SlideShare a Scribd company logo
1 of 2
Patou Nsiona
London-Croydon. Tel. +447944133113 or 07405089256 or 01689482715 Email: pansiona@hotmail.com
PROFESSIONAL QUALIFICATIONS AND EDUCATION
 Asbestos Awareness (Category A), High Speed Training, UK, January 2015
 SMSTS, CITB, London-UK, August 2014
 Prince 2 Foundation and Practitioner, APMG, UK, February 2014
 CSCS, CITB, London-UK, July 2012
 Emergency First Aid at Work (Level 2), SFA-Training, UK, November 2015
 MScin Construction Project Management, Waterford IT, Ireland, October 2011
 BSc(Honours) in Construction Management andEngineering, Waterford IT, Ireland, Sept 2009
 Foundation Certificate in Business Studies, Waterford IT, Ireland, September 2005
PERSONAL PROFILE
Bilingual construction professional with nativeFrench, valid Full Driver’s License and excellent cultural awareness. A
strong believer in “first time right” quality. Fast learner, Available to travel or relocate anywhereand at anytime within the
UK or internationally.
KEY SKILLS AND EXPERIENCE
 Construction Management and Engineering
 Areas of expertise include Refurbishment, Extensions, New build, RC frames, Piling, Bridges, Soil stabilisation, etc.
 Can do Project Management, Quality Control (as built surveys, Snagging and Handover), Health and Safety (Site
inductions, PPE, etc), Document Control (method statements, diverse registers), Microsoft Office package (Word,
Excel, PowerPoint, Outlook, etc), basic AutoCAD and Microsoft Project; Setting Out (gridlines, reference lines,
reference arcs, datum, pile cut and dig levels, stake out, etc), Temporary works (shutters, sheet piling, etc.) , Soil
stabilisation techniques and Foundations (bored and driven piling, micropiling, etc.). Has a good working knowledge
of Procurement, measuring andestimating, materials and many more.
ACHIEVEMENTS
 Praised by BAM
 Contractors project team for outstanding effort contributions in the £500 million N25 Waterford Bypass project:
retrieved over £70,000 unallocated fuels, successfully reported simultaneously to several members of Project
Management Team.
 Exceedingly praised for assisting Concorde BGW project management team in the timely project completion of the fast
tracked £2.5 million refurbishment of The Pilot Inn, a listed 4Stars Pub-Hotelin London Greenwich
 Successfully assisted Mountjoy Building and Maintenance Contract Manager putting back on track the construction
programme allowing an early completion of a school extension project in Epsom
 Successfully handed over 96 properties on time with Keepmoat in a challenging £7 million Decent Homes project.
CAREER HISTORY
Site Manager, Shanly Homes Ltd, September 7th
to December 29th
2015
 Cover position:
o 1st
fix to 2nd
fix plumbing, electrical and carpentry;glazing and roofing for 3 houses in Camberley
o Studworks and scaffolding supervision for 133 Multi-storey New built Apartments at Farley Hall,
Binfield
Finishing Manager, Bugler Homes, Mile End, 5 August 2015 to 27 August 2015
 Snagged electrical, solar, plumbing, painting, and decorating finishes in 9 triple storeys houses for Tower
Hamlets.
Assistant Site Manager, Barratt Homes, Bluebell Gate, East Grinstead, 18 May 2015 to 31 July 2015
 Led final stages of a new build project to procure 142 three and two storeys houses, overshadowing the Site
Manager from first fix through to completion of both internals and externals.
Site Manager, TheBreyer customer Group, Orpington,12 January 2015 to 27 March 2015
 Refurbished kitchens and bathrooms in a £90 million Decent Homes project with Affinity Sutton
 Managed program, operations and sub-contractors, Liaised with client, enforced health and safety.
Site Manager, Keepmoat, London, Chaucer House, Sutton, 12 August 2014 to 19 December 2014
 Successfully managed over 150 people’s workforce at peak in £7 Million challenging Decent Homes project.
 Project included M&E, communal areas, sprinkler systems, electric rewiring, kitchen and bathroom, doors
and windows replacement, externals, etc. with Affinity Sutton
Site Engineer, GEAR Construction, London, Waterloo-East, 28 July 2014 to 1 August 2014
Patou Nsiona
London-Croydon. Tel. +447944133113 or 07405089256 or 01689482715 Email: pansiona@hotmail.com
