A PRESENTATION
OF
VOCATIONAL TRAINING ON
COMBINED CYCLE POWER PLANT
PRESENTED BY:-
ARIJIT ROY
VIVEKANANDA GLOBAL UNIVERSITY
DIPLOMA 5TH SEM, ELECTRICAL DEPTT.
ROLL NO:- 14TEC1EE300
CONTENTS
• INTRODUCTION
• OVERVIEW OF PLANT
• FLOW DIAGRAM OF CCP
• BRAYTON CYCLE
• RANKINE CYCLE
• BASIC CONCEPTS OF ENERGY CONVERSTION
• CONVENTIONAL POWER STATION
• WAYS TO INCREASE BRAYTON CYCLE EFFICIENCY
• WAYS TO INCREASE RANKINE CYCLE EFFICIENCY
• CONFIGURATION CCGT POWER PLANT
• COMPONENT USED IN POWER PLANT
• CONFIGURATION OF STEAM TURBINE
• DM WATER PLANT
INTRODUCTION
 One of the largest Country-based Gas & Steam exploration and
production company
 Produces around 72% of North Eastern state's Electricity.
 The OTPC CCGT Power plant is 726.6 MW power plant having 2 units
(2×363.3)= 2(232.39+130.91)
(GAS+STEAM)
OTPC TRIPURA ASSET, PALATANA, TRIPURA
 Tripura is one of the main work centers of ONGC in North-
eastern region.
 On the based of ONGC newly planted OTPC is now larger
production of Electricity of 726.6 MW
 It is based at PALATANA, UDAIPUR with man power of little
more than 600.
COMBINE CYCLE
POWER PLANT
OVERVIEW: THERMAL POWER PLANT
COMBINE CYCLE POWER PLANT (CCPP)
Natural Gas - More versatile than coal & oil
- Can be used in 90% of energy applications
Electricity
COMBINED CYCLE GAS TURBINE:
• THE COMBINED CYCLE CONSISTS OF THE FOLLOWING TWO
CYCLES:
 BRAYTON CYCLE
 RANKINE CYCLE
BASIC CONCEPTS
• CHEMICAL ENERGY STORED IN FOSSIL FUELS SUCH AS COAL,
FUEL OIL OR NATURAL GAS IS CONVERTED SUCCESSIVELY INTO
THERMAL ENERGY
MECHANICAL ENERGY
ELECTRICAL ENERGY
• THE SIMPLE WORD EQUATION FOR THIS CHEMICAL REACTION
IS:
 FUEL + OXYGEN = HEAT + CARBON DI OXIDE + WATER
CONVENTIONAL POWER STATION
GAS
TURBINE COMPRESSOR
CC 1
GAS
GAS
AIR FROM
ATMOSPHERE
DRIVE
CC 2
BYPASS
STACK 2
BYPASS
STACK 1
HRSG 1
PUMP
STEAM
TURBINE
HRSG 2
CONDENSERCOOLING
WATER
GT
GEN
ST
GEN
SCHEME OF TYPICAL POWER PLANT - COMBINED CYCLE
BRAYTON CYCLE
• THE IDEAL BRAYTON CYCLE CONSISTS OF FOUR INTERNAL
REVERSIBLE PROCESS:
1-2: ISENTROPIC COMPRESSION ( IN COMPRESSOR)
2-3: CONSTANT PRESSURE HEAT ADDITION
3-4: ISENTROPIC EXPANSION ( IN TURBINE)
4-1: CONSTANT PRESSURE HEAT REJECTION
TO INCREASE THE BRAYTON CYCLE
EFFICIENCY
• THE BRAYTON CYCLE WITH REGENERATION OR
RECUPERATOR.
• INTERCOOLING.
• RE-HEATING
