SlideShare a Scribd company logo
1 of 4
Mobile: +91- 9866866483
BORAPUREDDI.ASHOK
E-mail: Ashokk548@gmail.com.
CAREER OBJECTIVE
• Has 5 years of experience during this tenure, worked on domain including network planning and
designing.
• Experience in multiple-platforms and acquired skills and expertise in Telecom platforms such as 3-GIS,
AutoCAD, Micro station, BST CAD, O-Cal Pro, Spida Cal and Network Engineering.
• Handled various assignments like digitizing,Planning and designing, PAR implementations,
documentation preparation.
• Expertise in suggesting the productivity tools and leading the teams for achieving the set targets of the
project to deliver in time and with 100% quality.
• Having good team management skills and had trained associates in various projects that are assigned.
PROFESSIONAL EXPERIENCE
• Working as CIVIL Engineer (from 26 th October 2015 to till Date) at Bechtel India Pvt Ltd, 244-245,
Knowledge Park, Udyog Vihar, Phase IV, Gurgaon.
• Worked as GIS Engineer (from 21th MAY 2011 to 16th
October 2015) at Cyient Ltd, Software Units
Layout, Infocity, Madhapur, HITEC City, Hyderabad.
EDUCATIONAL QUALIFICATION
 B. TECH in Electronics & Communication Engineering from JNTU Hyderabad, with aggregate 70%.
TECHNICAL SKILLS
 Operating Systems :Windows Family, MS-Office
 Packages (GIS) :3-GIS, AutoCAD Map3D, Micro station, BST CAD, O-Cal Pro & SPIDA CAL
AWARDS AND ACHIEVEMENTS
 Outstanding Team of the Month in November 2012
 Outstanding Team of the Month in September 2013
 Outstanding Team of the Month in May 2014
 Received “Associate of the Month” for April, 2012 for outstanding performance
 Received “Associate of the Month” for June, 2013 for outstanding performance
- 1 -
Project Profile
Project # 1
Project Title : Make Ready engineering(MRE)
Client : Google Fiber
Software : SpidaCalc V6.
Employer : Bechtel India Pvt Ltd.
Role : QC & QA
Project Description:
This project mainly
The scope included in the MRE is to perform the pole load analysis, propose and prepare the remedies. If a
pole is failing its stress limit (100% in case of existing poles, 80% in case of new poles); Create a permit
package with a logical grouping of poles (not exceeding 30 poles per permit) and provide the permit to Pole
Owner for approval.
Generally, the pole analysis deals with the safety factor of the pole based on the Wind rating provided by US
government and the actual load exist on pole. Based on these parameters we have to analyze the pole strength
and the life span of pole's. By using the analysis provided by Bechtel, the NES will replace the pole’s based on
their strength and span.
Project # 2
Project Name : AT&T Communications
Client : AT&T Communications, USA
Duration : Dec 2014 to till now
Applications : BSTCAD (Micro station) & O-Calc-Pro
Description:
Pole loading and BAU: O-Cal pro software used.
pole loading is total pole weight and span tension of cable’s “Span Rated Strength to Apply as Tension”
The O-Cal Pro product is installed with default values that do not meet AT&T requirements, A file has to be
prepared to set the values correctly.
Pole removed are proposed there are different work action codes are used AT&T.There three type of work
action codes used.
LightGig :
AT&T is the leading Telecom giant in USA, we at Cyient received the offshore work which in described below in detail:
Engineering Work orders were issued by the onshore team to us which describes the general description on how, what,
when, where and why a EWO project needs to be issued. These guidelines are intended to help the OSP design engineer in
their day-today activities.
Cable Metallic – this section contains reference charts and coding tables to be used as an aid for metallic cable selection
based on the field situation and the type of the construction. Metallic cables are cables having copper or aluminum
conductors. Different cable sheaths are used in different phases of outside plant facility construction, i.e., aerial, buried,
building service entrances, laterals from aerial, buried and underground plant, main underground and stubs or ties. The
