Key Elements Introduction
The presentation has made for general information and does not comprise comment or any
recommendation of any kind. Readers should consider their own circumstances and rely on their own
enquiries in relation to matters contained in this handout.
A. ATTHASIT a Power & Energy Collection
Plant Design Considerations 2
Objective of Discussion
 Overview the physical process for he thermal
power generation
 Key considerations mainly relevant to the
mechanical design considerations in the design
of thermal power plant
Out of Discussion Health, Safety and
Environmental Issues | Permits, Licenses and
Regulation | Other disciplines than the
mechanical factors are not covered in this
discussion | Mitigation Measures and Solutions
A. ATTHASIT a Power & Energy Collection
Thermal Power Generation 3
Thermal Power use fuel, air, and water to
generate electricity via a key thermal
processes — the steam turbine cycle for
conversion of thermal energy into mechanical
energy at the turbine and subsequently into
electrical energy at the generator. Each
process is supported by a cooling process
designed to remove heat from the system.
Thermal Power is the generation of electricity
by the combustion of fossil fuels (including gas,
coal and lignite) and/or biomass using
combinations of boilers, gas and steam
turbines and turbo-generators.
Mott MacDonald Capability in Power Sector:
> 5 GW as Lender’s and Owner’s Engineer for CCGT projects in 2013 – 2015 – conducted by our team between BKK & Singapore
A. ATTHASIT a Power & Energy Collection
Thermal Power Generation 4
Mott MacDonald Capability in Power Sector:
> 5 GW as Lender’s and Owner’s Engineer for CCGT projects in 2013 – 2015 – conducted by our team between BKK & Singapore
| European Power Plant Suppliers Association, Brussels, 2015 | Patrick Clerens, “Thermal Power in 2030”
34.1% to 48.4% thermal power shares in
generation range in 2030 (compared to
51.5% in the 2010)
In 2010-2030 Between 166 and 234.3 GW of
thermal power capacity additions are
required. This means that between 39.4
and 48.3% of installed thermal power
capacity in 2030 will be built in the years
2010-2030.
A. ATTHASIT a Power & Energy Collection
Coal-Fired Power Plant Schematic 5
Thermal Power use fuel, air, and water to generate electricity
via a key thermal processes — the steam turbine cycle for
conversion of thermal energy into mechanical energy at the
turbine and subsequently into electrical energy at the
generator. Each process is supported by a cooling process
designed to remove heat from the system.
a Power & Energy Collection
Elements of Consideration
FUEL AND COMBUSTION
6
A. ATTHASIT a Power & Energy Collection
Fuel Gas Interchangeability 7
 Gas composition can be
characterized using the
Wobbe Index (“WI”),
which is a key parameter
for defining gases from
different concessionary
resources and supplying
to customers within
adequate limits
 Typically WI variations of
up to 5% are allowed as
within permissible limits by
the gas turbine
manufacturer
WI Mixing West&East Gas
Concessionary Resource WI
Min Max
Gulf of Thailand Gas (East Gas) 1,160 1,400
Myanmar Gas (West Gas) 952 1,100
Mixed Gas 1,016 1,215
Wobbe Index = BTU/cubic foot / √(Specific Gravity)
A. ATTHASIT a Power & Energy Collection
Combustion 8
Flame and flameless firing of heavy fuel oil
www.oil-gasportal.com/flameless-combustion/
Combustion regimes in relation to the dilution and reactants’ temperature
A. ATTHASIT a Power & Energy Collection
Combustion & Mixing Rate 9
| University of Massachusetts Amherst
If the mixing is fast, the intrinsic
chemical kinetics governs the rate of
production of new species. This
requires a reduction of scale and of
differences in concentration
Perfect mixing for reactions is defined
as the instant reduction to a
homogeneous concentration field
Turbulent mixing between
read and blue fluid
Thin zone where reaction occurs
In pulverized fuel flames the time for devolatilization to take
place is of the order of 0.1 s and for char burn-out the time is 1
s; for particles burning in fluidized-bed combustors the
corresponding orders are 10 and 1000 s.
Therefore the burning of the char has a major effect on the
volume of the combustion chamber required to attain a given
heat release.
Combustion Rates of Coal
a Power & Energy Collection
Elements of Consideration
WATER
10
A. ATTHASIT a Power & Energy Collection
Water Use in the Power Plant 11
 Thermal Power Plants require large quantities of
water, primarily for cooling.
 A 240MW CCGT Cogeneration Power Plants require
