SlideShare a Scribd company logo
1 of 2
To obtain a carrier in a Telecom Company with challenging job in Telecommunication and,
facilitating my contribution through thoughts and action to the company vision and thus
achieve self-development by playing a significant role inbuilding the organization.
Name : Muhammad Naseem
Email : naseem.nokia@hotmail.com
DOB : 2 Jan 1985
Marital Status : Married
Nationality : Pakistani
Iqama number : 2337788687
Experience
2014 Hajj Project with MS (FLM Engineer)
2015 Hajj Project with NI, Network Implementation
SNS in Kingdom of Saudi Arabia 1year
Nokia Al Saudi NI, Network Implementation 3 Years
Good Experience on Nokia Multiradio Equipment:

MW Link Flexi Packet commissioning & troubleshooting

Power Injector troubleshooting

MW Link Flexi Packet 1+0 commissioning & troubleshooting

MW Link Flexi Packet 2+0 XPIC commissioning & troubleshooting

MW Link Flexi Packet 1+1 space diversity commissioning & troubleshooting

Speed capacity from 20mb to 200mb,400mb& 1020mb

Advance Qos, Cross Connection

MW Link DCN Visibility with Latest DCN plan

Latest FM200 1+0commissioning & troubleshooting

Latest FM200 2+0 commissioning & troubleshooting

Fiber RN tests

Ping test

IP migration

Site Master

2G IP Flexi Multiradio commissioning-integration & troubleshooting

3G Flexi Multiradio commissioning-integration & troubleshooting

LTE1800 Flexi Multiradio commissioning-integration & troubleshooting

LTE2300 Flexi Multiradio (FZNI) commissioning-integration & troubleshooting

LTE2300 Flexi Multiradio (FZNC) commissioning-integration & troubleshooting

RX sharing between 2G900 & UMTS900

RF sharing between 2G1800 & LTE1800

RF sharing between 2G900 & UMTS900

RFS tool

WFMS uploading experience
During LTE2300& LTE 1800 Optimization test :-

Troubleshooting downloading speed (LTE2300 FZNC + LTE2300 FZNI)

Troubleshooting uploading speed(LTE2300 FZNC + LTE2300 FZNI)

Troubleshooting CNIR issue(LTE2300 FZNC + LTE2300 FZNI)

Troubleshooting Clock wise swap issue (LTE2300 FZNC + LTE2300 FZNI)

Troubleshooting ping issueLTE2300 FZNC + LTE2300 FZNI)
Latest Technology
Small cell 3G integration & troubleshooting
Small cell 4G integration & troubleshooting via Bluetooth
FLM Engineer USF9 MS project (MADAF from Jan 2016 till todate)
Education & Qualification

Master in BTN (Bachelor Telecommunication Networking ) University of Comsets

2 years diploma Telecommunication & Networking Engineering

2 years diploma Computer Software & Hardware
Computer Skill:
Software, Microsoft Word, Microsoft Excel, Power Point, Inpage
from Modern Institute of information and Technology (MIIT)
Assemble and maintenance Computers- troubleshooting to different kinds of fault
restoration and replacement of defective parts & accessories, repair monitor, printer, UPS
and hardwire Electronic component device & accessories.
If you select me for the requested post, I assure you that I will perform all the duties
entrusted to me the best of my ability to the at most satisfaction of your management.

More Related Content

What's hot

Khaled Basalamah 2015 CV - Final
Khaled Basalamah 2015 CV - FinalKhaled Basalamah 2015 CV - Final
Khaled Basalamah 2015 CV - FinalKHALID BASALAMAH
 
3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?TTI Telecom
 
5 g ran architcture
5 g ran architcture5 g ran architcture
5 g ran architctureHemraj Kumar
 
VIJAY GODERA_Technical _CV
VIJAY GODERA_Technical _CVVIJAY GODERA_Technical _CV
VIJAY GODERA_Technical _CVVIJAY GODERA
 
5g architecture, Industrial Training
5g architecture, Industrial Training5g architecture, Industrial Training
5g architecture, Industrial TrainingSumanPramanik7
 
Long term evolution (lte) technology
Long term evolution (lte) technologyLong term evolution (lte) technology
Long term evolution (lte) technologykonan23
 
Lte, lte a, and lte-a pro migration to 5 g training
Lte, lte a, and lte-a pro migration to 5 g trainingLte, lte a, and lte-a pro migration to 5 g training
Lte, lte a, and lte-a pro migration to 5 g trainingTonex
 
LTE- Long Term Evolution
LTE- Long Term EvolutionLTE- Long Term Evolution
LTE- Long Term EvolutionRazib Bondu
 
MVG INSTALLATIONS Company Profile02
MVG INSTALLATIONS Company Profile02MVG INSTALLATIONS Company Profile02
MVG INSTALLATIONS Company Profile02Wayne Gilliland
 

What's hot (20)

Khaled Basalamah 2015 CV - Final
Khaled Basalamah 2015 CV - FinalKhaled Basalamah 2015 CV - Final
Khaled Basalamah 2015 CV - Final
 
3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?
 
