworksCedric Lam
 
Presentation on gpon and customer services by deepak sapate
Presentation on gpon and customer services by deepak sapatePresentation on gpon and customer services by deepak sapate
Presentation on gpon and customer services by deepak sapateDeepak Sapate
 
Og 103 test and analysis of gsm electromagnetic background issue1.0
Og 103 test and analysis of gsm electromagnetic background issue1.0Og 103 test and analysis of gsm electromagnetic background issue1.0
Og 103 test and analysis of gsm electromagnetic background issue1.0Ketut Widya
 
Panduit Signature Core Fiber Optic Cabling System
Panduit Signature Core Fiber Optic Cabling SystemPanduit Signature Core Fiber Optic Cabling System
Panduit Signature Core Fiber Optic Cabling SystemPanduit
 
Control Plane for High Capacity Networks Public
Control Plane for High Capacity Networks PublicControl Plane for High Capacity Networks Public
Control Plane for High Capacity Networks PublicCPqD
 

What's hot (19)

Fiberhome Smart ODN Solution
Fiberhome Smart ODN SolutionFiberhome Smart ODN Solution
Fiberhome Smart ODN Solution
 
Bts installation & commisioning
Bts installation & commisioningBts installation & commisioning
Bts installation & commisioning
 
Rahul resume.
Rahul resume.Rahul resume.
Rahul resume.
 
Pakistan cv 1
Pakistan  cv 1Pakistan  cv 1
Pakistan cv 1
 
Qypsys | Motorola Passive Optical LAN
Qypsys | Motorola Passive Optical LANQypsys | Motorola Passive Optical LAN
Qypsys | Motorola Passive Optical LAN
 
EPON Technology and its Application in China Telecomʹs Access Network Migration
EPON Technology and its Application in China Telecomʹs Access Network MigrationEPON Technology and its Application in China Telecomʹs Access Network Migration
EPON Technology and its Application in China Telecomʹs Access Network Migration
 
latest2
latest2latest2
latest2
 
Technological and Cost based comparison of NGPON
Technological and Cost based comparison of NGPONTechnological and Cost based comparison of NGPON
Technological and Cost based comparison of NGPON
 
Transformation of the Enterprise Network using Passive Optical LAN
Transformation of the Enterprise Network using Passive Optical LANTransformation of the Enterprise Network using Passive Optical LAN
Transformation of the Enterprise Network using Passive Optical LAN
 
What’s the Difference Between GPON and EPON
What’s the Difference Between GPON and EPONWhat’s the Difference Between GPON and EPON
What’s the Difference Between GPON and EPON
 
Ont, olt and mdu in gpon technology
Ont, olt and mdu in gpon technologyOnt, olt and mdu in gpon technology
Ont, olt and mdu in gpon technology
 
What is gpon
What is gponWhat is gpon
What is gpon
 
The Outlook of Broad Band Optical Access Networks
The Outlook of Broad Band Optical Access NetworksThe Outlook of Broad Band Optical Access Networks
The Outlook of Broad Band Optical Access Networks
 
Presentation on gpon and customer services by deepak sapate
Presentation on gpon and customer services by deepak sapatePresentation on gpon and customer services by deepak sapate
Presentation on gpon and customer services by deepak sapate
 
Og 103 test and analysis of gsm electromagnetic background issue1.0
Og 103 test and analysis of gsm electromagnetic background issue1.0Og 103 test and analysis of gsm electromagnetic background issue1.0
Og 103 test and analysis of gsm electromagnetic background issue1.0
 
Meltek Infosystems BSX 2010 Presentation
Meltek Infosystems BSX 2010 PresentationMeltek Infosystems BSX 2010 Presentation
Meltek Infosystems BSX 2010 Presentation
 
Panduit Signature Core Fiber Optic Cabling System
Panduit Signature Core Fiber Optic Cabling SystemPanduit Signature Core Fiber Optic Cabling System
Panduit Signature Core Fiber Optic Cabling System
 
Cv meynard
Cv meynardCv meynard
Cv meynard
 
Control Plane for High Capacity Networks Public
Control Plane for High Capacity Networks PublicControl Plane for High Capacity Networks Public
Control Plane for High Capacity Networks Public
 