service water or potable water of 9,000 m3 per day.
www.allianz.com
A. ATTHASIT a Power & Energy Collection
Water Cycle in Thermal Power Plants 12
 Water, the operating
medium, is pumped into the
steam generator, where it is
heated by fission or
combustion. The steam then
migrates through the pipe
system to the turbine and
drives it, producing electricity.
 In the condenser, the steam
condenses by emitting heat
energy to the cooling water.
Following this, the water is fed
back into the steam
generator and the process
begins again.
www.metrohm.com/en-ae/industries/energy_two-cycle-power-plants
A. ATTHASIT a Power & Energy Collection
Water Steam Circuit 13
 Heating, the high pressure
liquid enters a boiler where it
is heated at constant
pressure by an external heat
source to become a dry
saturated vapor.
 Expansion, the dry saturated
vapor expands through a
turbine, generating power.
This decreases the
temperature and pressure of
the vapour, and some
condensation may occur.
 Condensation, the wet vapor
then enters a condenser
where it is condensed at a
constant pressure to become
a saturated liquidwww.metrohm.com/en-ae/industries/energy_two-cycle-power-plants
A. ATTHASIT a Power & Energy Collection
Steam Boiler’s Hydrological Cycle 14
 The Creation of Pure Aqua, As the
boiler water is heated and
changes to steam free oxygen is
released, carbon dioxide is
released from the solids, and the
solids drop out (precipitate).
 First Contact with Acidity, as the
condensate cools, it becomes
easier for gasses, such as carbon
dioxide and oxygen to dissolve in
the water. The carbon dioxide
contributes to making the water
acidic and is the major source of
carbon dioxide found in the
boiler’s condensate return system.
 Suspended Solids, the acid
condition helps the water dissolve
limestone and it picks up other
dissolved and suspended solids.
www.metrohm.com/en-ae/industries/energy_two-cycle-power-plants
A. ATTHASIT a Power & Energy Collection
Discussion 15
http://pca-invest.com/ | Energy Technology Systems Analysis Programme | IEA ETSAP – Technology Brief E02
110 GW per year as per IEA Baseline scenario (IEA, 2008)
estimates a need for new CCGT power plant capacity
for the period 2005-2050.
CCGT plant with a 1700°C class
gas-turbine may attain an
electrical efficiency of 62–65%
(LHV) the CCGT efficiency
is expected to increase from
today’s 52%–60% to a maximum of
64% by 2020.
High exhaust-gas mass flows
associated with large gas turbines
impact superheater and reheater
designs as the design of the inlet
duct. Gas velocity is of concern
because of its possible effects on
tube vibration and heat absorption
A. ATTHASIT a Power & Energy Collection
Impact from Plant Design Failures 16
 Asset damages
 Loss in plant efficiency
 Plant operation reliability and
Availability
 Health, Safety and Environmental
impact
www.telegraph.co.uk
A power failure at the Fukushima nuclear power plant has affected the cooling system for spent fuel ponds.
A. ATTHASIT a Power & Energy Collection
Major Power Outages 17
wikipedia.org
Event
millions of
people affected location date
July 2012 India blackout 620 India 30 July 2012-31 July 2012
January 2001 India blackout 230 India 2 January 2001
November 2014 Bangladesh blackout 150 Bangladesh 1 November 2014
2015 Pakistan blackout 140 Pakistan 26 January 2015
2005 Java–Bali blackout 100 Indonesia 18 Aug 2005
1999 Southern Brazil blackout 97 Brazil 11 March 1999
2009 Brazil and Paraguay blackout 87 Brazil, Paraguay 10–11 Nov 2009
2015 Turkey blackout 70 Turkey 31 March 2015
Northeast blackout of 2003 55 United States, Canada 14–15 Aug 2003
2003 Italy blackout 55 Italy, Switzerland, Austria,
Slovenia, Croatia
28 Sep 2003
Thailand Nationwide blackout of 1978 40 Thailand 18 Mar 1978
Northeast blackout of 1965 30 United States, Canada 9 Nov 1965
Thailand in the South Pranakhorn Powerplant caused many generators across the country to shutdown - the Northern provinces of Thailand
experienced a blackout for 1 Hour, the Northwestern Provinces received 15 Minutes, the Central Provinces received 1 Hour, Bangkok and its
neighboring provinces blacked out for more than 2 hours. The southern Provinces received 30 Minutes Blackout. Within 9 hours and 20 Minutes, the
authorities is able to restore power across the country.
A. ATTHASIT a Power & Energy Collection
THANK YOU
18
The presentation has made for general information and does not comprise comment or any
recommendation of any kind. Readers should consider their own circumstances and rely on their own
enquiries in relation to matters contained in this handout.