• INTERCOOLING, RE-HEATING & REGENERATION
RANKINE CYCLE
• IDEAL CYCLE FOR VAPOUR PLANTS WITH NO
IRREVERSIBILITIES & CONSISTS OF THE FOUR PROCESS:
1-2: ISENTROPIC COMPRESSION IN PUMP.
2-3: CONSTANT PRESSURE HEAT ADDITION IN BOILER.
3-4: ISENTROPIC EXPANSION IN TURBINE.
4-1: CONSTANT PRESSURE HEAT REJECTION IN
CONDENSER.
TO INCREASE THE RANKINE CYCLE
EFFICIENCY
• LOWERING THE CONDENSER PRESSURE.
• SUPER-HEATING THE STEAM TO HIGH TEMPERATURE.
• INCREASING THE BOILER PRESSURE.
CONFIGURATION OF CCGT PLANT
 THE COMBINED-CYCLE SYSTEM INCLUDES SINGLE-SHAFT &
MULTI-SHAFT CONFIGURATIONS.
 THE SINGLE SHAFT SYSTEM CONSIST OF ONE GAS TURBINE , ONE STEAM
TURBINE, ONE GENERATOR & ONE HEAT RECOVERY STEAM GENERATOR
(HRSG).
KEY ADVANTAGES OF SINGLE-SHAFT ARRANGEMENTS:
OPERATING SIMPLICITY, SMALLER FOOTPRINT, LOWER START-UP COST.
MULTI –SHAFT SYSTEM HAVE ONE OR MORE GAS TURBINE-GENERATORS &
HRSG’S THAT SUPPLY STEAM THROUGH A COMMON HEADER TO A SEPARATE
SINGLE STEAM TURBINE- GENETRATOR.
IN TERMS OF OVERALL INVESTMENT A MULTI-SHAFT SYSTEM IS ABOUT 5%
HIGHER IN COST.
COMPONENTS USED IN POWER PLANT (GAS
TURBINE)
• SCRUBBERS: FUEL PASSES THROUGH SCRUBBERS THROUGH 10 INCH
HEADER TO REMOVE & TO CONTROL MAJOR DUST & DIRTY PARTICLES ALONG
WITH LIQUID GASES.
• FLAME ARRESTER: IT IS USED TO AVOID ANY KINGD OF ACCIDENTAL FIRE &
ANY ENVIRONMENTAL HAZARD CAUSES DUE TO GAS.
• GAS BOOSTING COMPRESSOR: INITIAL GAS IS PASSES THROUGH GBC FOR
COMPRESSION TO THE REQUIRED INCREASE IN PRESSURE AND
TEMPERATURE.
• COOLING TOWER: WATER IS USED A COOLING MEDIUM AT VARIOUS STAGES IN
GAS BOOSTING CHAMBER SUCH AS LUBRICATION UNIT & BYPASS CHAMBER.
THERE WERE 3 COOLING TOWERS FOR THE PURPOSE WITH 4 FANS.
CONFIGURATION FOR STEAM TURBINE
• THE TURBINE IS A SINGLE SHAFT MACHINE
WITH SEPARATE HP-IP (COMBINED) AND LP
PARTS.
• THE INDIVIDUAL TURBINE ROTORS AND
GENERATOR ROTOR ARE CONNECTED BY
RIGID COUPLING.
• THE HP-IP CYLINDER HAS A THROTTLE
CONTROL GOVERNING.
D.M. WATER PLANT
• D.M STANDS FOR DE-MINERALIZATION OF WATER.
1. TURBIDITY OF WATER IS REMOVED.
2. REMOVES BACTERIA & OTHER MICROBES.
3. NEUTRALIZES THE BASES & CONVERTS IT INTO
CORRESPONDING ACIDS.
4. REMOVES THE ACIDIC IONS PRESENT IN THE WATER.
5. THE FINAL STAGE, BALANCED REMOVAL OF IONS
TAKES PLACE USING A MIXED BED.
Arijit summer training