Similar to Telecom Radio RF Engineer

Similar to Telecom Radio RF Engineer (20)

vimal resume
vimal resumevimal resume
vimal resume
 
Obaidullah_CV
Obaidullah_CVObaidullah_CV
Obaidullah_CV
 
resume
resumeresume
resume
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
shashank3
shashank3shashank3
shashank3
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
 
Aslam fahmi cv
Aslam fahmi cvAslam fahmi cv
Aslam fahmi cv
 
Mamdouh C.V NEW
Mamdouh C.V NEWMamdouh C.V NEW
Mamdouh C.V NEW
 
CV_Satyendra
CV_SatyendraCV_Satyendra
CV_Satyendra
 
Aslam fahmi CV
Aslam fahmi CVAslam fahmi CV
Aslam fahmi CV
 
Resume sanjeev agarwal New
Resume sanjeev agarwal NewResume sanjeev agarwal New
Resume sanjeev agarwal New
 
Ganesh Wankhede CV
Ganesh Wankhede CVGanesh Wankhede CV
Ganesh Wankhede CV
 
omer daraz cv
omer daraz cvomer daraz cv
omer daraz cv
 
umer new cv
umer new cvumer new cv
umer new cv
 
Telecom Resume
Telecom ResumeTelecom Resume
Telecom Resume
 
CelPlan Portfolio - Utilities 2023.pptx
CelPlan Portfolio - Utilities 2023.pptxCelPlan Portfolio - Utilities 2023.pptx
CelPlan Portfolio - Utilities 2023.pptx
 
Naveed CV (1) (1)
Naveed CV (1) (1)Naveed CV (1) (1)
Naveed CV (1) (1)
 
AMIT _RESUME
AMIT _RESUMEAMIT _RESUME
AMIT _RESUME
 

More from Kamran Saeed

Laboratory Maintenance installation Commissioning Engineer
Laboratory Maintenance installation Commissioning EngineerLaboratory Maintenance installation Commissioning Engineer
Laboratory Maintenance installation Commissioning EngineerKamran Saeed
 
HVAC Chiller BMS Engineer
HVAC Chiller BMS EngineerHVAC Chiller BMS Engineer
HVAC Chiller BMS EngineerKamran Saeed
 
Calibration engineer vibration instruments
Calibration engineer vibration instrumentsCalibration engineer vibration instruments
Calibration engineer vibration instrumentsKamran Saeed
 
Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Kamran Saeed
 
Pre commissioning Instrument Engineer
Pre commissioning Instrument EngineerPre commissioning Instrument Engineer
Pre commissioning Instrument EngineerKamran Saeed
 
Analyzer Engineer Process Hydrocarbons
Analyzer Engineer Process HydrocarbonsAnalyzer Engineer Process Hydrocarbons
Analyzer Engineer Process HydrocarbonsKamran Saeed
 

More from Kamran Saeed (6)

Laboratory Maintenance installation Commissioning Engineer
Laboratory Maintenance installation Commissioning EngineerLaboratory Maintenance installation Commissioning Engineer
Laboratory Maintenance installation Commissioning Engineer
 
HVAC Chiller BMS Engineer
HVAC Chiller BMS EngineerHVAC Chiller BMS Engineer
HVAC Chiller BMS Engineer
 
Calibration engineer vibration instruments
Calibration engineer vibration instrumentsCalibration engineer vibration instruments
Calibration engineer vibration instruments
 
Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech
 
Pre commissioning Instrument Engineer
Pre commissioning Instrument EngineerPre commissioning Instrument Engineer
Pre commissioning Instrument Engineer
 
Analyzer Engineer Process Hydrocarbons
Analyzer Engineer Process HydrocarbonsAnalyzer Engineer Process Hydrocarbons
Analyzer Engineer Process Hydrocarbons
 

Recently uploaded

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 

Recently uploaded (20)