More Related Content

What's hot

PRASHANT ABSTRACT NTPC ANTA
PRASHANT ABSTRACT NTPC ANTAPRASHANT ABSTRACT NTPC ANTA
PRASHANT ABSTRACT NTPC ANTAprashant shukla
 
Ntpc anta training presentation
Ntpc anta training presentation Ntpc anta training presentation
Ntpc anta training presentation nishant pareek
 
summer training report ntpc anta
summer training report ntpc antasummer training report ntpc anta
summer training report ntpc antanishant pareek
 
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT94600banti
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTShivam Sharma
 
power plant engineering
power plant engineeringpower plant engineering
power plant engineeringGulfaraz alam
 
Combined heat and power - optimal power flow based on thermodynamic model wit...
Combined heat and power - optimal power flow based on thermodynamic model wit...Combined heat and power - optimal power flow based on thermodynamic model wit...
Combined heat and power - optimal power flow based on thermodynamic model wit...IJECEIAES
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur Yuvraj Singh
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC pptkirbadh
 
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)Rajan Kumar Choudhary
 
synopsis- Energy genration using exaust
synopsis- Energy genration using exaustsynopsis- Energy genration using exaust
synopsis- Energy genration using exaustItnesh Kumar
 
A presentation on summer training at NTPC corporate office noida
A presentation on summer training at NTPC corporate office noidaA presentation on summer training at NTPC corporate office noida
A presentation on summer training at NTPC corporate office noidaAshutosh Tripathi
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training reportsanjeevps12345
 
009 jgc2016 energy transmission & storage_Schmitz
009 jgc2016   energy transmission & storage_Schmitz 009 jgc2016   energy transmission & storage_Schmitz
009 jgc2016 energy transmission & storage_Schmitz senicsummerschool
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar Dilip kumar
 

What's hot (20)

Igcc
IgccIgcc
Igcc
 
PRASHANT ABSTRACT NTPC ANTA
PRASHANT ABSTRACT NTPC ANTAPRASHANT ABSTRACT NTPC ANTA
PRASHANT ABSTRACT NTPC ANTA
 
Ntpc anta training presentation
Ntpc anta training presentation Ntpc anta training presentation
Ntpc anta training presentation
 
summer training report ntpc anta
summer training report ntpc antasummer training report ntpc anta
summer training report ntpc anta
 
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
 
NTPC anta
NTPC anta NTPC anta
NTPC anta
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPT
 
power plant engineering
power plant engineeringpower plant engineering
power plant engineering
 
Combined heat and power - optimal power flow based on thermodynamic model wit...
Combined heat and power - optimal power flow based on thermodynamic model wit...Combined heat and power - optimal power flow based on thermodynamic model wit...
Combined heat and power - optimal power flow based on thermodynamic model wit...
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC ppt
 
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
 
Ntpc dadri ppt
Ntpc dadri pptNtpc dadri ppt
Ntpc dadri ppt
 
synopsis- Energy genration using exaust
synopsis- Energy genration using exaustsynopsis- Energy genration using exaust
synopsis- Energy genration using exaust
 
ntpc dadri
ntpc dadri ntpc dadri
ntpc dadri
 
A presentation on summer training at NTPC corporate office noida
A presentation on summer training at NTPC corporate office noidaA presentation on summer training at NTPC corporate office noida
A presentation on summer training at NTPC corporate office noida
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training report
 
009 jgc2016 energy transmission & storage_Schmitz
009 jgc2016   energy transmission & storage_Schmitz 009 jgc2016   energy transmission & storage_Schmitz
009 jgc2016 energy transmission & storage_Schmitz
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 

Viewers also liked

Technical Support in Thermal Power Generation Sector – Career Opportunities
Technical Support in Thermal Power Generation Sector – Career OpportunitiesTechnical Support in Thermal Power Generation Sector – Career Opportunities
Technical Support in Thermal Power Generation Sector – Career OpportunitiesAnurak Atthasit
 
Combined Cycle Gas Turbine Power Plant Part 1
Combined Cycle Gas Turbine Power Plant Part 1Combined Cycle Gas Turbine Power Plant Part 1
Combined Cycle Gas Turbine Power Plant Part 1Anurak Atthasit
 
Promenade culturelle thaïlandaise toulouse 2003
Promenade culturelle thaïlandaise toulouse 2003Promenade culturelle thaïlandaise toulouse 2003
Promenade culturelle thaïlandaise toulouse 2003Anurak Atthasit
 
Aircraft propulsion matching and off design
Aircraft propulsion   matching and off designAircraft propulsion   matching and off design
Aircraft propulsion matching and off designAnurak Atthasit
 
Ppt combined cycle power plant
Ppt combined cycle power plantPpt combined cycle power plant
Ppt combined cycle power plantDavid Grenier
 
Presentasi kasat mata 2.0 fixed
Presentasi kasat mata 2.0 fixedPresentasi kasat mata 2.0 fixed
Presentasi kasat mata 2.0 fixedpatrick panjaitan
 
Aircraft propulsion non ideal cycle analysis
Aircraft propulsion   non ideal cycle analysisAircraft propulsion   non ideal cycle analysis
Aircraft propulsion non ideal cycle analysisAnurak Atthasit
 
Energy Auditing Final Phase
Energy Auditing Final PhaseEnergy Auditing Final Phase
Energy Auditing Final PhaseSanjush Suresh
 