More Related Content

What's hot

Ntpc anta training presentation
Ntpc anta training presentation Ntpc anta training presentation
Ntpc anta training presentation nishant pareek
 
Prashant Shukla ppt on NTPC Anta
Prashant Shukla ppt on NTPC AntaPrashant Shukla ppt on NTPC Anta
Prashant Shukla ppt on NTPC Antaprashant shukla
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationShubhra Dhyani
 
combine cycle power plant
combine cycle power plantcombine cycle power plant
combine cycle power planttanuj jhankal
 
Combined heat power plant (chp)
Combined heat power plant (chp)Combined heat power plant (chp)
Combined heat power plant (chp)numanahmed88
 
PRASHANT ABSTRACT NTPC ANTA
PRASHANT ABSTRACT NTPC ANTAPRASHANT ABSTRACT NTPC ANTA
PRASHANT ABSTRACT NTPC ANTAprashant shukla
 
Prashant report final NTPC ANTA
Prashant report final NTPC ANTAPrashant report final NTPC ANTA
Prashant report final NTPC ANTAprashant shukla
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTShivam Sharma
 
Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur Yuvraj Singh
 
08b combined cycle-systems-jbc
08b combined cycle-systems-jbc08b combined cycle-systems-jbc
08b combined cycle-systems-jbcRajesh Sheoran
 
Practical Training Report on RGTPP Ramgarh Jaisalmer
Practical Training Report on RGTPP Ramgarh JaisalmerPractical Training Report on RGTPP Ramgarh Jaisalmer
Practical Training Report on RGTPP Ramgarh JaisalmerKamleshkumar bishnoi
 
Combined Heat and Power Generation - Commercial Energy Efficiency with Cogene...
Combined Heat and Power Generation - Commercial Energy Efficiency with Cogene...Combined Heat and Power Generation - Commercial Energy Efficiency with Cogene...
Combined Heat and Power Generation - Commercial Energy Efficiency with Cogene...The Brewer-Garrett Company
 
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT94600banti
 

What's hot (20)

NTPC anta
NTPC anta NTPC anta
NTPC anta
 
Ntpc anta training presentation
Ntpc anta training presentation Ntpc anta training presentation
Ntpc anta training presentation
 
Prashant Shukla ppt on NTPC Anta
Prashant Shukla ppt on NTPC AntaPrashant Shukla ppt on NTPC Anta
Prashant Shukla ppt on NTPC Anta
 
Igcc
IgccIgcc
Igcc
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
 
combine cycle power plant
combine cycle power plantcombine cycle power plant
combine cycle power plant
 
Combined heat power plant (chp)
Combined heat power plant (chp)Combined heat power plant (chp)
Combined heat power plant (chp)
 
Ntpc dadri ppt
Ntpc dadri pptNtpc dadri ppt
Ntpc dadri ppt
 
PRASHANT ABSTRACT NTPC ANTA
PRASHANT ABSTRACT NTPC ANTAPRASHANT ABSTRACT NTPC ANTA
PRASHANT ABSTRACT NTPC ANTA
 
Prashant report final NTPC ANTA
Prashant report final NTPC ANTAPrashant report final NTPC ANTA
Prashant report final NTPC ANTA
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPT
 
Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur
 
NTPC DADRI.
NTPC DADRI.NTPC DADRI.
NTPC DADRI.
 
ntpc dadri
ntpc dadri ntpc dadri
ntpc dadri
 
08b combined cycle-systems-jbc
08b combined cycle-systems-jbc08b combined cycle-systems-jbc
08b combined cycle-systems-jbc
 
power generation
power generationpower generation
power generation
 
Practical Training Report on RGTPP Ramgarh Jaisalmer
Practical Training Report on RGTPP Ramgarh JaisalmerPractical Training Report on RGTPP Ramgarh Jaisalmer
Practical Training Report on RGTPP Ramgarh Jaisalmer
 
Combined Heat and Power Generation - Commercial Energy Efficiency with Cogene...
Combined Heat and Power Generation - Commercial Energy Efficiency with Cogene...Combined Heat and Power Generation - Commercial Energy Efficiency with Cogene...
Combined Heat and Power Generation - Commercial Energy Efficiency with Cogene...
 