Jeffin_BSS_CV
Jeffin_BSS_CVJeffin_BSS_CV
Jeffin_BSS_CV
 
5 g ran architcture
5 g ran architcture5 g ran architcture
5 g ran architcture
 
Rana Ali CV
Rana Ali CVRana Ali CV
Rana Ali CV
 
VIJAY GODERA_Technical _CV
VIJAY GODERA_Technical _CVVIJAY GODERA_Technical _CV
VIJAY GODERA_Technical _CV
 
RAMZAN MALIK
RAMZAN MALIKRAMZAN MALIK
RAMZAN MALIK
 
Abdul Rafay CV
Abdul Rafay CVAbdul Rafay CV
Abdul Rafay CV
 
5g architecture, Industrial Training
5g architecture, Industrial Training5g architecture, Industrial Training
5g architecture, Industrial Training
 
Dt report
Dt reportDt report
Dt report
 
Long term evolution (lte) technology
Long term evolution (lte) technologyLong term evolution (lte) technology
Long term evolution (lte) technology
 
Mir Ahmed Raza
Mir Ahmed RazaMir Ahmed Raza
Mir Ahmed Raza
 
Lte, lte a, and lte-a pro migration to 5 g training
Lte, lte a, and lte-a pro migration to 5 g trainingLte, lte a, and lte-a pro migration to 5 g training
Lte, lte a, and lte-a pro migration to 5 g training
 
10 fn s48
10 fn s4810 fn s48
10 fn s48
 
Dnyaneshwar Kumbhar CV
Dnyaneshwar Kumbhar CVDnyaneshwar Kumbhar CV
Dnyaneshwar Kumbhar CV
 
LTE- Long Term Evolution
LTE- Long Term EvolutionLTE- Long Term Evolution
LTE- Long Term Evolution
 
Resume
ResumeResume
Resume
 
MVG INSTALLATIONS Company Profile02
MVG INSTALLATIONS Company Profile02MVG INSTALLATIONS Company Profile02
MVG INSTALLATIONS Company Profile02
 
Vijay joshi cv
Vijay joshi cvVijay joshi cv
Vijay joshi cv
 
Summary of 41 basic knowledge of LTE
Summary of 41 basic knowledge of LTESummary of 41 basic knowledge of LTE
Summary of 41 basic knowledge of LTE
 

Similar to CV 2016 Eng_Muhammad_Naseem

Similar to CV 2016 Eng_Muhammad_Naseem (20)

CV_Devesh
CV_DeveshCV_Devesh
CV_Devesh
 
Waqas_Abbasi
Waqas_AbbasiWaqas_Abbasi
Waqas_Abbasi
 
Aung Paing Phyo CV
Aung Paing Phyo CVAung Paing Phyo CV
Aung Paing Phyo CV
 
CV. Eng Muhammad Naseem
CV. Eng Muhammad NaseemCV. Eng Muhammad Naseem
CV. Eng Muhammad Naseem
 
Mehmood._Ahmed
Mehmood._AhmedMehmood._Ahmed
Mehmood._Ahmed
 
Rizwan Ahmad (f)
Rizwan Ahmad (f)Rizwan Ahmad (f)
Rizwan Ahmad (f)
 
Engr M Ali
Engr M AliEngr M Ali
Engr M Ali
 
Junaid Eisa CV-May2016
Junaid Eisa CV-May2016Junaid Eisa CV-May2016
Junaid Eisa CV-May2016
 