Aircraft propulsion component performance
Aircraft propulsion   component performanceAircraft propulsion   component performance
Aircraft propulsion component performanceAnurak Atthasit
 
Aircraft propulsion turbomachine 3 d
Aircraft propulsion   turbomachine 3 dAircraft propulsion   turbomachine 3 d
Aircraft propulsion turbomachine 3 dAnurak Atthasit
 
Aircraft propulsion non ideal turbomachine 2 d
Aircraft propulsion   non ideal turbomachine 2 dAircraft propulsion   non ideal turbomachine 2 d
Aircraft propulsion non ideal turbomachine 2 dAnurak Atthasit
 
Aircraft propulsion non ideal turbofan cycle analysis
Aircraft propulsion   non ideal turbofan cycle analysisAircraft propulsion   non ideal turbofan cycle analysis
Aircraft propulsion non ideal turbofan cycle analysisAnurak Atthasit
 
Aircraft propulsion turbomachine 2 d
Aircraft propulsion   turbomachine 2 dAircraft propulsion   turbomachine 2 d
Aircraft propulsion turbomachine 2 dAnurak Atthasit
 
Aircraft propulsion ideal turbofan performance
Aircraft propulsion   ideal turbofan performanceAircraft propulsion   ideal turbofan performance
Aircraft propulsion ideal turbofan performanceAnurak Atthasit
 
Aircraft propulsion readme first
Aircraft propulsion   readme firstAircraft propulsion   readme first
Aircraft propulsion readme firstAnurak Atthasit
 
Aircraft propulsion axial flow compressors off design performance
Aircraft propulsion   axial flow compressors off design performanceAircraft propulsion   axial flow compressors off design performance
Aircraft propulsion axial flow compressors off design performanceAnurak Atthasit
 

Viewers also liked (20)

Technical Support in Thermal Power Generation Sector – Career Opportunities
Technical Support in Thermal Power Generation Sector – Career OpportunitiesTechnical Support in Thermal Power Generation Sector – Career Opportunities
Technical Support in Thermal Power Generation Sector – Career Opportunities
 
Combined Cycle Gas Turbine Power Plant Part 1
Combined Cycle Gas Turbine Power Plant Part 1Combined Cycle Gas Turbine Power Plant Part 1
Combined Cycle Gas Turbine Power Plant Part 1
 
Non Adaptive Behavior
Non Adaptive BehaviorNon Adaptive Behavior
Non Adaptive Behavior
 
Silk Road
Silk RoadSilk Road
Silk Road
 
Promenade culturelle thaïlandaise toulouse 2003
Promenade culturelle thaïlandaise toulouse 2003Promenade culturelle thaïlandaise toulouse 2003
Promenade culturelle thaïlandaise toulouse 2003
 
Aircraft propulsion matching and off design
Aircraft propulsion   matching and off designAircraft propulsion   matching and off design
Aircraft propulsion matching and off design
 
Ppt combined cycle power plant
Ppt combined cycle power plantPpt combined cycle power plant
Ppt combined cycle power plant
 
Presentasi kasat mata 2.0 fixed
Presentasi kasat mata 2.0 fixedPresentasi kasat mata 2.0 fixed
Presentasi kasat mata 2.0 fixed
 
Aircraft propulsion non ideal cycle analysis
Aircraft propulsion   non ideal cycle analysisAircraft propulsion   non ideal cycle analysis
Aircraft propulsion non ideal cycle analysis
 
Energy Auditing Final Phase
Energy Auditing Final PhaseEnergy Auditing Final Phase
Energy Auditing Final Phase
 
Aircraft propulsion component performance
Aircraft propulsion   component performanceAircraft propulsion   component performance
Aircraft propulsion component performance
 
Aircraft propulsion turbomachine 3 d
Aircraft propulsion   turbomachine 3 dAircraft propulsion   turbomachine 3 d
Aircraft propulsion turbomachine 3 d
 
Aircraft propulsion non ideal turbomachine 2 d
Aircraft propulsion   non ideal turbomachine 2 dAircraft propulsion   non ideal turbomachine 2 d
Aircraft propulsion non ideal turbomachine 2 d
 
Aircraft propulsion non ideal turbofan cycle analysis
Aircraft propulsion   non ideal turbofan cycle analysisAircraft propulsion   non ideal turbofan cycle analysis
Aircraft propulsion non ideal turbofan cycle analysis
 
Aircraft propulsion turbomachine 2 d
Aircraft propulsion   turbomachine 2 dAircraft propulsion   turbomachine 2 d
Aircraft propulsion turbomachine 2 d
 
Aircraft propulsion ideal turbofan performance
Aircraft propulsion   ideal turbofan performanceAircraft propulsion   ideal turbofan performance
Aircraft propulsion ideal turbofan performance
 