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
 
NTPC Farakka
NTPC FarakkaNTPC Farakka
NTPC Farakka
 

Viewers also liked

Tugas menejement pak yayann.
Tugas menejement pak yayann.Tugas menejement pak yayann.
Tugas menejement pak yayann.resa safrida
 
Permen LHK no.70 2016 ttg baku mutu emisi usaha dan atau kegiatan pengolahan ...
Permen LHK no.70 2016 ttg baku mutu emisi usaha dan atau kegiatan pengolahan ...Permen LHK no.70 2016 ttg baku mutu emisi usaha dan atau kegiatan pengolahan ...
Permen LHK no.70 2016 ttg baku mutu emisi usaha dan atau kegiatan pengolahan ...Rizki Darmawan
 
MET 401 Chapter 7 -_combined_cycle_power_plant
MET 401 Chapter 7 -_combined_cycle_power_plantMET 401 Chapter 7 -_combined_cycle_power_plant
MET 401 Chapter 7 -_combined_cycle_power_plantIbrahim AboKhalil
 
Ppt combined cycle power plant
Ppt combined cycle power plantPpt combined cycle power plant
Ppt combined cycle power plantDavid Grenier
 
Artefact 1 for submission 7
Artefact 1 for submission 7Artefact 1 for submission 7
Artefact 1 for submission 7rebecca sparks
 
Critically examine the arguments surrounding the possibility of Turkish acces...
Critically examine the arguments surrounding the possibility of Turkish acces...Critically examine the arguments surrounding the possibility of Turkish acces...
Critically examine the arguments surrounding the possibility of Turkish acces...Eoin Guerin
 
Comunicación Social - Prensa Escrita
Comunicación Social - Prensa Escrita Comunicación Social - Prensa Escrita
Comunicación Social - Prensa Escrita jackelinegord
 
Sneha_Resume
Sneha_ResumeSneha_Resume
Sneha_ResumeSneha S
 
Mystery Trip presentation - SK
Mystery Trip presentation - SKMystery Trip presentation - SK
Mystery Trip presentation - SKSaul Korin
 
Redes Sociales en la Comunicación
Redes Sociales en la Comunicación Redes Sociales en la Comunicación
Redes Sociales en la Comunicación jackelinegord
 
Organo interno de fiscalización de nayarit.
Organo interno de fiscalización de nayarit.Organo interno de fiscalización de nayarit.
Organo interno de fiscalización de nayarit.Rodrigo Parra Romano
 
Microsoft .Net Framework
Microsoft .Net FrameworkMicrosoft .Net Framework
Microsoft .Net FrameworkRohit Rao
 

Viewers also liked (14)

Control laboratorio
Control laboratorioControl laboratorio
Control laboratorio
 
Tugas menejement pak yayann.
Tugas menejement pak yayann.Tugas menejement pak yayann.
Tugas menejement pak yayann.
 
Permen LHK no.70 2016 ttg baku mutu emisi usaha dan atau kegiatan pengolahan ...
Permen LHK no.70 2016 ttg baku mutu emisi usaha dan atau kegiatan pengolahan ...Permen LHK no.70 2016 ttg baku mutu emisi usaha dan atau kegiatan pengolahan ...
Permen LHK no.70 2016 ttg baku mutu emisi usaha dan atau kegiatan pengolahan ...
 
MET 401 Chapter 7 -_combined_cycle_power_plant
MET 401 Chapter 7 -_combined_cycle_power_plantMET 401 Chapter 7 -_combined_cycle_power_plant
MET 401 Chapter 7 -_combined_cycle_power_plant
 
Ppt combined cycle power plant
Ppt combined cycle power plantPpt combined cycle power plant
Ppt combined cycle power plant
 
-Haml Presentation
-Haml Presentation-Haml Presentation
-Haml Presentation
 
Artefact 1 for submission 7
Artefact 1 for submission 7Artefact 1 for submission 7
Artefact 1 for submission 7
 
Critically examine the arguments surrounding the possibility of Turkish acces...
Critically examine the arguments surrounding the possibility of Turkish acces...Critically examine the arguments surrounding the possibility of Turkish acces...
Critically examine the arguments surrounding the possibility of Turkish acces...
 