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 

Telecom Radio RF Engineer

  • 1. Instrument & Telecom Commissioning Engineer Kamran Saeed Add: Khobar Saudi Arabia, Instrumentengine@gmail.com, OiLsensor@hotmail.com M: 00966(595) 273934 Pak: 0092-345-228115 Skype: k_s_puri (Kamran) CAREER OBJECTIVE  A position of dynamic and energetic person to work as RF VSAT Telecommunication Commissioning Engineer with growth potential and challenging environment to utilize my technical experience for better prospects of organization. PROFESSIONAL EXPERIENCE . AU Holding: [ July 24, 2017 to Date ]  Commissioning Engineer ( Telecom/ Scada & Analyzers ) Current Job Responsibilites:- Project: Saudi Aramco Monitoring of Wells, Cathodic Protection, Production facilities RTU & Scada Contractor: Wipro Description: Commissioning Testing and performance of new (CP ) NETCONTROL & GE SCADA automation, UHF/VHF 350 to 360 MHZ Radio Master, Slave Radio Station, MDS Master Radio, NMS server and PDR Radio configuration and replacement. Site acceptance test procedures, Scada Remote stations, Visual Checks, Visual inspection, Radio status, RSSI Check, Frequency Interference Check, Link Check, and inspection of wave guide at all major Saudi Aramco sites Abquaiq, Harad, Shedgam, Khurais and other areas DLPS Alkhobar ,Saudi Arabia 2008 to July 2017  Working as “ Instrument & Telecom Engineer Projects: Saudi Aramco Description: Commissioning of Analyzers in Saudi Aramco Uthmaniya, Mubaraz, Tanajib, Shedgum and Kaust, for monitoring of Oil, Water, Refinery & Gas Oil separation Plant. Project: Sabic & Tasnee
  • 2. Description: Commissioning and Testing of the Analyzers for monitoring Petrochemical Waste Water facilities at all segements of Sabic and Tasnee. Working on STC Fiber Optics Network for OSP, FTTH, Junction and Access network projects. Using Network Engineering Tool (NE Tool) for supporting the field staff for troubleshooting fiber optics issues. Survey for OSP and FTTH installation and Laying all kind of Fiber optical cable for FTTH, Access and metro network including all type of Civil work. To Manage & reports from the beginning to completion of FTTH and OSP Projects ,Coordinate with the O&M department to hand over the OSP Site after the PAT. Working with different integrators to provide district wise FTTX connectivity in the Saudi Arabia, Carried out Trouble shouting from MSC to customer end by using different testing tool like OTDR, power meter, and source meter and laser gun. Conducting Preliminary Acceptance Test for Fiber Optic cable. Helping field Engineers and technicians through Fiber Joint Schematic (FJS), Cable Route Diagrams and Granite Table for troubleshooting the OSP and FTTX issues. For new implementations of DWDM nodes analyzing the OTDR Traces, section Loss Measurements. Monitoring and maintaining the Integrity of the Client networks and its vital Elements. Performing schedules maintenance Issues, trouble tickets and dispatching market personnel as required. Prepare survey procedures and coordinate and communicate these with involved parties’ .Conduct site survey to monitor quality of work performed and prepare regular reports on the quality of the survey & audit results. Review site reports, identify technical issues and other blocking issues, and escalate as necessary. Verify progress and quality of work of the vendors and contractors against agreed specifications and plans, and report any deviations as per project process. Working with various internal and external agencies to provide the necessary support and assistance. Developed fault tracing procedures for OSP and FTTH network using (EXFO), OTDR and optical power meter.OTDR testing for Link budgeting and maintaining test reports. Laying all kind of Fiber optical cable for primary network and secondary network. FTTH OSP design approvals according to STC standards and OSP construction activities as per construction drawing, Perform construction and maintenance of OSP and FTTH infrastructure according to industry standards.FTTH OSP work including laying/pulling &
  • 3. jointing of u/g copper and optical fiber cables, cable splicing, cable testing and reporting, PVC pipes, and construction of Main Holes and all other allied works. To make connectivity from MSC to cabinet and follow up to subscriber OPTICAL NETWORK TERMINAL (ONT) according to the STC plan and granite paper. Fiber cable cut activities (Corrective Maintenance), Preventive Maintenance. Patching in (MSC) by using LC, FC, SC connectors to make the connectivity between MSC and customer. Prepare access network design; including fiber access and fiber backbone networks, employing Fiber-To-The-Node (FTTN), Fiber-To-The-Premises (FTTP), and Fiber-To-The- Home (FTTH) technology, underground, including Manhole and conduit design as