 Stake out coordinated points for services (aircon, pipes, etc), walls, etc. to floors and ceilings in a demolition
and refurbishment project transforming a former government office building into a hotel.
Site Engineer, Balfour Beatty, Shepherd’s Bush, 14 July 2014-25 July 2014
 Traverse survey, Set out boundaries of proposed demolition and refurbishment project of a students’
accommodation at Goldhawk Street.
Assistant Site Engineer, Barratt Homes c/o FDLLimited, Croydon, 2 June 2014- 10 July 2014
 Set out gridlines, centre lines, columns, rampcapping, transfer datum, survey as built-works, give levels
 for column pours, head trees, pile dig and cut levels, concrete cubes sampling, etc. Project consisted into
building an RC frame set of apartments at the NSQ Wandle Park.
Site Manager(Finishing Foreman), Mountjoy Building Maintenance, Epsom, May 2014-June2014.
 Coordinate subcontractors, manage purchasing, document control, site inductions, and enforce health and
safety and quality control. Theproject consisted into building an extension to a school worth £2.5 million.
Assistant Site Engineer, Balfour Beatty, Shepherd’s Bush, March 2014-April2014
Set out gridlines, transfer datum, survey as built works for bricklayers in a 25 three storeys houses and
apartments project.
Unemployed looking forwork, January 2014-February 2014
Site Engineer, PDR Construction, Lewisham, November 2013-December 2013
 Survey levels of windows in RC framed multi-storeys building (mixed commercial and residential), transfer
datum and levels, supervisea concrete pour in the basement. Reported to Project Manager
Assistant Site Manager, ConcordeBGW, Greenwich, August 2013-November 2013
 Coordinate subcontractors in a fast pace contract worth £1.5 million to build extensions to an existing 4 stars
pub-hotel in Greenwich (listed building). High spec finishes comprised bespoke bathrooms, soundproofed
flooring, beds, bar, kitchen and unique decorations. Supervised drainage, mini-piling, foundation works,
masonry, glazing, steel framed roofing and internal finishes.
 Unemployed looking for work, May 2013-August 2013.
 Assistant Instructor, LRTT, Cotswold Airport, 8 April 2013-28 April2013
 Translate compositematerial classes to French-speaking aeronautical engineers and superviseworkshops.
 Self-employedContractor, Toronto-Canada, October 2012-April 2013
o Design and build basements partitions in privatedwellings and superviseprofessionals on site
 Operative, Dawn Meats, Waterford, Ireland, October 2011-September 2012.
 Packaged burgers and diverse meat product for export.
 Full-time student studyinga Masters degree in Construction project management, September 2010-October 2011
 Handyman (Part-time), Waterford-Ireland, July 2009-September 2010
 Generate a local customer base, survey buildings for defects and conduct repairs. This was the heat of
recession.
 Full-time student finishing degree in construction management and Engineering, September 2008-June 2009
 Site Engineer (Student), BamContractors, Waterford-Ireland, February 2008-August 2008
 Manage document control, Monitor budget (fuels and concrete), set out structures, quality control, piling,
soil stabilisation, measurement of quantities, document control, payroll, etc. in a €600 million project
consisting in bypassing the cites of Waterford and Cork. The project comprised a 430 meters cable stayed
bridge, numerous roads and bridge structures.
 Full-time student in Construction Management and Engineering, September 2005-February 2008
 Manager, Skynet Ltd, Waterford-Ireland, November 2002-August 2005
 Manage floor staff and do target sales of international call units, manage international fund transfers; deal
with customers’ grievances, etc. Reported to owner, small local company.
 Personal Assistant, FECODI, Johannesburg-Southafrica, January 1998-August 2002
 Export diamond, manage President’s diary and personnel, prepare meetings, travels and interpret from both
French and English languages at the Diamond Board in Johannesburg, manage transport, medical, hospitality
requirements and diverse logistics for members in transit.
HOBBIES AND INTERESTS
 Writing novels, learning new things, cooking, swimming, Judo
REFERENCES Available upon request