Comunicación Social - Prensa Escrita
Comunicación Social - Prensa Escrita Comunicación Social - Prensa Escrita
Comunicación Social - Prensa Escrita
 
Sneha_Resume
Sneha_ResumeSneha_Resume
Sneha_Resume
 
Mystery Trip presentation - SK
Mystery Trip presentation - SKMystery Trip presentation - SK
Mystery Trip presentation - SK
 
Redes Sociales en la Comunicación
Redes Sociales en la Comunicación Redes Sociales en la Comunicación
Redes Sociales en la Comunicación
 
Organo interno de fiscalización de nayarit.
Organo interno de fiscalización de nayarit.Organo interno de fiscalización de nayarit.
Organo interno de fiscalización de nayarit.
 
Microsoft .Net Framework
Microsoft .Net FrameworkMicrosoft .Net Framework
Microsoft .Net Framework
 

Similar to Arijit summer training

2912471 summer training
2912471 summer training2912471 summer training
2912471 summer trainingDebasish Das
 
COMBINE CYCLE POWER PLANT PPT summer training
COMBINE CYCLE POWER PLANT PPT summer trainingCOMBINE CYCLE POWER PLANT PPT summer training
COMBINE CYCLE POWER PLANT PPT summer trainingDebasish Das
 
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadriAbdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadriAbdul Hadi Rahmani
 
SIP Presentation
SIP PresentationSIP Presentation
SIP PresentationAmay Jain
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesVaibhav Paydelwar
 
353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt
353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt
353685130-CCGT-Combined-Cycle-Gas-Turbine.pptJiji118054
 
Gas power plant
Gas power plantGas power plant
Gas power plantAmit Sinha
 
power plant in bangladesh "horipur power plant"
power plant in bangladesh "horipur power plant"power plant in bangladesh "horipur power plant"
power plant in bangladesh "horipur power plant"shibli sadik
 
Binary cycle & co generation power plants
Binary cycle & co generation power plantsBinary cycle & co generation power plants
Binary cycle & co generation power plantsPalanivel rajan
 
Presentation on kstps
Presentation on kstps Presentation on kstps
Presentation on kstps bhanu meena
 
Basic Scheme Open Cycle Gas Turbine Plant
Basic Scheme Open Cycle Gas Turbine Plant Basic Scheme Open Cycle Gas Turbine Plant
Basic Scheme Open Cycle Gas Turbine Plant Aman Gupta
 
Combine cycle power plant
Combine cycle power plant Combine cycle power plant
Combine cycle power plant Khizar Siddique
 
Cogeneration CHP Combined Heat & Power Power Plant
Cogeneration  CHP Combined Heat & Power Power PlantCogeneration  CHP Combined Heat & Power Power Plant
Cogeneration CHP Combined Heat & Power Power PlantKESHAV
 
Biomass power plant
Biomass power plant Biomass power plant
Biomass power plant Santosh Kumar
 
Unit2 diesel engine power plant
Unit2 diesel engine power plantUnit2 diesel engine power plant
Unit2 diesel engine power plantPALANIVEL SUBBIAH
 
Handbook of mechanical engineering calculations
Handbook of mechanical engineering calculationsHandbook of mechanical engineering calculations
Handbook of mechanical engineering calculationsRoddy Castro
 
Handbook_of_Mechanical_Engineering_calcc
Handbook_of_Mechanical_Engineering_calccHandbook_of_Mechanical_Engineering_calcc
Handbook_of_Mechanical_Engineering_calccRAULCARDENASHUAMAN
 
IRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power PlantIRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power PlantIRJET Journal
 
27. COGENERATION.ppt
27. COGENERATION.ppt27. COGENERATION.ppt
27. COGENERATION.pptRENERGISTICS
 

Similar to Arijit summer training (20)

2912471 summer training
2912471 summer training2912471 summer training
2912471 summer training
 
COMBINE CYCLE POWER PLANT PPT summer training
COMBINE CYCLE POWER PLANT PPT summer trainingCOMBINE CYCLE POWER PLANT PPT summer training
COMBINE CYCLE POWER PLANT PPT summer training
 
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadriAbdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
 