applicable, in the area under study. Networks planning and optimization, system engineering, and maintenance of fiber optic transmission networks constituting long- haul & METRO networks, Junction & Access. Testing &Splicing ,Termination, laying and installation of indoor/ outdoor fiber network for GPON and GSM sites and Survey, Planning and design of OSP (Primary, Secondary & Junction Network) and other cabling techniques. Providing Technical support to the new deployment projects like GPON FTTH OSP.End to end coordination with Multi Vendors Ericsson/Huawei/Alcatel Lucent for ISP Equipment (OLT & ONT). . Responsible for checking and testing of OSP and ISP equipment, operation and maintenance of Access network, metro network OSP and FTTH. Installation ,signal testing,OTDR test result and report and trouble shouting of Fiber distribution terminal (FDT),ODF,Splitter,FDF,ONT,OLT and Fusion splicing of optical fiber. Making As built/Red line drawings at the end of the work completion. Conduct PAT for the implemented project. Prepare Site Acceptance Test results & Site Inventory documentation and follow up with vendors to clear the OILS prior to final acceptance. Making site inspection to make sure that works are accomplished according to the job order.Qualtity control management for all FTTH and OSP related jobs. FTTH/ OSP Engineer Petro Rabigh Complex– SAAF Line 3 Optical Fiber Project Client: Saudi Aramco Supervision of the outside plant (OSP) installations, testing & commissioning team for Fiber optic cables. Planning & implementation of FTTH, OSP, access and junction Networks. Troubleshooting, relocations, installation & MDT (Maintenance down Times) on different Fiber Optic Network. Troubleshooting and support for the FTTH, and FTTB from PON port up to the customer termination ONT.
  • 4. Prepare survey procedures and coordinate and communicate these with involved parties’ .Conduct site survey to monitor quality of work performed and prepare regular reports on the quality of the survey & audit results. Responsible for checking and testing of OSP and ISP equipment and operation and maintenance of Access network, metro network OSP and FTTX. Installation, Signal testing, OTDR test result and report and trouble shouting of Fiber distribution terminal (FDT), ODF, Splitter, FDF, ONT, OLT and Fusion splicing of optical fiber. Splicing, Termination and testing using OTDR, VFL & Power meter of OFC.Proven communication,planning & leadership skills with focus on conflict & problem resolution. Trouble Shooting on CISCO Routers and Switches. Routing and Switching, MDT, PAT, testing & commissioning PMR for the STC Data equipment. Troubleshooting on SDH and DWDM Systems different vendors. Developed fault tracing procedures for OSP and FTTH PON network using (EXFO), OTDR and optical power meter. OTDR testing for Link budgeting and maintaining test reports. Laying all kind of Fiber optical cable for primary and secondary network. Survey, Planning and installation of OSP and FTTH (Primary, Secondary & Junction Network) and other cabling techniques ,OSP and FTTH civil work including laying/pulling & jointing of u/g copper and optical fiber cables ,cable splicing, cable testing and reporting ,PVC pipes , and construction of Main Holes and all other allied works. Making Red line drawings at the end of the work completion. Conduct PAT for the implemented project. Prepare Site Acceptance Test results & Site Inventory documentation and follow up with vendors to clear the OILS prior to final acceptance. Making site inspection to make sure that works are accomplished according to the job order.Qualtity control management for all FTTH and OSP related jobs. Site Engineer Client: Saudi Telecom Company Location: Yanbu Industrial Area Laying all kind of Fiber optical cable for primary network and secondary network. Survey for the installation of optical fiber. Civil work for the laying of all kind of Fiber optical cable. Installation of Fiber distribution terminal (FDT), ODF, Splitter, FDF and Fusion splicing of optical fiber. Installation of optical fiber for FTTH and OSP projects and GSM tower. Installation of splitter terminal box (STB), terminal box (TB), optical network terminal (ONT), optical distribution frame (ODF). Carried out Trouble shouting from MSC to customer end by using different testing tool like OTDR, power meter, and source meter and laser gun. Patching in (MSC) by using LC, FC, SC connectors to make the connectivity between MSC and customer. To make all