More Related Content

What's hot

GNA Surveyors Ltd - Company Presentation 2014
GNA Surveyors Ltd - Company Presentation 2014GNA Surveyors Ltd - Company Presentation 2014
GNA Surveyors Ltd - Company Presentation 2014GNA Surveyors Ltd
 
Key experience Feb 2016
Key experience Feb 2016Key experience Feb 2016
Key experience Feb 2016Kim Barry
 
RBR Profile Aug 2013
RBR Profile Aug 2013 RBR Profile Aug 2013
RBR Profile Aug 2013 Ronan Hogan
 
Stuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWStuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWstuart johnson
 
Cameron ian pistorius curriculum vitae
Cameron ian pistorius curriculum vitaeCameron ian pistorius curriculum vitae
Cameron ian pistorius curriculum vitaeCameron Pistorius
 
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-ioshSite supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-ioshPavel Babincak
 
High-end refurbishment contractor in London.
High-end refurbishment contractor in London.High-end refurbishment contractor in London.
High-end refurbishment contractor in London.Mariusz Gawecki
 
Gregory McDonald SR Resume Final 1 (1)
Gregory McDonald SR Resume Final 1 (1)Gregory McDonald SR Resume Final 1 (1)
Gregory McDonald SR Resume Final 1 (1)Macko mcdonald
 
Karl Perry C.V.
Karl Perry C.V.Karl Perry C.V.
Karl Perry C.V.karl perry
 
Stuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWStuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWstuart johnson
 
Woodbar Corporate Brochure
Woodbar Corporate BrochureWoodbar Corporate Brochure
Woodbar Corporate BrochureBarry Robinson
 

What's hot (20)

march 16
march 16march 16
march 16
 
GNA Surveyors Ltd - Company Presentation 2014
GNA Surveyors Ltd - Company Presentation 2014GNA Surveyors Ltd - Company Presentation 2014
GNA Surveyors Ltd - Company Presentation 2014
 
Key experience Feb 2016
Key experience Feb 2016Key experience Feb 2016
Key experience Feb 2016
 
RW CV
RW CVRW CV
RW CV
 
RBR Profile Aug 2013
RBR Profile Aug 2013 RBR Profile Aug 2013
RBR Profile Aug 2013
 
Nabil Soliman
Nabil SolimanNabil Soliman
Nabil Soliman
 
Eoghans cv
Eoghans cvEoghans cv
Eoghans cv
 
Stuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWStuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEW
 
CV OG Jan 2016
CV OG Jan 2016CV OG Jan 2016
CV OG Jan 2016
 
Cameron ian pistorius curriculum vitae
Cameron ian pistorius curriculum vitaeCameron ian pistorius curriculum vitae
Cameron ian pistorius curriculum vitae
 
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-ioshSite supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
 
High-end refurbishment contractor in London.
High-end refurbishment contractor in London.High-end refurbishment contractor in London.
High-end refurbishment contractor in London.
 
Gregory McDonald SR Resume Final 1 (1)
Gregory McDonald SR Resume Final 1 (1)Gregory McDonald SR Resume Final 1 (1)
Gregory McDonald SR Resume Final 1 (1)
 
Karl Perry C.V.
Karl Perry C.V.Karl Perry C.V.
Karl Perry C.V.
 
Stuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWStuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEW
 
Stelian Dragomir CV
Stelian Dragomir CVStelian Dragomir CV
Stelian Dragomir CV
 
CV 2015 Christo Van Jaarsveld
CV 2015 Christo Van JaarsveldCV 2015 Christo Van Jaarsveld
CV 2015 Christo Van Jaarsveld
 
Cv abdullatif 2016
Cv abdullatif 2016Cv abdullatif 2016
Cv abdullatif 2016
 
Andy My CV
Andy My CVAndy My CV
Andy My CV
 
Woodbar Corporate Brochure
Woodbar Corporate BrochureWoodbar Corporate Brochure
Woodbar Corporate Brochure
 

Similar to newestcv

Similar to newestcv (20)

Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2
 
Andrew Pyper - resume
Andrew Pyper - resumeAndrew Pyper - resume
Andrew Pyper - resume
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
Resume for andy mitchell current
Resume for andy mitchell   currentResume for andy mitchell   current
Resume for andy mitchell current
 
Resume November 2016
Resume November 2016Resume November 2016
Resume November 2016
 
Simon Murphy CV
Simon Murphy CVSimon Murphy CV
Simon Murphy CV
 
Resume mark shuttleworth
Resume mark shuttleworthResume mark shuttleworth
Resume mark shuttleworth
 
Resume Mark Shuttleworth
Resume Mark ShuttleworthResume Mark Shuttleworth
Resume Mark Shuttleworth
 
01 CV 2016 Simon Barkley (1)
01 CV  2016 Simon Barkley  (1)01 CV  2016 Simon Barkley  (1)
01 CV 2016 Simon Barkley (1)
 
44494 Tom McCarthy Master CV
44494 Tom McCarthy Master CV44494 Tom McCarthy Master CV
44494 Tom McCarthy Master CV
 
Jason Davenport Resume
Jason Davenport Resume Jason Davenport Resume
Jason Davenport Resume
 
