ECE Engineer with 5+ years of experience in Telecom Network Integration and Optimization
1. RREESSUUMMEE
AANNJJUULL..NN
(B.E ECE Engineer)
E-mail:anjulclt@gmail.com
Mobile:+96891128672,+96895408025
OO BBJJEECCTT IIVVEE
Seeking a full-time position in well-established Telecom Company that offers
professional growth and ample opportunity to learn and enrich my competencies in my
profession
EEDDUUCCAATT IIOO NNAALL QQ UUAALLIIFFIICCAATT IIOO NNSS
Bachelor of Engineering(Electronics and communication), from Sri
SubramanyaEngineering College, Palani, India affiliated to University of Anna,2009
12th
, fromUmbichyHajee HSS, India affiliated to State Board of Higher Secondary
Examination.
1Oth
,from N.S.S HSS,Indiaaffiliated to State Board of examination
CCOO MM PPUUTT EERR KKNNOO WWLLEEDDGG EE
Completed training in Cisco Certified Network Associate
MS office
PPRROO FFEESSSSIIOO NNAALL EEXXPPEERRIIEENNCCEE
NUT OMAN LLC-ASP FOR ERICSSON(AUGUST 2014 TILL DATE)
ERICSSON-OMANTEL SINGLE RAN PROJECT
ROLE-IMPLEMENTATION ENGINEER
Commissioning and integration of the site for both 3G (WCDMA) & 4G
(LTE)from scratch which includes running Cabinet script, O and M script,
Site Equipment Script & Iub Script and making CVs accordingly
Creating and loading configuration scripts for Node B and ENode B
integration
Technical SPOC for smart laptop implementation in ERICSSON-
OMANTEL PROJECT(3G/LTE/CARRIER EXPANSION)
Implemented Mixed Mode UMTS900 activity
DUS cascading for L800 and L2600 adition
Delete and re-configuring the sites Using Moshell Commands.
2. Good understanding and working experience with UTRAN Software &
License upgrades, Emergency activation of license and troubleshooting
4th Carrier Addition/UMTS900 addition
Software Upgradation of LTE/3G nodes via moshell
Configuration of TCU in VSAT sites
Defining TMA/RET in LTE NODES
Troubleshouting based on signalling traces, VSWR, RSSI analysis
Configuration of Cascaded RET for Hexa Band Antenna
Capacity up-gradation and swapping of transmission equipments in
Outages
Ethernet switch configuration (Ethernet Bridge, VLAN, WAN, RLMEI,
LAG).
ERICSSON GLOBAL SERVICES LTD(NOV 2013-AUG 2014)
XL-AXIATA NodeBINTEGRATION PROJECT
Handling integration of ATM and IP Site’s RBS6201V2W, RBS6601W,RBS3418
in RNC3820, RNC3810 and in EVO RNC(using Secure
CRT,moshell,Filezilla,Citrix)
Handles the daily fault management, fault surveillance and monitoring of
RBS6000 family node Bs (RB6101 and RBS6102) using OSS-RC10 RAN/WRAN
applications and WINFIOL
New Site Integration with MOCN feature enable in RNC3820, RNC 3810, EVO
RNCAddition, Deletion & Modification of different control parameter for cell sites
3G nodes through the MO scripts and related operations
Dealing with new site integration remotely including the script preparation for
RNC3820,RNC3810 and EVO RNC as well as for Node-B type RBS6201V2W,
RBS6601W,RBS3418.
Handing over the site to customers without any alarm & defining the site in OSS.
Cell creating in RNC, and responsible for speech, data call, QOS from RNC to
NODE end.
Creation of all relation Scripts based on the radio input given from customer
Capacity Upgradation of 3G Nodes
3rd Carrier Activation
Carrying out remote Software upgrade for RNC and Node B using SMO
Post monitoring of newly integrated sites
Parameters setting, Neighbor relation CR, RNC Parameters CR.