field situation encountered should dictate which cable sheath is required.
As per EWO we used to place the Fiber optic cable types and size based upon the different outside plant environments
(i.e. aerial, underground, buried, building entrance, indoor) and as well as per different technologies. Fiber optic cable
designs change periodically due to technical and mechanical improvements.
- 2 -
Roles and Responsibilities:
 Involved in project specifications
 Performing quality checks on the pole loading and network designing
 Adopting new process strategies
 Resolving technical issues in liaison with client
 Provide technical support to the team
 Coordination with all the support functions
Project # 3
Project Name : FairPoint Communications
Client : FairPoint Communications, Portland, USA
Duration : Feb 2014 to Dec 2014
Applications : AutoCAD Civil, G-Technology & Intelect (Micro Station V8 (Bentley)
Description:
FairPoint Communications, Inc. is a leading communications provider of high-speed Internet access, local and
long-distance phone, television and other broadband services to customers in communities across 18 states.
Through its fast, reliable data network, FairPoint delivers data and voice networking communications solutions
to residential, business and wholesale customers. FairPoint’s resilient IP-based network in northern New
England, provides business customers a fast, flexible, affordable Ethernet connection that supports applications
like video conferencing and e-learning
The scope of this project is to capture cable, conduit and manhole plats and other records of certain FairPoint
telecommunication network facilities and features. Data will be captured from spread sheets (Pole Data) and
scanned Tiff (.tiff) images and will be converted to FairPoint’s existing G/Comms data format.
And perform conflation work for G/Comms network data for some wire centres in New Hampshire. This data
will be conflated to Navteq land base and migrated to FairPoint’s existing G/Comms data format. And
migration of the data from existing StellarRAD platform to upgraded G/Technology application.
Roles and Responsibilities:
 Involved in project specifications
 Performing quality checks on the converted and conflated data
 Adopting new process strategies
 Resolving technical issues in liaison with client
 Provide technical support to the team
 Coordination with all the support functions
Project # 3
Project Name : Qwest Conflation
Client : Century Link, US.
Duration : May 2011 to Feb 2014
Applications : AutoCAD MAP3D2011
- 3 -
Description:
Qwest Conflation project is to match the existing data (Land base and Plant data) to the updated data with
respect to the Teleatlas data (GDT) and other source like Ortho and USGS quads.Qwest gives the Input data in
Shape format. Data conflation will takes place in two steps. First one is conflating the Land base data so that it
overlays the GDT data. For this we need most recent Ortho Images.
Second step is Plant conflation, as soon as the wire centre accepted in Land base it comes to Plant conflation.
All the conflation of the Plant data must do using the Remote desktop technology only.
Roles and Responsibilities:
 Involved in the basic conflation process (Land base and Plant).
 Provided Technical clarifications for the team members.
 Planning of Aerial and Underground network by studying the Area and analysing the Telecom network
poles, Manholes, and pits etc.
 Quality check/Quality Analysis of the design drawings as per client requirements.
STRENGTHS:
 Ability to work and succeed autonomously and collaboratively
 Highly motivated and Enthusiastic
 Process Oriented and Methodical
 Willingness to learn
 Open and Honest
PERSONAL DETAILS:
Fathers Name: Suryanarayana
Date of Birth: 03 July 1991
Marital Status: Single
Nationality: Indian
Languages Known: Telugu,and English .
DECLARATION:
I hereby declare that the information furnished above is true to the best of my knowledge.
Place: Delhi (Ashok B)
- 4 -