Mohammed Abu Aqel Cv 11 10 2012
Mohammed Abu Aqel Cv 11 10 2012Mohammed Abu Aqel Cv 11 10 2012
Mohammed Abu Aqel Cv 11 10 2012
 
my Resume
my Resumemy Resume
my Resume
 
Saeed Jalal CV
Saeed Jalal CVSaeed Jalal CV
Saeed Jalal CV
 
Asif-Res-2015
Asif-Res-2015Asif-Res-2015
Asif-Res-2015
 
Ahmed Ibrahim.pdf
Ahmed Ibrahim.pdfAhmed Ibrahim.pdf
Ahmed Ibrahim.pdf
 
Ahmed Ibrahim.pdf
Ahmed Ibrahim.pdfAhmed Ibrahim.pdf
Ahmed Ibrahim.pdf
 
Naveed CV (1) (1)
Naveed CV (1) (1)Naveed CV (1) (1)
Naveed CV (1) (1)
 
Resume_Pavan
Resume_PavanResume_Pavan
Resume_Pavan
 
Imran Talib Network Engineer
Imran Talib Network EngineerImran Talib Network Engineer
Imran Talib Network Engineer
 
Osman Isam Isa Alfadel (CV)
Osman Isam Isa Alfadel (CV)Osman Isam Isa Alfadel (CV)
Osman Isam Isa Alfadel (CV)
 
CV of Saad
CV of SaadCV of Saad
CV of Saad
 
Dennis A Santos
Dennis A SantosDennis A Santos
Dennis A Santos
 

CV 2016 Eng_Muhammad_Naseem

  • 1. To obtain a carrier in a Telecom Company with challenging job in Telecommunication and, facilitating my contribution through thoughts and action to the company vision and thus achieve self-development by playing a significant role inbuilding the organization. Name : Muhammad Naseem Email : naseem.nokia@hotmail.com DOB : 2 Jan 1985 Marital Status : Married Nationality : Pakistani Iqama number : 2337788687 Experience 2014 Hajj Project with MS (FLM Engineer) 2015 Hajj Project with NI, Network Implementation SNS in Kingdom of Saudi Arabia 1year Nokia Al Saudi NI, Network Implementation 3 Years Good Experience on Nokia Multiradio Equipment:  MW Link Flexi Packet commissioning & troubleshooting  Power Injector troubleshooting  MW Link Flexi Packet 1+0 commissioning & troubleshooting  MW Link Flexi Packet 2+0 XPIC commissioning & troubleshooting  MW Link Flexi Packet 1+1 space diversity commissioning & troubleshooting  Speed capacity from 20mb to 200mb,400mb& 1020mb  Advance Qos, Cross Connection  MW Link DCN Visibility with Latest DCN plan  Latest FM200 1+0commissioning & troubleshooting  Latest FM200 2+0 commissioning & troubleshooting  Fiber RN tests  Ping test  IP migration  Site Master  2G IP Flexi Multiradio commissioning-integration & troubleshooting  3G Flexi Multiradio commissioning-integration & troubleshooting  LTE1800 Flexi Multiradio commissioning-integration & troubleshooting  LTE2300 Flexi Multiradio (FZNI) commissioning-integration & troubleshooting  LTE2300 Flexi Multiradio (FZNC) commissioning-integration & troubleshooting  RX sharing between 2G900 & UMTS900
  • 2.  RF sharing between 2G1800 & LTE1800  RF sharing between 2G900 & UMTS900  RFS tool  WFMS uploading experience During LTE2300& LTE 1800 Optimization test :-  Troubleshooting downloading speed (LTE2300 FZNC + LTE2300 FZNI)  Troubleshooting uploading speed(LTE2300 FZNC + LTE2300 FZNI)  Troubleshooting CNIR issue(LTE2300 FZNC + LTE2300 FZNI)  Troubleshooting Clock wise swap issue (LTE2300 FZNC + LTE2300 FZNI)  Troubleshooting ping issueLTE2300 FZNC + LTE2300 FZNI) Latest Technology Small cell 3G integration & troubleshooting Small cell 4G integration & troubleshooting via Bluetooth FLM Engineer USF9 MS project (MADAF from Jan 2016 till todate) Education & Qualification  Master in BTN (Bachelor Telecommunication Networking ) University of Comsets  2 years diploma Telecommunication & Networking Engineering  2 years diploma Computer Software & Hardware Computer Skill: Software, Microsoft Word, Microsoft Excel, Power Point, Inpage from Modern Institute of information and Technology (MIIT) Assemble and maintenance Computers- troubleshooting to different kinds of fault restoration and replacement of defective parts & accessories, repair monitor, printer, UPS and hardwire Electronic component device & accessories. If you select me for the requested post, I assure you that I will perform all the duties entrusted to me the best of my ability to the at most satisfaction of your management.