Current ian cv
Current ian cvCurrent ian cv
Current ian cv
 
Christopher Griffin Construction CV
Christopher Griffin Construction CVChristopher Griffin Construction CV
Christopher Griffin Construction CV
 
Baytree Dagenham Brochure
Baytree Dagenham BrochureBaytree Dagenham Brochure
Baytree Dagenham Brochure
 
CV_Andy_Coupland (1)
CV_Andy_Coupland (1)CV_Andy_Coupland (1)
CV_Andy_Coupland (1)
 
20100730 Jordan Cv
20100730 Jordan Cv20100730 Jordan Cv
20100730 Jordan Cv
 
Dave cv
Dave cvDave cv
Dave cv
 
IAN REID CV- Project Management
IAN REID CV- Project ManagementIAN REID CV- Project Management
IAN REID CV- Project Management
 
william-first-revision
william-first-revisionwilliam-first-revision
william-first-revision
 
Matthew Sutherley CV
Matthew Sutherley CVMatthew Sutherley CV
Matthew Sutherley CV
 

newestcv

  • 1. Patou Nsiona London-Croydon. Tel. +447944133113 or 07405089256 or 01689482715 Email: pansiona@hotmail.com PROFESSIONAL QUALIFICATIONS AND EDUCATION  Asbestos Awareness (Category A), High Speed Training, UK, January 2015  SMSTS, CITB, London-UK, August 2014  Prince 2 Foundation and Practitioner, APMG, UK, February 2014  CSCS, CITB, London-UK, July 2012  Emergency First Aid at Work (Level 2), SFA-Training, UK, November 2015  MScin Construction Project Management, Waterford IT, Ireland, October 2011  BSc(Honours) in Construction Management andEngineering, Waterford IT, Ireland, Sept 2009  Foundation Certificate in Business Studies, Waterford IT, Ireland, September 2005 PERSONAL PROFILE Bilingual construction professional with nativeFrench, valid Full Driver’s License and excellent cultural awareness. A strong believer in “first time right” quality. Fast learner, Available to travel or relocate anywhereand at anytime within the UK or internationally. KEY SKILLS AND EXPERIENCE  Construction Management and Engineering  Areas of expertise include Refurbishment, Extensions, New build, RC frames, Piling, Bridges, Soil stabilisation, etc.  Can do Project Management, Quality Control (as built surveys, Snagging and Handover), Health and Safety (Site inductions, PPE, etc), Document Control (method statements, diverse registers), Microsoft Office package (Word, Excel, PowerPoint, Outlook, etc), basic AutoCAD and Microsoft Project; Setting Out (gridlines, reference lines, reference arcs, datum, pile cut and dig levels, stake out, etc), Temporary works (shutters, sheet piling, etc.) , Soil stabilisation techniques and Foundations (bored and driven piling, micropiling, etc.). Has a good working knowledge of Procurement, measuring andestimating, materials and many more. ACHIEVEMENTS  Praised by BAM  Contractors project team for outstanding effort contributions in the £500 million N25 Waterford Bypass project: retrieved over £70,000 unallocated fuels, successfully reported simultaneously to several members of Project Management Team.  Exceedingly praised for assisting Concorde BGW project management team in the timely project completion of the fast tracked £2.5 million refurbishment of The Pilot Inn, a listed 4Stars Pub-Hotelin London Greenwich  Successfully assisted Mountjoy Building and Maintenance Contract Manager putting back on track the construction programme allowing an early completion of a school extension project in Epsom  Successfully handed over 96 properties on time with Keepmoat in a challenging £7 million Decent Homes project. CAREER HISTORY Site Manager, Shanly Homes Ltd, September 7th to December 29th 2015  Cover position: o 1st fix to 2nd fix plumbing, electrical and carpentry;glazing and roofing for 3 houses in Camberley o Studworks and scaffolding supervision for 133 Multi-storey New built Apartments at Farley Hall, Binfield Finishing Manager, Bugler Homes, Mile End, 5 August 2015 to 27 August 2015  Snagged electrical, solar, plumbing, painting, and decorating finishes in 9 triple storeys houses for Tower Hamlets. Assistant Site Manager, Barratt Homes, Bluebell Gate, East Grinstead, 18 May 2015 to 31 July 2015  Led final stages of a new build project to procure 142 three and two storeys houses, overshadowing the Site Manager from first fix through to completion of both internals and externals. Site Manager, TheBreyer customer Group, Orpington,12 January 2015 to 27 March 2015  Refurbished kitchens and bathrooms in a £90 million Decent Homes project with Affinity Sutton  Managed program, operations and sub-contractors, Liaised with client, enforced health and safety. Site Manager, Keepmoat, London, Chaucer House, Sutton, 12 August 2014 to 19 December 2014  Successfully managed over 150 people’s workforce at peak in £7 Million challenging Decent Homes project.  Project included M&E, communal areas, sprinkler systems, electric rewiring, kitchen and bathroom, doors and windows replacement, externals, etc. with Affinity Sutton Site Engineer, GEAR Construction, London, Waterloo-East, 28 July 2014 to 1 August 2014