More Related Content

What's hot

Mr Kong DeSheng CV Up to Now
Mr Kong DeSheng CV   Up to NowMr Kong DeSheng CV   Up to Now
Mr Kong DeSheng CV Up to NowDesheng Kong
 
Muditha dasanayake telecommunications engineer
Muditha dasanayake telecommunications engineerMuditha dasanayake telecommunications engineer
Muditha dasanayake telecommunications engineerMuditha Dasanayake
 
Hacker Resume IBM
Hacker Resume IBMHacker Resume IBM
Hacker Resume IBMAida Jaber
 
Resume RF Engineer Baseline 02162015
Resume  RF Engineer Baseline  02162015Resume  RF Engineer Baseline  02162015
Resume RF Engineer Baseline 02162015Michael Delgado
 
CV-NITIN NIWARIYA _ Electrical _
CV-NITIN NIWARIYA _ Electrical _ CV-NITIN NIWARIYA _ Electrical _
CV-NITIN NIWARIYA _ Electrical _ Nitin Niwariya
 
Pmp rf engineer resume
Pmp rf engineer resumePmp rf engineer resume
Pmp rf engineer resumeAhmad Hedib
 
Balaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBalaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBala G
 
Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)Janardhan Reddy
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Ali Omar
 

What's hot (20)

Mr Kong DeSheng CV Up to Now
Mr Kong DeSheng CV   Up to NowMr Kong DeSheng CV   Up to Now
Mr Kong DeSheng CV Up to Now
 
Ramesh.S.M
Ramesh.S.MRamesh.S.M
Ramesh.S.M
 
Muditha dasanayake telecommunications engineer
Muditha dasanayake telecommunications engineerMuditha dasanayake telecommunications engineer
Muditha dasanayake telecommunications engineer
 
Hacker Resume IBM
Hacker Resume IBMHacker Resume IBM
Hacker Resume IBM
 
Resume RF Engineer Baseline 02162015
Resume  RF Engineer Baseline  02162015Resume  RF Engineer Baseline  02162015
Resume RF Engineer Baseline 02162015
 
CV-NITIN NIWARIYA _ Electrical _
CV-NITIN NIWARIYA _ Electrical _ CV-NITIN NIWARIYA _ Electrical _
CV-NITIN NIWARIYA _ Electrical _
 
Pmp rf engineer resume
Pmp rf engineer resumePmp rf engineer resume
Pmp rf engineer resume
 
DEVI_001
DEVI_001DEVI_001
DEVI_001
 
Harshit Bhawsar Resume
Harshit Bhawsar ResumeHarshit Bhawsar Resume
Harshit Bhawsar Resume
 
resume
resumeresume
resume
 
Prashant Soman resume
Prashant Soman resumePrashant Soman resume
Prashant Soman resume
 
Balaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBalaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical Designer
 
Gtpl
GtplGtpl
Gtpl
 
Balaji Resume
Balaji ResumeBalaji Resume
Balaji Resume
 
Obaidullah_CV
Obaidullah_CVObaidullah_CV
Obaidullah_CV
 
Anshul_Resume
Anshul_Resume Anshul_Resume
Anshul_Resume
 
Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)
 
Resume_RF_Engineer
Resume_RF_EngineerResume_RF_Engineer
Resume_RF_Engineer
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
 
Electrical engineer 5 Years Exp
Electrical engineer 5 Years ExpElectrical engineer 5 Years Exp
Electrical engineer 5 Years Exp
 

Similar to Borapureddi Ashok_present

Similar to Borapureddi Ashok_present (20)

Manoj_Resume
Manoj_ResumeManoj_Resume
Manoj_Resume
 
Dhanam Sathiya Nathan_CV_02032016
Dhanam Sathiya Nathan_CV_02032016Dhanam Sathiya Nathan_CV_02032016
Dhanam Sathiya Nathan_CV_02032016
 