NATIONAL UNITED TELECOMMUNICATION( June 2013 to Oct 2013)
ERICSSON-OMANTElPROJECT(INTEGRATION ENGG)
Integration of ERICSSON 2g/3g/LTE (6201 CABINET)
Creating and loading configuration scripts for Node B and ENode B
integration
Second carrier addition in 3G nodes
Troubleshooting of RBS for both internal and external alarm clearance
Defining TMA/RET in LTE NODES
3. Performed Addition, Deletion & Modification of different control
parameter for cell sites (3G, Transmission nodes) through the MO
scripts and related operations
OEC-TECH (OMAN) (OCTOBER 2012 TO JUNE 2013)
ERICSSON-OMANTELPROJECT(PROJECT ENGINEER)
Integration of ERICSSON 2g/3g/LTE (6201 CABINET)
Creating and loading configuration scripts for Node B and ENode B
integration
Changing O&M IP’S of NODE B’s using Moshell
Defining TMA/RET in LTE NODES
Configuration and troubleshooting of O&M connectivity Node B
E1 routing to cell sites to establish link between RBS to RNC,
ATM to IP Migration(without missing license)
Sector addition in 3G nodes
Increasing the E1 capacity for ATM sites(3000 series)
Capacity up-gradation and swapping of transmission equipments in
Outages
Swapping the MMUs, NPUs and Radios during PWR, allowing network
nodes to carry data packets
Software up gradation of Traffic Node up to Baseline R22M10
Ethernet switch configuration (Ethernet Bridge, VLAN, WAN, RLMEI,
LAG).
Ethernet traffic over E1 (Bridging)
Ethernet traffic over Packet link.
REIME GHANA (WEST AFRICA) (MARCH 2012 TO JULY 2012)
AIRTEL MANAGEMENT SERVICE(TRAINING MANAGER)
MS TRAINING MANAGER for ERICSSON
NODE-B 6000 SERIES, giving training for engineers over here forSITE
INTEGRATION,DUW swapping, ALARM CLEARANCE and
Modification of different control parameter for cell sites (3G,
Transmission nodes)through the MO scripts and related operations using
moshell,rbs element manager and hyper terminal
Integration andMaintanence of ericsson 2g and 3g sites
(6202, 6201, 6101, 6601, 3216, 3116, 2116,)
Troubleshooting of RBS for both internal and external alarm clearance
Integration of Node-B with IP configuration for 3G
Performed Addition, Deletion & Modification of different control
parameter for cell sites (3G, Transmission nodes) through the MO
scripts and related operations.
DUW swapping
Providing Centrally Online Support to other field Engineers
4. Installation, commissioning and integration of Ericsson RBS (Both 2G
and 3G)indoor & outdoor
CONVERON TECHNOLOGIES PVT. LTD
AIRTEL(NOV 2011 TO JAN 2012)UGANDA, East Africa
Integration & commissioning of Ericsson RBS 2G&3G (6101,
6201,2116v2,2106v3,2106i,2206 ,2206v2) indoor & outdoor.
Troubleshooting of RBS for both internal and external alarm clearance
Supervise ASPs Installation and Engineering staff to ensure: work
inaccordance with Ericsson procedures and methods,
appropriateImplementation Processes are followed; correct
methods,instructions,checklists and reports are used by ASP
Verify and Rectify Antenna system Azimuth and Tilting. For site
acceptance.
Rectify the Feeder high Peak by using Sweep Test, Feeder Grounding
Performing drive test using TEMS in both idle and dedicated mode
ERICSSON INDIAPVT. LTD(OUT SOURCED BY TICS)
Period : From SEPTEMBER 2010 to JULY 2011
Designation : BSS ENGINEER
AIRCEL 2G&3G(SEPT 15 TO FEB 09)Coimbatore,Tamilnadu.
Integration &commissioning of Ericsson RBS (6601, 6601E,
6201 , 6202.6101,6102 BTS)
Creating and loading configuration scripts for Node B integration
Configuration and troubleshooting of O&M connectivity Node B
Integration& commissioning of Ericsson RBS (2964 and 2954)
Commissioning of Transmission equipments Ericsson Traffic
node( Tn 6p&Tn 2p)
Testing and commissioning of Traffic nodes, PDH, 7 ghz/15ghz
Radio.
Up gradation of Microwave Radios
Supervise ASPs Installation and Engineering staff to ensure:
work inaccordance with Ericsson procedures and methods,
appropriateImplementation Processes are followed; correct
methods,instructions,checklists and reports are used by ASP
E1 routing to cell sites to establish link between RBS to RNC,
Alarm extension for both 2G and 3G
VODAFONE 3G(FEB 10 TO MAY 9)-MUMBAI
Integration &commissioning of Ericsson RBS (6601, 6601E,
6201 and 6202 BTS) indoor & outdoor
Creating and loading configuration scripts for Node B integration
( Node B
Configuration and troubleshooting of O&M connectivity Node B
Integration of New NODE B with RNC and verification of the
same, like
5. Handover and call Quality testing using Ericsson TEMS Mobile
phone.
DUW SWAPPING
Quality analysis
BSNL 3G/2G( MAY 9 TO JULY 10)-HARYANA
Performed troubleshooting fault’s and alarm clearing for 3G/2G
BTS, Nodes and Transmission Nodes.