Aircraft propulsion readme first
Aircraft propulsion   readme firstAircraft propulsion   readme first
Aircraft propulsion readme first
 
Nuclear power plants
Nuclear power plantsNuclear power plants
Nuclear power plants
 
Aircraft propulsion axial flow compressors off design performance
Aircraft propulsion   axial flow compressors off design performanceAircraft propulsion   axial flow compressors off design performance
Aircraft propulsion axial flow compressors off design performance
 
Gas turbine
Gas turbineGas turbine
Gas turbine
 

Similar to Power Key Elements of a Thermal Power Generation

New Presentation on TPP-3 - Copy.pptx124
New Presentation on TPP-3 - Copy.pptx124New Presentation on TPP-3 - Copy.pptx124
New Presentation on TPP-3 - Copy.pptx12423195a0304
 
Report Guddu Power Plant
Report Guddu Power PlantReport Guddu Power Plant
Report Guddu Power PlantMuhammad Ahmed
 
New Presentation on TPP-1 - Copy.pptx123
New Presentation on TPP-1 - Copy.pptx123New Presentation on TPP-1 - Copy.pptx123
New Presentation on TPP-1 - Copy.pptx12323195a0304
 
Thermal power plant.pptx
Thermal power plant.pptxThermal power plant.pptx
Thermal power plant.pptxPranish Karn
 
Thermal Energy PPT
Thermal Energy PPTThermal Energy PPT
Thermal Energy PPTDARK95
 
EXPERIMENTAL ANALYSIS OF A MINI STEAM POWER PLANT
EXPERIMENTAL ANALYSIS OF A MINI STEAM  POWER PLANTEXPERIMENTAL ANALYSIS OF A MINI STEAM  POWER PLANT
EXPERIMENTAL ANALYSIS OF A MINI STEAM POWER PLANTMOHAMMED SHAROOQ
 
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportUtkarsh Chaubey
 
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...haxxo24
 
Seminar report on otec
Seminar report on otecSeminar report on otec
Seminar report on otecDebanjan Paul
 
Seminar Report On OCEAN THERMAL ENERGY CONVERSION
Seminar Report On OCEAN THERMAL ENERGY CONVERSIONSeminar Report On OCEAN THERMAL ENERGY CONVERSION
Seminar Report On OCEAN THERMAL ENERGY CONVERSIONAnik Samaddar
 
Boiling heat transfer and Core Hydraulics of NPP
Boiling heat transfer and Core Hydraulics of NPPBoiling heat transfer and Core Hydraulics of NPP
Boiling heat transfer and Core Hydraulics of NPPMd Asif Imrul
 
oceanthermalenergyconversion-170122175950.pdf
oceanthermalenergyconversion-170122175950.pdfoceanthermalenergyconversion-170122175950.pdf
oceanthermalenergyconversion-170122175950.pdfssuser65cc68
 
Ocean Thermal Energy Conversion
Ocean Thermal Energy ConversionOcean Thermal Energy Conversion
Ocean Thermal Energy ConversionKeshav Kumar Jha
 
Applications Of Nuclear Energy
Applications Of Nuclear EnergyApplications Of Nuclear Energy
Applications Of Nuclear EnergyMohamed Gamal
 
Water Efficiency in Thermal power Plant
Water Efficiency in Thermal power PlantWater Efficiency in Thermal power Plant
Water Efficiency in Thermal power PlantAtanu Maity
 
Overview of mejia thermal power station, DVC
Overview of mejia thermal power station, DVCOverview of mejia thermal power station, DVC
Overview of mejia thermal power station, DVCNITISHKHALKHO
 
coal based thermal power plant
coal based thermal power plantcoal based thermal power plant
coal based thermal power plant00veerchauhan
 
Energy and Exergy Analysis of a Cogeneration Cycle, Driven by Ocean Thermal E...
Energy and Exergy Analysis of a Cogeneration Cycle, Driven by Ocean Thermal E...Energy and Exergy Analysis of a Cogeneration Cycle, Driven by Ocean Thermal E...
Energy and Exergy Analysis of a Cogeneration Cycle, Driven by Ocean Thermal E...theijes
 

Similar to Power Key Elements of a Thermal Power Generation (20)

New Presentation on TPP-3 - Copy.pptx124
New Presentation on TPP-3 - Copy.pptx124New Presentation on TPP-3 - Copy.pptx124
New Presentation on TPP-3 - Copy.pptx124
 
Report Guddu Power Plant
Report Guddu Power PlantReport Guddu Power Plant
Report Guddu Power Plant
 
New Presentation on TPP-1 - Copy.pptx123
New Presentation on TPP-1 - Copy.pptx123New Presentation on TPP-1 - Copy.pptx123
New Presentation on TPP-1 - Copy.pptx123
 
Thermal power plant.pptx
Thermal power plant.pptxThermal power plant.pptx
Thermal power plant.pptx
 