  • 2. Patou Nsiona London-Croydon. Tel. +447944133113 or 07405089256 or 01689482715 Email: pansiona@hotmail.com  Stake out coordinated points for services (aircon, pipes, etc), walls, etc. to floors and ceilings in a demolition and refurbishment project transforming a former government office building into a hotel. Site Engineer, Balfour Beatty, Shepherd’s Bush, 14 July 2014-25 July 2014  Traverse survey, Set out boundaries of proposed demolition and refurbishment project of a students’ accommodation at Goldhawk Street. Assistant Site Engineer, Barratt Homes c/o FDLLimited, Croydon, 2 June 2014- 10 July 2014  Set out gridlines, centre lines, columns, rampcapping, transfer datum, survey as built-works, give levels  for column pours, head trees, pile dig and cut levels, concrete cubes sampling, etc. Project consisted into building an RC frame set of apartments at the NSQ Wandle Park. Site Manager(Finishing Foreman), Mountjoy Building Maintenance, Epsom, May 2014-June2014.  Coordinate subcontractors, manage purchasing, document control, site inductions, and enforce health and safety and quality control. Theproject consisted into building an extension to a school worth £2.5 million. Assistant Site Engineer, Balfour Beatty, Shepherd’s Bush, March 2014-April2014 Set out gridlines, transfer datum, survey as built works for bricklayers in a 25 three storeys houses and apartments project. Unemployed looking forwork, January 2014-February 2014 Site Engineer, PDR Construction, Lewisham, November 2013-December 2013  Survey levels of windows in RC framed multi-storeys building (mixed commercial and residential), transfer datum and levels, supervisea concrete pour in the basement. Reported to Project Manager Assistant Site Manager, ConcordeBGW, Greenwich, August 2013-November 2013  Coordinate subcontractors in a fast pace contract worth £1.5 million to build extensions to an existing 4 stars pub-hotel in Greenwich (listed building). High spec finishes comprised bespoke bathrooms, soundproofed flooring, beds, bar, kitchen and unique decorations. Supervised drainage, mini-piling, foundation works, masonry, glazing, steel framed roofing and internal finishes.  Unemployed looking for work, May 2013-August 2013.  Assistant Instructor, LRTT, Cotswold Airport, 8 April 2013-28 April2013  Translate compositematerial classes to French-speaking aeronautical engineers and superviseworkshops.  Self-employedContractor, Toronto-Canada, October 2012-April 2013 o Design and build basements partitions in privatedwellings and superviseprofessionals on site  Operative, Dawn Meats, Waterford, Ireland, October 2011-September 2012.  Packaged burgers and diverse meat product for export.  Full-time student studyinga Masters degree in Construction project management, September 2010-October 2011  Handyman (Part-time), Waterford-Ireland, July 2009-September 2010  Generate a local customer base, survey buildings for defects and conduct repairs. This was the heat of recession.  Full-time student finishing degree in construction management and Engineering, September 2008-June 2009  Site Engineer (Student), BamContractors, Waterford-Ireland, February 2008-August 2008  Manage document control, Monitor budget (fuels and concrete), set out structures, quality control, piling, soil stabilisation, measurement of quantities, document control, payroll, etc. in a €600 million project consisting in bypassing the cites of Waterford and Cork. The project comprised a 430 meters cable stayed bridge, numerous roads and bridge structures.  Full-time student in Construction Management and Engineering, September 2005-February 2008  Manager, Skynet Ltd, Waterford-Ireland, November 2002-August 2005  Manage floor staff and do target sales of international call units, manage international fund transfers; deal with customers’ grievances, etc. Reported to owner, small local company.  Personal Assistant, FECODI, Johannesburg-Southafrica, January 1998-August 2002  Export diamond, manage President’s diary and personnel, prepare meetings, travels and interpret from both French and English languages at the Diamond Board in Johannesburg, manage transport, medical, hospitality requirements and diverse logistics for members in transit. HOBBIES AND INTERESTS  Writing novels, learning new things, cooking, swimming, Judo REFERENCES Available upon request