SIP Presentation
SIP PresentationSIP Presentation
SIP Presentation
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
 
353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt
353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt
353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt
 
Gas turbine
Gas turbineGas turbine
Gas turbine
 
Gas power plant
Gas power plantGas power plant
Gas power plant
 
power plant in bangladesh "horipur power plant"
power plant in bangladesh "horipur power plant"power plant in bangladesh "horipur power plant"
power plant in bangladesh "horipur power plant"
 
Binary cycle & co generation power plants
Binary cycle & co generation power plantsBinary cycle & co generation power plants
Binary cycle & co generation power plants
 
Presentation on kstps
Presentation on kstps Presentation on kstps
Presentation on kstps
 
Basic Scheme Open Cycle Gas Turbine Plant
Basic Scheme Open Cycle Gas Turbine Plant Basic Scheme Open Cycle Gas Turbine Plant
Basic Scheme Open Cycle Gas Turbine Plant
 
Combine cycle power plant
Combine cycle power plant Combine cycle power plant
Combine cycle power plant
 
Cogeneration CHP Combined Heat & Power Power Plant
Cogeneration  CHP Combined Heat & Power Power PlantCogeneration  CHP Combined Heat & Power Power Plant
Cogeneration CHP Combined Heat & Power Power Plant
 
Biomass power plant
Biomass power plant Biomass power plant
Biomass power plant
 
Unit2 diesel engine power plant
Unit2 diesel engine power plantUnit2 diesel engine power plant
Unit2 diesel engine power plant
 
Handbook of mechanical engineering calculations
Handbook of mechanical engineering calculationsHandbook of mechanical engineering calculations
Handbook of mechanical engineering calculations
 
Handbook_of_Mechanical_Engineering_calcc
Handbook_of_Mechanical_Engineering_calccHandbook_of_Mechanical_Engineering_calcc
Handbook_of_Mechanical_Engineering_calcc
 
IRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power PlantIRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power Plant
 
27. COGENERATION.ppt
27. COGENERATION.ppt27. COGENERATION.ppt
27. COGENERATION.ppt
 

More from Arijit Roy

6 Weeks Summer Training In TelcoCrats
6 Weeks Summer Training In TelcoCrats6 Weeks Summer Training In TelcoCrats
6 Weeks Summer Training In TelcoCratsArijit Roy
 
4 Weeks Summer Training In BSNL, Agartala
4 Weeks Summer Training In BSNL, Agartala4 Weeks Summer Training In BSNL, Agartala
4 Weeks Summer Training In BSNL, AgartalaArijit Roy
 
4 Weeks Summer Training In BSNL, Agartala
4 Weeks Summer Training In BSNL, Agartala4 Weeks Summer Training In BSNL, Agartala
4 Weeks Summer Training In BSNL, AgartalaArijit Roy
 
project report
project reportproject report
project reportArijit Roy
 
Project report
Project reportProject report
Project reportArijit Roy
 
Summer Training Report Of OTPC
Summer Training Report Of OTPCSummer Training Report Of OTPC
Summer Training Report Of OTPCArijit Roy
 
arijit summer training
arijit summer trainingarijit summer training
arijit summer trainingArijit Roy
 

More from Arijit Roy (8)

6 Weeks Summer Training In TelcoCrats
6 Weeks Summer Training In TelcoCrats6 Weeks Summer Training In TelcoCrats
6 Weeks Summer Training In TelcoCrats
 
4 Weeks Summer Training In BSNL, Agartala
4 Weeks Summer Training In BSNL, Agartala4 Weeks Summer Training In BSNL, Agartala
4 Weeks Summer Training In BSNL, Agartala
 
4 Weeks Summer Training In BSNL, Agartala
4 Weeks Summer Training In BSNL, Agartala4 Weeks Summer Training In BSNL, Agartala
4 Weeks Summer Training In BSNL, Agartala
 
project report
project reportproject report
project report
 
Project report
Project reportProject report
Project report
 
Summer Training Report Of OTPC
Summer Training Report Of OTPCSummer Training Report Of OTPC
Summer Training Report Of OTPC
 
hard bind arj
hard bind arjhard bind arj
hard bind arj
 
arijit summer training
arijit summer trainingarijit summer training
arijit summer training
 