Thermal power plant term project
Thermal power plant term projectThermal power plant term project
Thermal power plant term project
 
Thermal Energy PPT
Thermal Energy PPTThermal Energy PPT
Thermal Energy PPT
 
EXPERIMENTAL ANALYSIS OF A MINI STEAM POWER PLANT
EXPERIMENTAL ANALYSIS OF A MINI STEAM  POWER PLANTEXPERIMENTAL ANALYSIS OF A MINI STEAM  POWER PLANT
EXPERIMENTAL ANALYSIS OF A MINI STEAM POWER PLANT
 
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
 
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
 
Seminar report on otec
Seminar report on otecSeminar report on otec
Seminar report on otec
 
Seminar Report On OCEAN THERMAL ENERGY CONVERSION
Seminar Report On OCEAN THERMAL ENERGY CONVERSIONSeminar Report On OCEAN THERMAL ENERGY CONVERSION
Seminar Report On OCEAN THERMAL ENERGY CONVERSION
 
Boiling heat transfer and Core Hydraulics of NPP
Boiling heat transfer and Core Hydraulics of NPPBoiling heat transfer and Core Hydraulics of NPP
Boiling heat transfer and Core Hydraulics of NPP
 
oceanthermalenergyconversion-170122175950.pdf
oceanthermalenergyconversion-170122175950.pdfoceanthermalenergyconversion-170122175950.pdf
oceanthermalenergyconversion-170122175950.pdf
 
Ocean Thermal Energy Conversion
Ocean Thermal Energy ConversionOcean Thermal Energy Conversion
Ocean Thermal Energy Conversion
 
Applications Of Nuclear Energy
Applications Of Nuclear EnergyApplications Of Nuclear Energy
Applications Of Nuclear Energy
 
Water Efficiency in Thermal Power plants
Water Efficiency in Thermal Power plants Water Efficiency in Thermal Power plants
Water Efficiency in Thermal Power plants
 
Water Efficiency in Thermal power Plant
Water Efficiency in Thermal power PlantWater Efficiency in Thermal power Plant
Water Efficiency in Thermal power Plant
 
Overview of mejia thermal power station, DVC
Overview of mejia thermal power station, DVCOverview of mejia thermal power station, DVC
Overview of mejia thermal power station, DVC
 
coal based thermal power plant
coal based thermal power plantcoal based thermal power plant
coal based thermal power plant
 
Energy and Exergy Analysis of a Cogeneration Cycle, Driven by Ocean Thermal E...
Energy and Exergy Analysis of a Cogeneration Cycle, Driven by Ocean Thermal E...Energy and Exergy Analysis of a Cogeneration Cycle, Driven by Ocean Thermal E...
Energy and Exergy Analysis of a Cogeneration Cycle, Driven by Ocean Thermal E...
 

More from Anurak Atthasit

Aircraft propulsion performance of propellers
Aircraft propulsion   performance of propellersAircraft propulsion   performance of propellers
Aircraft propulsion performance of propellersAnurak Atthasit
 
Aircraft propulsion combustor diffusor
Aircraft propulsion   combustor diffusorAircraft propulsion   combustor diffusor
Aircraft propulsion combustor diffusorAnurak Atthasit
 
Aircraft propulsion fuel injection
Aircraft propulsion   fuel injectionAircraft propulsion   fuel injection
Aircraft propulsion fuel injectionAnurak Atthasit
 
Aircraft Propulsion - Ideal Turbojet Performance
Aircraft Propulsion - Ideal Turbojet PerformanceAircraft Propulsion - Ideal Turbojet Performance
Aircraft Propulsion - Ideal Turbojet PerformanceAnurak Atthasit
 
Aircraft Propulsion - Review of Fundamentals
Aircraft Propulsion - Review of FundamentalsAircraft Propulsion - Review of Fundamentals
Aircraft Propulsion - Review of FundamentalsAnurak Atthasit
 
Droplet thermal behavior study with light scattering technique
Droplet thermal behavior study with light scattering techniqueDroplet thermal behavior study with light scattering technique
Droplet thermal behavior study with light scattering techniqueAnurak Atthasit
 

More from Anurak Atthasit (6)

Aircraft propulsion performance of propellers
Aircraft propulsion   performance of propellersAircraft propulsion   performance of propellers
Aircraft propulsion performance of propellers
 
Aircraft propulsion combustor diffusor
Aircraft propulsion   combustor diffusorAircraft propulsion   combustor diffusor
Aircraft propulsion combustor diffusor
 
Aircraft propulsion fuel injection
Aircraft propulsion   fuel injectionAircraft propulsion   fuel injection
Aircraft propulsion fuel injection
 
Aircraft Propulsion - Ideal Turbojet Performance
Aircraft Propulsion - Ideal Turbojet PerformanceAircraft Propulsion - Ideal Turbojet Performance
Aircraft Propulsion - Ideal Turbojet Performance
 