Acceptance test for both 2G(2954,2964) and 3G sites
External alarm extension for both 2G and 3G sites
Acceptance test for minilink
Verify and Rectify Antenna system Azimuth and Tilting. For site
acceptance.
Rectify the Feeder high Peak by using Sweep Test, Feeder
Grounding
Quality analysis
ECHO TELE SERVICES
Period :From JANUARY 2010 to SEPTEMBER 2010
Designation : Telecom Engineer
VIDEOCON 2G(NSN-NEC)-CALICUT,KERALA
Installation and commissioning of NEC microwave link
Project Management for project rollout within timelines.
Conducting site survey and LOS survey
Reports & Assist the O&M ENGG in inspections & audits.
Acceptance test of integrated sites
Punch point clearance and quality analysis
SSR ELECTRICAL AGENCIES
Period : From JUNE 2009 to DECEMBER 2009
Designation : Telecom Engineer
AIRCEL/DOCOMO/BSNL-KERALA,TAMILNADU
Had associated with the following projects of Bsnlindia(3G)
NEC of TATA DOCOMO and HUAWEI of AIRCEL
Installation and commisioning of MICROWAVE LINKS
Installation of GSM BTS(HUAWEI)
Conducting site survey and LOS survey
6. TOOLS
MOSHELL, WINFIOL,CITRIX, SECURE CRT,FILE ZILLA,Smart Laptop
Ericsson RBS Element Manager,Ericsson OMT 50.E,MINILINK CRAFT 2.20
EEXXPPEERRIIEENNCCEE ((RROO LLEE SSUUMM MM AARRIIEESS))
Currently working in NUT Oman LLC as RAN Engineer
Worked with GSC INDIA as NetworkEngineer,RAN Integration
Worked with ERICSSON Oman as INTEGRATOR for 2G/3G/LTE
Worked inERICSSONGHANA –AIRTEL MS PROJECT as TRAINING MANAGER
WORKED IN ERICSSONUGANDA-AIRTEL PROJECT as RAN ENGINEER
Has worked inERICSSON INDIA PVT LTD forAIRCEL 3Gproject in
Chennai,VODAFONE3G in Mumbai,andBSNL 3G/2Gproject in Haryana
Had associated with the following projects of BSNL India(3G),NEC of TATA
DOCOMO and HUAWEI of AIRCEL under KERALA & TAMIL NADU circle
Integration of ERICSSON NODE B,E-NODEB
Installation and Commisioning of Micro Wave linKS
Installaton of CDMA/GSM BTS
Conducting site survey and LOS survey
Installation of NETWORK MANAGEMENT SYSTEM(NMS)
Reports & Assist the O&M ENGG in inspections & audits.
Integration & commissioning of Ericsson 3G (6601,3418,6201,6202 and 3216,)
indoor & outdoor.
Integration & commissioning of Ericsson BTS (2964, 2954,6000 SERIES)
Testing and commissioning of Traffic nodes, PDH, 7 ghz/15ghz Radio.
Up gradation of Microwave Radios
E1 routing to cell sites to establish link between RBS to RNC,
MM AAIINN PPRROO JJEECCTT
MULTI PROTOCOL COMMUNICATION CONTROLLER FOR ONBOARD MARINE
INSTRUMENTSDone in embedded system at KELTRON (A GOVT AIDED COMPANY).This
is done for Indian navy .Used mainly for the safe landing of helicopters in the ship
and also for finding out the distance of submarines
PPAARRTT IICCIIPPAATT EEDD SSEEMM IINNAARRSS
BLUE TOOTH:-Which is an open wireless protocol for exchanging data over short
distances from fixed and mobile devices, creating personal area networks (PANs).
7. AACCHHIIEEVVEEMM EENNTT&AACCTT II VVIITT IIEESS
Actively participated in THEOGONIA 2009 ( A national level technical symposium
and exhibition conducted by the ECE Department of the College)
RREEFFEERREENNCCEESS
KHALDOUN ABBADI
IMPLEMENTATION MANAGER
ERICSSON OMAN
SMS/MMS +96897054920
EMAIL-khaldoun.abbadi@ericsson.com
PPEERRSSOO NNAALL DDEETT AAIILLSS
Date of birth : 05-10-1987
Sex : Male
Nationality : Indian
Driving license : Holding valid Indian Driving License
Passport : H5691792
Strengths : self motivated,enthusiastic with Leadership
Qualities and Confidence of getting and taking
Along with a team
Languages known : English, Malayalam, Hindi,Tamil
Permanent Address : SWAPNAPURI (H)
MANNUR (P.O)
CALICUT (DT)
KERALA
INDIA, PIN-673328
I hereby declare that the information furnished above is true to the best of my knowledge.
CALICUT ANJUL.N