The generator unit 02 at Babarabotuwa Oya Phase 11 MHPP experienced two breakdowns due to electrical flashovers causing damage to the stator winding and slots. After the first breakdown in November 2015, two coils were replaced, but it broke down again in January 2016 after running for 178 hours. Testing found the coils had poor insulation resistance and all 90 coils needed replacing. New coils were manufactured and supplied along with other accessories from Houghton International and installed, with insulation resistance test results in the gigohm range afterwards.