Aircraft Propulsion - Review of Fundamentals
Aircraft Propulsion - Review of FundamentalsAircraft Propulsion - Review of Fundamentals
Aircraft Propulsion - Review of Fundamentals
 
Droplet thermal behavior study with light scattering technique
Droplet thermal behavior study with light scattering techniqueDroplet thermal behavior study with light scattering technique
Droplet thermal behavior study with light scattering technique
 

Recently uploaded

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 

Recently uploaded (20)

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 

Power Key Elements of a Thermal Power Generation

  • 1. THERMAL POWER PLANT Anurak ATTHASIT, Ph.D. 1 a Power & Energy Collection| Bangkok December 2015 Key Elements Introduction The presentation has made for general information and does not comprise comment or any recommendation of any kind. Readers should consider their own circumstances and rely on their own enquiries in relation to matters contained in this handout.
  • 2. A. ATTHASIT a Power & Energy Collection Plant Design Considerations 2 Objective of Discussion  Overview the physical process for he thermal power generation  Key considerations mainly relevant to the mechanical design considerations in the design of thermal power plant Out of Discussion Health, Safety and Environmental Issues | Permits, Licenses and Regulation | Other disciplines than the mechanical factors are not covered in this discussion | Mitigation Measures and Solutions
  • 3. A. ATTHASIT a Power & Energy Collection Thermal Power Generation 3 Thermal Power use fuel, air, and water to generate electricity via a key thermal processes — the steam turbine cycle for conversion of thermal energy into mechanical energy at the turbine and subsequently into electrical energy at the generator. Each process is supported by a cooling process designed to remove heat from the system. Thermal Power is the generation of electricity by the combustion of fossil fuels (including gas, coal and lignite) and/or biomass using combinations of boilers, gas and steam turbines and turbo-generators. Mott MacDonald Capability in Power Sector: > 5 GW as Lender’s and Owner’s Engineer for CCGT projects in 2013 – 2015 – conducted by our team between BKK & Singapore
  • 4. A. ATTHASIT a Power & Energy Collection Thermal Power Generation 4 Mott MacDonald Capability in Power Sector: > 5 GW as Lender’s and Owner’s Engineer for CCGT projects in 2013 – 2015 – conducted by our team between BKK & Singapore | European Power Plant Suppliers Association, Brussels, 2015 | Patrick Clerens, “Thermal Power in 2030” 34.1% to 48.4% thermal power shares in generation range in 2030 (compared to 51.5% in the 2010) In 2010-2030 Between 166 and 234.3 GW of thermal power capacity additions are required. This means that between 39.4 and 48.3% of installed thermal power capacity in 2030 will be built in the years 2010-2030.
  • 5. A. ATTHASIT a Power & Energy Collection Coal-Fired Power Plant Schematic 5 Thermal Power use fuel, air, and water to generate electricity via a key thermal processes — the steam turbine cycle for conversion of thermal energy into mechanical energy at the turbine and subsequently into electrical energy at the generator. Each process is supported by a cooling process designed to remove heat from the system.
  • 6. a Power & Energy Collection Elements of Consideration FUEL AND COMBUSTION 6
  • 7. A. ATTHASIT a Power & Energy Collection Fuel Gas Interchangeability 7  Gas composition can be characterized using the Wobbe Index (“WI”), which is a key parameter for defining gases from different concessionary resources and supplying to customers within adequate limits  Typically WI variations of up to 5% are allowed as within permissible limits by the gas turbine manufacturer WI Mixing West&East Gas Concessionary Resource WI Min Max Gulf of Thailand Gas (East Gas) 1,160 1,400 Myanmar Gas (West Gas) 952 1,100 Mixed Gas 1,016 1,215 Wobbe Index = BTU/cubic foot / √(Specific Gravity)
  • 8. A. ATTHASIT a Power & Energy Collection Combustion 8 Flame and flameless firing of heavy fuel oil www.oil-gasportal.com/flameless-combustion/ Combustion regimes in relation to the dilution and reactants’ temperature
  • 9. A. ATTHASIT a Power & Energy Collection Combustion & Mixing Rate 9 | University of Massachusetts Amherst If the mixing is fast, the intrinsic chemical kinetics governs the rate of production of new species. This requires a reduction of scale and of differences in concentration Perfect mixing for reactions is defined as the instant reduction to a homogeneous concentration field Turbulent mixing between read and blue fluid Thin zone where reaction occurs In pulverized fuel flames the time for devolatilization to take place is of the order of 0.1 s and for char burn-out the time is 1 s; for particles burning in fluidized-bed combustors the corresponding orders are 10 and 1000 s. Therefore the burning of the char has a major effect on the volume of the combustion chamber required to attain a given heat release. Combustion Rates of Coal