B Mahendar- CV
B Mahendar- CVB Mahendar- CV
B Mahendar- CV
 
Resume
ResumeResume
Resume
 
Engr_DMH
Engr_DMHEngr_DMH
Engr_DMH
 
Tabish resume
Tabish resumeTabish resume
Tabish resume
 
Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016
 
Stretton CV
Stretton CVStretton CV
Stretton CV
 
WNarcho Resume
WNarcho ResumeWNarcho Resume
WNarcho Resume
 
Resume_Pavan
Resume_PavanResume_Pavan
Resume_Pavan
 
CV_ASIM_11_2014
CV_ASIM_11_2014CV_ASIM_11_2014
CV_ASIM_11_2014
 
Sachin_Bapat_Resume
Sachin_Bapat_ResumeSachin_Bapat_Resume
Sachin_Bapat_Resume
 
Sandeep Kumar
Sandeep KumarSandeep Kumar
Sandeep Kumar
 
Sandeep Kumar
Sandeep KumarSandeep Kumar
Sandeep Kumar
 
Sandeep Kumar
Sandeep KumarSandeep Kumar
Sandeep Kumar
 
Resume
ResumeResume
Resume
 
Sandeep resume
Sandeep resumeSandeep resume
Sandeep resume
 
Wireline-Engineering-Solutions-for-a-Leading-Broadband-Provider.pdf
Wireline-Engineering-Solutions-for-a-Leading-Broadband-Provider.pdfWireline-Engineering-Solutions-for-a-Leading-Broadband-Provider.pdf
Wireline-Engineering-Solutions-for-a-Leading-Broadband-Provider.pdf
 
kunal vedpathak
kunal vedpathakkunal vedpathak
kunal vedpathak
 
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECTCV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
 