Recently uploaded

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 

Recently uploaded (20)

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 

Arijit summer training

  • 1. A PRESENTATION OF VOCATIONAL TRAINING ON COMBINED CYCLE POWER PLANT PRESENTED BY:- ARIJIT ROY VIVEKANANDA GLOBAL UNIVERSITY DIPLOMA 5TH SEM, ELECTRICAL DEPTT. ROLL NO:- 14TEC1EE300
  • 2. CONTENTS • INTRODUCTION • OVERVIEW OF PLANT • FLOW DIAGRAM OF CCP • BRAYTON CYCLE • RANKINE CYCLE • BASIC CONCEPTS OF ENERGY CONVERSTION • CONVENTIONAL POWER STATION • WAYS TO INCREASE BRAYTON CYCLE EFFICIENCY • WAYS TO INCREASE RANKINE CYCLE EFFICIENCY • CONFIGURATION CCGT POWER PLANT • COMPONENT USED IN POWER PLANT • CONFIGURATION OF STEAM TURBINE • DM WATER PLANT
  • 3. INTRODUCTION  One of the largest Country-based Gas & Steam exploration and production company  Produces around 72% of North Eastern state's Electricity.  The OTPC CCGT Power plant is 726.6 MW power plant having 2 units (2×363.3)= 2(232.39+130.91) (GAS+STEAM)
  • 4. OTPC TRIPURA ASSET, PALATANA, TRIPURA  Tripura is one of the main work centers of ONGC in North- eastern region.  On the based of ONGC newly planted OTPC is now larger production of Electricity of 726.6 MW  It is based at PALATANA, UDAIPUR with man power of little more than 600.
  • 7. COMBINE CYCLE POWER PLANT (CCPP) Natural Gas - More versatile than coal & oil - Can be used in 90% of energy applications Electricity
  • 8. COMBINED CYCLE GAS TURBINE: • THE COMBINED CYCLE CONSISTS OF THE FOLLOWING TWO CYCLES:  BRAYTON CYCLE  RANKINE CYCLE
  • 9. BASIC CONCEPTS • CHEMICAL ENERGY STORED IN FOSSIL FUELS SUCH AS COAL, FUEL OIL OR NATURAL GAS IS CONVERTED SUCCESSIVELY INTO THERMAL ENERGY MECHANICAL ENERGY ELECTRICAL ENERGY • THE SIMPLE WORD EQUATION FOR THIS CHEMICAL REACTION IS:  FUEL + OXYGEN = HEAT + CARBON DI OXIDE + WATER
  • 11. GAS TURBINE COMPRESSOR CC 1 GAS GAS AIR FROM ATMOSPHERE DRIVE CC 2 BYPASS STACK 2 BYPASS STACK 1 HRSG 1 PUMP STEAM TURBINE HRSG 2 CONDENSERCOOLING WATER GT GEN ST GEN SCHEME OF TYPICAL POWER PLANT - COMBINED CYCLE
  • 12. BRAYTON CYCLE • THE IDEAL BRAYTON CYCLE CONSISTS OF FOUR INTERNAL REVERSIBLE PROCESS: 1-2: ISENTROPIC COMPRESSION ( IN COMPRESSOR) 2-3: CONSTANT PRESSURE HEAT ADDITION 3-4: ISENTROPIC EXPANSION ( IN TURBINE) 4-1: CONSTANT PRESSURE HEAT REJECTION
  • 13. TO INCREASE THE BRAYTON CYCLE EFFICIENCY • THE BRAYTON CYCLE WITH REGENERATION OR RECUPERATOR. • INTERCOOLING. • RE-HEATING • INTERCOOLING, RE-HEATING & REGENERATION