  • 10. a Power & Energy Collection Elements of Consideration WATER 10
  • 11. A. ATTHASIT a Power & Energy Collection Water Use in the Power Plant 11  Thermal Power Plants require large quantities of water, primarily for cooling.  A 240MW CCGT Cogeneration Power Plants require service water or potable water of 9,000 m3 per day. www.allianz.com
  • 12. A. ATTHASIT a Power & Energy Collection Water Cycle in Thermal Power Plants 12  Water, the operating medium, is pumped into the steam generator, where it is heated by fission or combustion. The steam then migrates through the pipe system to the turbine and drives it, producing electricity.  In the condenser, the steam condenses by emitting heat energy to the cooling water. Following this, the water is fed back into the steam generator and the process begins again. www.metrohm.com/en-ae/industries/energy_two-cycle-power-plants
  • 13. A. ATTHASIT a Power & Energy Collection Water Steam Circuit 13  Heating, the high pressure liquid enters a boiler where it is heated at constant pressure by an external heat source to become a dry saturated vapor.  Expansion, the dry saturated vapor expands through a turbine, generating power. This decreases the temperature and pressure of the vapour, and some condensation may occur.  Condensation, the wet vapor then enters a condenser where it is condensed at a constant pressure to become a saturated liquidwww.metrohm.com/en-ae/industries/energy_two-cycle-power-plants
  • 14. A. ATTHASIT a Power & Energy Collection Steam Boiler’s Hydrological Cycle 14  The Creation of Pure Aqua, As the boiler water is heated and changes to steam free oxygen is released, carbon dioxide is released from the solids, and the solids drop out (precipitate).  First Contact with Acidity, as the condensate cools, it becomes easier for gasses, such as carbon dioxide and oxygen to dissolve in the water. The carbon dioxide contributes to making the water acidic and is the major source of carbon dioxide found in the boiler’s condensate return system.  Suspended Solids, the acid condition helps the water dissolve limestone and it picks up other dissolved and suspended solids. www.metrohm.com/en-ae/industries/energy_two-cycle-power-plants
  • 15. A. ATTHASIT a Power & Energy Collection Discussion 15 http://pca-invest.com/ | Energy Technology Systems Analysis Programme | IEA ETSAP – Technology Brief E02 110 GW per year as per IEA Baseline scenario (IEA, 2008) estimates a need for new CCGT power plant capacity for the period 2005-2050. CCGT plant with a 1700°C class gas-turbine may attain an electrical efficiency of 62–65% (LHV) the CCGT efficiency is expected to increase from today’s 52%–60% to a maximum of 64% by 2020. High exhaust-gas mass flows associated with large gas turbines impact superheater and reheater designs as the design of the inlet duct. Gas velocity is of concern because of its possible effects on tube vibration and heat absorption
  • 16. A. ATTHASIT a Power & Energy Collection Impact from Plant Design Failures 16  Asset damages  Loss in plant efficiency  Plant operation reliability and Availability  Health, Safety and Environmental impact www.telegraph.co.uk A power failure at the Fukushima nuclear power plant has affected the cooling system for spent fuel ponds.
  • 17. A. ATTHASIT a Power & Energy Collection Major Power Outages 17 wikipedia.org Event millions of people affected location date July 2012 India blackout 620 India 30 July 2012-31 July 2012 January 2001 India blackout 230 India 2 January 2001 November 2014 Bangladesh blackout 150 Bangladesh 1 November 2014 2015 Pakistan blackout 140 Pakistan 26 January 2015 2005 Java–Bali blackout 100 Indonesia 18 Aug 2005 1999 Southern Brazil blackout 97 Brazil 11 March 1999 2009 Brazil and Paraguay blackout 87 Brazil, Paraguay 10–11 Nov 2009 2015 Turkey blackout 70 Turkey 31 March 2015 Northeast blackout of 2003 55 United States, Canada 14–15 Aug 2003 2003 Italy blackout 55 Italy, Switzerland, Austria, Slovenia, Croatia 28 Sep 2003 Thailand Nationwide blackout of 1978 40 Thailand 18 Mar 1978 Northeast blackout of 1965 30 United States, Canada 9 Nov 1965 Thailand in the South Pranakhorn Powerplant caused many generators across the country to shutdown - the Northern provinces of Thailand experienced a blackout for 1 Hour, the Northwestern Provinces received 15 Minutes, the Central Provinces received 1 Hour, Bangkok and its neighboring provinces blacked out for more than 2 hours. The southern Provinces received 30 Minutes Blackout. Within 9 hours and 20 Minutes, the authorities is able to restore power across the country.
  • 18. A. ATTHASIT a Power & Energy Collection THANK YOU 18 The presentation has made for general information and does not comprise comment or any recommendation of any kind. Readers should consider their own circumstances and rely on their own enquiries in relation to matters contained in this handout.