Borapureddi Ashok_present

  • 1. Mobile: +91- 9866866483 BORAPUREDDI.ASHOK E-mail: Ashokk548@gmail.com. CAREER OBJECTIVE • Has 5 years of experience during this tenure, worked on domain including network planning and designing. • Experience in multiple-platforms and acquired skills and expertise in Telecom platforms such as 3-GIS, AutoCAD, Micro station, BST CAD, O-Cal Pro, Spida Cal and Network Engineering. • Handled various assignments like digitizing,Planning and designing, PAR implementations, documentation preparation. • Expertise in suggesting the productivity tools and leading the teams for achieving the set targets of the project to deliver in time and with 100% quality. • Having good team management skills and had trained associates in various projects that are assigned. PROFESSIONAL EXPERIENCE • Working as CIVIL Engineer (from 26 th October 2015 to till Date) at Bechtel India Pvt Ltd, 244-245, Knowledge Park, Udyog Vihar, Phase IV, Gurgaon. • Worked as GIS Engineer (from 21th MAY 2011 to 16th October 2015) at Cyient Ltd, Software Units Layout, Infocity, Madhapur, HITEC City, Hyderabad. EDUCATIONAL QUALIFICATION  B. TECH in Electronics & Communication Engineering from JNTU Hyderabad, with aggregate 70%. TECHNICAL SKILLS  Operating Systems :Windows Family, MS-Office  Packages (GIS) :3-GIS, AutoCAD Map3D, Micro station, BST CAD, O-Cal Pro & SPIDA CAL AWARDS AND ACHIEVEMENTS  Outstanding Team of the Month in November 2012  Outstanding Team of the Month in September 2013  Outstanding Team of the Month in May 2014  Received “Associate of the Month” for April, 2012 for outstanding performance  Received “Associate of the Month” for June, 2013 for outstanding performance - 1 -
  • 2. Project Profile Project # 1 Project Title : Make Ready engineering(MRE) Client : Google Fiber Software : SpidaCalc V6. Employer : Bechtel India Pvt Ltd. Role : QC & QA Project Description: This project mainly The scope included in the MRE is to perform the pole load analysis, propose and prepare the remedies. If a pole is failing its stress limit (100% in case of existing poles, 80% in case of new poles); Create a permit package with a logical grouping of poles (not exceeding 30 poles per permit) and provide the permit to Pole Owner for approval. Generally, the pole analysis deals with the safety factor of the pole based on the Wind rating provided by US government and the actual load exist on pole. Based on these parameters we have to analyze the pole strength and the life span of pole's. By using the analysis provided by Bechtel, the NES will replace the pole’s based on their strength and span. Project # 2 Project Name : AT&T Communications Client : AT&T Communications, USA Duration : Dec 2014 to till now Applications : BSTCAD (Micro station) & O-Calc-Pro Description: Pole loading and BAU: O-Cal pro software used. pole loading is total pole weight and span tension of cable’s “Span Rated Strength to Apply as Tension” The O-Cal Pro product is installed with default values that do not meet AT&T requirements, A file has to be prepared to set the values correctly. Pole removed are proposed there are different work action codes are used AT&T.There three type of work action codes used. LightGig : AT&T is the leading Telecom giant in USA, we at Cyient received the offshore work which in described below in detail: Engineering Work orders were issued by the onshore team to us which describes the general description on how, what, when, where and why a EWO project needs to be issued. These guidelines are intended to help the OSP design engineer in their day-today activities. Cable Metallic – this section contains reference charts and coding tables to be used as an aid for metallic cable selection based on the field situation and the type of the construction. Metallic cables are cables having copper or aluminum conductors. Different cable sheaths are used in different phases of outside plant facility construction, i.e., aerial, buried, building service entrances, laterals from aerial, buried and underground plant, main underground and stubs or ties. The field situation encountered should dictate which cable sheath is required. As per EWO we used to place the Fiber optic cable types and size based upon the different outside plant environments (i.e. aerial, underground, buried, building entrance, indoor) and as well as per different technologies. Fiber optic cable designs change periodically due to technical and mechanical improvements. - 2 -
  • 3. Roles and Responsibilities:  Involved in project specifications  Performing quality checks on the pole loading and network designing  Adopting new process strategies  Resolving technical issues in liaison with client  Provide technical support to the team  Coordination with all the support functions Project # 3 Project Name : FairPoint Communications Client : FairPoint Communications, Portland, USA Duration : Feb 2014 to Dec 2014 Applications : AutoCAD Civil, G-Technology & Intelect (Micro Station V8 (Bentley) Description: FairPoint Communications, Inc. is a leading communications provider of high-speed Internet access, local and long-distance phone, television and other broadband services to customers in communities across 18 states. Through its fast, reliable data network, FairPoint delivers data and voice networking communications solutions to residential, business and wholesale customers. FairPoint’s resilient IP-based network in northern New England, provides business customers a fast, flexible, affordable Ethernet connection that supports applications like video conferencing and e-learning The scope of this project is to capture cable, conduit and manhole plats and other records of certain FairPoint telecommunication network facilities and features. Data will be captured from spread sheets (Pole Data) and scanned Tiff (.tiff) images and will be converted to FairPoint’s existing G/Comms data format. And perform conflation work for G/Comms network data for some wire centres in New Hampshire. This data will be conflated to Navteq land base and migrated to FairPoint’s existing G/Comms data format. And migration of the data from existing StellarRAD platform to upgraded G/Technology application. Roles and Responsibilities:  Involved in project specifications  Performing quality checks on the converted and conflated data  Adopting new process strategies  Resolving technical issues in liaison with client  Provide technical support to the team  Coordination with all the support functions Project # 3 Project Name : Qwest Conflation Client : Century Link, US. Duration : May 2011 to Feb 2014 Applications : AutoCAD MAP3D2011 - 3 -
  • 4. Description: Qwest Conflation project is to match the existing data (Land base and Plant data) to the updated data with respect to the Teleatlas data (GDT) and other source like Ortho and USGS quads.Qwest gives the Input data in Shape format. Data conflation will takes place in two steps. First one is conflating the Land base data so that it overlays the GDT data. For this we need most recent Ortho Images. Second step is Plant conflation, as soon as the wire centre accepted in Land base it comes to Plant conflation. All the conflation of the Plant data must do using the Remote desktop technology only. Roles and Responsibilities:  Involved in the basic conflation process (Land base and Plant).  Provided Technical clarifications for the team members.  Planning of Aerial and Underground network by studying the Area and analysing the Telecom network poles, Manholes, and pits etc.  Quality check/Quality Analysis of the design drawings as per client requirements. STRENGTHS:  Ability to work and succeed autonomously and collaboratively  Highly motivated and Enthusiastic  Process Oriented and Methodical  Willingness to learn  Open and Honest PERSONAL DETAILS: Fathers Name: Suryanarayana Date of Birth: 03 July 1991 Marital Status: Single Nationality: Indian Languages Known: Telugu,and English . DECLARATION: I hereby declare that the information furnished above is true to the best of my knowledge. Place: Delhi (Ashok B) - 4 -