  • 5. type of optical Fiber installation according to the STC plan and granite paper. To make a connectivity from MSC to cabinet and follow up to subscriber OPTICAL NETWORK TERMINAL (ONT) according to the STC plan and granite paper. Signal testing and trouble shouting of optical fiber by using power meter and source meter. To handover all jobs to STC as per STC standards and requirements. Prioritizes on-site installation activities to support the project schedule provided by the Project Manager. Coordinating with the logistic team to make sure material and equipment delivered at the site in time. Review site reports, identify discrepancies, technical issues and other blocking issues, and escalate as necessary .In coordination with contractors, vendors and Customer, prepare acceptance schedule and related documents. Verify progress and quality of work of the vendors and contractors against agreed specifications and plans, and report any deviations as per project process. Working with various internal and external agencies to provide the necessary support and assistance. BTC  Senior Engineer Operations Responsibilities:- I. Sawan Gas Plant & Sawan Rigs (Total Nos of Rig 25 ) Description: Installation, configurations, commissioning and testing of RF SCPC Earth Station Gas Rigs of M/s OMV’s (Austrian Company) 25 Rigs. Establishment of data and voice Communication involve RF high frequency wireless connection from Gas Sawan Rig (05), Sawan (10) and Duljan sites to their head office there at Islamabad via SCPC Link. Installation involve civil work for construction of base, installation of 3.0 M antenna, Low Noise Amplifier, OMT, SPT, Down converter, Upconverters and commissioning part consist of configuration of RF Agilis ASM 4800 modems. The assignment was being conducted regularly with interval of two months II. BHPBILLITION (Oil & Gas sector): Description: Rectification of faults in their 128kpbs, voice and data satellite RF communication link there at Zamzama Gas plant, Dadu, which is connected to head office in city of Islamabad. III. T.V One (Teleport) Description: Commissioning and testing of Satellite Encoder, Encoder’s Redundant Switches, 200 Watts Solid State Power Amplifier and maintenance of RF 6GHZ link. Propagation of Distribution Amplifier’s 0.75 V Video Signal to transponder via Encoder & Encoder Switches. IV. PAKTEL (Mobile Phone Operator) Description: Diagnoses of fault at their BTS sites. Operation comprises adjustment of power in Comstream Paradise modem, attenuation, frequencies in SPT (Agilis) at
  • 6. Karachi as well as Gwader BTS sites. Detection of fault with the help of spectrum analyzer such as spike in carrier while transmitting signal.  Commissioning of Radio (Wimen –II 24 db, 2.4GHZ). Antennas and Transceiver unit with line of sight alignment to another Microwave Antenna network system, with 512 Kbps baud rate.  Designing and preparation of Radio & Satellite Link Budge.  Installation of Power sections in Up converters during time of no power. V. PAKISTAN INTERNATIONAL AIRLINES (PIA) Description: Installation and commissioning of Earth Station at Karachi Airport. Configured as a main HUB for Quetta and Faisalabad Airports. ASM 4800 and COMTECH EF 600 satellite modems with Ring Focus 3.0 M Antenna were commissioned in order to connect with remote earth station with both cities via Satellite. VI. WAQT T.V Description: preparation of Civil work (Earth Station Base for 3.7 meter Anntena).Installation & Commissioning of their link from Lahore, Islamabad to Karachi using satellite (Paksat). VII. PRIME BANK: Description:Installation, commissioning & testing of Mesh Satellite Network at Clifton Branch ,Zamzama Karachi linked and configured with Lahore and Islamabad Branch via Satellite (AP-STAR-2R). 3.7m Antenna powered by 20 Watts Agilis SPT with pair of Comtech CDM 5700 modem. Civil Work Comprises construction of base and prior construction analysis also included in project VIII. ALLIED BANK Description: Installation, commissioning & testing of DVB-S2, remote satellite link to connect it with other branches for exchanging the data and internet traffic. 1.2M Ku Band Antenna, BUC and Access Broad Band Terminal (Efficient Channel Coding Inc, USA) were used. IX. BUSINESS PLUS Description: Maintenance of T.V channel transmitting video signals over PAKSAT satellite. Fault diagnostic and rectification comprising diagnostic of all electrical and electronic equipment involve in the RF transmission. QUALIFICATION  B.E 1998-99  Certification: Fiber Optics
  • 7.  Certification: Radyne RF Equipments.USA (Installation of Satellite Modems, Upconverter, NMS, Downconverters, RCS, SSPA at Pakistan Telecommunication Ltd, Karachi TRAININGS____________________________________________________________  Satellite Earth Station, Dhahmandro Pakistan 2005  T.D California,U.S.A. November 2013. PERSONAL PROFILE Marital Status : Married Nationality : Pakistani Iqama # : Transferable Languages : English, Urdu, Punjabi, Basic Arabic. REFERENCES 1. Mr. Ashraf, PMT , Saudi Aramco, Mobile: 0552352735 2. Mr. Yahya Al Janabi , Saudi Aramco Phone:013- 8768079