  • 14. RANKINE CYCLE • IDEAL CYCLE FOR VAPOUR PLANTS WITH NO IRREVERSIBILITIES & CONSISTS OF THE FOUR PROCESS: 1-2: ISENTROPIC COMPRESSION IN PUMP. 2-3: CONSTANT PRESSURE HEAT ADDITION IN BOILER. 3-4: ISENTROPIC EXPANSION IN TURBINE. 4-1: CONSTANT PRESSURE HEAT REJECTION IN CONDENSER.
  • 15. TO INCREASE THE RANKINE CYCLE EFFICIENCY • LOWERING THE CONDENSER PRESSURE. • SUPER-HEATING THE STEAM TO HIGH TEMPERATURE. • INCREASING THE BOILER PRESSURE.
  • 16. CONFIGURATION OF CCGT PLANT  THE COMBINED-CYCLE SYSTEM INCLUDES SINGLE-SHAFT & MULTI-SHAFT CONFIGURATIONS.  THE SINGLE SHAFT SYSTEM CONSIST OF ONE GAS TURBINE , ONE STEAM TURBINE, ONE GENERATOR & ONE HEAT RECOVERY STEAM GENERATOR (HRSG). KEY ADVANTAGES OF SINGLE-SHAFT ARRANGEMENTS: OPERATING SIMPLICITY, SMALLER FOOTPRINT, LOWER START-UP COST. MULTI –SHAFT SYSTEM HAVE ONE OR MORE GAS TURBINE-GENERATORS & HRSG’S THAT SUPPLY STEAM THROUGH A COMMON HEADER TO A SEPARATE SINGLE STEAM TURBINE- GENETRATOR. IN TERMS OF OVERALL INVESTMENT A MULTI-SHAFT SYSTEM IS ABOUT 5% HIGHER IN COST.
  • 17. COMPONENTS USED IN POWER PLANT (GAS TURBINE) • SCRUBBERS: FUEL PASSES THROUGH SCRUBBERS THROUGH 10 INCH HEADER TO REMOVE & TO CONTROL MAJOR DUST & DIRTY PARTICLES ALONG WITH LIQUID GASES. • FLAME ARRESTER: IT IS USED TO AVOID ANY KINGD OF ACCIDENTAL FIRE & ANY ENVIRONMENTAL HAZARD CAUSES DUE TO GAS. • GAS BOOSTING COMPRESSOR: INITIAL GAS IS PASSES THROUGH GBC FOR COMPRESSION TO THE REQUIRED INCREASE IN PRESSURE AND TEMPERATURE. • COOLING TOWER: WATER IS USED A COOLING MEDIUM AT VARIOUS STAGES IN GAS BOOSTING CHAMBER SUCH AS LUBRICATION UNIT & BYPASS CHAMBER. THERE WERE 3 COOLING TOWERS FOR THE PURPOSE WITH 4 FANS.
  • 18. CONFIGURATION FOR STEAM TURBINE • THE TURBINE IS A SINGLE SHAFT MACHINE WITH SEPARATE HP-IP (COMBINED) AND LP PARTS. • THE INDIVIDUAL TURBINE ROTORS AND GENERATOR ROTOR ARE CONNECTED BY RIGID COUPLING. • THE HP-IP CYLINDER HAS A THROTTLE CONTROL GOVERNING.
  • 19. D.M. WATER PLANT • D.M STANDS FOR DE-MINERALIZATION OF WATER. 1. TURBIDITY OF WATER IS REMOVED. 2. REMOVES BACTERIA & OTHER MICROBES. 3. NEUTRALIZES THE BASES & CONVERTS IT INTO CORRESPONDING ACIDS. 4. REMOVES THE ACIDIC IONS PRESENT IN THE WATER. 5. THE FINAL STAGE, BALANCED REMOVAL OF IONS TAKES PLACE USING A MIXED BED.

Editor's Notes

  1. - Fuel is burned in the gas turbine - The resulting energy in the gas turbine turns the generator drive shaft - Exhaust heat from the gas turbine is sent to a heat recovery steam generator (HRSG) - The HRSG turns the gas turbine exhaust heat into steam and feeds it to the steam turbine - The steam turbine delivers additional energy to the generator drive shaft - The generator converts the energy into electricity